SPS LS1 Planning meeting (No.32) 19/03/14. David Mcfarlane. Topics. Lifts and Monte-charges . Access to Monte Charges in BA2, 3 and 6 . Intervention secteur ZS 231/TCE. Deadlines for Works affecting Vacuum. AUG tests. New cable 3.3kV electrical safety network SPS. - PowerPoint PPT Presentation
Popular Tags:
33
SPS LS1 Planning meeting (No.32) 19/03/14 David Mcfarlane 1 SPS.Technical- [email protected]
Transcript
Page 1: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 1

SPS LS1Planning meeting (No.32)

19/03/14

David Mcfarlane

Page 2: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 2

Topics• Lifts and Monte-charges. • Access to Monte Charges in BA2, 3 and 6.• Intervention secteur ZS 231/TCE.• Deadlines for Works affecting Vacuum.• AUG tests.• New cable 3.3kV electrical safety network SPS.• GE/ASE Access tests.• Water back in service.• EPC tests of the Auxiliary Converters.• Cleaning campaign dates.• Planning.• False floors open in the BAs.• E.C.Rs.• Access rights and safety equipment.• Important Information.• A.O.B

Page 3: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 3

Lift Maintenance

Mar/Apr/May/ June

Page 4: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 4

Access to Monte Charge in BA2,BA3 and BA6

• If you require to access the Monte-charges in BA2,3 or 6, then contact me (David Mcfarlane-164247)

• If your request for access is valid then I will either contact the CSA to come and open the door for you or I will come and open it myself.

• This only concerns people who do NOT already have access rights to the Monte-charge keys located in the TRAKA box.

• This is only a temporary measure until the end of LS1

Page 5: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 5

Intervention secteur ZS 231/TCESuite à la réunion concernant les activités nécessaires pour le réalignement du TCE en LSS2, nous avons prévu le déroulement suivant,Si celui-ci est compatible avec les autres activités en LSS2… L’idée générale est de n’effectuer qu’une seule mise à la PA pour le remplacement du MP21632 et le réalignement du TCE,Et ce le plus rapidement possible afin d’effectuer les tests HT sur le ZS.Nous avons également découvert que la mise à la PA du secteur MST (232) sera également nécessaire. ZS (sector 231) & MST (sector 232) venting : 24 marsReplace MP 21632 : 25 marsReplace MP 21872 ??? : 25 marsTCE observation : 25-28 marsTCE new feet installation/alignement : 31 mars - 3 avrilReinstall vac chamber up/dwn TCE, pump dwn :4 avrilPompage secteur ZS-MST 4-15 avril … L’idée est de terminer les travaux avant le 4 avril afin de libérer la zone pour le tirage des câbles qui doit commencer le 07/04 .

Page 6: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 6

Deadlines for Works affecting Vacuum

Our proposed deadlines are: With no vacuum support I mean no support for new equipment or modifications. BA1: No vacuum support after 29th of MarchBA2: No vacuum support after 15th of MarchBA3: No vacuum support after 15th of MarchBA4: No vacuum support (nothing in the planning requesting vacuum support).BA5: No vacuum support after 29th of March. I see a problem here. I was checking your planning and there are several BI activities planned for April in parallel with BA1 reinstallation. When did you add this activities?BA6: No vacuum support (nothing in the planning requesting vacuum support).

Page 7: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 7

AUG tests

Page 8: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 8

New cable 3.3kV electrical safety network SPS

Hello, We continue to change the cables for the new electrical safety network on the SPSThe interventions are similar with the 13th of march at the BK2 - but during all day from 7 AM to 10PM. That means nobody down the tunnel during the work. I need :one day for the BK3 – SPS3 BA3-BB3one day for the BK4 – BK5 (the same day) cause we have to cut power at the same time on both site. I will create IMPACT and Note de coupure for these and we will discuss about it on Wednesday. If you have some dates when I CAN’T cut let me know and I will schedule two dates for these jobs. thanks

Page 9: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 9

GE/ASE Access tests

Page 10: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 10

Water back in serviceHi David, As discussed, below are the dates of the planned maintenance for the SPS cooling water circuits. My intention is, once the maintenance is finished, to leave all circuits running (unless the user requires otherwise – such as Septa cooling) BA1 – 09/06/14 to 20/06/14BA2 – 10/03/14 to 24/03/14BA3 – 24/03/14 to 04/04/14BB3 – 07/04/14 to 18/04/14BA4 – 07/04/14 to 18/04/14BA5 – 24/03/14 to 04/04/14BA6 – 10/03/14 to 21 /03/14ATLAS works on cooling towers (BA6 water OFFLINE) 22/04/14 to 13/05/14 I will need all the flexible hoses on the Main Magnet circuits to be replaced before the start dates of each BA to ensure that all maintenance can be completed during these periods. BA4 and BA6 are already done, BB3 not applicable, therefore BA2, BA3 and BA5 are a priority (in that order)

