Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information and practices and has since become the standard amongst project management around the globe. Study Guide
Transcript
Page 1: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

1Map

The Project Management Body of Knowledge (PMBOK)

The PMBOK guide is an attempt to document the generally accepted PM information and practices and has since become the standard amongst project management around the globe.

Study Guide

Page 2: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

2Map

Page 3: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

3Map

Processes overlap and interact throughout a project or phase.

Processes are described in terms of:• Inputs (documents, plans, designs, etc.) • Tools and Techniques (mechanisms applied to inputs) • Outputs (documents, products, etc.)

The Project Management Body of Knowledge (PMBOK)

is a collection of processes and knowledge areas generally accepted as best practice within the project management discipline.

As an internationally recognized standard (IEEE Std 1490-2003) it provides the fundamentals of project management, irrespective of the type of project be it construction, software, engineering, automotive etc.

PMBOK recognizes 5 basic process groups containing 42 processes and 9_knowledge areas typical of almost all projects.

Page 4: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

4Map

The Project Management Knowledge Areas organize the 42 project management processes into nine Knowledge Areas.

1. Integration Management2. Scope Management3. Time Management4. Cost Management5. Quality Management6. HR Management7. Communication Management8. Risk Management9. Procurement Management

Project Management Knowledge Areas describe the key competencies that project managers must develop.

• Four core knowledge areas lead to specific project objectives (scope, time, cost, and quality).

• Four facilitating knowledge areas are the means through which the project objectives are achieved (human resources, communication, risk, and procurement management).

• One knowledge area (project integration management) affects and is affected by all of the other knowledge areas.

Page 5: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

5Map

Knowledge Areas

Project Management Process Groups

Initiating Planning Executing Monitoring & Controlling Closing

Project Integration Management

Develop Project Charter

Develop Project Management Plan

Direct and Manage Project Execution

Monitor and Control Project WorkPerform Integrated Change Control

Close Project or Phase

Project Scope Management

Collect RequirementsDefine Scope Create Work Breakdown Structure (WBS)

Verify Scope Control Scope

Project Time Management Project Time Management

•Define Activities •Sequence Activities •Estimate Activity Resources•Estimate Activity Durations •Develop Schedule

•Control Schedule

Project Cost Management

Estimate Costs Determine Budget

Control Costs

Project Quality Management

Plan Quality Perform Quality Assurance

Perform Quality Control

Project Human Resource Management

•Develop Human Resource Plan

Acquire Project Team Develop Project Team Manage Project Team

Project Communications Management

Identify Stakeholders

Plan Communications Distribute Information Manage Stakeholder Expectations

Report Performance

Project Risk Management

•Plan Risk Management •Identify Risk •Perform Qualitative Risk Analysis •Perform Quantitative Risk Analysis •Plan Risk Response

•Monitor & Control Risk

Project Procurement Management

Plan Procurements Conduct Procurements Administer Procurements Close Procurements

Project Management Process Groups and Knowledge Areas Map (Process Matrix Chart)

Page 6: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

6Map

Knowledge Areas

Project Management Process Groups

Initiating Planning Executing Monitoring & Controlling Closing

Project Integration Management

Develop Project Charter

Develop Project Management Plan

Direct and Manage Project Execution

Monitor and Control Project Work

Perform Integrated Change Control

Close Project or Phase

Project Scope Management

Collect RequirementsDefine Scope Create Work Breakdown Structure (WBS)

Verify Scope Control Scope

Project Time Management Project Time Management

•Define Activities •Sequence Activities •Estimate Activity Resources•Estimate Activity Durations •Develop Schedule

•Control Schedule

Project Cost Management

Estimate Costs Determine Budget

Control Costs

Project Quality Management

Plan Quality Perform Quality Assurance

Perform Quality Control

Project Human Resource Management

•Develop Human Resource Plan

Acquire Project Team Develop Project Team Manage Project Team

Project Communications Management

Identify Stakeholders

Plan Communications Distribute Information Manage Stakeholder Expectations

Report Performance

Project Risk Management

•Plan Risk Management •Identify Risk •Perform Qualitative Risk Analysis •Perform Quantitative Risk Analysis •Plan Risk Response

