+ All Categories
Home > Documents > Specif,Const & QC Works .pdf

Specif,Const & QC Works .pdf

Date post: 02-Jun-2018
Category:
Upload: tinwin-htut
View: 236 times
Download: 0 times
Share this document with a friend

of 91

Transcript
  • 8/10/2019 Specif,Const & QC Works .pdf

    1/91

    Specifications, Construction Procedures

    and Quality Control Works

    for

    Road Construction

  • 8/10/2019 Specif,Const & QC Works .pdf

    2/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    3/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    4/91

    Embankment

    Material Specification

    Soil which is free from vegetable and deleterious material can

    be used.Liquid Limit .. 45

    Plasticity Index .. 18

  • 8/10/2019 Specif,Const & QC Works .pdf

    5/91

    Layer Specification

    Degree of Compaction ..... 90% (Mod.)

    Moisture content of soil before rolling . OMC 2%

    Camber and Level

    - Deviation under 10 straight edge applied both

    parallel and right angle to the centre line

    the road . > 9.5mm (3/8")

    - Level of the top most compacted surface . > Specified Level

    . < Specified Level

    - 12.5mm (1/2")

    Embankment

  • 8/10/2019 Specif,Const & QC Works .pdf

    6/91

    Degree of Compaction

    Degree of Compaction =( % ) Max: Dry Density obtained at Lab:

    Dry Density achieved at Field x100

    100

    100d

    d

    = dry density

    = bulk density

    = moisture content

  • 8/10/2019 Specif,Const & QC Works .pdf

    7/91

    Compaction Test at Lab ( Modified )

  • 8/10/2019 Specif,Const & QC Works .pdf

    8/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    9/91

    Construction Technique1. Remove top soil average 6" depth including clearing grass ,

    shrub, tree, stumps, down timber, rubbish and objectionable

    materials.

    2. Spread soils in layers

    3. Each loose layer thickness . 9"

    4. Break lumps and clods of soils into smaller particles.

    5. Add or reduce water so that moisture content = OMC(Mod.) 2%

    Embankment

  • 8/10/2019 Specif,Const & QC Works .pdf

    10/91

    Construction Technique (cont:)6. Compact using heavy compaction equipment to obtain the

    required Degree of Compaction.

    7. Measure density and moisture content.8. Measure camber and level.

    9. Compacted layer which does not conform with layer specification

    shall be dug out, adjusted and re-compacted to conform.

    Embankment

  • 8/10/2019 Specif,Const & QC Works .pdf

    11/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    12/91

    Subgrade

    Material Specification

    Borrow soil shall be used.

    Liquid Limit .. 40

    Plasticity Index .. 14

  • 8/10/2019 Specif,Const & QC Works .pdf

    13/91

    Layer Specification

    Degree of Compaction ..... 95% (Mod.)Soaked CBR .. design CBR

    Moisture content of soil before rolling . OMC 1%

    Camber and Level

    - Deviation under 10 straight edge applied both

    parallel and right angle to the centre line

    the road . > 9.5 mm (3/8")

    - Level of the top most compacted surface . > Specified Level

    . < Specified Level

    - 12.5 mm (1/2")

    Subgrade

  • 8/10/2019 Specif,Const & QC Works .pdf

    14/91

    Construction Technique

    1. Spread and compact soils in layers.2. Each loose layer thickness N.G.T. 9".

    3. Break lumps and clods of soil into smaller particles.

    4. Add or reduce water so that moisture content = OMC( Mod.) 1%

    5. Compact using heavy compaction equipment to obtain required

    density.

    6. Measure density and moisture content.

    7. Measure camber and level.

    8. Subgrade which does not conform with the layer specification shall

    be dug out, adjusted and re-compactde to conform.

