SOUTHERN REGIONAL PRESENTATIONKING ZWELITHINI STADIUM
15 APRIL 2015
1
The Ethekwini IDP
What is an IDP and why should we have an IDP
• A five year strategic document that guides the city towards achieving its long term 2020 vision
• Mutually owned and implementation geared document
• A legally required document that directs all municipal planning, financial planning and budgeting, using such legislation as the Constitution, Municipal Systems Act, Municipal Structures Act and the MFMA
Medium Term Planning (5yr) to implement our long term vision
OUTCOME BASED APPROACH FOR 3RD GENERATION IDPs
Millennium Development Goals
Medium Term Strategic FrameworkOutcome 9National Spatial Vision (NPC)
State of the Nation
Provincial Priorities
Provincial Spatial Economic Develop. StrategyLong Term Development Framework
Municipal Infrastructure Investment FrameworkInfrastructure Sector Plans
Community Access Model
State of the Province
3rd Generation IDP
Provincial Growth and Development Strategy
City’s Development Approach
ProjectsStrategic
focus areas Programmes
8 Point Plan
Vision
Priorities, challenges
development principles
What we have to do
How we are going to do it
A Plan to make it happen
Deciding on the platform to build in order to achieve the prosperity we desire
Screening all actions to promote only development that supports our core principles and values
8 city plans with key focus areas that outline a set of programmes and projects with budgets and timeframes for delivery
Where we want to be
Refining and refocusing or Vision to help guide action:
A defined Vision
Making hard choices
Development Principles
8 action plans
VISION
By 2030 eThekwini
will be Africa’s most
caring and livable city
CHOICES MADE
•Creating Sustainable Livelihoods•A Socially Cohesive City •A Financially Sustainable City•Creating a Safer City•Promoting an Accessible City•Environmentally Sustainable City
eThekwini’s
EIGHT
POINT
PLAN
From Vision to action…
Our IDP
City’s vision
Africa’s most caring and liveable City
Priority Areas
Create a Safe City
Promoting an Accessible
City
Environmental Sustainability
Creating Sustainable Livelihoods
Socially Cohesive
Financially Sustainable
Environmental Sustainability
Social Cohesive City
Financially Sustainable
Creating Sustainable Livelihoods
Accessible City
Creating a safer City
•Ecosystems and natural resources;•Build a green economy•Sustainable human settlement•Climate change;•Alignment environmental plans and Municipality’s strategic direction.
•Diversify our revenue base;•Sustainable budgeting;•Sound financial management and reporting;•Value for money expenditure.
•Responsive local government;•Respect and ubuntu;•Empower and develop skills•Development of vulnerable groups;•Develop a culture of helping citizens;•Municipal learning knowledge management;•Transparent and accountable
•Infrastructure•New livelihood choices;•Develop skills•Promote SMME•Secure resources •BR&E•Develop key economic sectors;•Develop priority nodes and corridors.
•Development of community forums;•Minimise risk•Create a healthier city;•Mitigate against disasters;•Alignment Health, Safety Programs;•Safety of citizens.
•use of public transport;•access to basic services;•Increase density•access to social facilities;•Align with SDF for the city;•communication networks;•Increase economic opportunities.
IDP 8 Point Plan
Budget
The IDP 8 Point plan
Creating a Quality Living Environment
IDP
8 P
OIN
T P
LA
N
Financially Accountable and Sustainable City
Good Governance and Responsive Local Government
Embracing out Cultural Diversity, Arts and Heritage
Creating a Platform for Growth, Empowerment and Skills Development
Fostering a Socially Equitable Environment
Develop and Sustain our Spatial, Natural and Built Environment
Developing a Prosperous, Diverse Economy and Employment Creation
Process and Timelines
• Table draft 15/16 IDP reviewed by EXCO In March 2015
• Draft 15/16 IDP tabled at Council on the 31 March 2015
• Advertise draft IDP to obtain comments from the public during April – May 2015
• Submitted draft IDP to MEC COGTA for assessment on 1st April 2015
• Public Hearings draft IDP and Budget Presentation combined
• After Public comments and COGTA Assessment final amendments to be made in May 2015
• Table the Final draft of IDP 2nd week of May 2015 to Exco
• Exco Table the final draft IDP together with Budget for adoption to Council end of May 2015
• Deliver final adopted IDP to MEC COGTA
DRAFT BUDGETS 2015/16 MTREF
11
BUDGETING PRINCIPLES
Balanced
Sustainable
Realistic
Income / Revenue driven – Affordability, if funds do not materialise review expenditure
Holistic – account for basket of goods & services provided, that are needs driven ito the IDP
BROAD PRINCIPLES Budget to contribute to achieving strategic objectives of the IDP. Sustainable, Affordable , Realistic and Balanced Major Tariffs - cost reflective, realistic and affordable tariffs Income/Revenue driven budgets – affordability ie if funds do not
materialise review expenditure Realistic and achievable collection rates Balancing capital expenditure for social, economic, rehabilitation and
support (including fleet and IT) Shift towards economic development and job creation
OPERATING BUDGETS 2015/16 MTREF14
TARIFFS
15
TARIFF INCREASES Tariffs must be cost reflective, affordable and sustainable i.t.o the
MFMA and Systems Act The adverse impact of the current economic climate, coupled
with unfavourable external financial pressures on services, make tariff increases higher than CPI levels inevitable
Cross subsidisation also impacts on tariffs Growth percentages conservative for tariffs – average not more
than 1%, however, electricity has a negative growth. A Sustainable Energy Levy of 0.1% on Electricity tariffs to fund
alternative energy strategies – not yet factored (slides on this matter to follow)
Proposed tariffs can be reviewed during the consultative process – but downwards not upwards 16
PROPOSED TARIFF INCREASES YEAR ON YEAR COMPARISONS 2015/16PROPOSED
2014/15 2013/14 2012/13 2011/12 2010/11
Electricity 12.2% Eskom proposed
14.24%
7.39% 5.5% 11% 19.8% 25%
Water: Domestic Business
9.5% 12.9%
Umgeni Water 7.7%
9.9%12.9%
9.5%12.5%
12.5%15.5%
7.5%12.5%
9.5%12.5%
Refuse Removal 7.9% 7.9% 6.9% 7% 6.5% 7.5%
Sanitation 7.9% 7.9% 6.9% 6.5% 6.5% NEW
Rates:Average
6.9% 6.9% 6.9% 6.5% 6.5% 7.9%
17
FREE BASIC SERVICES - RESIDENTIAL Rates: Life Line Pensioners, child-headed households, disability grantees and the medically boarded are
exempt from paying rates on the first R460 000 of their property value (This amount is inclusive of the R 120 000 mentioned above). Rebate increases from R 278 per month to R 302 per month
Residential Properties valued up to R 185 000 will be exempt from paying rates. All other properties valued above R 185 000, the first R 120 000 no rates charged
Vacant Land: No rates levied on first R 30 000 value of vacant land
Water The first 9kl of water is free to households with property values under R 250 000.
Electricity The first 50kwh of electricity is free to residents using less than 150kwh per month in
Eskom reticulated areas The first 65kwh of electricity is free to residents using less than 150kwh per month in eThekwini reticulated areas
Sewerage/ Sanitation The first 9kl of effluent disposal is exempt for all properties with values under R 250 000. In
addition, a free basic service is also available to indigent consumer units with VIP’s, urine diversion toilets and in informal settlements serviced by means of a toilet/ablution block within 200m.
Refuse removal Residential property valued up to R 250 000 exempt from domestic refuse removal tariff. In
addition, a free basic refuse removal service is also available to indigent consumer units living in rural, informal settlements and non-kerbside residents.
FREE BASIC SERVICES – RESIDENTIAL (contd)
CONSOLIDATED OPERATING BUDGETS
20
CONSOLIDATED OPERATING BUDGET
DETAILS ESTIMATE 2014/15
APPROX 2014/15
ESTIMATE 2015/16
EST - EST %
Salaries and Allowances 7,669,394 7,333,952 8,268,500 7.81
General Expenses 21,773,158 22,018,200 24,101,954 10.70
Repairs and Maintenance 3,101,050 3,137,329 3,152,219 1.65
Contributions 3,914,340 4,387,080 4,453,792 13.78
Total Expenditure 36,457,944 36,876,561 39,976,465 9.65
Recoveries (1,770,337) (1,693,955) (1,827,687) 3.24
Charges Outs (1,129,962) (1,112,929) (1,193,047) 5.58
Net Expenditure 33,557,644 34,069,678 36,955,731 10.13
Income (33,557,645) (34,069,678) (36,955,731) 10.13
Surplus / Deficit (0) (0) (0) (0)
MAJOR EXPENDITURE ITEMS
22
MAJOR EXPENDITURE ITEMS
DETAILS AUDITED OUTCOME 2013/2014
2014/2015 ORIGINAL BUDGET
2015/2016 ESTIMATES
EST V EST% INCR
R’000 R’000 R’000 %
BULK PURCHASES 7 839 588 8 520 259 9 760 765 14.6%
SALARIES AND ALLOWANCES 6 984 087 7 579 153 8 173 148 7.8%REPAIRS AND MAINTENANCE - including internal charges 2 483 482 3 101 050 3 152 219 1.7%
DEPRECIATION 1 613 564 1 944 925 2 085 418 7.2%
INTEREST ON LOANS 905 188 997 717 996 594 -0.1%
SECURITY 448 555 445 027 484 954 9.0%
FUEL 249 586 250 321 220 018 -12.1%
TRADING SERVICES
24
WATER SERVICES
25
WATER • Proposed Tariff increases: Domestic : 9.5% Business : 12.9% • Water tariff increase affected by Umgeni Water Bulk Tariff increase• Reduction of 0.5% on proposed domestic tariff when compared to previous year,
proposed business remains the same • Water loss in distribution still very high – 38%• Increased spend on Repairs and Maintenance and Capital has impacted on tariff increases• During the process the budget has been extensively cut• Any further cuts will include
– A cut in emergency repairs and maintenance– Reduction in the provision of water tanker services– Less funding to address water loss– Will impact on the provision of minimal services to the newly taken on areas eg.
