CONTENTS
2
• Introduction
• Summary of Performance
(Q2 +Q3)
• Performance: Quarter 2 & 3
of 2015/16
• Conclusion
INTRODUCTION
MISSION STATEMENT
SAWS will realise its vision through excelling in the following areas:
• Thought leadership in meteorological, climatological and other related sciences;
• The development of relevant and innovative applications and products utilising cutting edge technology;
• Establishing and leveraging collaborative partnerships.
4
VISION STATEMENT
“A weather and climate centre of excellence providing innovative solutions to ensure a
weather-ready region, sustainable development and economic growth”
5
SUMMARY OF PERFORMANCE QUARTER 2 & 3
7
82%
7%11%
PERFORMANCE ON OBJECTIVES
• 23/28 Targets (82%) –Achieved
• No targets were partially achieved in this quarter
• 2/28 Targets (7%) -Not Achieved and being addressed
• 3/28 Targets (11%) – No milestones, due to not requiring action in this Quarter
PERFOMANCE ON OBJECTIVESfor Quarter 2 of 2015/16 Financial Year
8
86%
3%11%
PERFORMANCE ON OBJECTIVES
• 24/28 Targets (86%) –Achieved/Partially Achieved
• 2 Targets partially achieved in this quarter
• 1/28 Targets (3%) -• Not Achieved and being
addressed
• 3/28 Targets (11%) – No milestones - are either annual targets or did not require action
PERFOMANCE ON OBJECTIVESfor Quarter 3 of 2015/16 Financial Year
QUARTER 2 & 3 of 2015/16: ACTUAL PERFORMANCE AGAINST PRE-DETERMINED OBJECTIVES
Actual Performance Against Targeted Performance - Interpretation Key
Achieved Met all requirements(On target)
Partially Achieved
Metrequirements substantially –there may be changes to requirements(Work in progress)
Not Achieved
Met none/some requirements –Requires urgent attention(Off target)
Nomilestone
No set milestone for that period
Information not provided
Information notevaluated at the time of reporting
STRATEGIC GOAL 1: TO ENSURE A WEATHER-READY NATION THROUGH THE PROVISION
OF RELEVANT METEOROLOGICAL AND RELATED PRODUCTS AND SERVICES
SO 1.1: Provide programmes / applications for weather and climate variability, climate change adaptation and mitigation
Key
Performance
Indicator
Baseline Annual Target 3rd Quarter
Target
Actual Performance
2nd Quarter 2015/16
Actual Performance
3rd Quarter 2015/16
Achievement/
Challenges/
Corrective measures
An air quality
modelling
and
forecasting
system
developed
Nil Air quality
modelling and
forecasting
system
feasibility
study
conducted
and approved
Approved
feasibility
study
Achieved
Feasibility study
drafted
Partially Achieved
Feasibility study not
yet approved
Air quality modelling
expert appointed -
October 2015
Feasibility study was
developed during
December 2015
Approval in process
Percentage
availability of
SAAQIS
90% SAAQIS
availability
90%
SAAQIS
availability
90%
Achieved
SAAQIS availability =
96%
Achieved
SAAQIS availability =
96%
Over-achievement
due to enhancement
of power supply
during the HPC
installation.
