Department for Manufacturing, Innovation, Trade, Resources and Energy South Australia’s Mineral and Resources Update Resources and Investment Symposium Broken Hill – May 2014 Dr Paul Heithersay Deputy Chief Executive Resources and Energy DMITRE
Transcript
Page 1: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Department for Manufacturing, Innovation, Trade, Resources and Energy

South Australia’s Mineral and Resources Update

Resources and Investment Symposium Broken Hill – May 2014

Dr Paul Heithersay Deputy Chief Executive Resources and Energy

DMITRE

Page 2: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Metal demand continues to grow rapidly

This puts severe pressure on industry to find and develop new mines

2

0

10

20

30

40

1900 1920 1940 1960 1980 2000 2020 2040

Forecast Demand Based on 3% pa growth

Historic Demand Average growth rate of 2.8% pa over last 24 years

Copper Mine Production (Mt pa Cu)

Cumulative copper production for all history

(1000 BC to 2013 AD) = 629 Mt Cu

In the next 24 years 635 Mt of copper will need to be mined

… that’s equal to the total amount produced in all

history to-date !

… and half of this was mined in the last 24 years

Source: MinEx Consulting © May 2014 , based on historic data from USGS

Page 3: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Strong demand for some of the high tech metals – but their overall market is still quite modest

3

Growth rates for minerals and metals: 2003-2013

-10%

0%

10%

20%

0.01 0.1 1 10 100 1000

Compound Annual Growth rate (tonnes basis) Bulk MineralsIndustrial MineralsBase MetalsLight MetalsPrecious MetalsHigh TechOther

Total Sales Revenue in 2013 (US$ Billion)

Cement

Iron Ore

Thermal Coal Coking Coal

Tantalum

Gallium Germanium

Lithium

REE Copper

Aluminium

Gold

Nickel

Cobalt

Source: USGS Mineral Commodity Summaries

Uranium

PGM

Silver

Silicon

Lime

Zinc

Note: Compound Annual Growth Rate was calculated by comparing World mine production for a given commodity in 2013 against 2003.

Phosphate

Potash

Page 4: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Exploration is becoming more difficult & expensive

Exploration expenditures and discoveries in the Western World

4 Source: MinEx Consulting © February 2014

Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes Bulk Mineral discoveries and satellite deposits found within existing camps

Number of Discoveries 2013 US$ Billion

$2.4b

$18.8b

$12.3b

Even after adjusting for unreported discoveries, in the last 5 years a large gap

has opened up between expenditures and the

number of deposits found

Page 5: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

… and we having to explore under deeper cover

Depth of cover for Base Metal discoveries in the World: 1900-2013

5

Note: Based on an analysis of 818 Primary Cu, Zn, Pb and Ni deposits > 0.1 Mt Cu-equivalent Bubble size refers to Mt Cu-eq of pre-mined Resource, as calculated using the average metal price for 2011-2013 Excludes satellite deposits within existing Camps. Excludes nickel laterite deposits

Source: MinEx Consulting © March 2014

The step increase in the depth of cover (post 1945)

was due to innovations in geophysics

Olympic Dam

Depth of Cover (Metres)

Talnakh Lubin

Pampa Escondida

Escondida

Page 6: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Innovations in GPx will play a key role in the future

Primary search method used at the prospect-scale for Base Metal discoveries (>0.1 Mt Cu-eq) in the World: 1900-2012

6 Source: MinEx Consulting © July 2013

0%

20%

40%

60%

80%

100% Serendipity

Prospector

Other

Drilling (Sole Method)

Visual

Conceptual/Geological

Geological Mapping

Extrapolated from KnownMineralisationGeochem

Geophysics + Geochem

Geophysics

Page 7: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Country & Social Risks are impacting on projects

It is taking longer to get a discovery into production, especially in emerging countries

7

7.1 Years

18.1 Years

9.8 Years

Years Delay

Discovery Year

Gold

Note: Bubble size refers to the pre-mined Resource Analysis based on 686 primary gold deposits >0.1 Moz found in the World

Source: MinEx Consulting © March 2014

Page 8: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

•We need new tools to explore undercover 100m to 1000m •We need innovative approaches between exploration , mining and land owners and other stakeholders •We need supportive governments to provide certainty for long term decisions •Sustained commitment to partner with industry in recording , preserving and presenting precompetitive data