UGU• Capital Expenditure eg. rollout of the Western and Northern Aqueducts impacted on
tariff increases• Decreased allocation of USDG TO Water: R249m 27
CLEANSING AND SOLID WASTE
28
CLEANSING AND SOLID WASTE• Proposed Tariff increase 7.9%• A cut in tariff will impact on the following: - Cut in the critical vacancies provision - Impact on repairs and maintenance for landfill sites and transfer
stations - EPWP and other clearing programs - Unable to provide even a minimal level of service to the new areas
34
SANITATION
35
SANITATION
• Proposed Tariff increase 7.9%• Any cut in tariff will impact on the following; Asset management and repairs and maintenance resulting in more
breakdowns Green drop status may be impacted May have to get more funding from Rates and General for the funding
of operational costs of ablution facilities (Rates and General funds 2/3 = R65m)
• The tariff increase is also impacted by: Increasing sludge disposal expenditure UD cleaning being undertaken for the first time
41
ELECTRICITY
42
ELECTRICITY
• Proposed Tariff increase 12.2%• Electricity tariff increase linked to ESKOM’s tariff increase• Budget trimmed extensively • Revenue in the decline due to energy efficiency initiatives implemented by users• Load shedding contributing to income decline – approx. R120m per annum• Any cut in tariff may result in the reduction of the salaries and repairs and
maintenance budget• May need to cut capital expenditure inorder that operating costs relating to capital
expenditure be cut• Most Metro’s will be increasing their tariffs by Nersa’s proposed increase for sales
tariffs of 12.2%• Some Metro’s are suggesting tariff increases of 15% and above• NOTE; ESKOM is proposing an additional 10% increase in tariff and if this materialises
then the sales tariff will be reviewed.
45
RATE AND GENERAL SERVICES
58
RATES AND GENERAL SERVICES
• Proposed Rates increase of 6.9% • Budget trimmed extensively • Main reasons for increases in expenditure is as a result of
debt servicing costs and provision for salary increases which is negotiated nationally.
• Operational costs of ablution facilities are being funded –R65m
• In instances departments are already reflecting a below macro increases
60
102
OTHER PROGRAMS
JOB CREATION AND SKILLS DEVELOPMENT
Unemployment rate at 25% Use of 587 plumbing contractors on a rotational basis to undertake water related services 1100 caretakers employed at Ablution Facilities with a further 50 to be employed this
year as further Ablution Facilities are completed Use of 444 Community Based Contractors utilising about 1770 people for Refuse
Removal services 37 graduate engineers employed under the mentorship programme EPWP Grant (R34.1m), Maximum payable is R100 per day of which R50 is subsidised by
National Treasury Zibambele Poverty Alleviation (R86m) – 6000 jobs created. 75 Community Based Contractors utilised in the roll out of rural water and sanitation
projects 684 people employed by DSW utilising EPWP grant funding
119
EPWP
37
• Metropolitan Municipalities have reported 601 030 work
opportunities for the period 1st of April 2009 to the 31 March 2014.
• In terms of Full Time Equivalents, Metropolitan Municipalities have
reported 198 357 Full Time Equivalents created.
• The eThekwini Metro has reported the highest number of work
opportunities at 134 883 followed by City of Cape Town at 113 106
work opportunities for the reporting period 2009 to 2013
• EPWP Grant for 2015/16 R 40.6m but actual expenditure
much higher with council funding being utilised
•
110
SECTOR DEVELOPMENT PROGRAMS
• Support to Industry (via Clusters, eg. Automotive, Clothing and Textiles, Chemicals, Maritime, Music Industry etc.) R28.8m
• Sector Development Initiatives eg support and grow the tourism sector - R10.5m
• Film Development and support to Durban International Film Festival) R5m
• Durban Green Corridor ( Agri-Tourism) R2m• Rural development R2m
118
YOUTH DEVELOPMENT( CONTD)
• There are a number of initiatives across the municipality that are specifically targeting youth development. In some instances, it is specific areas of scarce skills, in other instances, it is general up-skilling initiatives.
• The following is a summary of these initiatives to provide an overview of the programmes in place.
121
Name of Programme 2015/16 Budget R
Number of Learners
14 Under Graduate Accounting Trainees 1.2 million 14
13 Post Graduate Accounting Trainees 1 607 996 13
Trainee Valuers 627 212 4
Apprenticeships - Mechanics 788 290 10
Scarce Skills Programmes 1.5 million Various
Student Financial Aid 2.5 million 200
Graduate Work Experience 17 million 1 000
Learnerships/Apprenticeships/Skills Programmes 6.5 million Various programmes 956 learners
Engineering Bursary Students 2.2 million 15
Candidate Engineers 840 000 28
Community Skills Audit 2.1 million 40
IBM Project 5 million (external)
ISDG grant from National Treasury 24 million 87
Total Investment in Youth Development Initiatives 65.863million 2 367
122
POVERTY ALLEVIATIONSOUP KITCHENS
No. of volunteers (37 drivers & 271 volunteers) 308
No. of Soup Kitchens existing: 36 . Planned: 54 No.of Indigent people fed per month per site daily (average of 520 per day
per site) Each site is servicing five wards Budget Provision 2015/16 - R39.8m Alternate way of delivery to include faith based and welfare organisations Agricultural partnership and MOU with Food and Trees for Africa to supply
soup kitchens with produce and create sustainable agricultural products
123
AGRICULTURE
Community Gardens - 85 Fruit trees - average of 10 trees per garden Testing of soil & water Supported with organic fertilizer and compost . Provision of fencing, storage containers, toilets and water provision
infrastructure Provision of farming tools Total Agricultural Budget of R22.6m
RURAL DEVELOPMENT, FOOD SECURITY AND LAND REFORM
“The children who sleep in the streets, reduced to begging to make a living, are testimony to an unfinished job.” – Nelson Mandela
124
VULNERABLE GROUPS Vulnerable Groups: Create an enabling environment to be able to
participate in all Council and Government activities Achievement : As a Community Participation we employed disabled person
and going forward we have encouraged all other Council depts. to follow suit.
R3.5m provided by CPAS , Vulnerable Groups(Older Persons, People With Disabilities & Children) program as follows:-
• Finalisation of Vulnerable Groups Policy Review• Continue establishment of Vulnerable Groups forums @ ward level• Support Existing Forums• Implementation of annual events aimed @ protection of vulnerable groups• Partner & support organisations undertaking vulnerable groups
programmes
125
ECONOMIC DEVELOPMENT
Catalytic Projects – Economic Development Focus
Characteristics of Catalytic Projects• Major impact; Mega-scale; Stimulate a chain of new projects; Be in highly strategic places; On public
transport corridors or national trade routes.Catalytic Projects in/near Implementation:• Cornubia South; Cornubia North; Dube Trade Port; IRPTN Road Corridor C3 Bridge City to Pinetown;
IRPTN Rail Corridor C2 Bridge City to Umlazi; C3 IRPTN Node at Bridge City; Centrum & Municipal Complex; Warwick; Point Infill, Waterfront & Cruise Terminal; Keystone; King Edward Node; Back of Port.
Catalytic Projects in Preparation:• Amaoti Informal Settlement Upgrade; Avoca Greenfields; Virginia Airport Re-development; Durban CBD
Human Settlement Projects; Umlazi Urban Re-generation; Illovo South; Ntshongweni; Mpumalanga Town Centre; New Germany Industrial Re-development.
