SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Date post: 28-Oct-2015
Category:
Upload: gpricope
View: 66 times
Download: 6 times
Share this document with a friend
Description:
Offplot
80
Phase 3 Class 3 TIC Estimate INSTRUCTIONS FOR USE 1. Complete data entry section at top of "TIC Estimate Summary Sheet". 6. Conduct @Risk analysis to obtain contingency value. Notes 1. Cells shaded in blue are to be populated. PROJECT TIC ESTIMATE - PHASE 3/CLASS 3 (±10%) 2. Check the rates and factors at the top of the "Rates, Factors & Phase Summary" sheet an change as required. Rates and Factors are a guide only; to be confirmed by Project Manager 3. Enter actual costs for the previous and current phase (PH1, PH2 & PH3) in "Rates, Facto Phase Summary" sheet. The "Phase 4" and "Future Phases" sections of this sheet do not nee completed; this is calculated from the estimated capital equipment/material cost and the construction labour costs entered into the "TIC Estimate Summary" Sheet. 4. Complete engineering estimate for next phase using discipline "Detail_Est" sheets (by discipline leads). These will roll forward to the discipline "Activity Summary" sheets, t "Rates, Factors & Phase Summary" and to the "TIC Estimate Summary" sheet. 5. Copy, at a summary level, the capital equipment/material cost and construction labour c data from the Procurement and Construction Estimate to the "TIC Estimate Summary" Sheet.
Transcript
Page 1: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Phase 3 Class 3 TIC Estimate

INSTRUCTIONS FOR USE

1. Complete data entry section at top of "TIC Estimate Summary Sheet".

6. Conduct @Risk analysis to obtain contingency value.

Notes1. Cells shaded in blue are to be populated.

PROJECT TIC ESTIMATE - PHASE 3/CLASS 3 (±10%)

2. Check the rates and factors at the top of the "Rates, Factors & Phase Summary" sheet and change as required.Rates and Factors are a guide only; to be confirmed by Project Manager

3. Enter actual costs for the previous and current phase (PH1, PH2 & PH3) in "Rates, Factors & Phase Summary" sheet. The "Phase 4" and "Future Phases" sections of this sheet do not need to be completed; this is calculated from the estimated capital equipment/material cost and the construction labour costs entered into the "TIC Estimate Summary" Sheet.

4. Complete engineering estimate for next phase using discipline "Detail_Est" sheets (by discipline leads). These will roll forward to the discipline "Activity Summary" sheets, the "Rates, Factors & Phase Summary" and to the "TIC Estimate Summary" sheet.

5. Copy, at a summary level, the capital equipment/material cost and construction labour cost data from the Procurement and Construction Estimate to the "TIC Estimate Summary" Sheet.

Page 2: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Phase 3 Class 3 TIC Estimate

PROJECT TIC ESTIMATE - PHASE 3TIC ESTIMATE SUMMARY SHEET

Project Title: Sulphur Dioxide Reduction Project

Project No.(Caltex/WP): 359/Y5066

Workpack Reference: Lo-Cat Licensed technology

Workpack Description: Phase 3 cost estimate - Off plot - Lo-Cat process

Project Phase/Estimate Class: 3

Location: Caltex Lytton

Estimate Currency: A$

P3 Identifier: P3

Revision: A

Date: 11-Mar-06

Prepared By: Tran Thanh

DESCRIPTION

1000 Engineering & Project Management1010 Project Definition Phase $815,0001100 Project Management - Execute Phase $175,3071200 Detailed Engineering $175,3071500 Operate & Close-out $0

Engineering Leadership Overhead $58,281

2000 Construction Indirects - Staff Labour

3000 Construction Indirects - Equipment3100 Craneage3200 Scaffold Hire3400 General

4000 Construction Indirects - Services4050 NDT4100 Vacuum Tanker4150 Hydroblasting/Cleaning4200 Insulation4250 Painting4300 Caltex PCM4350 Caltex Workshop4400 Caltex Applications4450 Caltex PIS4500 Caltex Garage4550 Caltex General

5000 Construction Labour5100 Mechanical5500 Electrical/Instrumentation5600 Civil/Structural

6000 Bulk Materials6100 Piping6200 Hand Valves6300 Structural Steel6400 Civil Materials & Equipment6500 Cable Ladder6600 Cable6700 Misc. Electrical/Instrumentation

7000 Procured / Fabricated Items7050 Pumps7100 Valves7150 Fabricated Vessels7200 Fabricated Exchangers7250 Fabricated Piping7300 Structural Steel7400 Construction Consumables - Mechanical7600 Instruments7650 Control System Hardware7700 Junction Boxes

IPA COST CODE

Estimated Cost(AUD)

Page 3: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Phase 3 Class 3 TIC Estimate