8

As professionals in the industry we have a grand challenge

Page 9: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

South Australian Minerals and Energy Resources

1 Twelve months to January 2014

• Minerals ($144.7m) and Petroleum ($367.7m)

$512 million EXPLORATION EXPENDITURE

• ~$30 billion of potential capital for Minerals and Energy projects in the Major Developments Directory

$1.6 billion new CAPITAL EXPENDITURE

• Minerals ($5.4 b) and Petroleum ($1.6 b)

$6.9 billion resources PRODUCTION

• Minerals ($4.5 b) and Petroleum ($0.2 b) • 38% of South Australia’s total exports ($12.0 b)1

$4.7 billion EXPORTS

$188.7 million ROYALTIES

• more than double - 6,641 ten years ago

15,372 EMPLOYED

Page 10: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

South Australian Mineral and Petroleum Production by Commodity – 2000 - 2013

10

0

1

2

3

4

5

6

7

8

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

$ Bi

llion

Copper Hematite Magnetite Gold Uranium CoalOther Metallics Industrial Construction Gemstones Caroline 1 CO2 (well) Condensate

Minerals and Petroleum production for 2013 was $6.9 billion ($5.4b – Minerals and $1.6b – Petroleum)

Record Production

Page 11: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

South Australian Mineral Exploration Expenditure 1993 - 2013

11

0%

2%

4%

6%

8%

10%

12%

14%

16%

0

50

100

150

200

250

300

350

400

1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

South Australian expenditure SA's percentage share of Australian expenditure SASP Target 41 - $200m to 2015 Former SASP Target T1.18 - $100m

Sout

h Au

stra

lian

min

eral

ex

plor

atio

n ex

pend

iture

($ m

)

SA's

sha

re o

f Aus

tralia

n m

iner

al e

xplo

ratio

n ex

pend

iture

(%

)

source: ABS data Cat. 8412.0 and DMITRE

Challenger discovery

PACE

Four Mile discovery

Olympic Dam Expansion

Carrapateena discovery

Olympic Dam drill-

out

PACE 2020

Prominent Hill

discovery

Jacinth-Ambrosia discovery

Hillside discovery

Impact of GFC

Page 12: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

South Australian and Curnamona Province mineral exploration expenditure by commodity 2013

12

Copper$57.9m

40%

Iron ore$16.5m

11%

Other$43.6m

30%

Base Metals$22m 15%

Uranium $4.7m

3%

$144.7 million

Based on: ABS Cat. 8412, Dec 2013Based on: ABS Cat. 8412, Dec 2013Based on: ABS Cat. 8412, Dec 2013Based on: ABS Cat. 8412, Dec 2013

Uranium$4.3m 23%

Copper ± Gold$5.5m 30%

Iron Ore$4.1m 23%

Gold$2.8m 16%

Lead/Zinc$1.3m

7%

Other $0.15 1%

$18.2 million

Source: DMITRE, Mineral Resources Division

Curnamona Province represents a 12.6% of the South Australian Exploration Expenditure in 2013

South Australia Curnamona

Page 13: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Curnamona Province, South Australia Exploration Expenditure, 2004 - 2013

13

-

5

10

15

20

25

30

35

40

45

50

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013Milli

ons

Gold Iron Ore Lead/Zinc Copper ± Gold Other Commodities Uranium

Source: DMITRE, Mineral Resources Division

Total exploration expenditure $285.8 million in the last 10 years • Uranium $170.1 million – 60% of total • Copper ± Gold $63.9 million – 22% of total • Iron Ore $23.3 million – 8% of total • Gold $22.3 million – 8% of total

Page 14: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Explorers in the Curnamona Province – South Australia

14

Alliance Craton Explorer

Renascor Resources

Havilah Resources

Uranium One Australia

Heathgate Resources

Marmota Energy

Minotaur Operations

Beverley

Honeymoon

White Dam

Over 50 deposits with a mineral

resource (Fe, U3O8, Au, Cu,

Mo, Ag, Pb, Zn & Co)

Page 15: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Minotaur Announce Gold intersections - 22 May 2014

