Design, Codes, and Opportunities Steve Meicke HDR Engineering, Inc. Portland, OR Spillway Gate Hoist Machinery Rehab and Replacement
Transcript

Design, Codes, and Opportunities

Steve Meicke

HDR Engineering, Inc.

Portland, OR

Spillway Gate Hoist

Machinery Rehab and

Replacement

Purpose and Background 2

• Hoist machinery rehab: opportunity

to increase safety and reliability

• ‘Refresher course’ for project

owners:

– Applicable design codes, recent

changes

– Load cases for design

– Torque limiting techniques

Why are Gates Important?

3

What could happen at your

project if your gate doesn’t

function properly?

Introduction 4

• Dam construction in the NW occurred in

the early to mid-1900’s

• Many spillway gate hoist systems are

nearing or past their designed useful life

• Past designs may not meet present day

design criteria

– Improved understanding of fatigue

– Past design guidance:

• Not well understood

• May be based on internal knowledge

• No widely accepted codes

• Motivated by different factors

Issues Facing Existing Hoists 5

• Primary: Age! Years of fatigue,

exposure to elements, corrosion, wear

• Other possible issues:

– Lack of redundancy

– Overstress due to under-design

– High maintenance requirements and

costs

– Cumulative fatigue damage

– More…

What’s next? Rehab or Replacement?

Primary Design Codes for Design 6

• USACE EM 1110-1-2610:

– Significant update in July 2013

– Provides general design criteria, best

practices for a wide range of gate

components.

• AASHTO LRFD Moveable Highway

Bridge Design Specifications:

– Specific formulas used in design

– Fills in gaps and expands upon criteria

from EM-2610

EM 2610 – Recent Revisions 7

• Overall: doubled in length, added 400

MB reference materials

• Load Cases:

– Normal Case: change from actual hoist

load to 100% motor full load torque

– Overload case: clarification on wire

rope load sharing

• Other revisions:

– Bearings (AFB and composite)

– Wire rope

AASHTO LRFD Specifications 8

• More detail and calculation oriented…

– Design guidance that EM-2610 lacks

• Many of the same formulas and figures

as EM-2610

• Specific formulas for design:

– fatigue theory, contact stresses for

open gearing, stress concentration

factors, etc.

– Much more…

Design Codes - Summary 9

• EM-2610: general guidance on load

cases and allowables, best practices

• AASHTO LRFD: detailed calculation

guidance, fills EM-2610 gaps

• EM-2610 and AASHTO have much in

common, but differences exist

– Design team should be clear which

criteria will be used for each component

– Design criteria memo!

Motor Loads on Machinery

10

Load Cases for Design (EM-2610) 11

• Normal Operating Case:

– 50 / 50 lifting load split

– Motor at 100% Full Load Torque (FLT)

– Allowable Stress: 20% of Ultimate

– Purchased components: manufacturer

ratings

• Normal operating case often drives

design!

Load Cases for Design (EM-2610) 12

• Overload Case:

– 70 / 30 lifting load split: represents

jammed gate, racked to one side

• Must check worst case of 100 / 0!

– Motor at 280% FLT for NEMA D*

– Allowable Stress: 75% of Yield

• Normal startup torque: is does not

constitute Overload

Torque Limiting Techniques

13

Technique Pros Cons

Passive

Slip Clutch − Reliable

− Instant reaction − Additional maintenance

Current Limiting

Device − Inexpensive

− Prevents extended OL

− Response may not be

quick enough

Acitve Load / Torque Cell

with Feeback Loop

− Real-time feedback

− PM / failure diagnostics

− Fast response and motor

control possible

− Difficult to maintain

− Low reliability?

− Software support may

be an issue

− Most complex option

Effect to load cases mentioned previously?

Treatment of Torque Limiting Devices 14

• Project-by-project basis, based on

consequences of hoist failure

• Best practice is to assume these

devices will not perform when you need

them!

• Design hoist components to withstand

280% FLT and one-sided lifting

– Simple is beautiful

– May be cost prohibitive or not

necessary

What Else Can You Do?

15

Inspect and Maintain!

Conclusions:

16

• Spillway gate hoists: critical to safety

• Many existing systems nearing / past expected life

• Considerations for gate hoist rehab / replacement:

– Understand issues with your hoist

– Primary design codes, recent changes

– Load cases which drive design

– State of the art: torque limiting and control

Questions?

17

Thank You!

Additional Design References:

18

• Machinery Handbook

• Federal Wire Rope Specification RR-W-410

• Wire Rope User’s Manual

• EM-1110-2-3200: Wire Rope Selection Criteria for Gate

Operating Devices

• EM-1110-2-2702: Design of Spillway Tainter Gates

• AASHTO LRFD Moveable Highway Bridge Design

Specifications, revisions 2008

• AASHTO Movable Bridge Inspection, Evaluation and

Maintenance Manual 1998

• Peterson’s Stress Concentration Factors

• Steel Manual ASD

Mechanical / Structural Relationship

19

Structural Mechanical

Load Case 2:

Normal Operating Loads Size prime mover to lift load

Design system – determine

reduction, friction, drum

diameter, etc.

Overload Case Normal Case

70 / 30 lifting split,

locked rotor motor torque

50 / 50 lifting split,

FLT of motor

Check 1-sided lifting loads!

Design… Design…

Load Case 4:

overload 100/0

lifting split

Design…

Load Changed? Loads

Complete

Preliminary Gate Design

No

Yes

Wire Rope Loads

Gate Weight

Trunnion Friction


Recommended