STRATEGIC GOAL 1: To ensure a weather-ready nation through the provision of relevant meteorological and
related products and services
11
SO 1.2: Develop products and services
Key
Performance
Indicator
Baseline Annual
Target
3rd Quarter
Target
Actual Performance
2nd Quarter 2015/16
Actual
Performance 3rd
Quarter 2015/16
Achievement/
Challenges/ Corrective
measures
Number of
new products
and services
6 4
products
and / or
services
developed
1 Achieved
2 products developed
Achieved
1 product
developed
1. Lightning Threat Index
(enhancement of the
index)
2. Keisan Discomfort
Index
3. Evapo-transpiration
product developed
SO 1.1: Provide programmes / applications for weather and climate variability, climate change adaptation and mitigation
Key
Performance
Indicator
Baseline Annual
Target
3rd Quarter
Target
Actual Performance
2nd Quarter 2015/16
Actual
Performance 3rd
Quarter 2015/16
Achievement/
Challenges/ Corrective
measures
Percentage of
milestone
achieved as
per the R&D
strategy
R & D
strategy
implement-
ation plan
70% of
milestones
achieved
50% of
milestones
achieved
Achieved
30% of milestones
achieved
Achieved
50% of milestones
achieved
Targets set for the
research department as
per the APP and research
strategy have been met
12
STRATEGIC GOAL 1: To ensure a weather-ready nation through the provision of relevant meteorological and
related products and services
SO 1.2: Develop products and services
Key
Performance
Indicator
Baseline Annual
Target
3rd Quarter
Target
Actual Performance
2nd Quarter 2015/16
Actual Performance 3rd
Quarter 2015/16
Achievement/
Challenges/ Corrective
measures
Renewable
energy
sector
product /
application
developed
1 Wind
farm
product
Renewable
energy
sector
product /
application
developed
Product
Design
Achieved
SAWS is in
negotiation with
WindSim to provide
model output for
utilisation in
systems that
WindSim has
developed.
Achieved
Power Generation
Forecast Product has
been developed and is
being tested by
WindSim
Over-achieved - SAWS
identified and enhanced
existing technology to
develop a product as per
client requirements
Agro/
hydrological
product
developed
Not
measured
Agro /
hydrological
product
developed
Product
Testing
Achieved
Enthalpy heat-stress in poultry application. The product still being verified.
Achieved
3 Hydrological
products launched-
Rain watch platform
Information gathered
from the NEPAD project
assisted SAWS to
develop Agro-
hydrological products
13
STRATEGIC GOAL 1: To ensure a weather-ready nation through the provision of relevant meteorological and
related products and services
SO 1.2: Develop products and services
Key
Performance
Indicator
Baseline Annual
Target
3rd Quarter
Target
Actual
Performance 2nd
Quarter 2015/16
Actual Performance
3rd Quarter 2015/16
Achievement/
Challenges/ Corrective
measures
Number of
regional severe
weather
guidance maps
provided daily
in the RSMC
web
Not
measured
Provision
of 5
regional
severe
weather
guidance
maps daily
in the
RSMC web
Provision of 5
regional severe
weather
guidance maps
daily in the
RSMC web
Achieved
5 regional severe
weather guidance
maps provided
through the RSMC
web
Achieved
5 regional severe
weather guidance
maps are provided
through the RSMC
web portal
5 regional severe
weather guidance
maps are provided
through the RSMC web
portal
14
STRATEGIC GOAL 1: To ensure a weather-ready nation through the provision of relevant meteorological and
related products and services
STRATEGIC GOAL 2: TO ENSURE THE DEVELOPMENT OF RELEVANT METEOROLOGICAL
SCIENTIFIC CAPABILITY THROUGH COLLABORATION WITH STAKEHOLDERS, PARTNERS AND CLIENTS
SO 2.1: Promote SAWS and its distinctive capabilities
Key
Performance
Indicator
Baseline Annual Target 3rd Quarter
Target
Actual
Performance 2nd
Quarter 2015/16
Actual Performance
3rd Quarter 2015/16
Achievement/
Challenges/ Corrective
measures
Percentage
overall
stakeholder
satisfaction
level
84.8% 85% Conduct a
survey
No milestone