    Subgrade

  • 8/10/2019 Specif,Const & QC Works .pdf

    15/91

    Quality Control

    Measurement of Density and Moisture content

    - Frequency of Measurement 1/93 m 2 (1/1000 ft 2 )

    Measurement of Camber and Level

    - Frequency of Measurement ... 1/30 m (1/100ft)Measurement of Thickness

    - Frequency of Measurement ... 1/30 m (1/100 ft)

    In consultation with the Quality Control Engineer frequencyof measurement may be changed depending on the quality and

    uniformity of the construction.

    Subgrade

  • 8/10/2019 Specif,Const & QC Works .pdf

    16/91

    Tests for Measuring Degree of Compaction

    Core Cutter Method

    - for fine grained soils free from stones.

    Sand Replacement Method (Sand Cone)

    - for fine, medium and coarse grained soil

  • 8/10/2019 Specif,Const & QC Works .pdf

    17/91

    Core Cutter Test (Density) Sand Cone Test (Density)

  • 8/10/2019 Specif,Const & QC Works .pdf

    18/91

    Notes- v rf;ab ;rS borrow soil , lv dkv Qi f wmajcrS 30 t jyi fb u frS, l&rn f/-wHwm;t prSv rf;wmzu fo dkYwzgv Hkt wGi f; ajrrwl;&/- v rf;wmab ;wzu fwcsu frSp t v , fydki f;o dkYa&TUv sm; u m;v rf;v m;&m

    t wdki f;ci f;Mu dwf wn faq mu f&rn f/- v rf;wm (Embankment ) av smapmi f;rsm;u dkrBu dwfEdki fv Qi fwn faq mu fpOf

    v rf;wmt u s, fx u f 2 ab ;u dkwdk; wn faq mu fNyD;rSjyefckwfjzwf&rn f/

    - Abutment ESi fhu yfv su f Roller 0i fMu dwf&efcu fcJao mt u s, fwGi f Sand +Gravel t o kH;jyK t v Tmv dku f hand compactor o kH; ci f;Mu dwf&rn f/

    Embankment and Subgrade

  • 8/10/2019 Specif,Const & QC Works .pdf

    19/91

    Notes (cont:)

    - v rf;wmab ;&Sdt jri fhq Hk; a&wu fEdki fao mt jri fhx u ft en f;q Hk; 3 jri fhNyD;wn faq mu f&rn f/

    - t v Tmv dku f (wpfv Tmv Qi fo wfrSwft x lx u frydkb Jo wfrSwfo dyfo n f;rI&at mi f ci f;Mu dwf wn faq mu f&o n f/

    8 ~ 10 ton Roller o kH;v Qi f 9" t yGt x l jzefUMu dwf&ef/20 ~ 30 ton Compactor o kH;v Qi f 12" t yGt x ljzefUMu dwf&ef/

    Embankment and Subgrade

  • 8/10/2019 Specif,Const & QC Works .pdf

    20/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    21/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    22/91

    Layer SpecificationSoaked CBR of compacted layer 30%

    Degree of compaction 98% ( Modified )Moisture content of compacted material omc(Mod.) 1%Compacted thickness:-- Average compacted thickness Design thickness

    - Compacted thickness at any point < Design Thickness- 12.5 mm (1/2)

    Camber and level- Deviation under 10 ft straight edge applied both parallel and at

    right angled to the centre line of the road > 6.5 mm (1/4)- Level of the top most compacted surface . > Specified level. < Specified level

    - 6.5 mm (1/4)

    Granular Sub-base Course

  • 8/10/2019 Specif,Const & QC Works .pdf

    23/91

    Construction Technique

    1. Mix granular material at mixing yard.2. Spread granular material on accepted sub-base.

    3. Check camber.

    4. Compact thoroughly with 8 to 10-ton smooth wheeled roller,

    vibration rollers & tyred rollers.

    5. Measure degree of compaction of the compacted layer.

    6. Measure compacted thickness.

    7. Measure camber and level. Compacted layer which does notconform to the layer specification shall be dug out, adjusted and

    re-compacted to conform.

    Granular Sub-base Course

  • 8/10/2019 Specif,Const & QC Works .pdf

    24/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    25/91

    Crushed Rock Sub-base Course

    Material Specification

    Crushed rock shall be used.

