ONLINE PUBLIC ENGAGEMENT South West Mississauga Water System Improvements Watermain Construction on South Sheridan Way and Indian Grove
Transcript
Page 1: South West Mississauga Water System Improvements

ONLINE PUBLIC ENGAGEMENT

South West Mississauga Water System Improvements

Watermain Construction on South Sheridan Way and Indian Grove

Page 2: South West Mississauga Water System Improvements

Project background

What are we doing?

Watermain construction to ensure the Region maintains the water system in south west Mississauga by:

• Replacing aging critical watermain infrastructure (circa 1960)

• Adding new support watermains to the system to support customer demand and optimize pressure zones, with some areas experiencing an increase in water pressure

Page 3: South West Mississauga Water System Improvements

Watermain construction overview

Map Data © 2020 Google

South Sheridan Way

CONTRACT 1Indian Grove

February 2021 – Spring 2022

CONTRACT 2South Sheridan Way

Spring 2021 – Fall 2022

QEW

Page 4: South West Mississauga Water System Improvements

Contract 1 - Construction on Indian Grove

Ind

ian

Ro

ad

Contract 1 Includes:

600mm (24 inch) diameter transmission watermain

300mm (12 inch) diameter residential supply watermain

Schedule:

February 2021 to Spring 2022

Map Data © 2020 Google

Page 5: South West Mississauga Water System Improvements

Contract 1 - Construction sequence on Indian Grove

Construct 300mm

distribution watermain from South Sheridan Way

to Indian Road

Transfer all water services

from old transmission watermain to new

distribution watermain

Construct 600mm sub-

transmission watermain from South Sheridan Way

to Indian Road

Map Data © 2020 Google

Indian Grove

Indian Grove is a crowded utility corridor. Due to space constraints the two watermains must be constructed on opposite sides of the road. Construction sequence ensures water supply, and vehicle and pedestrian traffic flow is maintained.

Page 6: South West Mississauga Water System Improvements

Contract 1 - Construction impacts

Indian GroveLocal Traffic Only

Feb 2021 to Dec 2021

Access to paths from Indian Grove to

Tecumseh Public School and Wateska

Boulevard will be maintained

Indian GroveTemporary Sidewalk

South Sheridan Way Road Closure

Approximately 6 WeeksSummer 2021

Indian RoadTemporary Lane

ClosuresIntermittent

Driveway access will be maintained, and

any temporary interruptions will be

coordinated with homeowners

Map Data © 2020 Google

Page 7: South West Mississauga Water System Improvements

Contract 1 - Road closure and detour

South Sheridan Way Road ClosureApproximately 6 Weeks

Summer 2021

Map Data © 2020 Google

Detour Route

Road Closure

South Sheridan Way

Page 8: South West Mississauga Water System Improvements

Contract 1 - Indian Grove temporary sidewalk

• A temporary sidewalk will be constructed on east side of Indian Grove during watermain construction on the west side of Indian Grove

• The temporary sidewalk will be removed for 600mm watermain construction in same location

• Area will be restored to original condition at end of construction

Map Data © 2020 Google

Page 9: South West Mississauga Water System Improvements

Contract 1 - Driveway and landscaping restoration

• Watermains will be constructed within the municipal right-of-way but will disrupt driveways

• All efforts will be made to reinstate driveways to match existing conditions• Interlocking brick will be removed, stored

onsite and replaced• Region will contact residents with concrete

driveways to arrange restoration

• All efforts will be made to minimize tree removals/transplants

• New curb, sidewalk and asphalt on Indian Grove

Map Data © 2020 Google

Ind

ian

Gro

ve

Page 10: South West Mississauga Water System Improvements

Contract 2 - Construction on South Sheridan Way

• Sub-transmission and local distribution watermains on South Sheridan Way from Southdown Road to Indian Grove, and on Pierre Place, Indian Road and Cottonwood Court

• Pressure zone increase to residents on South Sheridan Way and Indian Road

• Construction from Spring 2021 to Fall 2022

South Sheridan Way

Map Data © 2020 Google

Page 11: South West Mississauga Water System Improvements

Contract 2 - Traffic impacts

South Sheridan Way

Map Data © 2020 Google

• Lane closures expected on South Sheridan Way during the day (9 a.m. to 4 p.m.)

• Flag persons onsite to maintain traffic flow in both directions

• Spring 2021 to Fall 2022

Page 12: South West Mississauga Water System Improvements

Contract 2 - Road closures and detours

South Sheridan Way Road Closure between Clarkson Road North and Indian RoadApproximately 6 Weeks, Summer/Fall 2021Access will be maintained to all properties

Detour Route

Road Closure

Map Data © 2020 Google

South Sheridan Way

Page 13: South West Mississauga Water System Improvements

Contract 2 - Road closures and detours

Detour Route

Road Closure

Map Data © 2020 Google

South Sheridan Way

South Sheridan Way Road Closure at Indian Road IntersectionApproximately 1 Week

Fall 2021

Page 14: South West Mississauga Water System Improvements

Contract 2 - Pedestrian detour

Pedestrian Detour Route

Sidewalk Closed

South Sheridan Way

Crestdale Road

South Sheridan Way Sidewalk Closed between Calgary Court and Vanier DriveApproximately 1 Month

Map Data © 2020 Google

Page 15: South West Mississauga Water System Improvements

Contract 2 - Pressure zone increase

• A water pressure increase is planned as part of Contract 2

• You will receive a notice with specific dates prior to the work

• Residents in this area will see an increase in the water pressure flowing from their taps

Old pressure zone boundary New pressure zone boundary Increased pressure

Map Data © 2020 Google

South Sheridan Way

Kira

n

Ct.

Page 16: South West Mississauga Water System Improvements

Contacts

Ben Percy, P.Eng.

[email protected]

(519) 824-8150 ext. 1281

Nicole Sartor, P.Eng.

[email protected]

(905) 791-7800 ext. 7832

Your comments are important to us. Please provide any comments or questions to the Region of Peel or GM BluePlan Engineering by November 30, 2020.