No action required
(annual target)
Achieved
Service Provider
appointed to conduct
survey, survey in
progress
Survey in progress
Develop and
implement
stakeholder
engagement
plan for
vulnerable
communities
NEW Develop and
implement
stakeholder
engagement
plan for
vulnerable
communities
Develop
stakeholder
engagement
programmes
Achieved
Vulnerable
communities
identified and
stakeholder
engagement plan
developed
Achieved
Stakeholder
engagement
programmes defined
in engagement plan
included in the
communications plan
Lights Conference
El Nino Summit
Various Provincial
Disaster Management
Advisory Fora
Ministerial Forum -
Drought
Issues – Drought,
seasonal Outlook,
Climate variability
STRATEGIC GOAL 2: To ensure the development of relevant meteorological scientific capability through
collaboration with stakeholders, partners and clients
16
SO 2.1: Promote SAWS and its distinctive capabilities
Key
Performance
Indicator
Baseline Annual Target 3rd Quarter
Target
Actual
Performance
2nd Quarter
2015/16
Actual
Performance 3rd
Quarter 2015/16
Achievement/
Challenges/
Corrective measures
Programmes
and campaigns
that promote
the
organisation as
per the
communi-
cations
strategy and
implement-
ation plan
Communi-
cations
Strategy
Develop and
implement
programmes and
campaigns that
promote the
organisation as
per the
communications
strategy and
implementation
plan
Implement
programme
and campaign
proposals
Achieved Achieved
Launched
Hydronet
platform and
product
19/11/2015
Lights Conference
12/11/2015
Various
Exhibitions
A Corporate
Communications
strategy with
programmes and
campaigns approved
with minor changes
17
STRATEGIC GOAL 2: To ensure the development of relevant meteorological scientific capability through
collaboration with stakeholders, partners and clients
SO 2.1: Promote SAWS and its distinctive capabilities
Key Performance
Indicator
Baseline Annual
Target
3rd Quarter
Target
Actual
Performance 2nd
Quarter 2015/16
Actual
Performance 3rd
Quarter 2015/16
Achievement/
Challenges/
Corrective measures
Number of articles in
scientific publications
28 14 10 Articles
and other
scientific
publications
Achieved
2 x articles
published in
scientific
journals
Achieved
5 Peer reviewed
articles have been
published in
Scientific Journals
Cumulative target
5 articles were
published in Q1 and
2 5 articles were
published in Q3
SO 2.2: Manage and leverage strategic partnerships and collaborations to ensure SAWS sustainability
Key Performance
Indicator
Baseline Annual
Target
3rd Quarter
Target
Actual
Performance 2nd
Quarter 2015/16
Actual
Performance 3rd
Quarter 2015/16
Achievement/
Challenges/
Corrective measures
Number of strategic
partnerships as per
the implementation
plan of the
Commercial Strategy
7
partnerships
8
partnerships
Draft
agreements
Achieved
Contracts signed
with AfriGIS &
AfriSEC
Hydrologic - in
progress
Achieved
Agreements
signed with:
AfriGIS, Hydrologic
& AfriSec
Over achievement
due to AfriGIS
agreement which was
in pipeline at the
start of the financial
year.
18
STRATEGIC GOAL 2: To ensure the development of relevant meteorological scientific capability through
collaboration with stakeholders, partners and clients
SO 2.3: Position SAWS as a pre-eminent Meteorological Institution nationally, regionally and globally
Key
Performance
Indicator
Baseline Annual Target 3rd Quarter
Target
Actual Performance
2nd Quarter
2015/16
Actual
Performance 3rd
Quarter 2015/16
Achievement/
Challenges/ Corrective
measures
National
Framework
for Climate
Services
(NFCS)
developed
and
implemented
Landscape
document
NFCS
developed
and approved
Review Report
and develop
NFCS
Achieved
Analysis was
conducted and
reviewed at a
National
Consultative
Workshop held on
17 July 2015.
Partially
Achieved
Service Provider
was appointed -
Develop NFCS and
Implementation
Plan
Complexity of the
project that comprises
multiple organisations
requires a dedicated
resource for executing
this work package.