    Material shall lie within the following grading : -

    COARSE AGGREGATE

    Size % Passing4.00" 10

    3.50" 90 - 1002.50" 25 - 601.50" 0 - 150.75" 0 - 5

  • 8/10/2019 Specif,Const & QC Works .pdf

    26/91

    Material Specification (cont:)

    KEYSTONE

    Size % Passing3/8" 100

    3/16" 85 - 1000.006" 10 - 30

    Los Angles Abrasion . 50 %

    Crushing Value .. 40 %

    Flakiness Index .. 40 %

    Sub-base

  • 8/10/2019 Specif,Const & QC Works .pdf

    27/91

    Layer Specification

    CBR 30 % ~ 40 %

    Compacted thickness

    - Average compacted thickness < Design thickness

    - Compacted thickness at any point ...< Design Thickness

    -12.5mm (1/2)

    Camber and level

    - Deviation under 10 ft straight edge applied both parallel and at

    right angled to the centre line of the road . > 9.5 mm (3/8)

    - Level of the top most compacted surface . > Specified level

    . < Specified level

    -12.5 mm (1/2)

    Sub-base

  • 8/10/2019 Specif,Const & QC Works .pdf

    28/91

    Base

    Material Specification

    Crushed rock shall be used as base material. Grading and physical properties of coarse aggregate shall be as follows:-

    Size % Passing3.0" 1002.5" 90 - 1002.0" 35 701.5" 0 15

    0.75" 0 - 5

  • 8/10/2019 Specif,Const & QC Works .pdf

    29/91

    Base Material Specification (cont: )

    Specific Gravity = 2.5 - 3.0Los-Angeles Abrasion Value........... 40%

    Crushing Value ......... 30%

    Absorption ........... 2%

    Flakiness Index ........ 30%Properties of stone screening shall be as follows:

    Size % Passing

    3/8" 100

    3/16" 85 - 100

    0.006" 10 - 30

    It shall be clean and free from clay or vegetable matter and

    Plasticity Index ..... 6%

  • 8/10/2019 Specif,Const & QC Works .pdf

    30/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    31/91

    Construction Technique

    1. Spread material in layers. Each compacted layer shall not exceed

    twice the maximum size of the coarse aggregate.

    2. Check camber and level and make adjustment.

    3. Compact thoroughly with 8 to 10-ton smooth wheeled roller.

    4. Measure CBR and density of the compacted layer.

    5. Measure compacted thickness.

    6. Measure camber and level. Compacted layer which does notconform to the layer specification shall be dug out, adjusted and

    re-compacted.

    Sub-base and Base

  • 8/10/2019 Specif,Const & QC Works .pdf

    32/91

    Quality Control

    Measurement of C.B.R

    - Frequency of Measurement 1/93 m 2 (1/1000 ft 2 )

    Measurement of compacted thickness

    - Frequency of Measurement ... 1/30 m (1/100 ft)Measurement of Camber and Level

    - Frequency of Measurement ... 1/30 m (1/100 ft)

    In consultation with the Quality Control Engineer frequency

    of measurement may be changed depending on the quality and

    uniformity of the construction.

    Sub-base and base

  • 8/10/2019 Specif,Const & QC Works .pdf

    33/91

    California Bearing Ratio (CBR)

    The percentage of California Bearing Ratio can be calculated by,

    Load on test specimen(at the same penetration)

    Load on standard crushed rock(at the same penetration)

    CBR % = X 100

  • 8/10/2019 Specif,Const & QC Works .pdf

    34/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    35/91

    Notes

    - t o kH;jyKao mv rf;ci f;ypn f;o n f Sub-base / Base wGi ft o kH;jyK&ef o i fhawmf ao mt &n ft ao G;&Sd&rn f/- t v Tmwpfv Tm\ t x lo n f t o kH;jyKao mcGJau smu ft Mu D;q kH;t G, f\ 2q x u

    rx lo i fhyg/

    - cGJau smu frsm;o wfrSwf&G, faphpkH (well graded) yg&rn f/- Base v Tmwn faq mu f&mwGi f cGJau smu fv Tmab ;o dkYa&TUx Gu fjci f;r&Sdap&ef t rmcHv rf;ykcHk;t m; wNydKi feu f u yfci f;NyD; , i f;v rf;ycHk;t ygt 0i f basecGJau smu fv Tmt m; v rf;\ v m;&mt wdki f;Bu dwf&rn f/