Key Actions• Indaba on Catalytic Projects; Dedicated Project Teams; Regular Oversight (Top 150 meeting); Budget
Commitment• Urgent Infrastructure requirements being investigated and will be considered in FINAL CAPITAL BUDGET
where no provision exists.• all line departments to ensure that their budgets support these projects.• Grants are re-allocated if necessary to align with these projects.• R15-20m allocation to project preparation of catalytic projects.• Will borrow more to fund catalytic projects subject to take-up being guaranteed and a reasonable ROI.• Will work closely with NT and explore creative funding options including PPPs, off-balance sheet
funding, JV’s, pledging of grants etc . 45
DRAFT CAPITAL BUDGET - 2015/16 MTREF
BROAD PRINCIPLES
Budget to contribute to achieving strategic objectives of the IDP.
Project planning normally 6 months prior to commencement of financial year to achieve 100% CAPEX spend
Loans to be sustainable and affordable and utilised for capital projects only
Balancing capital expenditure for social, economic, rehabilitation and support (including fleet and IT)
Post consultation and feedback from standing committees, projects and ward priorities can be reviewed. Also further opportunity exists for review during the adjustments budget
The detailed line item budget will be discussed at the various standing committees and caucuses
Housing – will be further consultation with Province on priorities as well as additional funding.
Ward profiles in respect of service delivery for each region for use by ward committee members/councillors will be included in the pack during the regional hearings
48
Major strain on capital budget due to increased demands and eradication of backlogs Capital budget has 5 key focus areas: - Social - Economic - Asset Management/ Rehabilitation - Environmental - Admin and support systems MSFM Model- projects operating expenditure and impact of capital on growth and incomeAccess modeling utilised in project allocation
CAPITAL BUDGET
DRAFT CAPITAL BUDGET - 2015/16 MTREF SOURCES OF FUNDING
DETAILS
PROPOSED BUDGET
2015/2016Rm %
PROPOSED BUDGET 2016/2017
Rm %
PROPOSED BUDGET 2017/2018
Rm %
Total proposed Capital Budget 5,969 6,367 6,870
Funded as follows:
Grant Funding 3,527 59% 3,677 58% 4,056 59%
Internal funding(including fuel levy) 1,442 24% 1,690 26% 1,814 26%
Borrowings 1,000 17% 1,000 16% 1,000 15%
Total funding available 5,969 6,367 6,870
CAPITAL BUDGET - HIGH LEVEL SUMMARY PER UNITSCAPITAL BUDGET 2015/16MTREF
DetailsPROPOSED BUDGET
2015/16 Rm
PROPOSED BUDGET 2016/17
Rm
PROPOSED BUDGET 2017/18
Rm
HOUSING 1218.930 1198.400 1134.686NEW HOUSING 628.020 643.900 738.786
HOUSING INFRASTRACTURE 400.910 404.500 395.900HOUSING HOSTELS 100.000 60.000 0.000INTERIM SERVICES 90.000 90.000 0.000
ENGINEERING 626.487 701.667 702.999ETHEKWINI TRASNPORT AUTHORITY 1 014.874 1 030.540 1 158.516WATER 730.156 793.119 809.667SANITATION 641.736 653.900 692.921SOLID WASTE 84.198 126.271 145.527ELECTRICITY 636.422 666.152 691.100ECONOMIC DEVELOPMENT AND PLANNING 245.081 272.422 364.910HEALTH AND SOCIAL SERVICES 206.823 346.628 509.502SECURITY AND SOCIAL SERVICES 89.198 73.389 81.940CORPORATE HUMAN RESOURCES 17.200 4.799 4.300GOVERNANCE 18.280 13.391 19.074OFFICE OF THE CITY MANAGER 326.917 350.259 367.865TREASURY 112.886 136.440 187.105
TOTAL 5 969.188 6 367.378 6 870.111
CAPITAL BUDGET - HIGH LEVEL SUMMARY PER UNIT
DESCRIPTIONPROPOSED BUDGET 2015/16
Rm
PROPOSED BUDGET 2016/17
Rm
PROPOSED BUDGET 2017/18
Rm
HUMAN SETTLEMENTS & INFRASTRUCTURE 4 952.803 5 170.050 5 335.416 Housing 1 218.930 1 198.400 1 134.686 Engineering 626.487 701.667 702.999 Water 730.156 793.119 809.667 Electricity 636.422 666.152 691.100 Sanitation 641.736 653.900 692.921 Solid Waste 84.198 126.271 145.527 ETA 1 014.874 1 030.540 1 158.516 COMMUNITY EMERGENCY SERVICES 296.021 420.017 591.442 Establishment of parks & gardens 14.355 20.970 24.759 Sportsfields 21.913 33.976 61.782 Community Halls 3.199 7.530 21.820 Cemeteries 4.227 13.359 21.140 Libraries 60.926 134.473 288.958 Pools and Beaches 33.641 16.824 23.469 Museums & Art Galleries 28.664 90.999 56.548 IMS 9.892 5.473 2.221 Clinics 21.058 15.184 5.195 Emergency Control & Disaster Management 20.926 14.831 13.340 Fire & Emergency Services 65.640 57.146 68.600 Plant and Equipment 8.949 7.839 3.610 Security Management 2.632 1.412 -
CAPITAL BUDGET - HIGH LEVEL SUMMARY PER UNITSCAPITAL BUDGET - HIGH LEVEL SUMMARY PER UNIT
DESCRIPTIONPROPOSED BUDGET 2015/16
Rm
PROPOSED BUDGET 2016/17
Rm
PROPOSED BUDGET 2017/18
Rm
ECONOMIC DEVELOPMENT & PLANNING 245.081 272.422 364.910
Economic Development 162.790 164.826 240.200
Business Support & Tourism 3.843 55.333 37.790
Development Planning and Management 19.979 5.525 3.720
Markets 18.724 16.250 32.080
Urban Renewal 39.645 30.400 51.000
ABM - Cato manor 0.050 0.040 0.060
DCM: Eco Dev & Planning 0.050 0.048 0.060
TREASURY 112.886 136.440 187.105
GOVERNANCE 18.280 13.391 19.074
City Hall 18.280 13.391 19.074
CORPORATE HUMAN RESOURCES 17.200 4.799 4.300
OFFICE OF THE CITY MANANGER 326.917 350.259 367.865
Information Technology 92.917 99.344 110.565
Metro Police - 5.915 0.300
Zonal Plans - Blocksum 234.000 245.000 257.000
TOTAL 5 969.188 6 367.378 6 870.111
ZONAL CONSULTATIONS
53
South Region - Public Comments
ISSUES RAISED Ward RESPONSES PROGRESS TO DATE DEPARTMENT
* Provision of a safe passage, pedestrian bridge side- walks at Mvuzane, Mbovu, Pezukomkhona, Sunduzwayo, Adams and Folweni. 96 To be investigated
ETA/Roads
* Request bridge from Umlazi J to Welbedutch. 82 To be investigated. Contact details required. ETA
* Bridge that connects Philani and Malikazi 83 To be investigated. Contact details required. ETA
*Monitoring of Architecture department and its operations so that the projects are started early. 83 Engineering
*Contractors are failing to deliver. We need internal departments to do jobs and the contractors can assist. 83
There is a balance between departmental work and outsourcing
Engineering
Zonal plan – capital budget for Zonal plans needs to be increased. City wide Engineering
85. Cllr N E Mthembu ward 81 umlazi 1. Informal settlement Phola place area at BXI next to house number B1662 storm water drainage to be built when it rains the houses flood . We request a drainage passage to be built and the top of the drainage passage must be built for access purposes like:- people going to bustops; when somebody passes away ; also for children to pass when going to school. 2. Ablution block outside lights are working one side. 3.Ward 80/81 there is a problem of water leaks.
81 Matters relating to stormwater design should reported to e-services or to the department on 0313117338
Water, Sanitation, Stormwater
92. We acknowledge the allocation of R1m per ward but please fast track the spending of these allocation so that some of our needs can be addressed. 1 to 103 No response provided
Many areas besides the west areas require more funding to clear backlog of gravel roads
Engineering and other departments
*. Street Lights – R603 Road (Illovo Area) 98It is requested that if there are lights that are not functioning, report to the Call Centre on 0801 313 111.
Electricity
South Region - Public Comments
ISSUES RAISED WARDS RESPONSES PROGRESS TO DATE DEPARTMENTThere is no water in H-section and water tankers are not being sent. 82 As far as Operations information, the problem
has been resolved.
EWS
There is no water in H-section and water tankers are not being sent. 82 As far as Operations information, the problem has been resolved.
EWS
18. Umlazi- Houses built are less than ten years and are already collapsing.
74,76,80,81,82,88,90
Retaining walls are being constructed, and some area are earmarked for rectification. Please provide house numbers.
Funding application for retaining walls was submitted to Province, due to funding limitation applications is not approved. The City must look at setting aside USDG
Housing
2.Cllr H G Maphumulo Ward 96 –Water borne sewage must be considered to eradicate the existing toilets challenge, especially at Adams Mission.