Maintain
position as
the regional
Tele-
communicati
ons Hub
(RTH) in
Africa
No target RTH status
quarterly
report
RTH status
quarterly report
Achieved
RTH Statistics
uploaded
Achieved
RTH Statistics
uploaded
N/A
19
STRATEGIC GOAL 2: To ensure the development of relevant meteorological scientific capability through
collaboration with stakeholders, partners and clients
SO 2.3: Position SAWS as a pre-eminent Meteorological Institution nationally, regionally and globally
Key
Performance
Indicator
Baseline Annual Target 3rd Quarter
Target
Actual Performance
2nd Quarter 2015/16
Actual
Performance 3rd
Quarter 2015/16
Achievement/
Challenges/
Corrective
measures
Maintain
position as the
Regional
Training
Centre
No target
set
Implementation
as per strategy
milestone
Implementation
as per strategy
milestone
Achieved
RTC strategy
implemented as per
agreed milestone
Achieved
RTC strategy
implemented as
per agreed
milestone
N/A
20
STRATEGIC GOAL 2: To ensure the development of relevant meteorological scientific capability through
collaboration with stakeholders, partners and clients
STRATEGIC GOAL 3:TO ENSURE A FINANCIALLY SUSTAINABLE ORGANISATION
SO 3.1: Grow aviation revenue
Key
Performance
Indicator
Baseline Annual
Target
3rd Quarter
Target
Actual
Performance 2nd
Quarter 2015/16
Actual Performance
3rd Quarter 2015/16
Achievement/
Challenges/ Corrective
measures
Aviation
revenue
growth
R104,5m R98,4m R25,6m Achieved
R30,9m
Achieved
R32,182m
Over-achievement due
to number of flights
higher than budgeted
and an increase in tariff
from R45.66 to R51.43
Met Authority
inspections
performed as
per schedule
No target
set
20
inspections
performed
5 Inspections
performed
Achieved
5 inspections
conducted as
scheduled
Achieved
5 inspections
conducted as
scheduled
5 inspections conducted
each quarter.
Q2:O.R Tambo, Grand
Central, Rand, Lanseria
and Wonderboom
Q3: Bloemfontein,
Kimberly, Upington, Port
Elizabeth and East
London
STRATEGIC GOAL 3: To ensure a financially sustainable organisation
22
SO 3.2: Grow commercial revenue
Key
Performance
Indicator
Baseline Annual
Target
3rd Quarter
Target
Actual
Performance 2nd
Quarter 2015/16
Actual
Performance 3rd
Quarter
2015/16
Achievement/ Challenges/
Corrective measures
Commercial
revenue
growth
R12,5m R36,9m
In process of
revision
(R16,0m)
R4m Not achieved
R2,6m
Not Achieved
R3,7m
Non-renewal of the Eskom LDN feed. Poor Automatic Weather Station sales. Reduced climate data sales. Corrective action:• Re-negotiated ESKOM
contract• Push instrument sales• Launched two applications
Q3• Proposals for training issued• Follow Sales leads on
lightning data
23
STRATEGIC GOAL 3: To ensure a financially sustainable organisation
SO 3.3: Maintain fiscal discipline
Key
Performance
Indicator
Baseline Annual
Target
3rd Quarter Target Actual
Performance 2nd
Quarter 2015/16
Actual
Performance 3rd
Quarter 2015/16
Achievement/
Challenges/ Corrective
measures
Unqualified
audited
Annual
Financial
Statements
Unqualified
Audit
Unqualified
Audited
annual
financial
statements
Favourable AG
Dashboard report
Achieved Achieved Favourable AG
Dashboard Report
received
24
STRATEGIC GOAL 3: To ensure a financially sustainable organisation
STRATEGIC GOAL 4: TO ENSURE CONTINUED PROVISION OF QUALITY WEATHER AND
RELATED INFORMATION IN SUPPORT OF SOCIO-ECONOMIC DEVELOPMENT
SO 4.1: Improve and enhance optimal observation network, processing and dissemination platforms
Performance
Indicator
BaselineAnnual
Target2015/16
Quarterly
Targets
Actual performance
Q2 2015/16
Actual
performance Q3
2015/16
Achievement/ Challenges/
Corrective measures
