SPECO TECH ROOFING & CEILING SYSTEMS PVT. LTD.
Division
PRE ENGINEERED STEEL
BUILDINGS
A renowned namein the field of
PRE ENGINEERED STEEL BUILDINGS (PEB)utilizing the most Hi-Tech solutions
AGENDA
About SPECO Comparison between
PEB & Conventional Steel Our Vision & Mission Introduction to PEB
Buildings Project Gallery SPECO PEB Buildings Framing Systems Types of PEB Buildings Products & Services SPECO Plant &
Machinery SPECO Winnings Our Clients
ABOUT US
• M/s Speco-Tech Roofing & Ceiling Systems Private Limited is an ISO Certified organization. Our pre-engineered building system is unmatched in its speed and value. Buildings, to suit specific needs, are designed, engineered, manufactured and shipped in less than 8 weeks and at a cost that is as low as 30 percent of the cost of conventional steel buildings (when compared to speed of occupancy and space usability).
• Clear spans up to 93 meters wide and eave heights as high as 30 meters are possible.
Associated manufacturer of Indian Oil, Bharat Petroleum and Hindustan Petroleum and Pan India
supply of Petrol Pump Canopies
Introduced Speco Pre Engineered Steel Buildings with State of the Art manufacturing Facilities in Faridabad
(HR).Plasma Arc Automated Plate Cutting Machine
COMPARISONPre –engineered buildings (PEB) Conventional Steel Buildings
Structure Weight PEB Buildings is on an average 30% lighter
because of the efficient use of Steel.
Primary & Secondary members are from
standard hot rolled which are heavier than
what is actually required by design
Design Quick & efficient as basic design is based on
international design codes.
Conventional Steel Structure Are designed
from scratch with limited design aids provided
to engineer.
Delivery Average delivery period 6 to 12 weeks
according to the given area. The Erection
process is faster and much easier with very
less requirement for equipment.
Average 20-26 Weeks
Foundations Simple design, easy to construct and light
weight.
Extensive heavy foundations required for
heavy sections
Overall Price Price per square meter may be as much as
20% lower than conventional steel.
Higher Price per square meter.
Future Expansion Depending on the size of structure installation
takes an average 7-10 day. Delivery after
order takes about 6-12 weeks.
Steel Building are permanent and cannot be
relocated.
Erection & Delivery Depending on the size of the structure
installation takes an average 4-6 weeks.
Delivery after order takes about 6-12 weeks.
Installation time is approx. Double than PEB.
Delivery of material averages from 20-26
weeks.
Performance All components have been specified and
designed specifically to act together as a
system for maximum efficiency precise fit, and
peak performance in the field.
Components are custom designed for a
specific application on a specific job. Design
and detailing errors are possible when
assembling the diverse components into
unique buildings.
VISSION & MISSION
VISION“To Create Opportunities Discover Latent Potential and Develop Existing Opportunities in the Pre Engineered Buildings (PEB) Market.”
MISSION“To facilitate the most beneficial, durable and smooth market presence for our clients.”
INTRODUCTION TO PEB BUILDINGS
Pre engineered buildings are metal buildings that consists of light gauge metal standing seam roof panels. These panels are fitted on steel purling spanning between rigid frames with light gauge metal wall cladding.
It is a relatively flexible and a lighter structure vs. a conventional steel framed building.
PEB systems are extensively used in industrial as well as several non industrial constructions all over the world.
PROJECT GALLERY
Kota, Rajasthan60000 Sq ft.
Kota, Rajasthan24654 Sqft.
Bokaro45673 Sqft.
Faridabad55000 Sqft.
SPECO PEB BUILDINGSSpecoTech PEB systems are custom made as per clientrequirements without compromising on the utility andfunctionality of a building. Pre engineered buildings by Specoare light in weight and more economical than otherconventional constructions.
Material specifics:
•High quality Galvalume, PPGI, GI, CR, high tensile steel•Tensile strength of GI steel and Galvalume: 240Mpa-550Mpa•Pre cut solid built up sections•SAW type welding of web to flange alternating with stitch weld•All columns/portals are in ready to erect condition and supplied in a fully finished for field assembly condition
FRAMING SYSTEMS
SPECO Pre-Engineered Steel Buildings are custom designed to provide maximum space utilization, excellent strength and highest safety standards.
Our basic architectural measures include:
Building Width:Building LengthEnd Bay LengthInterior Bay Length
TYPES OF PEB BUILDINGS
Ideal for manufacturing And factories that require cranes for material handling, these specialized building systems by Speco are designed to support crane systems of varying weights and measurements.
BUILDINGS WITH MEZZANINES
BUILDINGS WITH CRANES
Mezzanine floor systems by Speco are a very smart design. Made of superior galvanized steel, the decking’s of this system are supported by joints that are connected to mezzanine beams.
PRODUCTS & SERVICES
SPECO Pre-Engineered steel Buildings
Hi-Rib Roofing & Cladding Systems
CEE and Z Purlin SPECO Steel Deck
SPECO Crimp Curve Turbo & Air Ventilator
SPECO Klippon SPECO Standing Seam