DESCRIPTIONIPA COST CODE

Estimated Cost(AUD)

7750 MCCs and Switchgear7800 Motors7850 General Electrical7900 General Instrument7950 Construction Consumables - Electrical

8000 Spare Parts8100 Spare Parts - Mechanical (% of mechanical equipment cost) $08200 Spare Parts - Electrical/Instrumentation (% of inst. and electrical equipment cost) $0

Queensland Long Service Levy $4,284

Total - Base Estimate $1,228,178Design GrowthContingency $122,818Total $1,350,996

Page 4: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Phase 3 Class 3 TIC Estimate

file:///tt/file_convert/55cf9c75550346d033a9e882/document.xlsdocument.xlsRates, Factors & Phase Summary

04/17/2023

Rates and FactorsEngineering Charge Rate ($/hr) 110Design/Drafting Charge Rate ($/hr) 95Technical Services Charge Rate ($/hr) 85Engineering Factors (% of Capital Equipment/material cost + Construction Labour Cost)

Phase 1 NAPhase 2 NAPhase 3 NAPhase 4 NAPhase 5 6%

Contingency (% of Base Estimate) 10%Project Management Factor (% of discipline engineering costs) 100%Alliance Leadership Overhead (% of TIC Base Est., excluding QLD LS Levy) 5%Spares - Mechanical (% of Capital Equipment/material Cost) 3%Spares - Electrical (% of Capital Equipment/material Cost) 3%Queensland Long Service Levy (% of TIC Base Estimate) 0.35%

Phase 1, 2 & 3 TotalManhours Cost ($)

Phase 1 Actual Costs 800 $80,000Phase 2 Actual Costs 7000 $735,000Phase 3 Actual Costs to DateEstimate to complete phase 3Total Phase 1, 2 & 3 7,800 $815,000

Phase 4 Discipline Project Management Total(Loaded from Discipline Detailed Est. Sheets) Manhours Cost ($) Manhours Cost ($) Manhours Cost ($)Total Phase 2 1,594 $175,307 1593.7 $175,307 3,187 $350,614

Future Phases Discipline Project Management Total(Calculated from % rates above) Manhours Cost ($) Manhours Cost ($) Manhours Cost ($)Phase 5 0.00 $0 0.00 $0 0.00 $0Total Future Phase 0.00 $0 0.00 $0 0.00 $0

Rat

es

and

Fac

tors

are

a g

uid

e o

nly

; to

be

con

firm

ed b

y P

roje

ct

Man

ager

Page 5: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 5 of 73 04/17/2023

TECHNICAL SERVICES PROCESS ENGINEERING / DESIGN - STAFFHOUR ESTIMATEPH4

Project No : 359/Y5066Title : Sulphur Dioxide Reduction Project

Workpack Ref. : Lo-Cat Licensed technologyDescription : Phase 3 cost estimate - Off plot - Lo-Cat process

EngineeringEngineering Design

Hrs HrsCat Hours 128 NA

Rate 85.0 NA

% Of Total 100.0 NA

Total Hrs 128Total Cost $10,880

Rev Description Reviewed By DateA Issued For Estimate

Notes on Using this Estimate Sheet

1 Activities (WBS Nos.) are included as prompts for guidance. It is not necessary to complete all categories.2 Additional activities may be added as required.3 Norms (Unit Hours) may be adjusted to suit project requirements.4 Generally M00 is to be used on proposals and small FEED projects.5 Electronic copy of this template is stored in the following directory - G:\Engineering_Intranet\Process\Estimate_Sheets\6 Please advise the Engineering Manager of any additions, changes or adjustments required to norms or activities.

Notes on Using 'Insert New Row' button1 Position cursor in any cell - a new row will always be inserted below2 This function will also copy previous row fomulas and text to new row - please modify text accordingly

Notes on Using 'Delete Row' button1 Position cursor in a cell of the row you want to delete

Notes on Using 'View' & 'Hide' buttons1 Position cursor in a cell (or cells) that you want the '0' to be visible or not

Assumptions and Clarifications for this Estimate:

1 Project duration is 100 weeks from start of Phase 3 (FEED) April 2006 to end of Phase 5 (Commissioning) March 20082 Process cost estimate is prepared on the basis that Lo-Cat licensor GTP will provide the FEED, detail design package, supply, installation as3 per their tender submission on 2/3/2006, we only act as a supervisory, controlling, liaison, checking role to ensure the requirements are met.4 We will also be responsible for all the off-plot (OBL) activities to connect to the Sulphur Recovery plant, plus provision of utilities to include5 the both the Sulphur plant and the RPIP-DHTU upgrade.6 The Phase 3 cost estimate is to include all activities of Phase 4 to include all costs until the end of the project, not just for 7 phase 3 activitites.8 As per Kelvin's request, one cost estimate to be prepared for On-plot, and a separate cost estimate to be prepared for Off-Plot91011 Off plot includes the wet cake handling equipment, road load out, chemical storage and load in facility, RO water supply, effluent disposal,12 utilities, piping, layout, mechanical and E&I support, etc…1314 Tran Thanh, 12/3/200615