15 Source; Minotaur Exploration Ltd, ASX Release 22 May 2014

• Significant gold intersections from inaugural Mingary (SA) drilling

• Mingary Mine located in the northern part of Minotaur Exploration’s 100% owned Bonython Hill EL 4745 ~75km southwest of Broken Hill

Highlights • Assays from 2 RC holes at

Mingary Mine return significant gold values over 600 m strike: 14RCBH07: 16m @ 1.07 g/t Au,

0.26% Cu from 80m 14RCBH09: 16m @ 0.66 g/t Au,

0.38% Cu from 104m

• Potential for mineralised horizon to extend for 2km

Page 16: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Exploration Activity – Curnamona 2014

16

PROJECT

COMPANY

COMMODITY ANNOUNCEMENT

Four Mile East

Alliance Resources / Quasar Resources

Uranium Start-up 14 April 2014

Croziers Dam

Havilah Resources /MMG Expl

Copper Drilling results: 12.5m at 0.46% cu from 213.5m (21/1/14)

Kalkaroo Havilah Resources

Copper-Gold

First draft of the mining lease proposal lodged with DMITRE in May 2014

Maldorky Havilah Resources

Iron Ore Second draft of the mining lease proposal lodged with DMITRE in April 2014

Razorback Premium Iron Project

Royal Resources

Iron Ore

PFS optimisation work near completion. Mining Lease Proposal progressing and geotechnical studies continuing. Geological mapping and sampling continues on Fe prospects within the Red Dragon Venture, March 2014

Page 17: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

South Australian Resources

17

Gawler Craton

Curnamona

Includes Cu, U3O8, Au, Ag, Pb, Zn, HM

& Graphite

Page 18: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes
Page 19: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes
Page 20: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

South Australian Iron Ore Resources

20

Gawler Craton

Curnamona

Page 21: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

21 Source: Company websites, DMITRE, Deloitte Regional Infrastructure & Mining Plan

IRON ORE PRODUCTION IRON ORE RESOURCES

2012-13 Production

- JORC Resources

7,269Mt

Development/ Prospects

39Mtpa

Total 39Mtpa

IRON ORE IN SOUTH AUSTRALIA - BRAEMAR

BRAEMAR PROVINCE • Located East of South Australia, 250km from

Peterborough to Broken Hill near the New South Wales border.

• Estimated 20 billion tonnes of magnetite ore adjacent to the Broken Hill – Adelaide rail line.

• Currently 6 development projects and prospects with a combined forecast production of 39Mtpa by 2025

PROJECTS • Grants

• Lilydale

• Maldorky

• Mutooroo

• Red Dragon Venture (Razorback Ridge)

INFRASTRUCTURE • Adelaide – Broken Hill standard gauge railway

• Major road networks

• Linkages to existing and proposed ports

Page 22: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Braemar Iron Pty Ltd

22

• Project in pre concept

phase

• Estimated capital cost

$4.89 billion (mine and

infrastructure)

• Power connection to South

Australian network

• Slurrying allows low cost

• Construction period 2-3

years from approvals

Page 23: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Braemar Iron Pty Ltd

23

Page 24: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

South Australia – New South Wales MOU

• October 2013 signed at Broken Hill between the South Australian and New South Wales governments

• Promote both governments as proactive jurisdictions that welcome overseas investment in minerals and energy projects

• Develop alignment where possible between the geological and regulatory information and systems in both jurisdictions

24

Page 25: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Olympic Dam

• Copper a key pillar for BHP Billiton; Olympic Dam a Tier 1 asset

• Resource: 9.6 BILLION tonnes, 0.82% Cu, 0.26 kg/t U3O8 Worlds largest U deposit 4th largest Cu deposit

• Australia’s largest underground mine. 2013 production

174,400 tonnes copper (cathode) 4,009 tonnes U3O8 119,928 ounces gold 882,000 ounces silver

• U/G reserves: ~60 years at current production

25

Page 26: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Olympic Dam

• Focus on returning mine to profitability, despite negative trends in commodity prices

• Technology studies proceeding. Heap Leach testing continues

26

Page 27: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Olympic Dam

Working with BHPB on release of geo-scientific information • Papers published

• Soc Econ Geol Special Publication 16, 2012

• Presentations • Geol OD, SA Mining Nov 2013 • Geol Wirda Well, SA Mining Nov 2013