Page 11: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 11

EPC tests of the Auxiliary Converters

With this planning, OP can start the commissioning of the Software with a 1 week delay from our activities: e.g, OP tests for BA2 could start on 9th June. What we need:• The magnet interlocks shall be tested in May by MPE (R.Mompo/P.Dahlen): support from EPC is requested during this period,

• Services shall be present in each BA in time: water (magnet + surface building), no consignation (except BA1 until end of June),

• A general signalisation that some tests are ongoing: coordination EPC/MSC,

• EIS (https://edms.cern.ch/document/991272): from past experiences, this is a difficult point for us during our tests, especially for TI2/TI8. I propose that when the planning is agreed on, Marc Tavlet will be contacted by EPC.

Page 12: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 12

Cleaning campaign

Page 13: SPS LS1 Planning meeting (No.32) 19/03/14

EN

UndergroundSur

BA1

UndergroundSur

BA2

UndergroundSur

BA3

UndergroundSur

BA4

UndergroundSur

BA5

UndergroundSur

BA6

TI8TI2

TRANSFER TUNNELS

UndergroundSur

BA7

UndergroundSur

BA80/TCC2

2013

2014

2015

Dec.

Jan.

Feb.

Mar.

Apr.

May

Jun.

Jul.

Aug.

Sep.

Oct.

Nov.

Dec.

Jan.

Feb.

Mar.

Apr.

May

Jun.

Jul.

Aug.

Sep.

Oct.

Nov.

Dec.

Jan.

Feb.

Mar.

Apr.

2013

2014

2015

Dec.

Jan.

Feb.

Mar.

Apr.

May

Jun.

Jul.

Aug.

Sep.

Oct.

Nov.

Dec.

Jan.

Feb.

Mar.

Apr.

May

Jun.

Jul.

Aug.

Sep.

Oct.

Nov.

Dec.

Jan.

Feb.

Mar.

Apr.

General maintenance

Cold check out & Start-upDSO tests/HV tests

EPC Commissioning tests

Vacuum

Ions to NA61

General

Maintenance

General

Maintenance

General

Maintenance

General maintenance

General Maintenance

General Maintenance

General Maintenance

UA9 w

orks

RF upgrade works

EPC works

Civil Engineering

RF upgrade works

RF Upgrade works

RF Upgrade works

RF Upgrade works

SurveyHorizontal

Verticalsmoothing

Cables

Cables

Irradiated Cables

Cables

Re-route Cabling

Cables

Cables

CablesCables EL Studies

Prep work in

LSS1

Re-install equipment removed for cable works

Survey

SurveySurvey

Survey

Survey Survey SurveySurvey

SPS LS1 schedule

Beam onCool down/RP survey and Magnet tests

Protons to the North Area

Protons to LHC

Cool downNO

ACCESS

Cool downLimited ACCESS

Magnets

Magnets MagnetsMagnetsMagnetsMagnets

Magnets

Magnets

Magnets

Magnets

Magnets

Magnets

Magnets

Beam off : 16/02/13Beam on: 13/10/14

Open Access : 27/03/13Close Access : 27/06/14

Fibres

CV works

CV studies

CV Controls upgrade

Vacuum

TT10 Consolidation

18 KV

18 KV

18 KV

18 KV

Septa works

Kicker

Septa works

Kicker

TT20 pipew

ork

Magnets

Magnets

18 KV

Civil Engineering

Civil Engineering Civil EngineeringCivil Engineering

Civil Engineering

Magnets

Ring-main

Ring-main

Ring-main

Ring-main

Ring-main

Ring-main

Vacuum

VacuumVacuum

Vacuum

Crab Cavities

Crab Cavities

EPC works

Cooling tower 863

Ring-main

Cables

Fibres

18 KV

Civil Engineering in TT10

Fibres

Fibres

Fibres Fibres

CV maintenanceCV maintenance

CV maintenance

Cables

Kicker

Cables

RAL

Septareplacem

ent

Page 14: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 14

BA1 planning

• Planning for the re-installation of Equipment into BA1 following the completion of the irradiated cable campaign:

https://edms.cern.ch/file/1293491/4/LSS1_planning_sven_v4.1.mpp

Page 24: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 24

False floors lifted in Surface BAs

BAs Cabling pulling start Cable pulling end

BA1 (TS1- works)BA1 (Irradiated cable works)BA1 (Fibre Optics)