Activity IDCost Time & Resources Summary Engineering Design Total

(CTR)

XX4122A000 Default - total is less than 200 hours (& Proposals) NA

XX4122A100 General Coordination & Job Preparation 128 NA

XX4122A200 Business Case/Project Justification NA

XX4122A300 Process Document Checking NA

Page 6: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 6 of 73 04/17/2023

XX4122AA75 Eng. / Specialist Services NA

XX4122A850 Construction Support NA

XX4122A860 Inspection, Testing, Operator Training & Commissioning Support NA

XX4122A900 Formal Operator Training NA

NA

NA

Overall Totals 128 NA 128

Page 7: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: PROCESS

Page 7 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

P34122A000 Default - total is less than 200 hoursP34122A000 4A00-01A NOTE: This sheet "Tech Services Proc. Eng." seems to be duplicating the sheet "Process 1.00 100% 0%P34122A000 4A00-02A Detail_Est, and not as comprehensive as the later. It does not seem to tally towards the 1.00 100% 0%P34122A000 4A00-03A Summary sheet. Suggest to hide this sheet from view and just use the "Process Detail_Est" 1.00 100% 0%P34122A000 4A00-04A sheet. Tran Thanh 12/3/206 1.00 100% 0%

Sub Totals

Activity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

P34122A100 General Coordination & Job PreparationP34122A100 4A10-01A General Coordination & Job Preparation : Meetings 2 1.00 100% 0%P34122A100 4A10-02A General Coordination & Job Preparation : Project Reports - Weekly 0.3 1.00 100% 0%P34122A100 4A10-03A General Coordination & Job Preparation : Supervision 2 1.00 100% 0%P34122A100 4A10-04A General Coordination & Job Preparation : Site Visits 12 1.00 100% 0%P34122A100 4A10-05A General Coordination & Job Preparation : Inter-discipline Squad Checks 1.00 100% 0%P34122A100 4A10-06A General Coordination & Job Preparation : Inter-discipline Review Meetings 2 1.00 100% 0%P34122A100 4A10-07A General Coordination & Job Preparation : Project Closeout 1.00 100% 0%P34122A100 4A10-08A General Coordination & Job Preparation : Data Acquisition / Project Data Review 10 1.00 100% 0%P34122A100 4A10-09A General Coordination & Job Preparation : Process Plan 1 1.00 100% 0%P34122A100 4A10-10A General Coordination & Job Preparation : Filing Index and System 4 1.00 100% 0%P34122A100 4A10-11A General Coordination & Job Preparation : Certifying Authority Liaison 10 1.00 100% 0%P34122A100 4A10-12A General Coordination & Job Preparation : Quality Assurance 1 1.00 100% 0%

Bid Evaluation AssistanceP34122A100 4A10-21A Bid Evaluation Assistance : Mechanical Packages 5 1.00 100% 0%P34122A100 4A10-22A Bid Evaluation Assistance : Major Equipment Specs 2 1.00 100% 0%P34122A100 4A10-23A Bid Evaluation Assistance : Minor Equipment Specs 1 1.00 100% 0%P34122A100 4A10-24A Bid Evaluation Assistance : Control Valves 0.5 1.00 100% 0%P34122A100 4A10-25A Bid Evaluation Assistance : Actuated Valves 0.5 1.00 100% 0%P34122A100 4A10-26A Bid Evaluation Assistance : PSVs 0.5 1.00 100% 0%P34122A100 4A10-27A Bid Evaluation Assistance : Instruments 0.5 1.00 100% 0%

Vendor Data Review Input / IncorporationP34122A100 4A10-31A Vendor Data Review Input / Incorporation : Mechanical Packages 5 1.00 100% 0%P34122A100 4A10-32A Vendor Data Review Input / Incorporation : Major Equipment Specs 2 1.00 100% 0%P34122A100 4A10-33A Vendor Data Review Input / Incorporation : Minor Equipment Specs 1 1.00 100% 0%P34122A100 4A10-34A Vendor Data Review Input / Incorporation : Control Valves 0.5 1.00 100% 0%P34122A100 4A10-35A Vendor Data Review Input / Incorporation : Actuated Valves 0.5 1.00 100% 0%P34122A100 4A10-36A Vendor Data Review Input / Incorporation : PSVs 0.5 1.00 100% 0%P34122A100 4A10-37A Vendor Data Review Input / Incorporation : Instruments 0.5 1.00 100% 0%P34122A100 4A10-38A Vendor Data Review Input / Incorporation : Vendor Data Incorporation

