2017Special Economic Zone At
Duqm
Location
Location & Size
• Private-sector Opportunities
• Public-Private-Partnerships
• Government Projects
Location & Size
Location & Size
• Private-sector Opportunities
• Public-Private-Partnerships
• Government Projects
Location & Size
• Private-sector Opportunities
• Public-Private-Partnerships
• Government Projects
Location
• Politically stable and secure national context.
• Strategic location on international maritime routes outside the Straits of
Hermuz.
• Proximity to the giant Asian markets and the oil-rich Gulf countries.
• Pristine beaches and abundant fish stock.
• Preferential access under GCC, GAFTA, and US FTA.
• Good weather all year
Incentives
• Lucrative tax exemptions and no FDI restrictions.
• Transparent and proactive regulatory environment.
• 100% foreign ownership
• Exemption from Taxes (30 years)
• The Capital Of the Project can be fully owned by non Omanis
• No currency restrictions and trading
• No minimum capital requirement
• Exemption from import & export duties
• Zero corporate tax
• Zero personal income tax
One-Stop-Shop
• SEZAD offers a single point of contact.
• It provides investors with transparent, efficient and timely regulatory services in terms of:
• Tax exemption package
• Business registration
• Planning and construction permits
• Environmental approvals
• Business Licensing
• Facilitate the process for obtaining work permits for expat work force.
Master Plan
HEAVY INDUSTRIAL ZONE
MEDIUM INDUSTRY ZONE
LIGHT INDUSTRY ZONE
LOGISTICS
FISHERIES ZONE
TOURISM ZONE
CENTRAL BUSINESS
DISTRICT
RENEWABLE
ENERGY ZONE
RESIDENTIAL ZONE
Duqm Logistics
• Through Air, the airport is operating, daytime flights, cargo, maintenance hall and tower are under construction, finished by 2018.
• Through sea, the port is operating and will be in full fledge on 2020.
• Through inlands roads, high quality infrastructure
• Through rail, coming soon
Investment Opportunities
• Private-sector Opportunities
• Public-Private-Partnerships
• Government Projects
Investment Opportunities
• Oil Refinery and Petrochemical complex
• Availability of mineral resources: limestone, silica, basalt and
marble
• Manufacturing: Glass, Cement, Paints & Coatings, Fertilizers,
Granite Fiber, Ceramic Tiles & Fixtures, Solvents, Detergents,
Adhesives and Polymers
Investment Opportunities
Duqm Touristic Development
• Hotels • 2 up and running (Sea front hotels)
• 450 rooms
• 73 chalets
• Hotel City Hotel
• 2 committed Full fledge entertainment projects
• Rock Garden
16
Tourism Attractions
Long coastline
Beautiful sandy beaches
17
18 18
Supporting Services
SMEsEducation &
TrainingSoftware &
ICTCommercial &
Financial
Engineering & Construction
Private-sector Opportunities
Industrial Land Lease Rates
Industrial Land Lease Rates
• Power Generation & Desalination
• Renewable energy: wind and solar
• Waste management: residential and industrial
• Education and Training
• Health Care facilities
• Air cargo facilities
• Additional port facilities
• Additional new dry dock facilities
Public-Private Partnerships
Duqm Refinery
Oil Refinery: Oman Oil Company in
cooperation with the International
Petroleum Investment Company will
establish an oil refinery with a
potential capacity of 230,000 barrels
per day (bpd).
Oman Tank Terminal
• A large scale oil Storage terminal at Ras markaz. • A crude oil pipeline from the Oil fields vis Al Nahada
to Ras Markaz
Floating Storage
Crude Hub
Land Storage
Castor Oil Project
• SEBACIC Oman is 63$ million castor oil project in Duqm
• The project is currently under construction
Renaissance Labor Camp
• Over 16,000 beds
• Total build up area is around 200,000 m2
• World-class accommodation for workforces
• The Project cost Around RO 100 million
27
• On a land area of 1,170 hectares
• Is divided into: Heavy Industries –Light Industries –Mixed use land - Hotel
International School
• The school will have 100 classrooms with a maximum of 2,500
students and both Omani and expatriate students can enroll in the school.