96Sanitation
* Stream at Welbedutch East needs maintenance.Need to get exact location, in order to inspect and arrange the cleaning Water/RSM
*No infrastructure in RDP houses in 5 areas and no main sewers. Housing and Sanitation
* Informal Settlement with no VIP’s toilet, e.g J13. This will be addressed by phase 3 project for ablution container toilets Sanitation
* Rectification of Welbedutch East and Umgaga area. Water
3. Cllr N R Dlamini Ward 85 – Request speed humps for Emafezini Drive and Masibonge Drive. 85 ETA to investigate ETA
5. Cllr N E Mthembu ward 81 umlazi *Informal settlement Phola place area at BXI next to house number B1662 storm water drainage to be built because when its rains the houses flood . We request a drainage passage to be built and the top of the drainage passage must be built for access purposes like:- people going to bus tops; when somebody passes away ; also for children to pass when going to school. * Ablution block outside lights are working one side. *Ward 80/81 there is a problem of water leaks.
81 CSCM – to be investigated. Manager Stormwater Design unaware of this matter
Matters relating to stormwater design should reported to e-services or to the department on 0313117338
Water, Sanitation, Stormwater
REGIONAL PROFILE
REGIONAL PROFILE – SOUTH REGION(67,68,74,75,76,77,78,79,80,81,82,83,84,85,86,87,88,89,90,93,94,95,96,97
,98,99,100)Base Demographics:
Housing Information:
Formal Informal Traditional Other Total
Number 90 485 96 091 37 410 798 225 291
% 40 43 17 0 100
Population Estimate(2011) No. of Households
970 018 225 321
Social Facilities: Existing
Social Facilities: Backlogs
Health Facilities
Educational Institutions
Libraries SportsfieldsSwimming
PoolsFire
StationsIndoor Halls
Community Halls
7 13 4 6 2 8 2 1
Health Facilities
Educational Institutions
Libraries SportsfieldsSwimming
PoolsParks & Playlots
SAP Stations
Community Halls
81 302 15 73 8 119 20 55
REGIONAL PROFILE – SOUTH REGION(67,68,74,75,76,77,78,79,80,81,82,83,84,85,86,87,88,89,90,93,94,95,96,97
,98,99,100)
Essential Services: Households with Minimum Service
Essential Services: Backlogs
Service No. of Households
Housing: No. of Informal Structures for In-Situ Upgrade 147 439
Housing: No. of In-Situ Upgrade Sites requiring Interim Services 28 353
Water: Households without Minimum Service (Ground Tank) 28 375
Sanitation: Households without Minimum Service (UD Toilet) 73 173
Electricity: Households without Electricity 111 380
Water(%)
Sanitation(%)
Electricity(%)
Refuse Removal(%)
89 68 54 100
REGIONAL PROFILE – SOUTH REGION(67,68,74,75,76,77,78,79,80,81,82,83,84,85,86,87,88,89,90,93,94,95,96,97
,98,99,100)
60
Major Capital Spend Southern Region 2015/16-2017/18
• Sanitation R205m• Hostel Upgrades R86m• Electricity upgrade R77m• Lamontville Informal Settlement Upgrade R77m• Lamontville Ministerial R14.4m• R293 Rectification R71m• Umlazi Infill R58m• Dodoba top structure R31.5• Umlazi Interim Services R10.3m• Housing infrastructure R168m• Roads upgrade/Rehab R52m• Fire station Umkomaas R16.7m• Lovu landfill R13m• Economic development and town centre renewal R116.5m
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
61
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 67 14.079 47.738 83.452
Zonal Plan Office of the city Manager 3.000 3.141 3.295
510137Str Engineering - Roads 1.316 2.207 0.000
Makiligi Circle Eng - Roads 0.000 0.000 1.250
Ndoda Mpungose upgrade Eng - Roads 0.000 0.000 1.250
Smithsfield reservoir Water 0.000 0.088 1.828
Amanzimtoti river Trunk Sewer Sanitation 9.500 25.000 60.711
Adams Mission Library PRC- Libraries 0.175 0.000 0.100
Merebank Cemetery PRC- Parks 0.000 0.000 0.018
Low volume roads upgrade Engineering - RSWM 0.000 2.302 0.000
Road Rehab Engineering - Roads 0.087 0.000 0.000
KwaMakhutha Wire-Wall Rectification 0.000 15.000 15.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
62
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 68 130.519 126.093 164.063
Swwtw Digester Online Sanitation 50.000 66.210 89.044
Sea Outfalls Inspection Sanitation 3.071 0.000 2.428
Worst Condition Assets (Cdi 0-40%) Condition Index - Bonela / Chesterville Cemetery (renovation of change rooms & office building) PRC - Cemeteries 0.000 0.000 0.609
Southern Works Hydro Power Sanitation 2.194 0.000 0.000
Austerville 132/11kv Stn Electricity 5.000 32.000 40.000
Merebank Health 1.141 0.000 0.000
Austerville Health 1.141 0.000 0.000
Ethekwini Municipal Libraries Infrastructure Upgrade - Loss Control (Merebank Library) PRC- Libraries 0.000 0.000 0.100
Mobeni Heights Cemetery PRC- Parks 0.000 0.000 0.018
Road Rehab Engineering - Roads 5.084 0.000 0.000
Jacobs Housing - Hostels 8.000 7.000 10.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
63
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 74 64.889 37.690 4.448
Zonal Plan Office of the city Manager 3.000 3.141 3.295
MV/LV EFA-Informal Settlements S/L Electricity 0.300 0.300 0.300
Lamontville Clinic (clinic upgrade) Health 0.000 0.000 0.717
Ethekwini Municipal Libraries Infrastructure Upgrade - Loss Control (Lamontville Library) PRC- Libraries 0.000 0.000 0.100
Lamontville Cemetery PRC- Parks 0.000 0.000 0.018
Lamontville Gijima Cemetery PRC- Parks 0.000 0.000 0.018
Mxenge Museum PRC- Museums 0.877 3.249 0.000
Road Rehab Engineering - Roads 0.312 0.000 0.000
Lamontville Ministerial (Ward 69 , 74 & 75) Top Structure 14.400 0.000 0.000
Lamontville Informal settlement Housing - Infrastructure 46.000 31.000 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
64
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 75 16.234 18.682 23.890
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Swinton Road Taxi rank - Roof Upgrade Ethekwini Authority 0.025 0.000 0.000
Landsdowne Rs P/S New Pumps Sanitation 0.000 0.441 0.000
Landsdowne P/S Sanitation 0.000 0.000 8.095
MV/LV EFA-Formal Settlements UGM Electricity 2.000 2.500 2.500
Renovations and alterations (Mobeni) Emergency- Fire 0.000 1.600 0.000
Road Rehab Engineering - Roads 1.209 0.000 0.000
SJ Smith Housing - Hostels 10.000 11.000 10.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
65
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 76 26.649 29.806 26.453
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Ezimbuzini Mechanics Structure Business Supp 0.000 10.000 0.000
Umlazi (Ezimbuzini Retail Markets 0.000 0.265 0.000
Pedestrian Safety - Prince Mcwayizeni (Prince Mcwayizeni Dr/P67- Prince Mcwayizeni Dr/Sibusiso Mdakane Dr) Ethekwini Authority 0.210 0.000 0.000
Natural Resources (Isipingo Eco Centre) PRC- Parks 0.439 0.400 0.358
Road Rehab Engineering - Roads 7.000 0.000 0.000
Umlazi Glebelands Housing - Hostels 10.000 10.000 10.000
Umlazi Infill Part 5 Ph1 Unit (V8) / Umlazi Glebe Housing - Infrastructure 0.000 0.000 6.800
R293 Rectification (Ward 76,77,78,79,80,81) Housing - Hostels 6.000 6.000 6.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
66
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 77 76.596 30.441 25.795
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Umlazi J4 Engineering - Dev Eng 5.300 0.000 0.000
Umlazi J13 Engineering - Dev Eng 2.600 0.150 0.000
Umlazi JX4 Engineering - Dev Eng 2.400 0.000 0.000
Umlazi J 17+D189 Engineering - Dev Eng 0.000 0.900 0.000
Umlazi J7 Engineering - Dev Eng 0.000 1.400 0.000
Umlazi JX5 Engineering - Dev Eng 0.000 0.800 0.000
Passage : J874 / 852 Engineering - Roads 0.118 0.000 0.000
Passage : J808 / 815 Engineering - Roads 0.118 0.000 0.000
Passage : J854 / 855 Engineering - Roads 0.079 0.000 0.000
