SPSRB Decision Brief on Declaring a Product OperationalInstructions / Guidance
• This template will be used by NESDIS personnel to recommend to the SPSRB that a new satellite product be declared operational. A decision briefing should be given to the SPSRB 1 to 45 days prior to declaring a product/service operational. Slides are due on the last Friday of the month. The presentation will be at the SPSRB which meets on the 3rd Wednesday of every month.─ Send briefing to [email protected] and info copy [email protected] and [email protected]
• Occasionally, NOAA will stop a capability at a pre-operational phase. For example, a product from a research satellite may not go all the way to a full 24/7 operational phase. In such cases, this template will also be used to declare a new product is ready to be declared fully pre-operational (i.e., we have reached our end-state for this capability).
• Every new product that is ready for transition into operations will be briefed to the SPSRB. • Routine modifications to an existing product that is handled through the NESDIS OSPO change
management process does not have to be briefed to the SPSRB, unless directed by OSPO management or requested by the SPSRB.
• Updates or enhancements to existing satellite products do not have to be briefed to the SPSRB. The decision to declare these products as operational will be made by OSPO’s SPSD Division Chief or his Representative.
• The template is a guide and may require tailoring. However, adherence to the briefing outline is recommended because it ensures the SPSRB is presented the information needed to make decisions.
• Guidance is contained in the notes page. You can access the notes page by selecting “View” and “Notes Page” from the main menu.
• Delete this slide before you send your brief to the SPSRB secretaries
2
SPSRB Decision Briefon Declaring
“title” Operational
Presenter: name and office
Month day, year
V8 20 Jan 2012
V8 20 Jan 20123
Integrated Product Team (IPT)
• IPT Lead:• IPT Backup Lead:• NESDIS Team:
─ STAR:─ OSPO:─ OSD:─ Data Center:─ Others:
• User Team─ Lead:─ Others:
• Oversight Panel (OP) lead:• Other OPs involved:
V8 20 Jan 20124
Requirement(s)
• Requirement(s)─ SPSRB requirement number, title and summary of requirement
Date of Initial Technical Assessment and SPSRB decision Date of Proposal for Product Development and SPSRB decision
─ Others
• User community• Benefit to user• NOAA Mission Goal supported:• Mission priority:
V8 20 Jan 20125
Capabilities AssessmentCurrent Operational Capabilities
Requested Capabilities Proposed Operational Capabilities
Satellite Source (s)
Product Name
Accuracy
Latency
Timeliness
Coverage
Resolution
Other attributes
V8 20 Jan 20126
Proposed Product Deliverable Details
N=New E=Enhanced R=Replacement T=Tailored O=Other
Product Type and Number
Fiscal Year (FY)
Product Delivery/Tracking Name
Environmental Observational Parameters
Satellites Sensors N
#
E
#
R
#
T
#
O
#
Tailoring Options or Comments
Formats:
Coverage areas:
Resolutions:
Update cycle:
Other:
Formats:
Coverage areas:
Resolutions:
Update cycle:
Other:
Formats:
Coverage areas:
Resolutions:
Update cycle:
Other:
Formats:
Coverage areas:
Resolutions:
Update cycle:
Formats:
Coverage areas:
Resolutions:
Update cycle:
Other:
V8 20 Jan 20127
Project Milestones and Key Tasks(New Product Example)
Product Delivery/Tracking Name: xxxxxxx• MMM YY (mmm yy): Development Phase Begins
─ MMM YY: IPT Lead informed to begin product development─ MMM YY: Initial Archive Requirements identified─ MMM YY: Quality Monitoring Concept Defined─ MMM YY: Long-term Maintenance Concept Defined ─ MMM YY: Preliminary Design Review─ MMM YY: Development processing system defined─ MMM YY: Initial Information Technology (IT) Security concept defined─ MMM YY: Test case processed─ MMM YY: Critical Design Review─ MMM YY: Code is prepared for implementation─ MMM YY: Software Code Review─ MMM YY: Final Archive requirements identified─ MMM YY: Operational and backup processing defined