• phase I will have a built up area of 6,500 square meters, while
phase II will have an area of 5,500 square meters
SUMMARY ON NUMBER OF PROJECT’S(END OF APRIL 2017)
On-goingTendering
stage
Maintenance
projects
TORpreparatio
n
Completed projects
in 2016Total
Construction Projects 18 4 2 4 5 33
Consultancy Projects 12 2 0 0 1 15
0
5
10
15
20
25
30
35
Construction Projects Consultancy Projects
AWARDED PROJECT’S COST(GRAND TOTAL)
Total Cost
705,540,433 OMR
Consultancy
30,893,557 OMR
Construction
624,847,394 OMR
Maintenance
577,714 OMR
Project’s Cost Awarded in Feb 2017
49,085,667 OMR
GLIMPSES OF PROJECTSConstruction of SEZAD HQ Building
Atrium area glass fixing
Basement floor Epoxy painting
A view of SEZAD HQ Building
GLIMPSES OF PROJECTS
Construction of 150 Housing Units
A view of 150 Hosing Units
villas constructed for
MOH
GLIMPSES OF PROJECTS
SEZAD ROAD PROJECTS LAYOUT
GLIMPSES OF PROJECTS
Construction of Roads & Infrastructure for 150 Housing Units at Duqm
Inter Lock work
Road Marking work in progressBituminous Base Course
GLIMPSES OF PROJECTSMain Road Improvement at Duqm
Sultan Said Bin Taimur Road Planting Palm Trees Work In Progress
A View of Interlock Blocks fixing
GLIMPSES OF PROJECTSDESIGN AND CONSTRUCTION OF SERVICE ROAD & ANCILLARY
WORKS AT TOURIST ROAD
A VIEW OF SUBGRADE WORKS Embankment Grading Works
GLIMPSES OF PROJECTSConstruction of Interface Roadway Projects in Duqm (Road Sections 4)
Reinforced Concrete for Channel Base Slab Embankment progressing Structural Excavation Work in progress
GLIMPSES OF PROJECTSConstruction of Interface Roadway Projects in Duqm (Road Sections 2 & 3)
Ditch Lining work in progress
Utilities Ducts work in progress
Side Slope Trimming in progress
Bituminous Base Course Laying work in progress
Curb Stone in progress
GLIMPSES OF PROJECTSRoad to Automobile Assembling Facilities in Light & Medium
Industrial Zone In Duqm (KARWA)
PRIME COAT SPREADING
BITUMINOUS BASE COURSE LAYING AGGREGATE BASE COURSE LAYING
GLIMPSES OF PROJECTS
IP3 - Construction of Roads, Infrastructure & Buildings at the
Commercial Pre-gate, Gates and Inspection Zone, Port of Duqm
Load Test on Pile Type
Concrete channel 5A-1 base concrete
Pile Head Preparation
GLIMPSES OF PROJECTS
IP4 – Construction of Roads, Infrastructure & Building Works at the
Government Berth Area, Port of Duqm
Road Subgrade improvement layer
Construction of Ditch
Wall Rebar work for U/G OWS
Piling for Column Foundation
Water Proofing for Column Foundation
GLIMPSES OF PROJECTSIP2 – Construction of Roads, Infrastructure & Buildings at
Commercial Terminal and Operational Zone Areas, Port of DuqmSoil Investigation work in progressConcreting work in progress
CPT moving on site for
Vibro Compaction
WorkFormwork installation work in progress
GLIMPSES OF PROJECTSIP7: New Liquid Bulk Berths in the Port of Duqm
Liquid Berth Terminal
GLIMPSES OF PROJECTSFishery Port & Fishery Industrial Area
Master Layout
Marine and Road Work in progress
Proposed Master Plan
GLIMPSES OF PROJECTS
Construction of Jurf & Saay Channels at Duqm
Channels Excavation work in progress and Batching
Plant view
GLIMPSES OF PROJECTS
Construction of Jurf & Saay Protection Dams at Duqm
Dam foundation work in progress
Drilling work in progress at dam axis
Work in progress in area needs dewatering
GLIMPSES OF PROJECTS
New Airport Project Under Construction By MOTC
Air Traffic Control
Passenger Terminal Building
Cargo Building
Industrial Zone
HEAVY INDUSTRIAL ZONE
MEDIUM INDUSTRY ZONE
LIGHT INDUSTRY ZONE
Tourism & Real Estate
TOURISM ZONE • 24 km2 including 18 km of beaches
CENTRAL BUSINESS DISTRICT
RESIDENTIAL ZONE
Residential Projects
• Major residential developments
• First 23 ha handed over (Fronteer Town)
• 150 villa project for the locals