Vendor Data Review Input / Incorporation : 8.01 - P&IDs 1 1.00 100% 0%Vendor Data Review Input / Incorporation : 8.02 - Process Data Sheets 0.5 1.00 100% 0%Vendor Data Review Input / Incorporation : 8.03 - Line Lists 5 1.00 100% 0%Vendor Data Review Input / Incorporation : 8.04 - Equipment Lists 5 1.00 100% 0%

P33101A200 Business Case/Project JustificationP32101A200 3A30-01A Prepare Business Case/Project Justification 1 1.00 100% 0%P33101A300 Process Document Checking

StudiesP34122A300 4A20-01A Studies : Basis of Design 10 1.00 100% 0%P34122A300 4A20-02A Studies : Conceptual Study 10 1.00 100% 0%P34122A300 4A20-03A Studies : Control / ESD Philosophy 10 1.00 100% 0%P34122A300 4A20-04A Studies : Design Criteria 10 1.00 100% 0%P34122A300 4A20-05A Studies : Overpressure Protection 8 1.00 100% 0%P34122A300 4A20-06A Studies : Emergency Shutdown 15 1.00 100% 0%P34122A300 4A20-07A Studies : Relief and Blowdown 15 1.00 100% 0%P34122A300 4A20-08A Studies : Process Control 15 1.00 100% 0%P34122A300 4A20-09A Studies : Fire Protection 15 1.00 100% 0%P34122A300 4A20-10A Studies : Line Sizing 10 1.00 100% 0%P34122A300 4A20-11A Studies : Maintenance Isolation 10 1.00 100% 0%P34122A300 4A20-12A Studies : Vent and Drains 40 1.00 100% 0%P34122A300 4A20-13A Studies : Insulation 10 1.00 100% 0%P34122A300 4A20-14A Studies : Chemical Injection 10 1.00 100% 0%

Process Simulations (HYSYS)P34122A300 4A20-21A Process Simulations Check 25 1.00 100% 0%

Materials Selection / Corrosion ProtectionP34122A300 4A20-25A Materials Selection / Corrosion Protection : Material Selection/Review 30 1.00 100% 0%P34122A300 4A20-26A Materials Selection / Corrosion Protection : Material Selection PFD 10 1.00 100% 0%

Safety / Loss PreventionP34122A300 4A20-31A Safety / Loss Prevention : Process Safety Diagram 15 1.00 100% 0%P34122A300 4A20-32A Safety / Loss Prevention : Risk Management Plan 60 1.00 100% 0%P34122A300 4A20-33A Safety / Loss Prevention : Hazard Identification/Assessment 12 1.00 100% 0%P34122A300 4A20-34A Safety / Loss Prevention : Critical Layout Drawings 8 1.00 100% 0%P34122A300 4A20-35A Safety / Loss Prevention : Safety Measures/Procedures 40 1.00 100% 0%P34122A300 4A20-36A Safety / Loss Prevention : Safety Case Support 20 1.00 100% 0%

Input to HAZOPP34122A300 4A20-41A HAZOP Attendance 8 1.00 100% 0%P34122A300 4A20-42A HAZOP Action Approval 10 1.00 100% 0%

Input to Design ReviewP34122A300 4A20-51A Design Review Attendance 8 1.00 100% 0%P34122A300 4A20-52A Design Review Action Approval 10 1.00 100% 0%

Pipeline Simulations (PIPESIM)P34122A300 4A20-61A Pipeline Simulations Check 8 1.00 100% 0%

Technical NotesP34122A300 4A20-71A 15 1.00 100% 0%P34122A300 4A20-72A 15 1.00 100% 0%P34122A300 4A20-73A 15 1.00 100% 0%P34122A300 4A20-74A 15 1.00 100% 0%P34122A300 4A20-75A 15 1.00 100% 0%

Develop P&ID - Issued For ConstructionP34122A300 4A25-15A Check P&IDs - Issued For Construction 1 1.00 100% 0%

Maintenance of Frozen P&ID post AFC / AFDP34122A300 4A25-19A Maintenance of Frozen P&ID post AFC / AFD : 5.01 - Construction P&ID 4 1.00 100% 0%P34122A300 4A25-20A Maintenance of Frozen P&ID post AFC / AFD : 5.02 - Demolition P&ID 2 1.00 100% 0%

PFD / UFD Preparation & MaintenanceP34122A300 4A25-59A Check PFDs / UFDs 8 1.00 100% 0%