MV/LV EFA-Informal Settlements S/STN Electricity 0.500 0.500 0.500
Umlazi infill Part 4 (Ward 78, 80,81, 82, 83, 84, 85, 86, 87, 88, 89) Top Structure 0.000 0.000
Umlazi Infill Phase 1 Part 4 Top Structure 42.345 0.000 0.000
Umlazi Infill Phase 1 Part 5 Top Structure 2.990 0.000 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
67
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 77 76.596 30.441 25.795
Umlazi Infill Project, Phase 2 Top Structure 1.725 6.000 5.700
Isandlwana Umlazi Ward B10 (Unit F, G & H) Top Structure 0.120 0.300 0.300
Umlazi J4 - Interim Services Engineering - Dev Eng 5.300 0.000 0.000
Umlazi J13 - Interim Services Engineering - Dev Eng 2.600 0.150 0.000
Umlazi JX4- Interim Services Engineering - Dev Eng 2.400 0.000 0.000
Umlazi J 17+D189 - Interim Services Engineering - Dev Eng 0.000 0.900 0.000
Umlazi J7 - Interim Services Engineering - Dev Eng 0.000 1.400 0.000
Umlazi JX5 - Interim Services Engineering - Dev Eng 0.000 0.800 0.000
KwaMgaga Rectification Rectification 5.000 14.000 16.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
68
Department Budget 2015/16Rm
Budget 2016/17Rm
Ward - 78 8.463 9.141
Zonal Plan Office of the city Manager 3.000 3.141
Traffic calming - Sigonyela Road Ethekwini Authority 0.120 0.000
Traffic calming - Umzimvubu Road Ethekwini Authority 0.080 0.000
Traffic calming - Mpevu Road Ethekwini Authority 0.120 0.000
Umlazi Parks - fibre PRC- Parks 0.000 0.000
Road Rehab Engineering - Roads 0.143 0.000
Umlazi Infill - KX1 Housing - Infrastructure 5.000 6.000
Umlazi Infill Part 2 Phase 1Unit Q(Q8-Q10) Housing - Infrastructure 0.000 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
69
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 79 52.933 12.065 3.832
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Umlazi GX6 Engineering - Dev Eng 1.400 0.000 0.000Sidewalks: Ngwenya road Engineering - Roads 0.118 0.000 0.000Umlaas River Gx 11 Ped Bridge Engineering - Roads 8.000 0.000 0.000F370 Sdumo Mathe road Umlazi F Eng - Stormwater 0.315 0.000 0.000
KwaMashu G Pool (upgrade) PRCC- Pools & Beaches 0.000 0.000 0.179
Umlazi G ( Upgrade of paving around Pool) PRCC- Pools & Beaches 0.000 0.424 0.358
Umlazi B10 (GX1,F3,F9) Ph2 Housing - Infrastructure 2.950 0.000 0.000
Umlazi B10 (GX7/8) Design fees (CX3, GX20, WX1, GX1, F9, F3, WX2, GX5 & M15) Housing - Infrastructure 6.000 0.000 0.000
Umlazi B10 (WX2) Ph3 Housing - Infrastructure 13.600 0.000 0.000
Umlazi Infill (GX5) Housing - Infrastructure 7.500 0.000 0.000
Umlazi Infill- CX3 Housing - Infrastructure 7.500 8.500 0.000
Umlazi Infill -LX2 Housing - Infrastructure 1.150 0.000 0.000Umlazi GX6 - Interim Services Engineering - Dev Eng 1.400 0.000 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
70
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 80 26.851 34.141 3.725
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Umlazi E2 (Egoli) Engineering - Dev Eng 3.000 0.000 0.000
V2/V3/V4 Engineering - Dev Eng 3.600 0.000 0.000
Umlazi AX1 Engineering - Dev Eng 0.000 0.200 0.000
Umlazi A3 Engineering - Dev Eng 1.500 0.000 0.000
Umlazi V10(Shayamoya) Engineering - Dev Eng 1.100 0.000 0.000
Umlazi A1 Engineering - Dev Eng 0.500 0.000 0.000
Umlazi EX7 (Ethopia) Engineering - Dev Eng 0.000 4.300 0.000Eradication of Backlogs - District 6 - Umlazi E PRC- Halls 0.000 0.000 0.430
Umlazi EX9/ E16 (Thandanani) Engineering - Dev Eng 0.000 1.700 0.000
Umlazi E5 (Ekuthuleni) Engineering - Dev Eng 0.000 1.100 0.000
V10 Engineering - Dev Eng 0.000 1.100 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
71
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 80 26.851 34.141 3.725
Umlazi EX4 (Thokoza) Engineering - Dev Eng 0.000 1.100 0.000
Sidewalk: Sibusiso Mdakane road - School Engineering - Roads 0.118 0.000 0.000
Road Rehab Engineering - Roads 0.533 0.000 0.000
Umlazi Infill - EX1 Housing - Infrastructure 3.800 12.000 0.000
Umlazi E2 (Egoli) - Interim Services Engineering - Dev Eng 3.000 0.000 0.000
V2/V3/V4 - Interim Services Engineering - Dev Eng 3.600 0.000 0.000
Umlazi AX1 - Interim Services Engineering - Dev Eng 0.000 0.200 0.000
Umlazi A3 - Interim Services Engineering - Dev Eng 1.500 0.000 0.000
Umlazi V10(Shayamoya) - Interim Services Engineering - Dev Eng 1.100 0.000 0.000
Umlazi A1 - Interim Services Engineering - Dev Eng 0.500 0.000 0.000
Umlazi EX7 (Ethopia) - Interim Services Engineering - Dev Eng 0.000 4.300 0.000
Umlazi EX9/ E16 (Thandanani) - Interim Services Engineering - Dev Eng 0.000 1.700 0.000
Umlazi E5 (Ekuthuleni) - Interim Services Engineering - Dev Eng 0.000 1.100 0.000
V10 - Interim Services Engineering - Dev Eng 0.000 1.100 0.000
Umlazi EX4 (Thokoza) - Interim Services Engineering - Dev Eng 0.000 1.100 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
72
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 81 16.881 22.141 6.295
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Umlazi EX15 (Buyani) Engineering - Dev Eng 1.500 0.000 0.000
Umlazi EX14 (Jabulani) Engineering - Dev Eng 0.000 2.200 0.000
Umlazi EX11 (Ekuthembeni) Engineering - Dev Eng 0.000 0.500 0.000
Road Rehab Engineering - Roads 0.071 0.000 0.000
Umlazi Infill - CX1 Housing - Infrastructure 2.400 9.600 3.000
Umlazi Infill - FX3 Housing - Infrastructure 8.410 4.000 0.000
Umlazi EX15 (Buyani) - Interim Services Engineering - Dev Eng 1.500 0.000 0.000
Umlazi EX14 (Jabulani) - Interim Services Engineering - Dev Eng 0.000 2.200 0.000
Umlazi EX11 (Ekuthembeni) - Interim Services Engineering - Dev Eng 0.000 0.500 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
73
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 82 19.859 21.741 32.344
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Umlazi N 4 Engineering - Dev Eng 1.700 0.000 0.000
Traffic calming - Zwe Madlala Drive Ethekwini Authority 0.220 0.000 0.000
Umlazi W Hall PRC- Halls 0.500 4.000 12.541
Umlazi- J Library (development of a new library) PRC- Libraries 0.000 1.000 2.508
Umlazi W PRC- Libraries 0.263 0.000 0.000
Road Rehab Engineering - Roads 0.076 0.000 0.000
Umlazi Infill - HX17 Housing - Infrastructure 5.000 13.600 0.000
Umlazi Infill - WX1 Housing - Infrastructure 7.400 0.000 0.000
Umlazi N 4 - Interim Services Engineering - Dev Eng 1.700 0.000 0.000
Umlazi Infill Part 2 Phase 1 Unit H (HX14) Housing - Infrastructure 0.000 0.000 14.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
74
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 83 19.990 27.291 9.295
Zonal Plan Office of the city Manager 3.000 3.141 3.295Umlazi L12 (Ekuthuleni) Engineering - Dev Eng 1.700 0.000 0.000Umlazi MX1 Engineering - Dev Eng 0.500 0.000 0.000Umlazi MX3 Engineering - Dev Eng 0.000 1.200 0.000
Umlazi M8/9/10 Engineering - Dev Eng 0.000 6.100 0.000Sidewalks: Sukuma road Engineering - Roads 0.118 0.000 0.000P325 Viviyo road Umlazi P Eng - Stormwater 0.108 0.000 0.000KwaMnyandu Taxi rank - Roof Upgrade Ethekwini Authority 0.063 0.000 0.000
Umlazi Infill - M8,9,10 Housing - Infrastructure 6.300 1.000 0.000Umlazi L12 (Ekuthuleni) - Interim Services Engineering - Dev Eng 1.700 0.000 0.000Umlazi MX1 - Interim Services Engineering - Dev Eng 0.500 0.000 0.000Umlazi MX3 - Interim Services Engineering - Dev Eng 0.000 1.200 0.000Umlazi M8/9/10 - Interim Services Engineering - Dev Eng 0.000 6.100 0.000Umlazi M 14(Shisa-Bhe) - Interim Services Engineering - Dev Eng 0.000 1.900 0.000Umlazi M 14(Shisa-Bhe) - Interim Services Engineering - Dev Eng 0.000 0.100 0.000Umlazi MX6 (Ekuphileni)- Interim Services Engineering - Dev Eng 0.000 0.150 0.000Umlazi MX6 (Ekuphileni) - Interim Services Engineering - Dev Eng 0.000 0.400 0.000R293 Rectification (Ward83,84,85,86,87,88) Rectification 6.000 6.000 6.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