    - Base ci f;NyD; u m;rsm;ay;jzwfygu riding comfort t wGu f o Jyg;yg;ci f;cJhv Qi f surface course rwi fci fao csmo Jrsm;v SJx kwfNyD;rSsurface course wi f&rn f/Interlooking au mi f;ap&efjzpfo n f/

    Sub-base and Base

  • 8/10/2019 Specif,Const & QC Works .pdf

    36/91

    Prime Coat Material Specification

    Either slow curing or medium curing cut-back bitumen shall be used.

    Preparation of materials.

    Medium curing cut-back

    - 55% to 65% of 80-100 penetration grade bitumen and- 35% to 45% of the mixture of 3 parts kerosene and one part

    diesel

    (or)

    Slow curing cutback - 50% to 60% of 80-100 penetration grade bitumen and

    - 40% to 50% of diesel

  • 8/10/2019 Specif,Const & QC Works .pdf

    37/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    38/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    39/91

    Construction Technique (cont: )

    4. Never allow the traffic during the curing period.

    5. If bitumen has not been completely absorbed by the base

    course within 24 hours after the priming, light sand blinding

    shall be applied.

    6. Sweep all loose excess sand.

    Prime Coat

  • 8/10/2019 Specif,Const & QC Works .pdf

    40/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    41/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    42/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    43/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    44/91

    Construction Technique

    1. Prior to application of bitumen loose dirt and other objectionable

    materials shall be removed from the surface by means of broom.

    2. Bitumen shall be sprayed uniformly at the specified spraying

    temperature.3. Immediately following the spraying of bitumen and while it is still

    warm the chipping for the first dressing shall be spread uniformly

    at the specified rate.

    Double Bituminous Surface Treatment(D.B.S.T)

  • 8/10/2019 Specif,Const & QC Works .pdf

    45/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    46/91

    Construction Technique (cont: )5. Spray bitumen for the second dressing as mentioned in

    paragraph 2.

    6. Spread chipping for the second dressing as mentioned in

    paragraph 3.7. Roll as mentioned in paragraph 4.

    8. The pavement may be opened to traffic as soon as the dressing has

    cured sufficiently to prevent the chipping from being picked up by

    the wheel of the vehicles passing over it.

    Double Bituminous Surface Treatment(D.B.S.T)

  • 8/10/2019 Specif,Const & QC Works .pdf

    47/91

    Quality Control

    Measurement of spraying temperature and rate :-

    - Frequency of Measurement = Every furlong (Max.)

    Measurement of spreading rate of chipping :-

    - Frequency of Measurement = Every 1/2 furlong (max.)

    Double Bituminous Surface Treatment(D.B.S.T)

    In consultation with the Quality Control Engineer frequency

    of measurement may be changed depending on the qualityand uniformity of the construction.

  • 8/10/2019 Specif,Const & QC Works .pdf

    48/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    49/91

    Semi-grout Penetration Macadam (cont: ) Material Specification (cont: )

    Specific Gravity 2.5 - 3.0Silt and Clay Content 2.0%

    Los Angles Abrasion Value 40.0%

    Crushing Value 30.0%

    Absorption 2.0%Flakiness Index 30.0%

    Bitumen

    - 80/100 pen. grade bitumen shall be used.

    - Rate of spray = 0.50 - 0.56 ( 0.6 ) gal./sq.yd. (1st. application)- Rate of spray = 0.22 - 0.3 ( 0.22 ) gal./sq.yd.( 2nd. application)

    - Spraying Temperature = 165 C to 175 C

  • 8/10/2019 Specif,Const & QC Works .pdf

    50/91

    Layer Specification

    Grading and amount of coarse aggregate, keystone and chippingshall conform to material specification.