•Monitor & Control Risk

Project Procurement Management

Plan Procurements Conduct Procurements Administer Procurements Close Procurements

Project Management Process Groups and Knowledge Areas Map (Process Matrix Chart)

Page 7: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

7Map

Inputs Tools & Techniques Outputs

Develop Project Charter PROCESS GROUP = Initiating | KNOWLEDGE AREA = Project Integration Management

Inputs, Tools and Techniques, and Outputs

1. Expert judgment 1. Project Charter 1. Project Statement of work2. Business case3. Contract4. Enterprise environmental

factors5. Organizational process

assets

Page 8: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

8Map

Inputs Tools & Techniques Outputs

Identify StakeholdersPROCESS GROUP = Initiating | KNOWLEDGE AREA = Project Communications Management

Inputs, Tools and Techniques, and Outputs

1. Stakeholder analysis2. Expert judgment

1. Stakeholder register2. Stakeholder management

strategy

1. Project Charter2. Procurement documents3. Enterprise environmental

factors4. Organizational process

assets

Page 9: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

9Map

Inputs Tools & Techniques Outputs

Develop Project Management PlanPROCESS GROUP = Planning | KNOWLEDGE AREA = Project Integration Management

Inputs, Tools and Techniques, and Outputs

1. Expert judgment 1. Project Management Plan1. Project charter2. Outputs from planning

processes3. Enterprise environmental

factors4. Organizational process

assets

Page 10: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

10Map

Inputs Tools & Techniques Outputs

Collect RequirementsPROCESS GROUP = Planning | KNOWLEDGE AREA = Project Scope Management

Inputs, Tools and Techniques, and Outputs

1. Interviews2. Focus groups3. Facilitated workshops4. Group creativity

techniques5. Group decision-making

techniques6. Questionnaires and

surveys7. Observations8. Prototypes

1. Requirements documentation

2. Requirements management plan

3. Requirements traceability matrix

1. Project charter2. Stakeholder register

Page 11: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

11Map

Inputs Tools & Techniques Outputs

Define Scope PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Scope Management

Inputs, Tools and Techniques, and Outputs

1. Expert judgment2. Product analysis3. Alternative identification4. Facilitated workshops

1. Project scope statement2. Project document updates

1. Project charter2. Requirements

documentation3. Organizational process

assets

Page 12: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

12Map

Inputs Tools & Techniques Outputs

Create Work Breakdown Structure (WBS)PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Scope Management

Inputs, Tools and Techniques, and Outputs

1. Decomposition 1. WBS2. WBS dictionary3. Scope baseline4. Project document updates5.

1. Project Scope Statement2. Requirements

documentation3. Organizational process

assets

Page 13: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

13Map

Inputs Tools & Techniques Outputs

Define Activities PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Time Management

Inputs, Tools and Techniques, and Outputs

1. Decomposition2. Rolling wave planning3. Templates4. Expert judgment

1. Activity list2. Activity attributes3. Milestone list

1. Scope baseline2. Enterprise environmental

factors3. Organizational process

assets

Page 14: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

14Map

Inputs Tools & Techniques Outputs

Sequence Activities PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Time Management

Inputs, Tools and Techniques, and Outputs

1. Precedence diagram method (PDM)

2. Dependency determination3. Applying leads and lags4. Schedule Network

Templates

1. Project schedule network diagrams

2. Project document updates3.

1. Activity List2. Activity attributes3. Milestone list4. Project scope statement5. Organizational process

assets

Page 15: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

15Map

Inputs Tools & Techniques Outputs

Estimate Activity ResourcesPROCESS GROUP = Planning | KNOWLEDGE AREA = Project Time Management

Inputs, Tools and Techniques, and Outputs

1. Expert judgment2. Alternative analysis3. Published estimating data4. Bottom-up estimating5. Project Management

software

1. Expert judgment2. Alternative analysis3. Published estimating data4. Bottom-up estimating5. Project Management

software6.

