+ All Categories
Home > Documents > SPANOS Newsletter Issue 3 October 2010

SPANOS Newsletter Issue 3 October 2010

Date post: 17-Mar-2016
Category:
Upload: spanos-industries-sa
View: 219 times
Download: 0 times
Share this document with a friend
Description:
Quarterly edition «SPANOS Industries UpDate» aims to communicate to its current customers, potential customers, partners and collaborators product & service news as well as all recent activities of SPANOS Group.
Popular Tags:
4
Oct. 10 SPANOS INDUSTRIES GROUP LATEST NEWS THE ÒGREEN DEVELOPMENTÓ is taking place in quick pace in the region of Central and Western Macedonia, Greece. THE RELEVANT MUNICIPALITIES of Imathia and Kozani prefectures have leased hundreds of thousands of square meters of land in rough and unapproachable areas, to ÒEnergiaki PolymylouÓ, subsidiary company of the multinational ÒGamesaÓ (Develop- ment and Sale of Aeolian Parks). The construction of the Aeolian park will also present reciprocal benefits to the relevant municipalities through the sale of electric power. Overall, 19 wind generators will be installed (each one of them will produce electric power of 2MW), and their foundations are already under construction. IN PROJECTS OF THIS NATURE, where access is almost impossible, the cost of installing a fixed concrete plant is unprofitable and some times prohibitive; taking these under con- sideration, the subcontracting joint venture Ò Techniki Anaptiksi ATEVE Ð Latomeia Vourka AVEEÓ, responsible for the concrete sector of the project, has selected and trusted the innova- tive mobile batching plant ÒMOBISPA- 2Ó by SPANOS ODYSSEAS AVETE , with a capacity of 80m3/h. According to Mr.Vourkas Nikolaos, President & Managing Director of ÒLatomeia Vour- ka AVEEÓ, the selection of MOBISPA-2 Òwas based on its top manufactur- ing quality, its rapid and cost-saving transportation, installation and opera- tion and the 24/7 and credible techni- cal support provided by SPANOSÓ. THE MOBILE CONCRETE BATCH- ING PLANT MOBISPA-2, is mounted on two (2) semi-trailers which fully cover the traffic regulations regarding dimensions, lights, signs, breaks etc and which are fully unified with the batching plant. Upon them, lie assem- bled and connected all the systems concerning storage, operation, weigh- ing, transport and mixture, and eve- rything else that renders the machine fully autonomous. THE FULL COVERAGE of the traffic regulations does not demand the issue of a special transportation license, and therefore, all that is demanded for the transportation from one job site to another is a common 2 axle tractor per semi- trailer. Green Development Innovative solutions by SPANOS for inaccessible projects of ÒGreen DevelopmentÓ
Transcript
Page 1: SPANOS Newsletter Issue 3 October 2010

Oct. 10 SPANOS INDUSTRIES GROUP LATEST NEWS

THE ÒGREEN DEVELOPMENTÓ is taking place in quick pace in the region of Central and Western Macedonia, Greece.

THE RELEVANT MUNICIPALITIES of Imathia and Kozani prefectures have leased hundreds of thousands of square meters of land in rough and unapproachable areas, to ÒEnergiaki PolymylouÓ, subsidiary company of the multinational ÒGamesaÓ (Develop-ment and Sale of Aeolian Parks). The construction of the Aeolian park will also present reciprocal benefits to the relevant municipalities through the sale of electric power. Overall, 19 wind generators will be installed (each one of them will produce electric power of 2MW), and their foundations are already under construction.

IN PROJECTS OF THIS NATURE, where access is almost impossible, the cost of installing a fixed concrete plant is unprofitable and some times prohibitive; taking these under con-sideration, the subcontracting joint venture Ò Techniki Anaptiksi ATEVE Ð Latomeia Vourka AVEEÓ, responsible for the concrete sector of the project, has selected and trusted the innova-tive mobile batching plant ÒMOBISPA-2Ó by SPANOS ODYSSEAS AVETE , with a capacity of 80m3/h. According to Mr.Vourkas Nikolaos, President & Managing Director of ÒLatomeia Vour-ka AVEEÓ, the selection of MOBISPA-2 Òwas based on its top manufactur-ing quality, its rapid and cost-saving transportation, installation and opera-tion and the 24/7 and credible techni-cal support provided by SPANOSÓ.

