+ All Categories
Home > Documents > SPECTRUM STRATEGY & VISION ICAO FSMP WG-F-32 16-24 February 2015 Raffi Khatcherian EUROCONTROL...

SPECTRUM STRATEGY & VISION ICAO FSMP WG-F-32 16-24 February 2015 Raffi Khatcherian EUROCONTROL...

Date post: 28-Dec-2015
Category:
Upload: solomon-gibbs
View: 245 times
Download: 2 times
Share this document with a friend
Popular Tags:
9
SPECTRUM STRATEGY & VISION ICAO FSMP WG-F-32 16-24 February 2015 Raffi Khatcherian EUROCONTROL DPS/POL Spectrum Management SESAR WP15.01.06 Spectrum Project Manager
Transcript
Page 1: SPECTRUM STRATEGY & VISION ICAO FSMP WG-F-32 16-24 February 2015 Raffi Khatcherian EUROCONTROL DPS/POL Spectrum Management SESAR WP15.01.06 Spectrum Project.

SPECTRUM STRATEGY & VISION

ICAO FSMP WG-F-32 16-24 February 2015

Raffi KhatcherianEUROCONTROL DPS/POL Spectrum Management

SESAR WP15.01.06 Spectrum Project Manager

Page 2: SPECTRUM STRATEGY & VISION ICAO FSMP WG-F-32 16-24 February 2015 Raffi Khatcherian EUROCONTROL DPS/POL Spectrum Management SESAR WP15.01.06 Spectrum Project.

ICAO FSMP WG-F-32 16-24 February 2015 2

Spectrum Aviation CNS Enabler

Secure the long-term availability of suitable radio spectrum to meet all of aviation's future objectives through cooperative engagement in the global spectrum environment.

Page 3: SPECTRUM STRATEGY & VISION ICAO FSMP WG-F-32 16-24 February 2015 Raffi Khatcherian EUROCONTROL DPS/POL Spectrum Management SESAR WP15.01.06 Spectrum Project.

ICAO FSMP WG-F-32 16-24 February 2015

Approach to the SESAR Spectrum Vision and Strategy

Creates a framework which will deliver benefits to aviation and enable the sector to react effectively to external influences in a changing external spectral environment.

3

Page 4: SPECTRUM STRATEGY & VISION ICAO FSMP WG-F-32 16-24 February 2015 Raffi Khatcherian EUROCONTROL DPS/POL Spectrum Management SESAR WP15.01.06 Spectrum Project.

ICAO FSMP WG-F-32 16-24 February 2015

Assumptions

Aeronautical spectrum allocations will continue to be under significant pressure from other sectors for the foreseeable future.

New spectrum bands for aviation use are unlikely to be made available.

The assignment and use of spectrum within a State will remain a sovereign issue and voting rights at ITU World Radiocommunication Conferences will remain only with Member States.

4

Page 5: SPECTRUM STRATEGY & VISION ICAO FSMP WG-F-32 16-24 February 2015 Raffi Khatcherian EUROCONTROL DPS/POL Spectrum Management SESAR WP15.01.06 Spectrum Project.

ICAO FSMP WG-F-32 16-24 February 2015

Spectrum Vision & StrategyEnhanced aeronautical spectrum management

Providing a coordinated overall spectrum strategy employed to create a sustainable environment for spectrum efficient aeronautical systems;

Deploying improved processes for identifying, analysing, coordinating and promoting aviation's spectrum needs;

Taking a longer-term view of aeronautical spectrum requirements.

5

Page 6: SPECTRUM STRATEGY & VISION ICAO FSMP WG-F-32 16-24 February 2015 Raffi Khatcherian EUROCONTROL DPS/POL Spectrum Management SESAR WP15.01.06 Spectrum Project.

ICAO FSMP WG-F-32 16-24 February 2015

Spectrum Vision & StrategyHolistic CNS&S approach

Providing spectrum expertise for CNS teams to ensure an inter-discipline approach to development, deployment and removal of outdated aeronautical systems;

Promoting the development of spectrally efficient CNS systems to minimise the demand for additional spectrum to support future aviation growth;

Promoting the withdrawal of obsolete and redundant systems in compliance with the future deployment programme.

6

Page 7: SPECTRUM STRATEGY & VISION ICAO FSMP WG-F-32 16-24 February 2015 Raffi Khatcherian EUROCONTROL DPS/POL Spectrum Management SESAR WP15.01.06 Spectrum Project.

ICAO FSMP WG-F-32 16-24 February 2015

Spectrum Vision & StrategyFinancial decision-making processes

Ensuring cost effective technological evolutions; Minimising the impact and timescales of technological transitions.

7

Page 8: SPECTRUM STRATEGY & VISION ICAO FSMP WG-F-32 16-24 February 2015 Raffi Khatcherian EUROCONTROL DPS/POL Spectrum Management SESAR WP15.01.06 Spectrum Project.

ICAO FSMP WG-F-32 16-24 February 2015

Delivering the Spectrum Strategy

Enhanced Spectrum Management Process Holistic CNS&S Financial Decision Making

8

Page 9: SPECTRUM STRATEGY & VISION ICAO FSMP WG-F-32 16-24 February 2015 Raffi Khatcherian EUROCONTROL DPS/POL Spectrum Management SESAR WP15.01.06 Spectrum Project.

Q&A

ICAO FSMP WG-F-32 16-24 February 2015 9


Recommended