SouthGrid Technical Meeting. Pete Gronbech SouthGrid Technical Coordinator EVO March 2012. Q411 Metrics. Overall delivering more CPU (185%) and Disk (236%) than the MoU. Slight increase compared to earlier in the year, but major changes will come with the GridPp4 h/w tranche purchases - PowerPoint PPT Presentation
Popular Tags:
14
SouthGrid Technical Meeting Pete Gronbech SouthGrid Technical Coordinator EVO March 2012
Transcript
Page 1: SouthGrid Technical Meeting

SouthGridTechnical Meeting

Pete GronbechSouthGrid Technical Coordinator

EVOMarch 2012

Page 2: SouthGrid Technical Meeting

Q411 Metrics

Overall delivering more CPU (185%) and Disk (236%) than the MoU. Slight increase compared to earlier in the year, but major changes will come with the GridPp4 h/w tranche purchases

Availability/reliability dropped at most sites; Why?

CPU utilisation remains acceptable.

2SouthGrid January 2012

% of promised (by that time) disk available to GridPP

% of promised (by that time) CPU availableAverage SAM (SLL page) availability performance over the last quarterAverage SAM (SLL page) reliability performance over the last quarterAverage SLL untargeted ATLAS test performance (UK test)

Approx. CPU utilisation (wall clock time)

Approx. CPU utilisation (CPU time)

Page 3: SouthGrid Technical Meeting

SouthGrid January 20123

UK Tier 2 reported CPU

– Historical View to present

Page 4: SouthGrid Technical Meeting

SouthGrid January 20124

SouthGrid SitesAccounting as reported by

APEL

Page 5: SouthGrid Technical Meeting

What about the rest of GridPP sites?

SouthGrid January 20125

Page 6: SouthGrid Technical Meeting

Other GridPP Tier2 Resources

• NorthGrid

 Total available to

GridPPPromised (GridPP MoU

2011)

SiteHEPSPE

C06Storage

(TB)CPU

(HS06)Storage

(TB)

Lancaster 28627 992 3395 515

Liverpool 8390 543 2996 554

Manchester 22264 687 7284 224

Sheffield 4800 298 1198 252

Totals 64081 2520 14873 1545

SouthGrid January 20126

 Total available to

GridPPPromised (GridPP MoU

2011)

SiteHEPSPEC

06 Storage (TB) CPU (HS06) Storage (TB)DURHAM 8141 23 3916 104ECDF 14445 177 3118 77GLASGOW 21300 1363 11638 1341

• ScotGrid

 Total available to

GridPPPromised (GridPP MoU

2011)

SiteHEPSPEC

06 Storage (TB) CPU (HS06) Storage (TB)UKI-LT2-Brunel 11371 570 6317 176UKI-LT2-IC-HEP 17993 1200 19439 522UKI-LT2-QMUL 28622 1320 6302 956UKI-LT2-RHUL 9558 706 4620 213UKI-LT2-UCL-HEP 2006 159 515 14Totals 69550 3955 37193 1881

• LondonGrid  Total available to

GridPPPromised (GridPP MoU

2011)

SiteHEPSPEC

06 Storage (TB) CPU (HS06) Storage (TB)EFDA JET 1772 10.5 0 0Birmingham 3345 195 2119 95Bristol 2247 110 1173 27Cambridge 2445 255 1445 135Oxford 8961 620 2483 255RALPP 18974 1060 13109 440         Totals 37744 2250 20329 951

• SouthGrid

Page 7: SouthGrid Technical Meeting

Gridpp4 h/w generated MoU for 2012-14

2012 TB 2013 TB 2014 TB

bham 265 282 346

bris 96 96 116

cam 123 139 167

ox 409 456 549

Jet 19 21 26

RALPPD 830 862 1034

Total 1744 1857 2237

2012 HS06 2013 HS06 2014 HS06

bham 3375 3305 4184

bris 1651 1619 1982

cam 730 770 949

ox 3287 3372 4173

Jet 166 169 208

RALPPD 10082 9959 12243

7SouthGrid January 2012

Old MoU GPP3 h/w 2012 TB

bham 124

bris 35

cam 174

ox 328

RALPPD 573

Total 1244

2012 HS06

bham 2724

bris 1429

cam 1738

ox 2974

RALPPD 16515

Page 8: SouthGrid Technical Meeting

Future Resources

• New MoU’s show lack of Storage space at Birmingham, and Jet, with a problem at Bristol in 2014

• Shortage of CPU at Birmingham by 2014.