THE MOBILE CONCRETE BATCH-ING PLANT MOBISPA-2, is mounted on two (2) semi-trailers which fully cover the traffic regulations regarding dimensions, lights, signs, breaks etc and which are fully unified with the batching plant. Upon them, lie assem-bled and connected all the systems concerning storage, operation, weigh-ing, transport and mixture, and eve-rything else that renders the machine fully autonomous.

THE FULL COVERAGE of the traffic regulations does not demand the issue of a special transportation license, and therefore, all that is demanded for the transportation from one job site to another is a common 2 axle tractor per semi-trailer.

Green Development Innovative solutions by SPANOS for inaccessible projects of ÒGreen DevelopmentÓ

Page 2: SPANOS Newsletter Issue 3 October 2010

SPANOSÕS CONSTRUCTION SECTOR is expended with the new Carbotech K45H truck mounted concrete pump, which is developed from carbon fibre composite material. It's the first truck mounted

pump with a vertical reach of 44,1m within 32ton of weight using carbon fiber for the boom sections. HPG 1408EPC pumping unit with electronic management enables achievement of high productivity, smoothness during pumping and fuel saving. For ensure the safety, this machine has K-TRONIC stability system which provides secured operations.

K45H TRUCK MOUNTED PUMP is based on carbon fiber technology, a new direction in concrete industry, and it represents a powerful alternative for steel. Carbon fiber sections are very sustainable and have great rigidity, hence, all K45HÕs components have been optimized accordingly.

For more information visit www.cifa.com

MOBISPA-2, is both easy to transport and simple and fast to install, a fact that permits the production of high standards concrete in a few hours from the arrival of the machine in the job site, without demanding special job site preparations, special foundations etc.

THE MOBILE CONCRETE BATCHING PLANT MOBISPA-2, has been primarily fully developed from SPANOS Industries S.A. and is patented based on ΟΒΙ 2006/0100625 certificate. During designing the plant, it was fully forethought that the stability and the essential security should fully cover the demands of DIN 15018 specification.

THE MANUFACTURING QUALITY is fully certified according to ISO 9001:2008.Every batching plant bears the CE sign, which states compliance with the 2006/42 CEE regulation concerning machinery safety.

FURTHERMORE, due to the fact that the road network is used for transportation purposes, the whole structure fully covers the European directions 27/97 EC, 98/12-ECE-R13, 97/28 ECE ÐR48, 996/64 EC ,2001/43 ECE-R30, R54, R64 , 89/297EC and therefore it can move around in every country of the European Union.

THEY ARE ACCOMPANIED by detailed in-stallation and use manual as well as analyti-cal and encoded spare parts list, while their unobstructed operation is secured through the 24 hour technical support and guaranteed delivery of spare parts within 24 hours. Ad-ditionally, the specialized stuff of SPANOS provides full training of the operators through up-to-date training material.

THEIR OVERALL CHARACTERISTICS and confirmed high performance have ranked them as the safest and most cost-effective solution in the sector of mobile concrete plants worldwide.

Revolution in ConstructionCIFAÕs Carbotech K45H truck mounted concrete pump

Page 3: SPANOS Newsletter Issue 3 October 2010

New launch The new ZOOMLION GRADER PY190 has been launched by SPANOS in Kosovo

ÒThe choice for Zoomlion grader was made due

to its excellent price/quality ratio. Within only three months,

operation with PY190 completely fulfilled

our expectations. We are convinced that the

choice we made was just right... Value for money

obtained 100%!Ó

Mr. Adem Rrustemaj, share owner of Joos-Krasniqi

SPANOS HAS RECENTLY INTRODUCED the new Zoomlion grader PY190 to the Balkan market; it has been sold to Joos-Krasniqi, a German-Kosovarian construction company that is located in the area of Junik in Kosovo. Outstanding performance overland and work adaptability, clipper-built profile design, comfortable driving cab and high-power air condition, are only a few of the characteristics that make the new Zoomlion grader PY190 stand out. The grader started to operate immediately providing optimized work conditions, safety and security, under all circumstances.

THE PY190 GRADER, which is designed and manufactured using top manufacture technology and three-dimension design method, is very flexible with small turning radius, easy to handle and extremely effective in its overall performance. Its engine, a Shangcai D6224, is designed especially for construction machinery and it ensures stable and reliable power output. The ZF gearbox guarantees accurate and flexible walking and pace changing and the hydraulic system adopts international advanced control technology.

