12
CITIZENS TASK FORCE CONCEPTS FOR SOUTHERN GATEWAY
Transcript
Page 1: Southern Gateway Ppt Presentation_10-Nov-2015

8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015

http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 1/13

CITIZENS TASK FORCE CONCEPTSFOR SOUTHERN GATEWAY

Page 2: Southern Gateway Ppt Presentation_10-Nov-2015

8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015

http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 2/13

TWO CONCEPTS - ONE PROJECT

Klyde WCentral Expressway Model

• Our concept for the SouthernGateway uses two alreadysuccessful models within thecity of Dallas

• The Central Expressway

Model of building belowgrade.

• The Klyde Warren Park Modelof decking across the belowgrade highway.

Page 3: Southern Gateway Ppt Presentation_10-Nov-2015

8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015

http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 3/13

HISTORY OF I-35E

Dallas Zoo

This picture was taken in Augu

1959, just before the Dallas Zocut off from the core of Oak CThe view is looking south fromMarsalis Avenue. Notice theexisting residential communitiedirectly in the path of the Inte

Page 4: Southern Gateway Ppt Presentation_10-Nov-2015

8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015

http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 4/13

HISTORY OF I-35E

This photo was taken ju

year later in October 1highway’s path througCliff including the presZang Curve has been of homes and businessto construction.

Severed residentialstreets andconnections

Dallas Zoo

Zang Boulevard

Page 5: Southern Gateway Ppt Presentation_10-Nov-2015

8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015

http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 5/13

HOW CAN WE DO BETTER?

Focus on key improvements to the SouthernGateway Design

• Improved traffic flow and safety measures

• Protection against noise and air pollution

• Better information to drivers

• Minimizing the ROW of the project

• Reconnecting the community

Page 6: Southern Gateway Ppt Presentation_10-Nov-2015

8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015

http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 6/13

IMPROVING TRAFFIC FLOW AND SAFET

• Combine the southbound 12th Street exit with the exit

for Marsalis Avenue• Combine the northbound exit for Beckley/Overton

Road with the Loop 12/Ann Arbor exit using existingROW to extend the frontage road

• Continue to prohibit hazardous cargo

• Provide at least 2 continuous lanes between I-20 andI-30

• Provide a continuous usable shoulder throughoutentire length of project

• No thru-lanes should become exit-only lanes

• Provide raised reflective lane marker buttons insteadof stripes

Page 7: Southern Gateway Ppt Presentation_10-Nov-2015

8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015

http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 7/13

PROTECTION AGAINST NOISE AND AIR POLLUT

• Provide acoustic pavement the

entire length of the highway

• Put the Oak back in Oak Cliff withmassive tree plantings along thehighway

• Prohibit loud braking by trucks

• Provide acoustic walls a minimum

of 8 feet high for residentialneighborhoods

Page 8: Southern Gateway Ppt Presentation_10-Nov-2015

8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015

http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 8/13

PROVIDE BETTER INFORMATION TO DRIVE

• Provide fewer signs but with clearer messages along the highway

• No new advertisement signage on residential portions of the highway

• Change the electronic signage to provide alternative routes instead otravel time using a single route

Travel Time to I-35E & Inwood Road:

Via I-35E 26minVia Hampton Rd 28min

Travel Time to I-35E & Wycliff Ave:Via Polk St 21minVia I-35E 23min

Examples for NB US-67

Page 9: Southern Gateway Ppt Presentation_10-Nov-2015

8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015

http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 9/13

MINIMIZING ROW

• Use the Central Expressway model and put

the highway below grade• Having the highway below grade is a must

between Clarendon and 8th street

• Cantilever the frontage roads over the mainlanes of the highway

• Cantilever the main lanes over the managed

lanes to minimize ROW in the Zang Curve• It must be below grade from Clarendon to 8th 

St. at a minimum

• If you can do it for North Dallas you can do

for Oak Cliff

Page 10: Southern Gateway Ppt Presentation_10-Nov-2015

8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015

http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 10/13

RECONNECTING NEIGHBORHOODS

• Provide numerous pedestrian connections

and crossovers at neighborhoods such asBeckley Club, Beckleywood, RuthmeadePlace, and Oak Park Estates

• Use the Klyde Warren Park Model and deckover I-35 between Ewing and Beckley toreconnect the Dallas Zoo with the core ofOak Cliff

Page 11: Southern Gateway Ppt Presentation_10-Nov-2015

8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015

http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 11/13

RECONNECTING OAK CLIFF

I-35E with a deck park

Meet me at the Giraffe

I-35E today

Page 12: Southern Gateway Ppt Presentation_10-Nov-2015

8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015

http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 12/13

CONCLUSIONS

Page 13: Southern Gateway Ppt Presentation_10-Nov-2015

8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015

http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 13/13

QUESTIONS?


Recommended