• MMM YY (mmm yy): Pre-operational Phase Begins─ MMM YY: Operational and backup processing capabilities in place─ MMM YY: Final IT Security Concept Defined─ MMM YY: Pre-operational product output evaluated & tested─ MMM YY: Code transitions to operations; all documentation is complete─ MMM YY: Operational and backup capabilities reach ops status─ MMM YY: Brief SPSRB Oversight Panel(s) on product status─ MMM YY: Brief SPSRB capability is ready to go operational
• MMM YY (mmm yy): Operational Phase Begins─ MMM YY: SPSRB declares product operational
SPSRB Secretaries/manager update the SPSRB product metrics web pages OSD updates Satellite Products database
V8 20 Jan 20128
Data Flow DiagramGINI Ingest/Remap System
SATEPS/NSOF
Fairmont, WV
GOES Ingestand NOAA Port
Interface(GINI)
SDI3_3/SDI3_4SDI4_3/SDI4_4
NPORT3/NPORT4/NPORT6
Send mail
Raw GOES Satellite Data
ADDE Pull
SDIIngest System
AWIPSVSFTP Push
SATEPS Security at ESPC/NSOF
NSOF
SDI5_1/SDI5_2 NPORT5
Send mail
Raw GOES Satellite Data
ADDE Pull
GOES Ingestand NOAAPort
Interface(GINI)
SDIIngest
System
NWS Test NCF
AWIPSVSFTP Push
NWS (For NOAAPORT
Feed) ANCFNWB BackupSBN BNCF
McLean, VA
AWIPSVSFTP Push
Product Server
GP05/GP13 SATEPSDIST 4/SATEPSDITb4
AWIPSComposite
PolarMicrowave
Five DPIProducts
BlendedTPW
Low CloudBase
Data Flow Diagram Legend
AWIPSSFTP Push
AWIPSSFTP Push
GP67/GP68
GP75/GP78
Silver Spring, MD
Fairmont, WV
SATEPSDIST 1
SATEPSDIST4/SATEPSDISTb4
AWIPSSFTP Push
AWIPSSFTP Push
Arrow indicates direction of connection
Send mail/SMTP – Port 25
SSH – Port 22
ADDE – Port 112
http – Port 80
VSFTP – Port 21
OSDPD/ESPC-GINI-ESDA31-0001-V1.2Baseline Date: January 12, 2011
External User Zone
Development Zone
Distribution Zone (DMZ)
Private NSOF Network
Production Zone
Staging Zone
WWB Zone
AWIPSVSFTP Push
AWIPSSFTP Pull
AWIPSSFTP Push
V8 20 Jan 20129
Guidance
Insert a few slides that clearly show the following
• Quality of the product─ Technical performance ─ Strengths and weaknesses─ Peer reviews conducted
Recommend appropriate Oversight Panel review performance prior to SPSRB briefing
─ For new NPP products include a short quality assessment from the STAR cal/val lead. If you do not know the STAR person, contact Laurie Rokke
• User readiness and acceptance of product─ Is user ready to use product? If user not using product operationally, please explain
when this will happen─ Has user received training on how to use the product?
Delete this guidance slide when submitting your briefing
V8 20 Jan 201210
Plan of Operations
• Product Retirement Plan─ Define if we will pursue the retirement of a product as a result of
implementing a new or enhanced product under this project
• Archive Plan─ Define need for archive, archive location and duration of archive─ Define deliverables to archive (e.g., software, documentation, etc.)
• Long Term Maintenance Plan─ Define STAR science maintenance plan and funding source─ Define OSPO maintenance plan and funding source
• Quality Monitoring Plan─ Define Quality Control (QC) tools to be used─ Define who will use the QC tools ─ Describe how the QC tools will be used (e.g., what thresholds trigger action)
• Documentation/Metadata Plan─ Describe who will do documentation and metadata and what will be done
V8 20 Jan 201211
Satellite Product End-to-End Documentation System (SPEEDS)
• Product Name:• Projected Date to Go Operational:• Product Description:• Product System:• Platform:• Satellite(s):• Instrument(s) used:• Channels:• Horizontal Resolution:• Vertical Resolution:• Frequency:• Coverage:• Accuracy:• Formats:• Web Page:• Product Oversight Panel:• Users:• Archive:
V8 20 Jan 201212
SPSRB User Request Status
• Has the SPSRB user request been fully satisfied?
V8 20 Jan 201213
SPSRB Decision
• General comments• User input• STAR senior representative input• OSPO senior representative input• OSD senior representative input
• Consensus decision reached?─ Yes: summarize decision─ No: summarize direction