TIMELINE
2006 20152015
South Waterfront Schnitzer CampusSouth Waterfront
Portland Aerial Tram
Tilikum Crossing
South Waterfront Greenway
SCB4 SCB6 SCB7 SCB8 SCB9SCB5
connects to parking garage below KCRB
increase in parking
access off of Moody Ave
primary parking and front door dependent upon Arthur St and Promenade completion
large site
on the river
substantial increase in parking
connects to tunnel
new loading dock
primary parking access dependent upon Sheridan St completion
campus commons on the river
increase in parking & bike storage
connects to tunnel
primary front door dependent upon Promenade & Arthur St completion
parking garage connects to CLSB
connects to tunnel
on the river
adjacent to Tilikum Crossing
primary front door dependent upon Promenade & Bond Ave. completion
on the river
minimal street frontage
small site
primary front door dependent upon Bond Ave. completion
provides urban pedestrian connection to the west
connects to tunnel & loading dock
houses CUP & support space
access off of Moody
dependent upon Sheridan St completion
CAMPUS PLANNING & REAL ESTATE
SOUTH WATERFRONT SCHNITZER CAMPUS 2017 MASTER PLAN
Future Bui ld-Out Perspect ive Render ing South Waterfront Context Map
OHSU’s South Waterfront Schnitzer Campus Master Plan was developed as part of an internal process to understand the development potential as it relates to block size, site access, regulatory frameworks, and other conditions. These materials do not reflect approved projects, and are used to help inform ongoing planning processes.
& HEALING 2 (CHH2)SW M
AC
AD
AM
AV
E
SW
RIV
ER
PA
RK
WA
YSW WHITAKER ST
SW B
ON
D A
VE
SW GAINES ST
SW M
OO
DY
AVE
SW BO
ND
AVE
MEADE
ARTHUR
SHERIDAN
PROM
ENA
DE
WI
LL
AM
ET
TE
R
IV
ER
I -
5
SW CURRY ST
CO
RB
ETT
KEL
LY HO
OD
CURRY
WHITAKER
GIBBS
CO
RB
ETT
CTK
ELL
YSW
KELLY
WA
Y
ISLAND WAY
I - 5HO
OD
WA
TER
SW WOODS ST
ARTHUR
KELLY
SW M
OO
DY AV
E.
ROSS ISLAND BRIDGE
I-5
LANE
GAINES
CO
RB
ETT
KEL
LY
MARQUAM BRIDGE
TILIKUM CROSSIN
G
KRCB
SCB-4
SCB-5
SCB-6
SCB-7
OHSU COMMONS
SCB-8
SCB-9
Knight Cancer
Research Building
RLSB
MDY3030
Moody
Robertson
Collaborative Life
Sciences Building
CHH1Center for
Health & Healing
CHH226B
Block 33
Block 23
Block 27
Center for 26BW
CUP
TRAM
Health & Healing
RPVRood Family
Pavilion
OHSU SOUTH WATERFRONT SCHNITZER CAMPUS
OHSUSOUTH WATERFRONT CENTRAL DISTRICT
ROBERTSON COLLABORATIVE LIFE
SCIENCES BUILDING
KNIGHT CANCER RESEARCH BUILDING
SCB4
SCB5
SCB6
SCB7
SCB8
SCB9
SW ARTHUR ST
SW SHERIDAN STMARQUAM BRIDGE (I-5)
SW MEADE ST
SW BOND AVE
SCB9
KCRB
SCB4
SCB5SCB6
SCB7
SCB8RLSB
SW M
OO
DY
AVE
TILIKUM CROSSING
COMMONS
201820142002Knight Cancer Research Building
Robertson Collaborative Life Sciences Building
Schnitzer Investment Corporation land donation
FLOOR AREA RATIO (FAR) MAXIMUM HEIGHT
9:1 MAX
6:1 OVERLAY
4:1 BASE
325’ MAX
250’ OVERLAY 75’
125’
250’ MAX
125’ OVERLAY 75’
125’
9:1 MAX
6:1 OVERLAY
4:1 BASE
SCB4 Lot Area: 48,830 SFBase + Overlay FAR: 292,980 GSFMax FAR: 439,470 GSF
SCB5 Lot Area: 76,070 SFBase + Overlay FAR: 456,420 GSFMax FAR: 684,630 GSF
SCB6 Lot Area: 91,750 SFBase + Overlay FAR: 550,500 GSFMax FAR: 825,750 GSF SCB7 Lot Area: 71,550 SFBase + Overlay FAR: 429,300 GSFMax FAR: 643,950 GSF
SCB8 Lot Area: 36,053 SFBase + Overlay FAR: 216,318 GSFMax FAR: 324,477 GSF
SCB9 Lot Area: 47,505 SFBase + Overlay FAR: 285,030 GSFMax FAR: 427,545 GSF
SCB4 SCB5
SCB6 SCB7SCB8SCB9