Calculations - General ProcessP34122A300 4A30-01A Calculations - General Process : Equipment Sizing 0.1 1.00 100% 0%P34122A300 4A30-02A Calculations - General Process : Line Sizing - Prelim 0.5 1.00 100% 0%P34122A300 4A30-03A Calculations - General Process : Line Sizing - Detailed 4 1.00 100% 0%P34122A300 4A30-04A Calculations - General Process : Loop Seal Sizing 2 1.00 100% 0%P34122A300 4A30-05A Calculations - General Process : Control Valve Sizing 1 1.00 100% 0%P34122A300 4A30-06A Calculations - General Process : Restriction Orifice Plate Sizing 3 1.00 100% 0%P34122A300 4A30-07A Calculations - General Process : Control System Setpoints 20 1.00 100% 0%P34122A300 4A30-08A Calculations - General Process : Deluge and Firewater Requirement Calculation 50 1.00 100% 0%P34122A300 4A30-09A Calculations - General Process : Static Pressure Drop Calculations 20 1.00 100% 0%P34122A300 4A30-10A Calculations - General Process : Corrosion Rates 20 1.00 100% 0%P34122A300 4A30-11A Calculations - General Process : Utility Consumptions 1 1.00 100% 0%P34122A300 4A30-12A Calculations - General Process : Miscellaneous 5 1.00 100% 0%

Calculations - Flare / BlowdownP34122A300 4A30-21A Calculations - Flare / Blowdown : Relief Contingency Tables 20 1.00 100% 0%P34122A300 4A30-22A Calculations - Flare / Blowdown : Relief Valve Sizing Calculations 2 1.00 100% 0%P34122A300 4A30-23A Calculations - Flare / Blowdown : Relief Valve Data Sheets 2 1.00 100% 0%P34122A300 4A30-24A Calculations - Flare / Blowdown : Pressure Settle-out Calculations 5 1.00 100% 0%P34122A300 4A30-25A Calculations - Flare / Blowdown : Depressuring Calculations 4 1.00 100% 0%P34122A300 4A30-26A Calculations - Flare / Blowdown : Flare System Network Evaluation 30 1.00 100% 0%P34122A300 4A30-27A Calculations - Flare / Blowdown : Flare Header Sizing - Prelim 2 1.00 100% 0%

Split Eng/Design

Split Eng/Design

Page 8: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: PROCESS

Page 8 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34122A300 4A30-28A Calculations - Flare / Blowdown : Flare Header Sizing - Detail 5 1.00 100% 0%P34122A300 4A30-29A Calculations - Flare / Blowdown : PSV Inlet / Outlet Piping Sizing - Prelim 0.5 1.00 100% 0%P34122A300 4A30-30A Calculations - Flare / Blowdown : PSV Inlet / Outlet Piping Sizing - Detail 1 1.00 100% 0%P34122A300 4A30-31A Calculations - Flare / Blowdown : Flare Tip Specification 10 1.00 100% 0%P34122A300 4A30-32A Calculations - Flare / Blowdown : Flare Radiation / Surface Temperatures 20 1.00 100% 0%P34122A300 4A30-33A Calculations - Flare / Blowdown : Materials Selection 5 1.00 100% 0%P34122A300 4A30-34A Calculations - Flare / Blowdown : Technical Notes 40 1.00 100% 0%P34122A300 4A30-35A Calculations - Flare / Blowdown : FLARENET Model Preparation 12 1.00 100% 0%P34122A300 4A30-36A Calculations - Flare / Blowdown : FLARESIM Model Preparation 8 1.00 100% 0%

Process Equipment Data SheetsP34122A300 4A36-01A Process Equipment Data Sheets : Vessels/Drums 10 1.00 100% 0%P34122A300 4A36-02A Process Equipment Data Sheets : Columns 15 1.00 100% 0%P34122A300 4A36-03A Process Equipment Data Sheets : Column Internals, Reactors 10 1.00 100% 0%P34122A300 4A36-04A Process Equipment Data Sheets : Fired Heaters 15 1.00 100% 0%P34122A300 4A36-05A Process Equipment Data Sheets : Heat Exchangers 8 1.00 100% 0%P34122A300 4A36-06A Process Equipment Data Sheets : Heat Exchanger Thermal/Hydraulic Rating 10 1.00 100% 0%P34122A300 4A36-07A Process Equipment Data Sheets : Pumps - Major 8 1.00 100% 0%P34122A300 4A36-08A Process Equipment Data Sheets : Pumps - Minor 4 1.00 100% 0%P34122A300 4A36-09A Process Equipment Data Sheets : Compressors / Expanders 30 1.00 100% 0%P34122A300 4A36-10A Process Equipment Data Sheets : Tanks 6 1.00 100% 0%P34122A300 4A36-11A Process Equipment Data Sheets : Filters 6 1.00 100% 0%P34122A300 4A36-12A Process Equipment Data Sheets : Pig Launcher / Receiver 2 1.00 100% 0%P34122A300 4A36-13A Process Equipment Data Sheets : Packaged Units 15 1.00 100% 0%P34122A300 4A36-14A Process Equipment Data Sheets : Miscellaneous 5 1.00 100% 0%