75
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 84 6.004 4.400 4.225
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Umlazi BB 868 Engineering - Dev Eng 0.800 0.000 0.000
Traffic calming - South Spinal road (Masimbonge drive to 2548 street) Ethekwini Authority 0.320 0.000 0.000
Traffic calming - Bhambatha road Ethekwini Authority 0.220 0.000 0.000
Traffic calming - Mugabe road Ethekwini Authority 0.100 0.000 0.000
Umlaas Trunk Sewer Augmentation Sanitation 0.000 0.441 0.000
MV/LV EFA-Formal Settlements S/L Electricity 0.500 0.500 0.500
Umlazi AA PRC- Libraries 0.000 0.141 0.000
Umlazi BB ( Upgrade paving around pool) PRC- Pools & Beaches 0.000 0.000 0.358
Simunye PRC- Parks 0.000 0.177 0.072
Road Rehab Engineering - Roads 0.264 0.000 0.000
Umlazi BB 868 - Interim Services Engineering - Dev Eng 0.800 0.000 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
76
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 85 17.870 14.741 3.395
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Umlazi ZX16 (Phalamende) Engineering - Dev Eng 0.000 2.000 0.000
Umlazi N 6 Engineering - Dev Eng 0.000 0.300 0.000
Traffic Signal - Intersection : Old South Coast Rd / Sabjee Rd Ethekwini Authority 0.200 0.000 0.000
Ethekwini Municipal Libraries Infrastructure Upgrade - Loss Control (Umlazi AA Library) PRC- Libraries 0.000 0.000 0.100
Road Rehab Engineering - Roads 0.520 0.000 0.000
Umlazi Infill - P8 Housing - Infrastructure 4.150 0.000 0.000
Umlazi Infill - PMH Housing - Infrastructure 10.000 7.000 0.000
Umlazi ZX16 (Phalamende) - Interim Services Engineering - Dev Eng 0.000 2.000 0.000
Umlazi N 6 - Interim Services Engineering - Dev Eng 0.000 0.300 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
77
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 86 8.939 4.907 4.012
Zonal Plan Office of the city Manager 3.000 3.141 3.295
21 Thamela Crl Umlazi U Eng - Stormwater 0.360 0.000 0.000
Pedestrian Safety - Maurice Gumede DRIVE(UMLAZI U)-Btw Mkhathali dr & philani walk, and amakhosi walk to sbu magwanyana dr Ethekwini Authority 1.150 0.000 0.000
How Long Park PRC- Parks 1.400 1.766 0.717
Road Rehab Engineering - Roads 0.129 0.000 0.000
Umlazi UX3 (Qhiph'Khowe) - Interim Services Engineering - Dev Eng 2.900 0.000 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
78
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 87 4.906 14.346 33.474
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Mangosuthu Traders Kiosks Business Supp 0.000 1.412 0.000
Kwamnyandu Traditional Food Market Business Supp 0.000 7.062 6.000
Umlazi DX18 Engineering - Dev Eng 0.000 1.100 0.000
Road 109101 Engineering - Roads 0.439 0.530 0.000
Pedestrian Safety - Mayibuye Drive(UMLAZI)-Btw Mkhiwane Road & GUMTREE CRES Ethekwini Authority 0.350 0.000 0.000
Umlazi D Upgrade Multi Use PRC- Halls 0.439 0.000 0.179
Umlazi 3 Library (Book stock) PRC- Libraries 0.439 0.000 0.000
Road Rehab Engineering - Roads 0.240 0.000 0.000
Umlazi DX18 - Interim Services Engineering - Dev Eng 0.000 1.100 0.000
Umlazi Infill - Part 4 - HX2 Housing - Infrastructure 0.000 0.000 24.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
79
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 88 10.643 11.038 3.940
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Umlazi V Node Business Supp 0.000 3.531 0.000
Umlazi AX1 Engineering - Dev Eng 0.000 1.300 0.000
Worst Condition Assets (Cdi 0-40%) Condition Index - Dudley Street - erect wall & fence and upgrade of office Prcc - Cemeteries 0.000 1.766 0.609
Ezimbuzini Taxi rank - Roof Upgrade Ethekwini Authority 0.310 0.000 0.000
Umlazi S Cemetery PRC- Parks 0.000 0.000 0.018
Umlazi T Cemetery PRC- Parks 0.000 0.000 0.018
Road Rehab Engineering - Roads 0.033 0.000 0.000
Umlazi Infill - BX4 Housing - Infrastructure 7.300 0.000 0.000
Umlazi AX1 - Interim Services Engineering - Dev Eng 0.000 1.300 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
80
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 89 43.809 46.764 24.030
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Town centre renewal - Isipingo Economic Dev 11.000 17.000 10.000
16 Inwabi Road Business Hive & offices Business Supp 0.000 9.181 0.000
Isipingo WTW Upgrades Sanitation 18.000 7.000 0.000
Isipingo Civic PRC- Libraries 0.175 0.000 0.000
Isipingo Hills (Upgrade of Filter room, Supervisors office and First Aid) PRC- Pools & Beaches 0.000 0.177 0.717
Lotus Cemetery PRC- Parks 0.000 0.000 0.018
Siyaphambile PRC- Parks 0.000 0.265 0.000
Road Rehab Engineering - Roads 1.634 0.000 0.000
Umlazi T Housing - Hostels 10.000 10.000 10.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
81
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 90 58.456 60.903 16.568
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Isipingo Traders Shelters Business Supp 0.000 5.650 0.000
Nkanku Road 10.000 0.000 0.000
Sidewalks: Jacaranda Crescent Engineering - Roads 0.553 0.000 0.000
Old Main Road Engineering - Roads 0.000 0.000 0.600
Isipingo Hills ( Upgrade of Filter room; Supervisors office ; First Aid) PRC- Pools & Beaches 0.439 0.000 0.000
Isipingo CBD Taxi Ranks (North and Alexandra Rd) - New Rank Ethekwini Authority 4.000 0.000 0.000
Isipingo Rail reservoir Water 0.000 0.088 1.828
Lotus Park reservoir Water 0.000 0.088 1.828
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
82
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 90 58.456 60.903 16.568
Composting Sanitation 0.877 0.883 0.000
Refinery road pump station rising main Sanitation 0.000 6.576 0.000
Sapref 132/33kv S/Stn Electricity 12.000 0.000 0.000
Reunion Substation Electricity 0.000 40.000 0.000
Isipingo Customer Services Electricity 1.000 0.000 0.000
Reunion Pool (Upgrade of Filter room, Supervisors Office and First Aid) PRC- Pools & Beaches 0.000 0.177 0.717
Reunion Pool ( Upgrade of Filter room; Supervisors Office and First Aid) PRC- Pools & Beaches 0.439 0.000 0.000
Renovations and alterations (Prospecton) Emergency- Fire 1.579 0.000 4.000
Road Rehab Engineering - Roads 15.269 0.000 0.000
Nkanku Road Top Structure 5.000 0.000 0.000
Ex Own Rectification (Ward 90,94) Rectification 4.300 4.300 4.300
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
83
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 93 117.174 35.122 33.883
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Access road A665 From Wanda Cele Rd To Sports Field Engineering - Roads 1.957 0.000 0.000
York Street, Amanzimtoti-Collapsed pipe Eng - Stormwater 0.000 1.500 0.000
Garden Lots reservoir Water 0.000 0.088 1.828
Umbogintwini reservoir Water 0.000 0.088 2.742
Amanzimtoti Old main Rd Sewer Reticulation Sanitation 7.019 0.883 0.000
Relocation Umdoni rising main - Arbour road Sanitation 3.510 1.766 0.000
Elevated Sewer to Arbour Town Developments (Sub 4) Sanitation 0.000 1.324 0.000
Amanzimtoti WWTW Sludge Dewatering Sanitation 13.161 0.000 0.000
Umbogintwini Upgrade Electricity 22.000 24.000 0.000
Athlone Park PRC- Parks 0.000 1.214 0.000
Delhoo Lane Cemetery PRC- Parks 0.000 0.000 0.018
Road Rehab Engineering - Roads 0.971 0.000 0.000
Ezimbokdweni Top Structure 12.360 0.000 0.000
Ezimbokodweni (Emplangweni) Housing - Infrastructure 10.000 0.000 0.000
Sobonakhona Phase 1 (Ward 93, 96 & 100) Top Structure 43.197 1.118 26.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