    Compacted thickness- Average compacted thickness Design thickness

    - Compacted thickness at any point Design Thickness- 6.7 mm (1/4)

    Camber and level- Deviation under 10 ft straight edge applied both parallel and at

    right angled to the centre line of the road 1/8 "- Level of the top most compacted surface . > Specified level

    . < Specified level- 9.5 mm (3/8)

    Semi-grout Penetration Macadam (cont: )

  • 8/10/2019 Specif,Const & QC Works .pdf

    51/91

    Construction Technique

    1. Spread coarse aggregate. Measured camber & level.

    2. Compact with 8-10 tons smooth wheeled roller.

    3. Spray bitumen uniformly.

    - Spraying temperature = 300 Deg.F - 350 Deg.F.

    - Spraying Rate = 0.50- 0.56 gal./sq.yd.

    4. Spreading and rolling of key stone.

    - The keystone shall preferably be applied immediately after

    spraying bitumen in a number of application, the first being just

    sufficient to prevent the roller wheel sticking.

    Semi-grout Penetration Macadam

  • 8/10/2019 Specif,Const & QC Works .pdf

    52/91

    Construction Technique (cont: )

    - Then as rolling continues, further keystones shall be spread until

    all the voids in coarse aggregate layer have been filled without

    having any loose key stone on the surface of the coarse aggregate

    layer.

    - Rolling shall continue until key stones are thoroughly embedded

    into the voids of coarse aggregate layer and until there is little

    or no movement under the roller.

    5. Broom excess Keystone. Check camber & level.

    6. Spray bitumen for seal coat.

    - Spraying Rate = 0.22 - 0.3 gal./sq.yd.

    Semi-grout Penetration Macadam

  • 8/10/2019 Specif,Const & QC Works .pdf

    53/91

    Construction Technique (cont: )7. Spread chipping and roll with pneumatic tyred roller immediately

    after the application of bitumen.

    - Approximate spreading rate = 120 sq.yd./ton.

    - Rolling shall continue until the chippings are firmly embedded in the bituminous material.

    8. Broom excess chipping. Measure camber and level.

    Surface course which does not conform to the specification shall

    be dug out, replaced and constructed to conform.

    Semi-grout Penetration Macadam

  • 8/10/2019 Specif,Const & QC Works .pdf

    54/91

    Quality Control

    Measurement of grading of coarse aggregate, keystone and

    chipping .

    - Frequency of measurement = 1/200 m (1/furl).

    Measurement of bitumen spraying rate and temperature- Frequency of measurement = 1/200 m (1/furl).

    Measurement of compacted thickness, camber and level .

    - frequency of measurement = 1/30 m (1/100 ft).

    In consultation with the Quality Control Engineerfrequency of measurement may be changed depending on the

    quality and uniformity of the construction.

    Semi-grout Penetration Macadam

  • 8/10/2019 Specif,Const & QC Works .pdf

    55/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    56/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    57/91

    Layer Specification (cont: )

    Camber and level

    - Deviation under 10 ft straight edge applied both parallel and at

    right angled to the centre line of the road 6.5 mm (1/4)- Level of the top most compacted surface . > Specified level

    . < Specified level

    - 19 mm (3/4)

    Hard Shoulder

  • 8/10/2019 Specif,Const & QC Works .pdf

    58/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    59/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    60/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    61/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    62/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    63/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    64/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    65/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    66/91

