SPS 200 MHzSPS 800 MHzRF Power upgradeProgress reportApril 2014
Eric
Mon
tesin
os
LIU
-SPS
mee
ting,
30
April
201
4
LHC Inject
orUpgrade
SPS 200 MHzExisting Amplifiers upgrade
New RF Amplifiers
New RF Building
LSS3 Tunnel integration
Eric
Mon
tesin
os
2
LIU
-SPS
mee
ting,
30
April
201
4
LHC Inject
orUpgrade
Existing amplifiers upgradeSiemens plant
HV AC capacitors for RS2004 trolleys being purchasedNew prototype RS2004 trolley under evaluationIf validated, 5 additional trolleysMaintenance being completed
Philips plantMaintenance being completed
Eric
Mon
tesin
os
3
Siemens Philips
LIU
-SPS
mee
ting,
30
April
201
4
LHC Inject
orUpgrade
New RF Amplifiers
Drivers IT completedTTI Norte, Spanish company has been awarded the contractA first pre-series batch of 12 x 1.25 kW units will be built and evaluated
Finals Technical SpecificationUnder completionOpened to all technologiesAll inclusive with options (controls)Maximum ratings increased
Eric
Mon
tesin
os
4
LIU
-SPS
mee
ting,
30
April
201
4
LHC Inject
orUpgrade
New BAF3 RF buildingConstruction work has started
Trees cutCV piping upgrade doneRoad under constructionBuilding foundations ongoing
OptionsMezzanine validatedGT10 hoppers modified (bigger in case we need to install 4 x 350 mm transmission lines)
Eric
Mon
tesin
os
5
LIU
-SPS
mee
ting,
30
April
201
4
LHC Inject
orUpgrade
LSS3 Tunnel IntegrationCleaning cables campaign completed
HBWD integration ongoingFeedthroughs orderedVacuum flanges provided by TE-VSCBody under fabricationElectrodes slightly modifiedSupporting & alignment system are okInstallation in August (if project validated and all items delivered on time and tested)
Eric
Mon
tesin
os
6
LIU
-SPS
mee
ting,
30
April
201
4
LHC Inject
orUpgrade
Involved peopleDep-Group Persons
BE-RF Eric Montesinos, Charles Julie, SPS power team, Elena Chapochnikova, Thomas Bohl, Wolfgang Höfle, Philippe Baudrenghien, Urs Wehrle
BE-ABP Ghislain Roy, Patrick Bestmann, Yannis PapaphilippouBE-ASR Marc Tavlet, Christelle Gaignant, Axelle DeleuBE-BI Christian Boccard, Patrick OdierDGS-SEE Guillaume Fontana, Cécile PintoDGS-RP Nadine Conan, Christophe TromelEN-CV Mauro Nonis, Michele Battistin, Alexandre Broche, Aurelio Berjillos Barranco
EN-EL François Duval, Guillaume Gros, Christophe Crombez, Jean-Pierre Sferruzza, Denis Ribiollet
EN-HE Caterina Bertone, Pascal Brunero, Serge Pelletier, Yann Seraphin, Patrick Vallet, Gilles Roche, Helder Lorenco
EN-MEF Frédéric Galleazzi, Yvon Muttoni, David McFarlane, Antoine Kosmicki, Yannick Beraud
GS-ASE Nino Rama
GS-SE Luz-Anastasia Lopez-Hernandez, Laurent Faisandel, Christophe Biot
TE-EPC Gilles LeGodec, Christophe CoupatTE-MSC Jérémie BaucheTE-VSC Paolo Chiggiato, Antonio Mongelluzzo, Jose Antonio Ferreira Samoza
Eric
Mon
tesin
os
7
LIU
-SPS
mee
ting,
30
April
201
4
LHC Inject
orUpgrade
SPS 800 MHz powerAll eight individual IOT transmitters validated
First line has been tested up to equivalent of 200 kW at the cavity input(4 x 60 kW + low pass filters losses + combiners losses + circulator losses + WG losses)
As soon as water will be back in the SPS, we will restart the cavities with their new controllers (debugging)
Eric
Mon
tesin
os
8
Cavity #2Load
Short
Cavity #1
Load
Short
End2014
LIU
-SPS
mee
ting,
30
April
201
4
LHC Inject
orUpgrade
SPS 800 MHz powerVery bad news from Electrosys regarding circulator, the second one has even not been ordered (not informing us)
We will move the circulator to process the second cavity and operated the first one with fast reflected power measurements to protect the tubes
We are in the process of buying the missing circulators (will be long)
Eric
Mon
tesin
os
9
Cavity #2Load
Short
Cavity #1
Load
Short
End2014