84
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 94 15.711 31.053 32.646
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Ped Bridge - Ezimbokodweni 2015/16 Engineering - Roads 1.755 0.000 0.000
Ped Bridge - Emansomini, Ezimbokodweni Riv.2016/17 Engineering - Roads 0.877 3.973 0.000
Dudu Mhkize circle Engineering - Roads 1.316 1.766 0.000
Road A637 upgrade Eng - Roads 0.000 0.000 9.000
Southern Depot Buildings Electricity 0.100 0.100 0.100
Ethekwini Municipal Libraries Infrastructure Upgrade - Loss Control (KwaMashu Library) PRC- Libraries 0.281 0.000 0.000
KwaMakutha Library PRC- Libraries 0.132 0.000 0.000
Kwamakhutha Cemetery PRC- Parks 0.000 0.000 0.018
Qedindlala PRC- Parks 0.250 0.000 0.000
Qedindlala PRC- Parks 0.000 0.309 0.125
Isisekelo Sempilo PRC- Parks 0.000 0.265 0.107
KwaMakhutha Housing - Hostels 8.000 7.000 5.000
Nsimbini Rural Top Structure 0.000 14.500 15.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
85
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 95 15.589 24.143 26.752
Zonal Plan Office of the city Manager 3.000 3.141 3.295Road A626 upgrade Eng - Roads 0.000 0.000 4.000
Traffic calming - Phumowakhe Road (Dirk Uys street to Stellawood road) Ethekwini Authority 0.200 0.000 0.000
Traffic calming - Thasoso Road Ethekwini Authority 0.080 0.000 0.000Folweni 2 Res (6 Meg) Water 0.000 0.000 1.828Ensimbini reservoir Water 0.000 4.017 0.914Folweni Cemetery PRC- Parks 0.000 0.000 0.018Masibambane-mhlalantombi PRC- Parks 0.200 0.000 0.000Zimiseleni PRC- Parks 0.200 0.000 0.000Sicelusizo PRC- Parks 0.000 0.221 0.090Vukani PRC- Parks 0.000 0.265 0.107Folweni Fire Station (Land and Project Packaging) Emergency- Fire 0.000 1.500 0.000
Road Rehab Engineering - Roads 3.009 0.000 0.000Dodoza Top Structure 0.000 15.000 16.500Dodoza Top Structure 0.500 0.000 0.000Folweni (Ward 95 & 96) Top Structure 8.400 0.000 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
86
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 96 10.700 12.750 15.712
Zonal Plan Office of the city Manager 3.000 3.141 3.295
eFolweni Business Hive Business Supp 0.000 0.000 8.000
Shozi road Engineering - Roads 2.351 0.000 0.000
Adams clinic access road 84140Trk Engineering - Roads 0.219 0.441 0.000
510049Str/Bheka Gumede/Alutha Mkhize/Mdavu Sikhonde Engineering - Roads 1.316 2.737 0.000
Folweni 1 Res (6 Meg) Water 0.000 0.000 1.828
Effluent Pumping System from Southern area WWTW'S to Nungwane Dam Sanitation 0.000 0.883 2.428
Buhlebenkanyiso Club PRC- Parks 0.200 0.000 0.000
Masikhuthazane PRC- Parks 0.000 0.177 0.072
Ukukhanya Kwezwe School PRC- Parks 0.000 0.221 0.090
Osizweni garden PRC- Parks 0.250 0.000 0.000
Low volume roads upgrade Engineering - RSWM 3.363 5.151 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
87
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 97 11.013 5.944 7.723 Ezimbuzini Herb Market Business Supp 0.000 2.119 0.000
Sidewalks: Mayville Terrace Engineering - Roads 0.276 0.000 0.000
Sidewalks: Krantzdraai Crescent Engineering - Roads 0.237 0.000 0.000
Sidewalks: Gracedale Engineering - Roads 0.118 0.000 0.000
Winkelspruit Taxi rank - Roof Upgrade Ethekwini Authority 0.071 0.000 0.000
Illovo Beach reservoir Water 0.000 0.088 1.828Doonside reservoir Water 0.000 0.088 0.914
Kingsburgh WTW modifications Sanitation 4.387 0.000 0.000
Ethekwini Municipal Libraries Infrastructure Upgrade - Kingsburgh (Fibre) PRC- Libraries 0.582 0.000 0.000Amanzimtoti Library PRC- Libraries 0.088 0.000 0.000
Kingsburgh- Study Hall, paving & parking, fencing, re-purposing PRC- Libraries 0.000 0.000 0.358
Amanzimtoti Lifeguard Tower (rehabilitation of Tower) PRC- Pools & Beaches 1.000 2.648 4.300
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
88
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 97 11.013 5.944 7.723
Worst condition Assets (Cdi 0-40%) Condition Index - Ablution & Shower Upgrades - District 5 (Warner Beach) PRC- Pools & Beaches 0.000 0.000 0.179
Worst condition Assets (Cdi 0-40%) Condition Index PRC- Pools & Beaches 0.263 0.000 0.000
Amanzimtoti Parks - diginet PRC- Parks 0.000 0.000 0.054
Kingsburgh Parks - diginet PRC- Parks 0.000 0.000 0.054
Hutchison Parks - fiber PRC- Parks 0.000 0.000 0.018
Amanzimtoti Bird Park - none PRC- Parks 0.000 0.000 0.018
Road Rehab Engineering - Roads 3.991 0.000 0.000
Amanzimtoti Mission Reserve - additional Land acquisition 0.000 1.000 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
89
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 98 46.300 50.314 55.577
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Tourism Nodes & Corridors - Umgababa Economic Dev 9.500 18.000 15.000
Umnini reservoir Water 0.000 3.394 0.914
Amagcingo reservoir Water 0.000 3.266 1.828
New depot - Toti Water 0.175 0.177 0.000
Bulk Sewer to Lower Illovo & Illovo Country Club Sanitation 0.000 5.738 0.000
Lovu Landfill Cell Phases and Infrastructure Works Solid Waste 13.029 0.000 11.000
Umgababa Swimming Pool - New PRC- Pools & Beaches 0.439 0.177 0.179
Umgababa Beach - upgrade of beach; investigation of blue flag status PRC- Pools & Beaches 0.000 0.441 4.300
Uqalo St /Rd10073 Engineering - Roads 0.439 0.441 0.000
Lovu B Cemetery PRC- Parks 0.000 0.000 0.018
Lovu C Section Cemetery PRC- Parks 0.000 0.000 0.018
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
90
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 98 46.300 50.314 55.577
Umgababa Cemetery PRC- Parks 0.000 0.000 0.018
Vukuzibambele PRC- Parks 0.300 0.000 0.000
Esigodini PRC- Parks 0.000 0.265 0.107
Fire and Emergency - Training Facility Emergency- Fire 5.168 1.766 10.000
Low volume roads upgrade Engineering - RSWM 2.242 3.507 0.000
Road Rehab Engineering - Roads 0.008 0.000 0.000
Lovu rectification Top Structure 0.000 10.000 8.900
Kingsburg West Top Structure & services 12.000 0.000 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
91
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 99 111.651 60.984 55.768
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Magabheni Rural Development Economic Dev 17.000 0.000 0.000
Craigeburn Housing - Infrastructure 15.000 0.000 0.000
Roseneath Gardens Housing - Infrastructure 3.000 0.000 0.000
Craigieburn Cemetery Staff Change room PRC - Cemeteries 0.000 0.000 1.075
Worst condition Assets (Cdi 40%-60%) : Umkomaas PRC- Pools & Beaches 0.000 0.000 0.657
Bhoqwana road & Uzemu road – Magabheni Engineering - Roads 2.202 0.000 0.000
Sidewalks: Eagle road – Umkomaas Engineering - Roads 0.355 0.000 0.000
Traffic calming - Brad Street Ethekwini Authority 0.080 0.000 0.000
Magabheni Res Water 4.100 0.000 1.828
Clansthal res Water 0.000 0.088 0.914
Midnite Café reservoir Water 0.000 13.904 1.828
Pump Station and rising main to close Umkomaas Wtw Sanitation 0.000 0.441 0.000
Umkomaas Sdp Wastewater Treatment Works Sanitation 0.877 4.414 0.000
Craigieburn WTW modifications Sanitation 1.053 0.000 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
92
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 99 111.651 60.984 55.768
South Coast to Umkomaas Trunk Sewer Sanitation 0.000 0.883 2.428
Saicor Village Sewer Extension Sanitation 4.519 0.000 0.000
Waterborne Sewer Reticulation to Bengu Rd Area - Umkomaas Sanitation 4.387 0.000 4.045
Investigation - Purchase of Land (Regional Cemetery South) PRC - Cemeteries 0.000 0.000 1.792
Umkomaas Drift PRC - Cemeteries 0.000 0.000 1.792
Cemetery -Internal Road Upgrade- Umkomaas drift PRC - Cemeteries 0.000 0.000 0.358
Umkomazi Health 0.000 1.059 0.000