• HyLogger Data – in prep • Historical sulphur isotope and fluid inclusion data – in planning

27

Page 28: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Generating New Concepts In Copper Exploration in SA

0102030405060708090

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29

Cu (M

t)

PRO

MIN

ENT…

CARR

APAT

E…

HILL

SIDE

KAPU

NDA

KAN

MAN

TOO

EMM

IE B

LUFF

KALK

ARO

O

CATT

LE G

RID

MU

TOO

ROO

WAL

LARO

O

WIN

DABO

UT

MO

ON

TA

NO

RTH…

BURR

A

WES

T DO

ORA

PARA

BARA

NA

CAIR

N H

ILL

BLIN

MAN

MO

UN

T…

ANAB

AMA

MG

14

ELSI

E AD

AIR

CATT

LE…

BREM

ER

ANG

AS

MO

UN

TAIN

POO

NA

WHE

AL…

Olympic Dam Total Remaining Cu Statistical under-representation of large 1-3Mt Cu occurrences and no giant 3-80 Mt Cu…. so far

28

Page 29: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Nyrstar Port Pirie Smelter Transformation

The issue • Nyrstar required to improve lead-in-air emissions levels from 2016,

through EPA licence variation in July 2012 • Reductions in % children with blood lead levels below Australian

guideline level had plateaued

2 options 1. INVEST - replace 60-year-old sinter plant smelting technology 2. CLOSURE - significant economic, environmental, social and

community impacts for the Port Pirie region and the State • Lose 965 regional jobs, • Lose 2,500 jobs across SA; • Lose $840 million in exports; • GRP reduced by $132 million in Port Pirie region; • GSP reduced by $304 million

29

Page 30: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Nyrstar Port Pirie Smelter Transformation

Government Support Package – 4 Elements 1. Financing support, via a guarantee, for third party funding

required for capital investment

2. Regulatory certainty for 10 years relating to lead-in-air concentrations for transformed smelter

• Port Pirie Smelting Facility (Lead-In-Air) Concentrations Act 2013 commenced operation on 1 May 2014

3. 10 year, $50 million ‘Targeted Lead Abatement Program’ for Port Pirie, jointly developed with Nyrstar

• Leverage air quality improvements to lower children’s blood lead levels through targeted interventions on lead exposure

4. Major Development Authorisation, granted in December 2013

30

Page 31: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Nyrstar Port Pirie Smelter Transformation

The solution • May 2014 - Agreement to transform smelter, secure Port Pirie’s

long-term sustainable and commercial future • $514 million investment by Nyrstar

• ~$103m from Nyrstar • ~$291m from 3rd party investor(s) underwritten by SA Government and

supported by EFIC guarantee • ~$120m from forward sale of silver metal output

Outcomes • Modern - best available enclosed bath smelting technology • Flexible - ‘advanced metals processing facility’ • Reduce emissions - lead reduced by 50%, sulphur by 90% • Lower blood lead; improve health outcomes for young children • Avoid major economic, environmental & community impacts

31

Page 32: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Nyrstar Port Pirie Smelter Transformation

Air quality improvement – before and after transformation

32

Page 33: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

SOUTH AUSTRALIAN DRILL CORE REFERENCE LIBRARY

Page 34: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Evaluating PACE 2004-2014 – Major Findings

34

… for a ~ $50M investment … • Well managed and acknowledged globally as an

exemplar for government investment in stimulating exploration leading to new discoveries

• An additional $700m in private mineral exploration investment representing a leverage of at least 20:1 on expenditure

• An increase in State mining revenue of $2,400m • Increased mineral exploration expenditure • Exceeded SASP Target of $200m for several years • Fifteen significant successes resulting from

collaborative drilling including the Carrapateena copper-gold discovery

• Widely recognised as the benchmark exploration initiative with other jurisdictions adopting the a “PACE-like” model

Page 35: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Evaluating PACE 2004-2014 – Into the Future

35

Main themes for a future PACE 1. Improving land access for exploration 2. Multidisciplinary frontier terrane programs 3. Collaborative programs, particularly

drilling 4. Pre-competitive geoscience and value

adding 5. Capacity building in government and

industry With a Priority on: • Promoting exploration in frontier terranes • Encouraging junior sector participation • Enhancing land access