29/04/201308/10/201308/04/2013

02/08/201325/03/201424/04/2013

BA2 06/01/2014 28/04/2014

BA3BA3 (Fibre Optics)

27/03/201322/04/2014

31/05/201320/05/2014

BA4BA4 (Fibre Optics)

27/05/201307/10/2013

12/07/201325/10/2013

BA5BA5 (Fibre Optics)

27/03/201330/09/2013

24/05/301311/10/2013

BA6BA6 (Fibre Optics)

13/09/201313/5/2013

08/11/201324/05/2013

BA7 14/10/2013 07/11/2013

• Below is a table showing the dates that EL will be pulling cables at each point of the SPS.• During these periods large sections of the false floor in these surface buildings will be lifted.• Any works in the BA’s that involve lifting of the false floors MUST be reported to the Coordination team

• If you require access to racks or other equipment in the surface buildings during these periods you must check with planning first.

Page 25: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 25

Engineering Change Requests• Any and all new equipment being installed in the SPS requires

an ECR BEFORE it can be installed. It must also be approved by planning and coordination.

• Templates and Guidelines for Engineering Change Requests:– EDMS: 1271880

• SPS ECR template (in DFS):– https

://dfsweb.web.cern.ch/dfsweb/Services/DFS/DFSBrowser.aspx/Applications/CERN/Workgroup%20Templates/SPS/ECR-Template-SPS.dotx

Page 26: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 26

Current ECR’s for LS1https://edms.cern.ch/nav/P:CERN-0000076703:V0/P:CERN-0000096067:V0/TAB3

1. Removal of AEWB Pick-up from position 31932 to 31502 • (EDMS No. 1245361) UNDER IMPLEMENTATION

2. Removal of a BPWA Pick-up from position 31931 to 31101 • (EDMS No. 1245393) UNDER IMPLEMENTATION

3. Installation of a new Wideband Kickers system in position 32173 • (EDMS No. 1245400) RELEASED

4. Installation of a new HBW Damper Pick-up in place of BPWA 31931 & AEWB 31932• (EDMS No. 1245401) RELEASED

5. Replacement of 4 old BPA and 2 BPD by 6 BPCE in LSS1 & LSS2• (EDMS No. 1246559) RELEASED

6. Reinstallation of pump and gauges (Pirani + Penning) in 11993 (vacuum sector 150)• (EDMS No. 1249305) RELEASED

7. Modification LSS1 sectorization (new VVSF + displacement VVSB 11772)• (EDMS No. 1249307 v.2) RELEASED

8. Installation of 3 BCT in LSS5 for North Area protection during Ions operations in SPS.• (EDMS No. 1075945) UNDER IMPLEMENTATION

Page 27: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 27

Current ECR’s for LS1https://edms.cern.ch/nav/P:CERN-0000076703:V0/P:CERN-0000096067:V0/TAB3

9. Transfer of the Fast Beam Current Transformers (BCTFR.31451) for the SPS circulating beam from LSS3 to LSS5.• (EDMS No. 1221341) RELEASED

10. SPS Beam Position Monitoring Prototyping Setup in LSS4.• (EDMS No. 1099630) RELEASED

11. Installation de 4 moniteurs de position (2 BPH, 2 BPV), dédiés au système Damper.• (EDMS No. 1251693) RELEASED

12. Installation d'un nouveau moniteur de position de type BPCR en LSS2 au 22105.• (EDMS No. 1251695) RELEASED

13. Displacement of Door PPG2145 separating the LHC and the SPS in the TI2 tunnel.• (EDMS No. 1253832) UNDER IMPLEMENTATION

14. Interlocking of Injection Tunnel upstream areas with LHC powering.• (EDMS No. 1257949) RELEASED

15. Move of BPH.31998 to BPH.42173.• (EDMS No. 1272718) RELEASED

16. Optical Fibre Racks.• (EDMS No. 1273766) UNDER IMPLEMENTATION

Page 28: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 28

Current ECR’s for LS1https://edms.cern.ch/nav/P:CERN-0000076703:V0/P:CERN-0000096067:V0/TAB3

17. Removal of old fixed TMP vacuum groups in 11655-11691.• (EDMS No. 1273232) RELEASED

18. BYBPM racks under the SPS dipole magnets as part of the Upgrade of Beam Position Monitors electronics (MOPOS).• (EDMS No. 1282651) UNDER IMPLEMENTATION