    * f Gi f f f hf & f Gi f&Sd& fh

  • 8/10/2019 Specif,Const & QC Works .pdf

    67/91

    t em*wfwGi fwn faq mufrn hfu w&mv rf;wGi f&Sd&rn fhv rf;ci f;ypn f;t rsdK;t pm;rsm;ESi fhv rf;v Tm\ pHcsdefpHnTef;rsm;

    t v Tm t o kH;jyKv rf;ci f;ypn f; v rf;v Tm\ pHcsdefpHnTef;v rf;wmEmbankment

    -v rf;ab ;ajr (o kdU) o , f, lajr- Liquid Limit 45- Plasticity Index 18

    - o dyfo n f;rSkt q i fh (DOC) 90 %(Modified)

    v rf;at mu fcHajrSubgrade

    -o wfrSwf t i ft m; (CBR) &Sdao majr- Liquid Limit 40- Plasticity Index 14

    -o dyfo n f ;rSkt q i fh(DOC) 95 %(Modified)

    ' k- t ajccHv TmSub-base Course

    - *0H(o dkU) au smu fa&majr (Granular)- cGJau smu f (Crushed Rock)- x kH; (o dkU)b dv yf ajrjzi fht m;jzn hfjyKjyi f (stabilization)

    x m;ao majrMu D; (o kdU) au smu fa&majr

    - *0H? au smu fa&majr (Soaked CBR 25 %)- cGJau smu f (CBR 30 % ~ 40 %)- Stabilization (UCS = 0.75 ~ 1.5 Mpa)

    t ajccHv TmBase Course

    - Well Graded Crushed Rock -x Hk; (o kdU) b dv yfajr (o kdU)u w&mjzi fht m;jzn hf jyKjyi f

    (stabilization) x m;ao mau smu fa&majr (o kdU) cGJau smu f

    - Crushed Rock (CBR 80 %)- Stabilization (UCS = 1.5 ~ 3.0 Mpa)

    rsu feSmjyi fv TmSurface Course

    -u w&mu Gefu &pf Asphalt Concrete (cGJau smu f? u w&m)--DBST (for low volume traffic)

    - AC {Marshall Stability = 3.5 kN(790 psi)~ 9.0 kN (2025 psi), Flow 2 mmAir Voids = 3 ~ 5 %}

    - DBST { Grading of aggregates, BitumenTemperature and Rate of spray ]

  • 8/10/2019 Specif,Const & QC Works .pdf

    68/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    69/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    70/91

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    0.001 0.01 0.1 1 10

    p e r c e n

    t a g e p a s s i n g

    ( % )

    partical size (mm)

    Grading Curve of Type I

  • 8/10/2019 Specif,Const & QC Works .pdf

    71/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    72/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    73/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    74/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    75/91

    Construction Procedures (cont:)

  • 8/10/2019 Specif,Const & QC Works .pdf

    76/91

    6. Compaction should be performed using a 8 to 10 ton smooth-wheeled roller with vibration and 8 to 15 ton pneumatic-tyred roller or an

    equivalent vibratory roller.7. All rolling shall be longitudinal progressing gradually from the outside

    towards the center with each succeeding pass uniformly overlapping the previous pass.

    8. After the primary compaction, the surface is generally shaped to the proper cross section by a grader.

    9. Compaction should be repeated until required compaction degree and proper grain interlock are achieved. Final rolling is done by a pneumatictired or smooth wheel rollers.

    10. Measure CBR and density of the compacted layer. Level and camber should also be measured.

    11. In case they do not satisfy the required specification, such layer should be dug out, regulated and compacted again.

    Construction Procedures (cont:)

  • 8/10/2019 Specif,Const & QC Works .pdf

    77/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    78/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    79/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    80/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    81/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    82/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    83/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    84/91

    jzefUci f;jyD;cGJau smufrsm;t m;a&jzef;aeykH

  • 8/10/2019 Specif,Const & QC Works .pdf

    85/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    86/91

    Tandem Roller jzi fhci f;MudwfaeykH

  • 8/10/2019 Specif,Const & QC Works .pdf

    87/91

    Tired Roller jzi fhci f;MudwfaeykH

  • 8/10/2019 Specif,Const & QC Works .pdf

    88/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    89/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    90/91

  • 8/10/2019 Specif,Const & QC Works .pdf

    91/91

    wnfaqmufjyD;ao m Well Graded Base Course


Recommended