CONCERNING MAINTENANCE OF THE MOTOR, it proves to be an easy job thanks to the special open double leaf streamline.

FINALLY, as far as the noise levels are concerned, the machine is equipped with special noise killing measure which is compatible with CE authentication standard. Mr. Adem Rrustemaj, shareholder of Joos-Krasniqi was glad to share his experience: ÒThe choice for Zoomlion grader was made due to its excellent price/quality ratio. Within only three months, operation with PY190 completely fulfilled our expectations. We are convinced that the choice we made was just right... Value for money obtained 100%!Ó

ZOOMLIONÕS EARTH MOVING EQUIPMENT have been designed and manufactured in order to comply with the highest worldwide standards and overcome the most challenging conditions.

THE WHOLE ZOOMLION RANGE is available in Greece and the wider area of Balkans exclusively by SPANOS INDUSTRIES.

Page 4: SPANOS Newsletter Issue 3 October 2010

SPANOS-REDOX SPANOSÕ collaboration with REDOX

SPANOS INDUSTRIES S.A.THESSALONIKI - HEAD OFFICES3rd zone, Square Block 42, Industrial Area of Sindos, PO Box 63, GR 570 22Τel: 0030 2310 586600Fax: 0030 2310 [email protected]

ATHENS33rd km Athens - Lamia, 190 11 Polydendri - AtticaΤel: 0030 22950 23533Fax: 0030 22950 22869

LIMASSOL: SPANOS ODYSSEAS (CYPRUS) LTD208, F. Roosevelt Ave.3045 Zakaki - LimassolΤel: 00357 25 662611 & 12Fax: 00357 25 827970

BUCHAREST: SPANOS INDUSTRIA SRLDrumul Garii Nr 25-35 Otopeni, BucharestΤel: 0040 021 3524304Fax: 0040 021 [email protected]

SKOPJE: SPANOS INDUSTRIES DOOEL33a/16, Leninova St.P.O.Box 4621000 Skopje Τel: 00389 70393287Fax: 00389 [email protected]

TIRANA: SPANOS ALBANIA SHPKAutostrada Durres-Tirane, km 18 Marikaj Τel: 00355 575 80602Fax: 00355 575 [email protected]

PRISHTINŒE: : SPANOS KOSOVA SHPKMagistralja Prishtin‘-Shkup, Kilometri i 4-te, 10000 Prishtin‘, KosovaTel: 00381 38564210Fax: 00381 [email protected]

www.spanos.com.gr

BEING AWARE OF THE IMPORTANCE OF THE RE-CYCLING, SPANOS Group became exclusive dealer for REDOX Recycling Technology which is special-ized for supplying, engineering, process technology and project management of the sorting lines for solid waste. Throughout cooperation, SPANOS of-fers applied, customized and flexible recycling solu-tions, which respond to contemporary trends.

REDOX IS THE NUMBER ONE SPECIALIST and sup-pliers of recycling systems on international level where sorting lines extract materials, such as met-als, wood, paper and aggregates. Each process of production has its own specific characteristics and its analogous waste stream. REDOXÕs specialized knowledge, experience, new technologies and ultra-modern machinery guarantee the effective recycling for the following waste streams:– Construction, Demolition & Excavation site waste– Industrial and Commercial Waste– Organic waste and compost– Packaging Material and co-mingled waste– Glass– Alternative fuel production, RDF, SRF & biomass– Municipal Solid Waste– Gypsum Recycling– Customized Recycling Solutions– Treatment of Industrial Waste Water– Waste Water to Energy

BEFORE THE INSTALLATION, all ma-chines are assembled in the production hall and extensively tested. This guaran-tees the proper operating of machines and avoids any unnecessary delays during installation. The installation takes from few days to several weeks depending of the complexity. In addition, costs and efficiency are taken under consideration, hence the solutions are not only reliable, but very favorable as well.

THE SYSTEMS HAVE ALREADY STARTED to be active in Greece and Cyprus, while the operation in other subsidiaries is expected.

For further details please contact:

Thessaloniki: Mr. Theodoros Kosmidis [email protected]

Athens: Mr. Constantinos Vasilas [email protected]

Limassol: Mr. Charalampos Vafiades [email protected]

Tirana: Mr. Ermir Goci [email protected]

Skopje: Mr. Aleksandar Telenta [email protected]


Recommended