Utility Equipment Datasheets - Chemical InjectionP34122A300 4A36-21A Utility Equipment Datasheets - Chemical Injection : Hydrate Suppression 2 1.00 100% 0%P34122A300 4A36-22A Utility Equipment Datasheets - Chemical Injection : Corrosion Inhibition 2 1.00 100% 0%P34122A300 4A36-23A Utility Equipment Datasheets - Chemical Injection : Emulsion Breaking 2 1.00 100% 0%P34122A300 4A36-24A Utility Equipment Datasheets - Chemical Injection : Defoaming 2 1.00 100% 0%P34122A300 4A36-25A Utility Equipment Datasheets - Chemical Injection : Flow Improvers 2 1.00 100% 0%

Utility Equipment Datasheets - Gas SystemP34122A300 4A36-26A Utility Equipment Datasheets - Gas System : Fuel Gas System 2 1.00 100% 0%P34122A300 4A36-27A Utility Equipment Datasheets - Gas System : Power Gas System 2 1.00 100% 0%P34122A300 4A36-28A Utility Equipment Datasheets - Gas System : Fuel Gas Cooler 2 1.00 100% 0%P34122A300 4A36-29A Utility Equipment Datasheets - Gas System : Fuel Gas Outlet Scrubber 2 1.00 100% 0%P34122A300 4A36-30A Utility Equipment Datasheets - Gas System : Fuel Gas Suction Scrubber 2 1.00 100% 0%P34122A300 4A36-31A Utility Equipment Datasheets - Gas System : Fuel Gas Superheater 2 1.00 100% 0%

Utility Equipment Datasheets - Water Gas SystemP34122A300 4A36-32A Utility Equipment Datasheets - Water Gas System : Potable Water 2 1.00 100% 0%P34122A300 4A36-33A Utility Equipment Datasheets - Water Gas System : Fire Water System 2 1.00 100% 0%P34122A300 4A36-34A Utility Equipment Datasheets - Water Gas System : Washdown Water 2 1.00 100% 0%P34122A300 4A36-35A Utility Equipment Datasheets - Water Gas System : Hot Water 2 1.00 100% 0%P34122A300 4A36-36A Utility Equipment Datasheets - Water Gas System : Steam 2 1.00 100% 0%

Utility Equipment Datasheets - Air SystemsP34122A300 4A36-37A Utility Equipment Datasheets - Air Systems : Instrument Air 2 1.00 100% 0%P34122A300 4A36-38A Utility Equipment Datasheets - Air Systems : Service Air 2 1.00 100% 0%P34122A300 4A36-39A Utility Equipment Datasheets - Air Systems : HVAC & Pressurisation Fans 2 1.00 100% 0%