1. Activity List2. Activity attributes3. Resource calendars4. Enterprise environmental

factors5. Organizational process

assets

Page 16: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

16Map

Inputs Tools & Techniques Outputs

Estimate Activity Durations PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Time Management

Inputs, Tools and Techniques, and Outputs

1. Expert judgment2. Analogous estimating3. Parametric estimating4. Three-point estimates5. Reserve analysis

1. Activity duration estimates2. Project document updates3.

1. Activity list2. Activity attributes3. Activity resource

requirements4. Resource calendars5. Project scope statement6. Enterprise environmental

factors7. Organizational process

assets8.

Page 17: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

17Map

Inputs Tools & Techniques Outputs

Develop Schedule PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Time Management

Inputs, Tools and Techniques, and Outputs

1. Schedule network analysis2. Critical path method3. Critical chain method4. Resource levelling5. What-if scenario analysis6. Applying leads and lags7. Schedule Compression8. Scheduling tool

1. Project Schedule2. Schedule baseline3. Schedule data4. Project document updates

1. Activity List2. Activity attributes3. Project Schedule Network

diagram4. Activity Resource

requirements5. Resource Calendars6. Activity duration estimates7. Project scope statement8. Enterprise Environmental

Factors9. Organizational process

assets

Page 18: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

18Map

Inputs Tools & Techniques Outputs

Estimate Costs PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Cost Management

Inputs, Tools and Techniques, and Outputs

1. Expert Judgment2. Analogous Estimate3. Parametric Estimate4. Bottom-Up Estimate5. Three-Point Estimate6. Reserve Analysis7. Cost Of Quality8. Project Management

Estimating Software9. Vendor Bid Analysis

1. Activity Cost Estimate2. Basis of Estimates3. Project Document updates

1. Scope Baseline2. Project Schedule3. HR Plan4. Risk Register5. Enterprise Environmental

Factors6. Organizational Process

assets

Page 19: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

19Map

Inputs Tools & Techniques Outputs

Determine Budget PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Cost Management

Inputs, Tools and Techniques, and Outputs

1. Cost Aggregation2. Reserve Analysis3. Expert Judgment4. Historical relationships5. Funding limit

reconciliation

1. Cost Performance BaselineProject Funding requirementsProject document updates

1. Activity Cost Estimates2. Basis of Estimate3. Scope Baseline4. Project Schedule5. Resource Calendars6. Contracts7. Organizational Process

Assets8.

Page 20: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

20Map

Inputs Tools & Techniques Outputs

Plan Quality PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Quality Management

Inputs, Tools and Techniques, and Outputs

1. Cost-benefit analysis2. Cost of quality3. Control charts4. Benchmarking5. Design of experiments6. Statistical sampling7. Flow charting8. Proprietary quality

management methodology9. Additional quality planning

tools10.

1. Quality management plan2. Quality metrics3. Quality checklists4. Process improvement plan5. Project document updates6.

1. Scope baseline2. Stakeholder register3. Cost performance baseline4. Schedule baseline5. Risk register6. Enterprise environmental

factors7. Organizational Process

assets

Page 21: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

21Map

Inputs Tools & Techniques Outputs

Develop Human Resource Plan PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Human Resource Management

Inputs, Tools and Techniques, and Outputs

1. Organization charts and2. position descriptions3. Networking4. Organizational Theory

1. Human resource plan1. Activity resource requirements

2. Enterprise environmental factors

3. Organizational process assets

Page 22: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

22Map

Inputs Tools & Techniques Outputs

Plan Communications PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Communications Management

Inputs, Tools and Techniques, and Outputs

1. Communication requirements analysis

2. Communication technology

3. Communication models4. Communication methods5.

1. Communications management plan

2. Project document updates3.

1. Stakeholder register2. Stakeholder management

strategy3. Enterprise environmental

factors4. Organizational process

assets

Page 23: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

23Map

Inputs Tools & Techniques Outputs

Plan Risk Management PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Risk Management

Inputs, Tools and Techniques, and Outputs

1. Planning meetings & analysis

1. Risk Management plan1. Project Scope Management

2. Cost management plan3. Schedule management

plan4. Communication

management plan5. Enterprise environmental

factors6. Organizational process

assets

Page 24: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

24Map

Inputs Tools & Techniques Outputs

Identify Risk PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Risk Management

Inputs, Tools and Techniques, and Outputs

1. Documentation reviews2. Information gathering

technique3. Checklist analysis4. Assumptions analysis5. Diagramming techniques6. SWOT analysis7. Expert judgment8.