Umkomaas (Fibre) PRC- Libraries 0.000 0.000 1.806
Craigieburn(Fibre) PRC- Libraries 0.000 0.000 1.254
Craigieburn Cemetery PRC- Parks 0.000 0.000 0.018
Illfracombe Cemetery PRC- Parks 0.000 0.000 0.018
Magabeni Cemetery PRC- Parks 0.000 0.000 0.018
Umkomaas Memorial Park Cemetery PRC- Parks 0.000 0.000 0.018
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
93
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 99 111.651 60.984 55.768
Umkomaas Village Cemetery PRC- Parks 0.000 0.000 0.018
Siyaphemba PRC- Parks 0.250 0.000 0.000
Siyaphambile PRC- Parks 0.000 0.265 0.107
Umkomaas Fire Station (Permanent Facility) Emergency- Fire 16.715 0.000 0.000
Low volume roads upgrade Engineering - RSWM 6.012 3.288 0.000
Umnini Zone 3 (Ward 98, 99) Top Structure 5.000 10.000 0.000
Umnini Rural Housing Project zone 2 topstructure 8.600 0.000 0.000
Craigieburn topstructure 0.000 12.000 16.000
Craigieburn (Alternative technology) topstructure 15.000 0.000 0.000
Amahlongwa Rural Housing Project topstructure 0.000 10.000 15.000
Roseneath Gardens topstructure 3.000 0.000 0.000
Ex Own Affairs Rectification Rectification 1.500 1.500 1.500
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
94
Department Budget 2015/16Rm
Budget 2016/17Rm
Budget 2017/18Rm
Ward - 100 14.264 20.447 38.108
Zonal Plan Office of the city Manager 3.000 3.141 3.295
Umbumbulu and Nungwane Dam Economic Dev 2.000 2.000 15.000
Umbumbulu Business Supp 0.000 0.000 2.000
Luganda Health 0.000 1.412 0.000
Umbumbulu Library PRC- Libraries 0.000 1.000 2.508
Umbhedula Cemetery PRC- Parks 0.000 0.000 0.018
Umbumbulu Hub Upgrade Engineering- Ims 0.439 0.441 0.179
Qiniselani Nempilo garden PRC- Parks 0.200 0.000 0.000
Ekuthuleni Club Garden PRC- Parks 0.000 0.000 0.107
Low volume roads upgrade Engineering - RSWM 6.725 5.480 0.000
Zwelibomvu/Isimahla RHP (Ward 100, 12) Planning 0.450 0.000 0.000
Zwelibomvu/Vumazonke RHP Planning 0.450 0.000 0.000
Vumengazi/Ngoyameni Rural Planning 0.000 6.972 15.000
Vumengazi Planning 1.000 0.000 0.000
CAPITAL BUDGET 2015/16 MTREF WARDS ALLOCATION
NORTH REGION, SOUTH REGION, WESTERN REGION, CENTRAL REGION
BLOCKSUMS – PROJECTS TO BE ALLOCATED TO SPECIFIC WARDS DURING THE
COURSE OF THE YEAR
95
CAPITAL BUDGET 2015/16 MTREF BLOCKSUMS
Budget 2015/16
RmBudget 2016/17
RmBudget 2016/17
RmBlocksum Engineering - Stomwater 112.299 140.487 43.500Northern areas road Upgrades 61.710 118.825 0.000Emergency funding - all zones 32.700 21.662 30.000StormWater System Upgrades - Zone 16 6.884 0.000 6.000Other Engineering (various small projects) 11.005 0.000 7.500 Ethekwini Authority 139.100 269.690 325.538ITS & IFMS - PTIS funded 100.000 200.000 250.000Planning & Programme Support - PTIS funded 25.000 25.000 25.000PT Ranks Holding areas 0.000 10.000 10.000PT Fundamental Restructuring (Existing) 0.000 9.690 9.538Intelligent T/port sys. (ITS) Traffic Mgm. 2.000 4.000 4.000Traffic calming - High order roads - Various 0.000 5.000 5.000Pedestrian Safety 0.000 5.000 6.000Other ETA (various small projects) 12.100 11.000 16.000 Water 215.119 275.187 292.040Bulk sales meters 4.387 25.248 27.422Domestic meters - Installation 7.897 13.242 13.711Reservoir refurbishment 10.529 8.828 10.969Waterloss 55.000 60.000 59.413Relays & Extension 28.077 29.132 31.992Prv Installation 35.096 35.312 36.562Replacement of Water pipes 20.000 20.000 27.422Rural Water 21.645 44.140 41.132Labour Based Construction - Housing ( Water) 6.098 0.000 9.141Water meters 8.774 8.828 4.570Other Water (various small projects) 17.616 30.457 29.707
CAPITAL BUDGET 2015/16 MTREF BLOCKSUMS
Budget 2015/16
RmBudget 2016/17
RmBudget 2016/17
RmBlocksum provided Sanitation 276.690 294.035 230.707Ablution Blocks - In Situ Upgrade 250.000 260.000 210.470Rural Sanitation 12.284 20.000 20.237Other Sanitation (various small projects) 14.406 14.035 0.000 Electricity 16.100 34.500 42.000
MV/LV Service Connections-Change over applications 1.000 30.000 35.000MV/LV Reinforcement UGM 15.000 1.500 1.500Other Electricity (various small projects) 0.100 3.000 5.500 Health, Safety and Security services 3.755 1.006 1.600Mobile Clinics ( Service to Rural Areas) 1.755 0.000 0.000Other health (various small projects) 2.000 1.006 1.600 Parks ,Recreation, Cemeteries, Libraries and Culture 19.273 25.737 18.309Purchase of Library Books 12.737 14.125 7.883
Other Parks ,Recreation ,Cemeteries, Libraries and Culture (various small projects) 6.536 11.612 10.427 Treasury – Real Estate 3.948 3.496 4.000Land acquisition 3.948 3.496 4.000 Total Blocksum Allocation 786.284 1044.138 957.694
SERVICE DELIVERY OUTPUTS
98
SOUTH REGION (Ward no 67,68,74,75,76,77,78,79,80,81,82,83,84,85,86,87,88,89,90,93,94,95,96,97,98,99,100)
Service delivery outputs for the next 3 financial years are as follows:
Service 2015/16 2016/17 2017/18
Number of Houses 1 218 1 310 1 270Number of Water Connections 3 610 2 602 4 730Kilometres of New & Replacement Pipes 361 260.2 473Number of Water Treatment Works 3 4 Number of Ablution Facilities 166 185 141Number of Sewer Connections 2 610 1 902 4 430Kilometres of Waste Water Pipes 261 190.2 443No. of Houses Receiving Solid Waste Service 248 902 278 130 478 730Kilometres of Gravel to Black-Top 2 175 1 354 2 916Number of Lane Kilometres on Road Rehabilitation (Across All Wards)
200 220
Kilometres of Sidewalks 4 435 6 622 2 306Number of Stormwater Systems Upgraded 3 1 12
Number of Sportsfields to be Built/ Maintained/ Upgraded
4 4 3
Number of Libraries to be Built/ Maintained/ Upgraded
8 2 5
Number of Agricultural Hubs 31 31 31Number of Parks to be Built/ Maintained/ Upgraded 6 6 6
Number of Community Halls to be Built/ Maintained/ Upgraded
3 3 3
Number of Fire Stations to be Built/ Maintained/ Upgraded
1 4
Number of Pedestrian Bridges 2 1 Number of Beaches to be Built/ Maintained/ Upgraded
3 3 3
• Municipal Systems Act requires an IDP and Performance Scorecard to be compiled and is linked to the term of office for local councillors.
• During the course of the 5 year period the IDP including the Performance Scorecard is reviewed on an annual basis.
• The City’s delivery plan is organized into 8 separate but related plans.• The plans are supportive of each other to ensure effective delivery. • Eight Plans are as follows:
– Plan One: Develop and Sustain our Spatial, Natural and Built Environment – Plan Two: Developing a Prosperous, Diverse Economy and Employment Creation. – Plan Three: Creating a Quality Living Environment – Plan Four: Fostering a Socially Equitable Environment. Fostering a Socially Equitable Environment. – Plan Five: Creating a Platform for Growth, Empowerment and Skills Development – Plan Six: Embracing our cultural diversity, arts and heritage. – Plan Seven: Good Governance and Responsive Local Government. – Plan Eight: Financially Accountable and Sustainable City.
The Performance Scorecard measures the delivery on the Eight Plans and the Strategic Focus Areas
IDP AND SCORECARD REVIEW
• All municipalities and municipal entities must prepare an annual report at the end of each financial year - Section 121 (1) of the Municipal Finance Management Act 56 of 2003 (MFMA)
• eThekwini Annual Report 2013/14 was tabled at Council on 29 January 2015
• Annual Report released for public comment in February 2015• Oversight Report of Annual Report process and final comments was
adopted at Council on 31 March 2015• Final print version of the Annual Report will be available by July 2015;
the report is currently available on www.durban.gov.za
ANNUAL REPORT PROCESS
THANK YOU