• This all assumes current levels of resources at sites. Old storage and CPU will come out of warrantee and be retired so new purchases need to maintain enough resource to cover the MoU commitments

SouthGrid January 20128

Page 9: SouthGrid Technical Meeting

GridPP4 h/w Grants

SouthGrid January 20129

Brunel

IC

QM

RH

UCL

LAN

LIVMAN

SHEF

DU

EC

GLA

BHAM

BRIS

Cam

OX

RAL

jet

Sussex

68000

133500

107000

66500

7500

78500

40500

92000

32000

5500

33000

114500

35500

14500

13000

45500

109500

0

5000

Actual Grants

Actually £3000

Page 10: SouthGrid Technical Meeting

DRI Grants

• An unexpected bonus was the Digital Research Infrastructure Proposal. Work started in late October, and by the end of the year we had submitted grant requests for a total of £3m.

10

Site Gridmon PerfSonnar Inc VAT Grant AwardBirmingham £91,900 £2,000 £112,680 £112,500Bristol £52,000 £2,000 £64,800 £65,000Brunel £132,391 £2,000 £161,269 £161,500Cambridge £37,064 £2,000 £46,877 £47,000Durham £18,183 £2,000 £24,220 £24,000ECDF £90,123 £2,000 £4,000 £115,348 £115,500Glasgow £295,500 £12,000 £4,000 £373,800 £374,000Imperial £295,600 £2,000 £4,000 £361,920 £362,000Lancaster £229,672 £2,000 £4,000 £282,806 £283,000Liverpool £96,187 £2,000 £117,824 £118,000Manchester £165,025 £2,000 £4,000 £205,230 £205,000Oxford £127,464 £2,000 £4,000 £160,157 £160,000QMUL £247,036 £2,000 £4,000 £303,643 £303,500RALPP £64,585 £2,000 £79,902 £80,000RHUL £82,920 £2,000 £101,904 £102,000Sheffi eld £98,500 £2,000 £120,600 £120,500Sussex £21,500 £2,000 £28,200 £28,000Swansea £22,520 £2,000 £29,424 £29,500UCL £20,200 £2,000 £26,640 £26,500Warwick £15,000 £2,000 £20,400 £20,500RAL T1 £216,426 £2,000 £262,111 £262,000Total £2,419,796 £52,000 £28,000 £2,999,755 £3,000,000

Page 11: SouthGrid Technical Meeting

Procurement deadlines etc

• Both the GridPP4 h/w grant and the DRI money must be spent before the end of this Financial Year ie 31st March 2012.

• Orders had better be made now or very soon. • Invoices should be paid before 31st March 2012

SouthGrid January 201211

Page 12: SouthGrid Technical Meeting

Sussex

• Suspended or Candidate sites•  • Later this week, sites in suspended or Candidate

state for longer than 6 months will be closed - COD has collected a list of exceptions from NGIs. This does not affect any GridPP site, except maybe Sussex. I note that as per https://ggus.eu/ws/ticket_info.php?ticket=78177, Sussex is set as 'Uncertified', (my memory says it used to be 'Candidate', although I can't recall what the difference between the two is right now).

• Plans to grid enable….SouthGrid January 2012

12

Page 13: SouthGrid Technical Meeting

SL4 EOL

• SL4 support finished yesterday– What servers are still out there

• LCG-CE• DPM• ??

SouthGrid January 201214

Page 14: SouthGrid Technical Meeting

SouthGrid January 201215

Conclusions

• SouthGrid sites utilisation level except maybe RALPP?• JET will be setup for ATLAS production new h/w will help.• RALPPD still our lead site.• Sussex, Warwick and Swansea had DRI money, what will this

lead to?• Main goal at the moment is to spend the two grants asap.