19. Installation de Coffrets d'Alimentation en LSS1 et TT10.• (EDMS No. 1282860) UNDER IMPLEMENTATION

20. Installation d'un rack de jonction RX11695=TS1 au BA1, afin de limiter les longueurs des câbles à changer lors d'un futur remplacement.• (EDMS No. 1288607) UNDER IMPLEMENTATION

21. Installation de nouveaux chemins de câbles en LSS1+ du SPS.• (EDMS No. 1291889 v.2) RELEASED

22. TPSN replacement in LSS2 of SPS.• (EDMS No. 1302672 v.1) UNDER IMPLEMENTATION

23. Replacement of pumps in 3 tanks MKP in LSS1 of the SPS .• (EDMS No. 1328248 v. 0.1) RELEASED

24. Suppression of VVFA 11899 in LSS1 of SPS.• (EDMS No. 1328249v. 0.1) RELEASED

Page 29: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 29

Current ECR’s for LS1https://edms.cern.ch/nav/P:CERN-0000076703:V0/P:CERN-0000096067:V0/TAB3

25. New shielding wall behind TIDV 11892 in SPS .• (EDMS No. 1331621v. 0.1) RELEASED

26. Modification of Numbering of SPS Civil Works.• (EDMS No. 1346653v. 0.1) UNDER APPROVAL

27. New Cable Tray in LSS5- of SPS.• (EDMS No. 1346655v. 0.1) UNDER IMPLEMENTATION

28. Helium 2K Pumping Units Installation in the Alcove Region of SPS Point 4 (BA4).• (EDMS No. 1354826v. 0.1) UNDER APPROVAL

29. Installation of a wire scanner BWSRE in LSS5 of the SPS.• (EDMS No. 1356736v. 0.1) IN WORK

30. Increase of the MDHD 11832 steering strength for the LIU-SPS Q20 optics.• (EDMS No. 1359692v. 0.1) UNDER APPROVAL

31. Modification of 2 Shielding Towers in LSS5 of the SPS.• (EDMS No. 1360306v. 0.1) RELEASED

32. Upgrade of the UA9 equipment during LS1.• (EDMS No. 1365265v. 0.1) IN WORK

Page 30: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 30

Access rights and safety equipment• Everyone who enters the SPS MUST have the following:

– Completed the correct courses. (sir.cern.ch)• Safety course levels 1, 2 and 3. or CERN Safety Introduction

• Safety during LS1• Habilitation Electrique. • Electrical Safety Awareness• Radiological Protection. (RP Training for CERN Supervised Radiation Areas)

• Self Rescue Mask Training.

– The correct access authorisation (via EDH).• Zone Code “SPS” for access into the SPS• Zone Code “NA_TARG” for access into BA80• Zone Code “CNGS” for access into the CNGS areas• Zone Code “SPS-KN-000” for “Autorisation conduite RTL”• Zone Code “SPS-KN-001” for “SPS Shutdown Padlock”

– A valid approved IMPACT. (with their name included on this IMPACT)– They must know the number of this IMPACT.– Safety shoes.– Biocell.– Electronic dosimetre.– Passive dosimetre.– Helmet plus Light.

• Please note that personnel are not allowed to work in the tunnel alone!!

Page 31: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 31

Important information• Useful Contact Numbers

– SPS Coordination Team• David MCFARLANE- 164247• Franck BAIS – 165467• James RIDEWOOD - 160590

– Control Room• SPS CCC – 77500• TI CCC – 72201• CSA - 62511

– RP• Christophe Tromel – 163199• Angelito Herve – 163168• Nadine Conan (BA1) – 160641• Elodie Aubert - 169097• Kurt Weiss (BA1) -160759

– Coordination Safety• Emmanuel Paulat – 163870• John Etheridge - 164647

Page 32: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 32

• Please make sure you fill out your IMPACTS correctly!!!! And in plenty of time!!!!!!– The intervention period is “LS1-SPS” Do not put “OPERATION 2013” or leave it blank as no one will

sign it.

• There are currently 28 IMPACTs that are “LATE”. If you have completed your work then you need to close the related IMPACT.

• If you have ANY concerns about not being complete before the 27th June 2014. I need to know about it NOW!!!!

A.O.B.

Page 33: SPS LS1 Planning meeting (No.32) 19/03/14

[email protected] 33

SPS coordination website

http://sps.web.cern.ch/SPS/

http://cern.ch/LS1planning

\\cernhomeJ.cern.ch\J\jocksoft\Public\LS1

Next meeting02/04/2014112-R-028