Utility Equipment Datasheets - Oil SystemsP34122A300 4A36-41A Utility Equipment Datasheets - Oil Systems : Lubricating Oils 2 1.00 100% 0%P34122A300 4A36-42A Utility Equipment Datasheets - Oil Systems : Hydraulic Oil 2 1.00 100% 0%P34122A300 4A36-43A Utility Equipment Datasheets - Oil Systems : Deaerator Air Blower 2 1.00 100% 0%P34122A300 4A36-44A Utility Equipment Datasheets - Oil Systems : Deluge Skid 2 1.00 100% 0%P34122A300 4A36-45A Utility Equipment Datasheets - Oil Systems : Diesel Filter Package 2 1.00 100% 0%P34122A300 4A36-46A Utility Equipment Datasheets - Oil Systems : Diesel Storage Tank 2 1.00 100% 0%P34122A300 4A36-47A Utility Equipment Datasheets - Oil Systems : Diesel Transfer Pump 2 1.00 100% 0%P34122A300 4A36-48A Utility Equipment Datasheets - Oil Systems : Fine Filter Package (Water Injection) 2 1.00 100% 0%P34122A300 4A36-49A Utility Equipment Datasheets - Oil Systems : Flare Tip / Igniter Package 2 1.00 100% 0%P34122A300 4A36-50A Utility Equipment Datasheets - Oil Systems : Generator 2 1.00 100% 0%P34122A300 4A36-51A Utility Equipment Datasheets - Oil Systems : Hydraulic Power Package 2 1.00 100% 0%P34122A300 4A36-52A Utility Equipment Datasheets - Oil Systems : Instrument Air Package 2 1.00 100% 0%P34122A300 4A36-53A Utility Equipment Datasheets - Oil Systems : Instrument Air Receiver 2 1.00 100% 0%P34122A300 4A36-54A Utility Equipment Datasheets - Oil Systems : Open Drain Pump (Haz) 2 1.00 100% 0%P34122A300 4A36-55A Utility Equipment Datasheets - Oil Systems : Open Drain Pump (Non Haz) 2 1.00 100% 0%P34122A300 4A36-56A Utility Equipment Datasheets - Oil Systems : Open Drain Tank (Haz) 10 1.00 100% 0%P34122A300 4A36-57A Utility Equipment Datasheets - Oil Systems : Open Drain Tank (Non Haz) 2 1.00 100% 0%P34122A300 4A36-58A Utility Equipment Datasheets - Oil Systems : Sea Water Lift Caisson 2 1.00 100% 0%P34122A300 4A36-59A Utility Equipment Datasheets - Oil Systems : Sea Water Lift Pump 2 1.00 100% 0%P34122A300 4A36-60A Utility Equipment Datasheets - Oil Systems : Service Air Receiver 2 1.00 100% 0%P34122A300 4A36-61A Utility Equipment Datasheets - Oil Systems : Skimmer Pile 2 1.00 100% 0%P34122A300 4A36-62A Utility Equipment Datasheets - Oil Systems : Skimmer Pile Pump 2 1.00 100% 0%P34122A300 4A36-63A Utility Equipment Datasheets - Oil Systems : Sparge Gas Vessels 2 1.00 100% 0%P34122A300 4A36-64A Utility Equipment Datasheets - Oil Systems : Test Separator 2 1.00 100% 0%P34122A300 4A36-65A Utility Equipment Datasheets - Oil Systems : Water Injection 2 1.00 100% 0%P34122A300 4A36-66A Utility Equipment Datasheets - Oil Systems : Water Injection Booster Pump 2 1.00 100% 0%P34122A300 4A36-67A Utility Equipment Datasheets - Oil Systems : Water Injection Pump 2 1.00 100% 0%P34122A300 4A36-68A Utility Equipment Datasheets - Oil Systems : Well Equalisation Pump 2 1.00 100% 0%P34122A300 4A36-69A Utility Equipment Datasheets - Oil Systems : Wellhead Hydraulic Package 2 1.00 100% 0%

Process Instrument Data SheetsP34122A300 4A36-81A Process Instrument Data Sheets : Control Valve Data Sheets 3 1.00 100% 0%P34122A300 4A36-82A Process Instrument Data Sheets : Actuated Valve Data Sheets 2 1.00 100% 0%P34122A300 4A36-83A Process Instrument Data Sheets : PSV Data Sheets 2 1.00 100% 0%P34122A300 4A36-84A Process Instrument Data Sheets : Restriction Orifice Plate Data Sheets 2 1.00 100% 0%P34122A300 4A36-85A Process Instrument Data Sheets : Specialty Piping Items List (per item) 1 1.00 100% 0%P34122A300 4A36-86A Process Instrument Data Sheets : Flowmeter Data Sheets 2 1.00 100% 0%P34122A300 4A36-87A Process Instrument Data Sheets : Pressure Instruments 2 1.00 100% 0%P34122A300 4A36-88A Process Instrument Data Sheets : Temperature Instruments 2 1.00 100% 0%P34122A300 4A36-89A Process Instrument Data Sheets : Level Instruments 2 1.00 100% 0%P34122A300 4A36-90A Process Instrument Data Sheets : Analysers 2 1.00 100% 0%P34122A300 4A36-91A Process Instrument Data Sheets : Other Instruments 2 1.00 100% 0%

Schedules and ListsP34122A300 4A40-01A Schedules and Lists : Equipment List - Develop 5 1.00 100% 0%P34122A300 4A40-02A Schedules and Lists : Equipment List - Maintain 30 1.00 100% 0%P34122A300 4A40-03A Schedules and Lists : Line List - Develop - x lines 0.1 1.00 100% 0%P34122A300 4A40-04A Schedules and Lists : Line List - Maintain - x lines 0.1 1.00 100% 0%P34122A300 4A40-05A Schedules and Lists : Safe Charts 5 1.00 100% 0%P34122A300 4A40-06A Schedules and Lists : Cause & Effects Matrices (FECs) 3 1.00 100% 0%

A75 Subcontracts - Engineering / SpecialistsP34122A75 Eng. / Specialist ServicesP34122A75A 4A75-01A Enquiry Package - Eng. / Specialist Services : Scope of Work Review 30 1.00 100% 0%P34122A75C 4A75-02A Vendor Liaison - Eng. / Specialist Services : Vendor Liaison - Eng. / Specialist Services 30 1.00 100% 0%

P34122A850 Construction SupportP34122A850 4A85-01A Construction Support : Construction Support 100 1.00 100% 0%P34122A850 4A85-02A Construction Support : Commissioning Support 100 1.00 100% 0%