% Availability
of data
Radar
56.81% Radar data
availability
= 80%
Radar data
availability=
75%
Not Achieved
Radar availability =
65.02%
Achieved
Radar availability
=75%
Under-achievement:
• power supply challenges
• Long lead times for the
delivery of spares
Corrective Action:
• Repair/ replacement of
faulty parts
• Strengthened
maintenance
programme
% Availability
of data
LDN
96.48% LDN data
availability
= 80%
LDN data
availability
= 80%
Achieved
LDN availability =
92.09%
Achieved
LDN availability
=89.67%
Over achieved:
• maintenance agreement
with Manufacturer
STRATEGIC GOAL 4: To ensure continued provision of quality weather and related information in support of socio-
economic development
26
SO 4.1: Improve and enhance optimal observation network, processing and dissemination platforms
Key
Performance
Indicator
Baseline Annual Target 3rd Quarter
Target
Actual
Performance
2nd Quarter
2015/16
Actual
Performance 3rd
Quarter 2015/16
Achievement/ Challenges/
Corrective measures
MoU with
Security
cluster or
other
partner with
similar
capabilities
NEW Develop
MoU with
Security
cluster or
other partner
with similar
capabilities
Draft MoU Achieved
Discussion held
with SITA ,
MoU drafted
Achieved
Draft MoU
developed
Discussions held with SITA
due to their capability
27
SO 4.2: Retain certification and maintain Total Quality Management System
Key
Performance
Indicator
Baseline Annual Target 3rd Quarter
Target
Actual
Performance 2nd
Quarter 2015/16
Actual Performance
3rd Quarter
2015/16
Achievement/
Challenges/ Corrective
measures
Third party
audit report
on ISO 9001
certification
Re-
certification
ISO 9001
Retention of
ISO Certificate
Retention of
ISO Certificate
Achieved
Retention of
ISO Certificate
Achieved
Retention of ISO
Certificate
Surveillance Audit in
September- October
2015.
No findings
ISO 9001 certificate
was retained
STRATEGIC GOAL 4: To ensure continued provision of quality weather and related information in support of socio-
economic development
27
STRATEGIC GOAL 5:TO CREATE A STRATEGY-DRIVEN HUMAN CAPITAL CAPACITY
IN SUPPORT OF A WEATHER-READY NATION
SO 5.1: Ensure the availability of strategy-driven human capital capacity
Key
Performance
Indicator
Baseline Annual
Target
3rd Quarter
Target
Actual Performance
2nd Quarter 2015/16
Actual
Performance 3rd
Quarter
2015/16
Achievement/ Challenges/
Corrective measures
Talent
retention rate
Talent
retention of
scarce and
critical skills
92% 92% Monitoring of
retention figures
Achieved
98% talent retention
rate achieved
Achieved
Talent
Retention
Monitored and
at 98 %
Over - Achievement due
to implementation of
various HR interventions
% Average
organisational
performance
rating
86% 80% N/A No Milestone
Annual target
No Milestone
Annual target
Monitoring continues
82% of set targets
achieved(Unaudited)
STRATEGIC GOAL 5: To create a strategy-driven human capital capacity
in support of a weather-ready nation
29
SO 5.2: Build a talent pool for atmospheric science and related services
Key Performance
Indicator
Baseline Annual
Target
3rd Quarter
Target
Actual
Performance 2nd
Quarter 2015/16
Actual
Performance 3rd
Quarter 2015/16
Achievement/
Challenges/
Corrective measures
Implementation
of the National
Education plan
for atmospheric
and related
sciences
Engage
stakeholders
Implement
phase 1 of
the plan
Implementation
of stakeholder
engagement plan
Achieved
Implementation
of stakeholder
engagement
plan continuing
Achieved
Implementation of
stakeholder
engagement plan
continuing
Engaged with:
ARC, University of
Free state, Dept. of
Higher Education
and Training, Dept.
