+ All Categories
Home > Documents > SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project...

SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project...

Date post: 04-Jul-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
24
SPS Transparency Workshop 12-13 October 2015
Transcript
Page 1: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

SPS Transparency Workshop

12-13 October 2015

Page 2: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

Session 6:

Overview of the SPS NSS

Page 3: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

How to submit notifications?

Central Registry of Notifications (CRN)

E-mail ([email protected]); or Fax (+41 22 739 5638); or Mail

3

NOTIFICATION FORMATS: HTTP://WWW.WTO.ORG/ENGLISH/TRATOP_E/

SPS_E/TRANSPARENCY_TOOLKIT_E

Page 4: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

Online Submission of SPS Notifications

Since 2011, possible to submit SPS notifications online (with the SPS NSS - https://nss.wto.org-)

The system makes the processing of notifications easier and faster, for both Members and the Secretariat.

4

Page 5: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

SPS Notification Submission System SPS-NSS https://nss.wto.org

5

SPS National Notification Authority

request access to:

[email protected]

Page 6: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

Login Names

NZLSPSNSS01 Administrative rights to submit

NZLSPSNSS02 Can fill out but cannot submit

Page 7: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

NB// Tabs correspond to the 13 fields of the notification document

Page 8: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

Who’s using the NSS? 66 Members have been given access

37 Members have used the system at least once

Argentina Mozambique

Australia Nepal

Belize Netherlands

Brazil New Zealand

Chile Nigeria

China Peru

Costa Rica Philippines

Dominican Republic Russian Federation

Ecuador Slovenia

European Union South Africa

France Chinese Taipei

Ghana Thailand

Indonesia Togo

Jamaica Turkey

Japan Uganda

Korea, Republic of Ukraine

Macao, China United States

Mexico Zimbabwe

Morocco

Page 9: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

9

IT Project: Enhancements to SPS IMS & SPS NSS

Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing

platform available

o Phase II: Enhancements to SPS IMS – Testing platform will be available during 1st semester of 2016

Page 10: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

10

Enhancements to SPS NSS – Pilot Group Members

Brazil

Canada

Chile

China

European Union

Hong Kong, China

New Zealand

South Africa

United States

Page 11: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

11

New SPS NSS – Pilot Platform http://nss2.wto.org/sps

Page 12: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

12

Page 13: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

13

Page 14: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

14

Page 15: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

15

Page 16: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

16

Page 17: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

17

Page 18: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

18

Page 19: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

19

Page 20: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

20

Page 21: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

New SPS NSS

Practical Exercise

Page 22: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

New SPS NSS

Group Sessions

Page 23: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

23

Group Room Resource Persons

English CR Anneke, Tim, Anna,

Yeji

Français B Marième, Rolando

Español D Christiane, Marion

Training session 11.30-13.00

Page 24: SPS Transparency Workshop 12-13 October 2015 · 2015-10-23 · SPS IMS & SPS NSS Two-phase project launched in 2015 o Phase I: Enhancements to SPS NSS – Testing platform available

Test Site http://nss2.wto.org/sps

Switzerland login:

Cameroun login:

Ecuador login:

Password: test


Recommended