1. Risk register 1. Risk Management plan2. Activity Cost Estimates3. Activity duration estimates4. Scope Baseline5. Stakeholder register6. Cost Management plan7. Schedule Management

plan8. Quality Management plan9. Project documents10. Enterprise environmental

factors11. Organizational Process

assets

Page 25: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

25Map

Inputs Tools & Techniques Outputs

Perform Qualitative Risk Analysis PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Risk Management

Inputs, Tools and Techniques, and Outputs

1. Risk probability and impact assessment

2. Probability and impact assessment

3. Risk data quality assessment

4. Risk categorization5. Risk urgency assessment6. Expert judgment7.

1. Risk register updates 1. Risk register2. Risk Management plan3. Project scope statement4. Organizational process

assets

Page 26: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

26Map

Inputs Tools & Techniques Outputs

Perform Quantitative Risk Analysis PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Risk Management

Inputs, Tools and Techniques, and Outputs

1. Data gathering and representative techniques

2. Quantitative risk analysis and modelling techniques

3. Expert Judgment4.

1. Risk register updates 1. Risk register2. Risk Management Plan3. Cost Management plan4. Schedule Management

plan5. Organizational Process

assets6.

Page 27: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

27Map

Inputs Tools & Techniques Outputs

Plan Risk Response PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Risk Management

Inputs, Tools and Techniques, and Outputs

1. Strategies for negative risks or threats

2. Strategies for positive risks or opportunities

3. Contingent response strategies

4. Expert judgment

1. Risk register updates2. Risk-related contract

decisions3. Project management plan

updates4. Project document updates

1. Risk register2. Risk Management Plan3.

Page 28: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

28Map

Inputs Tools & Techniques Outputs

Plan ProcurementsPROCESS GROUP = Planning | KNOWLEDGE AREA = Project Procurement Management

Inputs, Tools and Techniques, and Outputs

1. Make-or-buy analysis2. Expert judgment3. Contract types4.

1. Procurement management plan

2. Procurement statements of work

3. Make-or-buy decisions4. Procurement documents5. Source selection criteria6. Change requests

1. Scope baseline2. Requirements

documentation3. Teaming agreements4. Risk register5. Risk-related contract

decisions6. Activity resource

requirements7. Project schedule8. Activity cost estimates9. Cost performance baseline10. Enterprise environmental

factors11. Organizational process

assets

Page 29: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

29Map

Inputs Tools & Techniques Outputs

Direct and Manage Project ExecutionPROCESS GROUP = Executing | KNOWLEDGE AREA = Project Integration Management

Inputs, Tools and Techniques, and Outputs

1. Expert judgement2. Project management

information system

1. Deliverable2. Work performance

information3. Change requests4. Project Management Plan

Updates5. Project document updates

1. Project management plan2. Approved change requests3. Enterprise Environmental

factors4. Organizational Process

Assets

Page 30: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

30Map

Inputs Tools & Techniques Outputs

Perform Quality Assurance PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Quality Management

Inputs, Tools and Techniques, and Outputs

1. Plan Quality and Perform Quality Control tools and techniques

2. Quality audits3. Process analysis

1. Organizational process updates

2. Change requests3. Project management plan

updates4. Project document updates

1. Project management plan2. Quality metrics3. Work performance

information4. Quality control

measurements

Page 31: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

31Map

Inputs Tools & Techniques Outputs

Acquire Project Team PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Human Resource Management