of Water Affairs and
Sanitation, Transport
SETA, Disaster
Management &
Unisa
Number of
bursaries
62 62 N/A No Milestone
Annual target
No Milestone
Annual target
N/A
Percentage of
bursars
absorbed by
SAWS in critical
strategic areas
65% of
Bursars
absorbed by
SAWS in
critical
strategic
areas
45 % *
(9 Bursars)
N/A No Milestone
Annual target
No Milestone
Annual target
N/A
30
STRATEGIC GOAL 5: To create a strategy-driven human capital capacity
in support of a weather-ready nation
SAWS EMPLOYMENT EQUITY STATISTICS
SAWS PROFILE AS AT 31/12/15 - EMPLOYMENT EQUITY
Occupational Levels Male Female Foreigners Total
A C I W A C I W N/A
Top management 1 0 0 0 3 0 0 1 0 5
Senior management 6 0 1 0 7 0 0 2 0 16
Professionally qualified and experienced
specialists
40 4 1 21 19 1 0 8 7 101
Skilled technical and academically
qualified workers, supervisors
55 5 4 23 29 4 3 13 1 137
Semi-skilled and discretionary decision
making
38 10 0 8 45 9 1 4 1 116
Unskilled and defined decision making 9 3 0 0 2 0 0 0 0 14
Temporary Employees 9 0 0 1 12 0 0 0 0 22
TOTAL PERMANENT 158 22 6 53 117 14 4 28 9 411
32
SAWS STATS VERSUS THE DEMOGRAPHICS OF SA- EMPLOYMENT EQUITY(END QUARTER 2)
Corrective action - EE plan targets in line with skills availability - interventions include the recruitment plan targeting skills development amongst Africans and develpment of strategy on attraction and retention of persons with disabilities
33
(*) Targets as per the SAWS Employment Equity Plan
(**) People with Disabilities
RaceNational
Demographics
Baselineas at
31/03/2015
SAWS Target [*]
SAWS Statistics as at
30/09/2015
Deviation from Target
Year-to-DateVariance
Africans 80.50% 67.00% 74.00% 67.00% -7.00% 0.00%
White 8.30% 21.10% 14.70% 20.40% 5.70% -0.70%
Coloured 8.80% 8.50% 8.80% 9.00% 0.20% 0.50%
Indians 2.50% 2.70% 2.50% 2.40% -0.10% -0.30%
Foreigners 0.00% 0.70% 0.00% 1.20% 1.20% 0.50%
TOTAL 100.10% 100.00% 100.00% 100.00% 0.00% 0.00%
PwD** 2.00% 1.00% 3.00% 1.40% -1.60% 0.40%
SAWS STATS VS THE DEMOGRAPHICS OF SA- EMPLOYMENT EQUITY (END QUARTER 3)
Corrective action - EE plan targets in line with skills availability - interventions include the recruitment plan targeting skills development amongst Africans and develpment of strategy on attraction and retention of persons with disabilities
34
[1]
FOREIGNERS
(*)Targets as per the SAWS Employment Equity Plan
(**) People with Disabilities
RaceNational
Demographics
Baseline
as at
31/03/2015
SAWS
Target [*]
SAWS
Statistics as at
31/12/2015
Deviation
from Target
Year-to-Date
Variance
Africans 80.50% 67.00% 74.00% 67.00% -7.00% 0.00%
White 8.30% 21.10% 14.70% 19.70% 5.00% -1.40%
Coloured 8.80% 8.50% 8.80% 8.75% -0.05% 0.25%
Indians 2.50% 2.70% 2.50% 2.40% -0.10% -0.30%
Foreigners 0.00% 0.70% 0.00% 2.15% 2.15% 1.45%
TOTAL 100.10% 100.00% 100.00% 100.00% 0.00% 0.00%
PwD** 2.00% 1.00% 3.00% 1.40% -1.60% 0.40%
FINANCIAL REPORT FOR THE PERIOD ENDING 30 SEPTEMBER 2015
FINANCIAL REPORT ACTUAL VERSUS BUDGET for the period ending 30 September 2015
FINANCIAL REPORTREVENUE – Actual versus Budget for the period ending 30 September 2015
Revenue:
Total revenue below budget by R1,8 million (-1.2%)
Aviation revenue above budget by 24.01% (R11,45 million)
Commercial revenue 69.92%below budget (R12,93 million)
Financial Report as at 30 September 2015.001
37
FINANCIAL REPORT EXPENDITURE – Actual versus Budget for the period ending 30 September 2015
Financial Report as at 30 September 2015.001
38
FINANCIAL REPORT FOR THE PERIOD ENDING 31 DECEMBER 2015
FINANCIAL REPORT ACTUAL VERSUS BUDGET for the period ending 31 December 2015
Description
2014/15
FULL YEAR
Actual
R
2015/16
FULL YEAR
Budget
R
2015/16
YTD
Budget
R
2015/16
YTD
Actual
R
2015/16
YTD
Budget
Variance
R
2015/16
YTD
Budget
Variance
%
Total Revenue 310,338,127 284,872,000 210,678,988 226,051,781 15,372,794 7.30%
