8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015
http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 1/13
CITIZENS TASK FORCE CONCEPTSFOR SOUTHERN GATEWAY
8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015
http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 2/13
TWO CONCEPTS - ONE PROJECT
Klyde WCentral Expressway Model
• Our concept for the SouthernGateway uses two alreadysuccessful models within thecity of Dallas
• The Central Expressway
Model of building belowgrade.
• The Klyde Warren Park Modelof decking across the belowgrade highway.
8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015
http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 3/13
HISTORY OF I-35E
Dallas Zoo
This picture was taken in Augu
1959, just before the Dallas Zocut off from the core of Oak CThe view is looking south fromMarsalis Avenue. Notice theexisting residential communitiedirectly in the path of the Inte
8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015
http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 4/13
HISTORY OF I-35E
This photo was taken ju
year later in October 1highway’s path througCliff including the presZang Curve has been of homes and businessto construction.
Severed residentialstreets andconnections
Dallas Zoo
Zang Boulevard
8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015
http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 5/13
HOW CAN WE DO BETTER?
Focus on key improvements to the SouthernGateway Design
• Improved traffic flow and safety measures
• Protection against noise and air pollution
• Better information to drivers
• Minimizing the ROW of the project
• Reconnecting the community
8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015
http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 6/13
IMPROVING TRAFFIC FLOW AND SAFET
• Combine the southbound 12th Street exit with the exit
for Marsalis Avenue• Combine the northbound exit for Beckley/Overton
Road with the Loop 12/Ann Arbor exit using existingROW to extend the frontage road
• Continue to prohibit hazardous cargo
• Provide at least 2 continuous lanes between I-20 andI-30
• Provide a continuous usable shoulder throughoutentire length of project
• No thru-lanes should become exit-only lanes
• Provide raised reflective lane marker buttons insteadof stripes
8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015
http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 7/13
PROTECTION AGAINST NOISE AND AIR POLLUT
• Provide acoustic pavement the
entire length of the highway
• Put the Oak back in Oak Cliff withmassive tree plantings along thehighway
• Prohibit loud braking by trucks
• Provide acoustic walls a minimum
of 8 feet high for residentialneighborhoods
8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015
http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 8/13
PROVIDE BETTER INFORMATION TO DRIVE
• Provide fewer signs but with clearer messages along the highway
• No new advertisement signage on residential portions of the highway
• Change the electronic signage to provide alternative routes instead otravel time using a single route
Travel Time to I-35E & Inwood Road:
Via I-35E 26minVia Hampton Rd 28min
Travel Time to I-35E & Wycliff Ave:Via Polk St 21minVia I-35E 23min
Examples for NB US-67
8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015
http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 9/13
MINIMIZING ROW
• Use the Central Expressway model and put
the highway below grade• Having the highway below grade is a must
between Clarendon and 8th street
• Cantilever the frontage roads over the mainlanes of the highway
• Cantilever the main lanes over the managed
lanes to minimize ROW in the Zang Curve• It must be below grade from Clarendon to 8th
St. at a minimum
• If you can do it for North Dallas you can do
for Oak Cliff
8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015
http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 10/13
RECONNECTING NEIGHBORHOODS
• Provide numerous pedestrian connections
and crossovers at neighborhoods such asBeckley Club, Beckleywood, RuthmeadePlace, and Oak Park Estates
• Use the Klyde Warren Park Model and deckover I-35 between Ewing and Beckley toreconnect the Dallas Zoo with the core ofOak Cliff
8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015
http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 11/13
RECONNECTING OAK CLIFF
I-35E with a deck park
Meet me at the Giraffe
I-35E today
8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015
http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 12/13
CONCLUSIONS
8/20/2019 Southern Gateway Ppt Presentation_10-Nov-2015
http://slidepdf.com/reader/full/southern-gateway-ppt-presentation10-nov-2015 13/13
QUESTIONS?