Olympic Dam

Carrapateena

Page 36: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

All funding to be rolled into “PACE Frontiers” Initial PACE Frontiers budget ($4.0M; 2013/14 – 14/15) + Ongoing PACE 2020 commitment ($1.8M p.a.) + 2014 Election Commitment of $4.0M over 4 years ($1.0M p.a 2014/15 – 17/18) Focused on precompetitive data and delivery Incorporate recommendations of PACE review Strong commitment to collaborative opportunities – more diverse research opportunities

36

PACE Frontiers – 2014 to 2018

14/15 15/16 16/17 17/18 PACE Frontiers 2.0M - - - PACE 2020 1.8M 1.8M 1.8M 1.8M PACE Discovery 1.0M 1.0M 1.0M 1.0M

Total Investment 4.8M 2.8M 2.8M 2.8M

Page 37: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

PACE Frontiers Mineral Systems Drilling on the Gawler Craton with DET-CRC

PACE 2020 Major regional geophysical surveys; Co-fund the Geoscientist Assistance Program; PACE Energy; APY Liaison Officer; Chair of Exploration Geology

PACE Discovery Collaborative opportunities including exploration drilling projects (through the PACE Discovery Drilling Program) and targeted research

37

PACE Frontiers – Forward Budget Model

14/15 15/16 16/17 17/18 PACE Frontiers 2.0M - - - PACE 2020 1.8M 1.8M 1.8M 1.8M PACE Discovery 1.0M 1.0M 1.0M 1.0M

Total Investment 4.8M 2.8M 2.8M 2.8M

Page 38: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Geoscientist Assistance Program (GAP)

• 33 placements with high retention rate • Additional funding for training • 22 companies involved • $750,000 paid up-front to SACOME; cost of

program ~$200,000 annually

July 2009 – December 2012

• > Current Discussion • Term: 3 – 4 Year program funded annually • Funding: Co-funded through PACE and

Centre for Excellence • Level: $175 – 250K p.a. • Delivered through partnership with

SACOME

GAP 2014

38

Page 39: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Mineral Exploration in South Australia 2012-13

39

Annual Review includes • Major mines and Developing projects

mineral resources and production • Detailed company exploration data

releases • Comprehensive mineral exploration

expenditure statistical analysis • Investor Opportunities Overview

Page 40: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Reasons to attend the 2014 national RESA Skills and Productivity Summit – 6th June Network with new and existing resources sector colleagues. Learn about the latest trends and creative perspectives. Hear what industry leaders have to say during the dynamic interactive panel discussion and case study sessions. Gain clarity on workforce and skilling issues from a diverse range of highly acclaimed presenters. Details – www.resa.org.au

Page 41: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

Metal demand continues to grow rapidly

This puts severe pressure on industry to find and develop new mines

41

0

10

20

30

40

1900 1920 1940 1960 1980 2000 2020 2040

Forecast Demand Based on 3% pa growth

Historic Demand Average growth rate of 2.8% pa over last 24 years

Copper Mine Production (Mt pa Cu)

Cumulative copper production for all history

(1000 BC to 2013 AD) = 629 Mt Cu

In the next 24 years 635 Mt of copper will need to be mined

… that’s equal to the total amount produced in all

history to-date !

… and half of this was mined in the last 24 years

Source: MinEx Consulting © May 2014 , based on historic data from USGS

Page 42: South Australia’s Mineral and Resources Update · 4 . Note: Discoveries are Based on deposits > 100koz Au, >100 kt Cu, > 250kt Zn+Pb, >10kt Ni, >5 kt U3O8 or equivalent size Excludes

42

Disclaimer

The information contained in this presentation has been compiled by the Department for Manufacturing, Innovation, Trade, Resources and Energy (DMITRE) and originates from a variety of sources. Although all reasonable care has been taken in the preparation and compilation of the information, it has been provided in good faith for general information only and does not purport to be professional advice. No warranty, express or implied, is given as to the completeness, correctness, accuracy, reliability or currency of the materials. DMITRE and the Crown in the right of the State of South Australia does not accept responsibility for and will not be held liable to any recipient of the information for any loss or damage however caused (including negligence) which may be directly or indirectly suffered as a consequence of use of these materials. DMITRE reserves the right to update, amend or supplement the information from time to time at its discretion.