Total Expenditure (281,431,488) (284,872,000) (219,291,661) (219,174,847) 116,814 0.05%
Administrative Expenditure (15,133,160) (8,353,090) (6,515,344) (1,589,936) 4,925,408 75.60%
Compensation of Employees (174,765,899) (191,668,000) (148,611,750) (143,025,562) 5,586,188 3.76%
Other Operating Expenditure (91,532,429) (84,850,910) (64,164,568) (74,559,350) (10,394,782) -16.20%
Operating Surplus/(Deficit) 28,906,639 - (8,612,674) 6,876,934 15,489,608 179.85%
(before depreciation and amortisation)
Depreciation (23,785,365) (24,480,528) (18,360,395) (23,852,997) (5,492,602) -29.92%
Amortisation (2,750,853) (3,635,472) (2,726,604) (3,518,072) (791,468) -29.03%
Gains from Fair Value Adjustments (27,988,627) - - - - 0.00%
(Deficit)/Surplus for the Period (25,618,206) (28,116,000) (29,699,674) (20,494,136) 9,205,538 31.00%
FINANCIAL REPORTREVENUE – Actual versus Budget for the period ending 31 December 2015
Revenue:
Total Revenue above budget by R15,37 million (7.30%)
Aviation Revenue above budget by 24.57% (R18,01 million)
Commercial Revenue 22.04% below budget (R2,64 million)
Financial Report as at 31 December 2015.001
41
FINANCIAL REPORT EXPENDITURE – Actual versus Budget for the period ending 31 December 2015
Financial Report as at 31 December 2015.001 47
Strategic Goals Linked to Budget and Actual for the period ended 31 December 2015
Financial Report as at 31 December 2015.001
43
AG DASHBOARD AND AUDIT OUTCOME 2014/15 Addressing ICT Audit Findings
AG’s 2015/16 Dashboard of Key Drivers of Internal Control
45
AG’s 2015/16 Dashboard of Key Drivers of Internal Control
46
ICT FINDINGS
Two findings contributing to the
– Password for the JDE system user, with full access to the JDE application and data, is known to the external consultants. In addition this account was used to update business transactions, which is contrary to the purpose of this account.
– The operating system, database and firewall level auditing features were either not recording all security events or were not being maintained for adequate time periods before being overwritten.
47
MITIGATION PLAN & PROGRESS
Audit Finding Progress on Mitigation Plan
JDE Password Resolved• Process has been implemented to monitor activities performed
by the consultants included in this is the Change Request Forms which are verified independently by ICT personnel.
Operating System, Database & Firewall Audit Logs
• An audit approach has been developed to identify and prioritisesecurity events that are important to SAWS minimize the impactof activating the logs on the system.
• Audit features have been activated for the relevant securityevents. As a cost cutting measure, Open Source software is beingevaluated to assist in the management of the logs with theobjective of reducing the time and effort required to review thelogs.
(CGICTPF = Corporate Governance of ICT Policy Framework)
48
49
AG’s 2014/15 Dashboard - Key Drivers of Internal Control (continued)
Kindly note: Although these findings affected the Dashboard of Key Drivers
of Internal Control, as contained in the Management Letter, it did not affect
the Auditor-General’s Report regarding Internal Control (refer p. 127 of
Annual Report) that states the following:
“I consider internal control relevant to my audit of the financial statements,
annual performance report and compliance with legislation. I did not identify
any significant deficiencies in internal control.”
CONCLUSION
Challenges/Opportunities (This year`s focus)
Resource mobilisation to maintain and
invest in Infrastructure & Human Capital
Service to the Aviation Industry – ICAO`s
proposed Business Model (Regionalisation
versus Local Provision)
Attraction and retention of women at
management level as well as people with
disabilities at all levels
Labour relations issues
50
51
Thank you!