Spur 53 from IH 10 to Babcock Road SPUR 53 (UTSA BOULEVARD) PUBLIC HEARING
Transcript
Page 1: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

SPUR 53 (UTSA BOULEVARD) PUBLIC HEARING

Page 2: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

SPUR 53 (UTSA BOULEVARD) FROM: IH 10 TO: BABCOCK ROAD CSJ: 2230-02-004 AND 0915-12-459 SAN ANTONIO, BEXAR COUNTY, TX

PUBLIC HEARING March 17, 2014

Monroe May Elementary School 15707 Chase Hill Boulevard San Antonio, Texas 78256

Page 3: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Welcome Project Overview Environmental Overview Public Comments

Agenda

3

Page 4: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Welcome

Purpose of the Public Hearing: To solicit feedback from the community regarding proposed improvements.

Options for Commenting: 1) Verbal comments will commence after the presentation. 2) Written comments can be placed in the comment box. 3) Fax comments to 210-615-6295. 4) E-Mail comments to: [email protected] 5) Mail comments to: Texas Department of Transportation Attn: Barrlynn West

P.O. Box 29928 San Antonio, TX 78229-0928

Deadline for comments: March 27, 2014 Public Hearing Report will be posted at www.txdot.gov when analysis is

complete.

4

Page 5: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Welcome (Introductions)

Elected Officials Present

TxDOT Representatives

Project Team Members

5

Page 6: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Project Overview (Location Map)

6

Page 7: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Project Overview (Need and Purpose)

Need:

Traffic congestion that is expected to worsen and growth of The University of Texas at San Antonio (UTSA).

Purpose:

To improve mobility for vehicles and pedestrians within the project limits.

7

Page 8: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Project Overview (Project Description)

Project Length : 2.35 miles.

From Babcock Road to UTEX Boulevard : Expand from a 2-lane roadway to 4-lane roadway with curb, storm sewer, and pedestrian and bicycle accommodations.

From UTEX Boulevard to IH 10: Existing 4 lanes - re-stripe existing outside lane to serve as shared use lane, and add sidewalk on south side of roadway.

Provide medians from Babcock Road to Edward Ximenes Avenue.

Improvements would require additional right-of-way and an easement.

8

Page 9: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Project Overview (Previous Public Involvement)

Two previous public meetings were held for the project, one in December 2007 and one in November 2008.

Multiple Stakeholder meetings have been held with individuals, HOA’s, and UTSA.

Design changes in response to public comment:

– Shifted alignment in central portion of project away from residents to reduce traffic noise and reduce impacts to trees.

– Construct shared use path on both sides of the roadway from Babcock Road to Valero Way.

– Construct right turn lanes into Edward Ximenes Ave. and James Bauerle Blvd.

9

Page 10: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Project Overview (Typical Sections)

10

Existing Typical Section From Babcock Road to UTEX Blvd.

Proposed Typical Section From Babcock Road to Edward Ximenes Ave. (Varies).

Page 11: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Project Overview (Typical Sections)

11

Proposed Typical Section From Babcock Road to Edward Ximenes Ave. (Varies).

Proposed Typical Section From Edward Ximenes Ave. to Valero Way.

Page 12: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Project Overview (Typical Sections)

12

Proposed Typical Section From UTEX Blvd. to IH 10

Existing Typical Section From UTEX Blvd. to IH 10

Page 13: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Project Overview (Project Planning and Funding)

Programmed in the 2013-2016 Transportation Improvement Program (TIP).

Total Estimated Construction Cost: $18.7 Million.

– TxDOT: $7.6 Million

– CoSA: $11.1 Million

Funding Source:

– TxDOT: State and Federal Funds.

– CoSA: Local and Federal Funds.

13

Page 14: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Project Overview (Project Schedule)

Anticipated Environmental Clearance: Spring 2014.

TxDOT Letting Date: Summer 2014.

CoSA Letting Date: Spring 2015.

Construction Duration: Approximately 2 Years per project.

14

Page 15: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Environmental Overview

Key Environmental Issues Studied:

Traffic Noise

Edwards Aquifer

Vegetation

Threatened and Endangered Species

Section 4(f) and Chapter 26

15

Page 16: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Environmental Overview

Traffic Noise:

Noise barriers were determined to be reasonable and feasible at 3 locations.

Edwards Aquifer: Project is on Edwards Aquifer Recharge Zone and the

Contributing Zone Within the Transition Zone. Water Pollution Abatement Plan.

16

Page 17: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Environmental Overview

Vegetation Impacts: 6.9 acres of Grassland/Mixed Herbaceous vegetation. 2.5 acres of Mixed Deciduous Woodland vegetation. 0.5 acre of Riparian vegetation. Threatened and Endangered Species Impacts: May affect, but not likely to adversely affect federally listed

Golden-cheeked Warbler (GCW). May affect, but not likely to adversely affect federally listed

karst invertebrates in Karst Zone 2.

17

Page 18: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Environmental Overview

Section 4(f) and Chapter 26: The proposed project would require additional ROW from

UTSA and SAWS. These properties are subject to Section 4(f) and Chapter 26 regulations.

Under Section 4(f) of the 1966 Transportation Act, projects which impact or use public parks, recreation areas, wildlife or waterfowl refuges and historic sites, must perform a 4(f) evaluation. • De Minimis Determination.

Chapter 26 of the Parks and Wildlife Code applies whenever TxDOT proposes to use or take any public land designated and used as a park, recreation area, scientific area, wildlife refuge, or historic site. • Must hold a public hearing.

18

Page 19: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Environmental Overview

Environmental Assessment: Further details are provided in the Environmental

Assessment (EA). Project plans and the EA are available for viewing tonight. Project information can be viewed at the San Antonio

TxDOT District office from 8am to 5pm Monday through Friday:

TxDOT San Antonio District Office 4615 NW Loop 410 San Antonio, TX 78229

19

Page 20: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

Public Comments Options for Commenting: Verbal comments will commence after the formal

presentation. Written comments can be placed in the comment box. Fax comments to 210-615-6295. E-Mail comments to: [email protected] Mail comments to: Texas Department of Transportation Attn: Barrlynn West P.O. Box 29928 San Antonio, TX 78229-0928 Deadline for comments: March 27, 2014 Public Hearing Report will be posted at www.txdot.gov

when analysis is complete.

20

Page 21: Spur 53 (UTSA Boulevard)ftp.dot.state.tx.us/pub/txdot-info/sat/spur_536/spur53...2014/03/17  · Welcome Project Overview Environmental Overview Public Comments Agenda 3 Spur 53 from

Spur 53 from IH 10 to Babcock Road

VERBAL COMMENTS

SPUR 53 (UTSA BOULEVARD) PUBLIC HEARING


Recommended