Inputs, Tools and Techniques, and Outputs

1. Pre-assignment2. Negotiation3. Acquisition4. Virtual teams

1. Project staff assignments2. Resource calendars3. Project management plan

updates

1. Project management plan2. Enterprise environmental

factors3. Organizational process

assets

Page 32: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

32Map

Inputs Tools & Techniques Outputs

Develop Project Team PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Human Resource Management

Inputs, Tools and Techniques, and Outputs

1. Interpersonal skills2. Training3. Team-building activities4. Ground rules5. Co-location6. Recognition and rewards7.

1. Interpersonal skills2. Training3. Team-building activities4. Ground rules5. Co-location6. Recognition and rewards

1. Project staff assignments2. Resource calendars3. Project management plan

updates

Page 33: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

33Map

Inputs Tools & Techniques Outputs

Manage Project Team PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Human Resource Management

Inputs, Tools and Techniques, and Outputs

1. Observation and conversation

2. Project performance appraisals

3. Conflict management4. Issue log5. Interpersonal skills

1. Enterprise environmental factors updates

2. Organizational process assets updates

3. Change requests4. Project management plan

updates

1. Project staff assignments2. Project management plan3. Team performance assets4. Performance reports5. Organizational process

assets6.

Page 34: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

34Map

Inputs Tools & Techniques Outputs

Distribute Information PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Communications Management

Inputs, Tools and Techniques, and Outputs

1. Communication methods2. Information distribution

tools

1. Organizational process assets updates

1. Project management plan2. Performance reports3. Organizational process

assets

Page 35: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

35Map

Inputs Tools & Techniques Outputs

Manage Stakeholder Expectations PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Communications Management

Inputs, Tools and Techniques, and Outputs

1. Communication methods2. Interpersonal skills3. Management skills4.

1. Organizational process assets updates

2. Change requests3. Project management plan

updates4. Project document updates

1. Stakeholder register2. Stakeholder management

strategy3. Project management plan4. Issue log5. Change log6. Organizational process

assets7.

Page 36: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

36Map

Inputs Tools & Techniques Outputs

Conduct ProcurementsPROCESS GROUP = Executing | KNOWLEDGE AREA = Project Procurement Management

Inputs, Tools and Techniques, and Outputs

1. Bidder conferences2. Proposal evaluation

techniques3. Independent estimates4. Expert judgment5. Advertising6. Internet search7. Procurement negotiations8.

1. Selected sellers2. Procurement contract

award3. Resource calendars4. Change requests5. Project management plan

updates6. Project document updates7.

1. Project Management Plan2. Procurement documents3. Source Selection criteria4. Qualified seller list5. Seller proposals6. Project documents7. Make-or-buy decisions8. Teaming agreements9. Organizational process

assets10.

Page 37: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

37Map

Inputs Tools & Techniques Outputs

Monitor and Control Project WorkPROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Integration Management

Inputs, Tools and Techniques, and Outputs

1. Expert judgment 1. Change requests2. Project management plan

updates3. Project document updates

1. Project management plan2. Performance reports3. Enterprise environmental

factors4. Organizational process

assets

Page 38: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

38Map

Inputs Tools & Techniques Outputs

Perform Integrated Change Control PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Integration Management

Inputs, Tools and Techniques, and Outputs

1. Expert judgment2. Change control meetings3.

1. Change request status updates

2. Project management plan updates

3. Project document updates

1. Project management plan2. Work performance

information3. Change requests4. Enterprise environmental

factors5. Organizational process

assets

Page 39: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

39Map

Inputs Tools & Techniques Outputs

Verify Scope PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Scope Management

Inputs, Tools and Techniques, and Outputs

1. Inspection 1. Accepted Deliverable2. Change requests3. Project document updates4.

1. Project management plan2. Requirements

documentation3. Requirements traceability

matrix4. Validated deliverables

Page 40: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

40Map

Inputs Tools & Techniques Outputs

Control Scope PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Scope Management

Inputs, Tools and Techniques, and Outputs

1. Variance analysis 1. Work performance measurements

2. Organizational process assets updates

3. Change requests4. Project management plan

updates5. Project document updates

1. Project management plan2. Work Performance

Information3. Requirements

documentation4. Requirements traceability

matrix5. Organizational process

assets

Page 41: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

41Map

Inputs Tools & Techniques Outputs

Control Schedule PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Time Management

Inputs, Tools and Techniques, and Outputs

1. Performance reviews2. Variance analysis3. Project management

software4. Resource levelling5. What-if scenario analysis6. Adjusting leads and lags7. Schedule compression8. Scheduling tool

1. Work performance measurementsOrganizational process assets updatesChange requestsProject management plan updatesProject document updates

1. Project management plan2. Project schedule3. Work performance

information4. Organizational process

assets

Page 42: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

42Map

Inputs Tools & Techniques Outputs

Control Costs PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Cost Management

Inputs, Tools and Techniques, and Outputs

1. Earned Value management2. Forecasting3. To-complete performance

index (TCPI)4. Performance reviews5. Variance analysis6. Project Management

software7.

1. Work performance measurements

2. Budget forecast3. Organizational process

assets updates4. Change request5. Project management plan

updates6. Project document updates

1. Project management Plan2. Project funding

requirements3. Work Performance

information4. Organizational Process

assets

Page 43: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

43Map

Inputs Tools & Techniques Outputs

Perform Quality Control PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Quality Management

Inputs, Tools and Techniques, and Outputs

1. Cause and effect diagram2. Control charts3. Flow charting4. Histogram5. Pareto chart6. Run chart7. Scatter diagram8. Statistical Sampling9. Inspection10. Approved change requests

review

1. Quality control measurements

2. Validated changes3. Validated deliverables4. Organizational process

assets updates5. Change requests6. Project management plan

updates7. Project document updates

1. Project management plan2. Quality metrics3. Quality checklists4. Work performance

measurements5. Approved change requests6. Deliverable7. Organizational process

assets

Page 44: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

44Map

Inputs Tools & Techniques Outputs

Report Performance PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Communications Management

Inputs, Tools and Techniques, and Outputs

1. Variance analysis2. Forecasting methods3. Communication methods4. Reporting systems5.

1. Performance reports2. Organizational process

assets updates3. Change requests

1. Project Management Plan2. Work performance

information3. Work performance

measurements4. Budget forecasts5. Organizational process

assets

Page 45: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

45Map

Inputs Tools & Techniques Outputs

Monitor & Control Risk PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Risk Management

Inputs, Tools and Techniques, and Outputs

1. Risk assessment2. Risk audits3. variance and trend

analysis4. Technical performance

measurement5. Reserve analysis6. Status meetings

1. Risk register updates2. Organizational Process

assets updates3. Change requests4. Project management plan

updates5. Project document updates

1. Risk register2. Project management plan3. Work performance

information4. Performance reports

Page 46: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

46Map

Inputs Tools & Techniques Outputs

Administer ProcurementsPROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Procurement Management

Inputs, Tools and Techniques, and Outputs

1. Contract change control system

2. Procurement performance reviews

3. Inspection and audits4. Performance reporting5. Payment systems6. Claims administration7. Records management

system

1. Procurement documentation

2. Organizational process assets updates

3. Change requests4. Project management plan

updates

1. Procurement documents2. Project management plan3. Contract4. Performance reports5. Approved change requests6. Work performance

information

Page 47: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

47Map

Inputs Tools & Techniques Outputs

Close Project or PhasePROCESS GROUP = Closing | KNOWLEDGE AREA = Project Integration Management

Inputs, Tools and Techniques, and Outputs

1. Expert judgment 1. Final product, service or result transition

2. Organizational process assets updates

1. Project management plan2. Accepted deliverables3. Organizational process

assets

Page 48: Source: PMBOK 4 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.

Source: PMBOK 4th Ed.

48Map

Inputs Tools & Techniques Outputs

Close ProcurementsPROCESS GROUP = Closing | KNOWLEDGE AREA = Project Procurement Management

Inputs, Tools and Techniques, and Outputs

1. Procurement audits2. Negotiated settlements3. Records management

system

1. Closed procurements2. Organizational process

updates

1. Project management plan2. Procurement

documentation


Recommended