P34122A860 Inspection, Testing, Operator Training & Commissioning SupportP34122A860 4A86-01A Inspection, Testing, Operator Training & Commissioning Support : Definition of Commissioning Method 1 1.00 100% 0%P34122A860 4A86-01A Inspection, Testing, Operator Training & Commissioning Support : Input to Precommissioning Procedures & Checks 40 1.00 100% 0%P34122A860 4A86-01A Inspection, Testing, Operator Training & Commissioning Support : Input to Commissioning Procedures & CFTs 1 1.00 100% 0%P34122A860 4A86-01A Inspection, Testing, Operator Training & Commissioning Support : Input to Operating Manuals 60 1.00 100% 0%P34122A860 4A86-01A Inspection, Testing, Operator Training & Commissioning Support : Input to Training 10 1.00 100% 0%P34122A900 Formal Operator TrainingP34122A900 4A90-01A Formal Operator Training : Attendance at Training Sessions 8 1.00 100% 0%P34122A900 4A90-02A 1.00 100% 0%

Page 9: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 9 of 73 04/17/2023

PROCESS ENGINEERING / DESIGN - STAFFHOUR ESTIMATE PH4

Project No : 359/Y5066Title : Sulphur Dioxide Reduction Project

Workpack Ref. : Lo-Cat Licensed technologyDescription : Phase 3 cost estimate - Off plot - Lo-Cat process

EngineeringEngineering Design

Hrs HrsCat Hours 1594 0

Rate 110.0 95.0

% Of Total 100.0 0.0

Total Hrs 1594Total Cost $175,307

Rev Description Reviewed By DateA Issued For Estimate

Notes on Using this Estimate Sheet

1 Activities (WBS Nos.) are included as prompts for guidance. It is not necessary to complete all categories.2 Additional activities may be added as required.3 Norms (Unit Hours) may be adjusted to suit project requirements.4 Generally M00 is to be used on proposals and small FEED projects.5 Electronic copy of this template is stored in the following directory - G:\Engineering_Intranet\Process\Estimate_Sheets\6 Please advise the Engineering Manager of any additions, changes or adjustments required to norms or activities.

Notes on Using 'Insert New Row' button1 Position cursor in any cell - a new row will always be inserted below2 This function will also copy previous row fomulas and text to new row - please modify text accordingly

Notes on Using 'Delete Row' button1 Position cursor in a cell of the row you want to delete

Notes on Using 'View' & 'Hide' buttons1 Position cursor in a cell (or cells) that you want the '0' to be visible or not

Assumptions and Clarifications for this Estimate:

1 Project duration is 100 weeks from start of Phase 3 (FEED) April 2006 to end of Phase 5 (Commissioning) March 20082 Process cost estimate is prepared on the basis that Lo-Cat licensor GTP will provide the FEED, detail design package, supply, installation as3 per their tender submission on 2/3/2006, we only act as a supervisory, controlling, liaison, checking role to ensure the requirements are met.4 We will also be responsible for all the off-plot (OBL) activities to connect to the Sulphur Recovery plant, plus provision of utilities to include5 the both the Sulphur plant and the RPIP-DHTU upgrade.6 The Phase 3 cost estimate is to include all activities of Phase 4 to include all costs until the end of the project, not just for 7 phase 3 activitites.8 As per Kelvin's request, one cost estimate to be prepared for On-plot, and a separate cost estimate to be prepared for Off-Plot91011 Off plot includes the wet cake handling equipment, road load out, chemical storage and load in facility, RO water supply, effluent disposal,12 utilities, piping, layout, mechanical and E&I support, etc…1314 Tran Thanh, 12/3/200615

Activity IDCost Time & Resources Summary Engineering Design Total

(CTR)

XX4122P000 Default - total is less than 200 hours (& Proposals)

XX4122P100 General Coordination & Job Preparation & meetings 128

XX4122P110 Bid Evaluation of Off plot equipment 29

XX4122P120 Communication with Vendor, input to contractor / incorporation, emails 28

Page 10: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 10 of 73 04/17/2023

XX4122P200 Various design Studies for Off-plot 130

XX4122P210 Process Simulations (HYSYS)

XX4122P220 Materials Selection / Corrosion Protection 40

XX4122P230 Safety / Loss Prevention / Hazard Identification / Ergonomics 70

XX4122P240 Process Input to HAZOP 128

XX4122P250 Process Input to Design Review 112

XX4122P260 Pipeline Simulations (PIPESIM)

XX4122P270 Technical Notes

XX4122P300 Develop P&ID : Issued For Review 196

XX4122P310 Develop P&ID : Issued For HAZOP 30

XX4122P320 Develop P&ID : Issued For Design 18

XX4122P330 Develop P&ID : Issued For Construction 18

XX4122P340 Maintenance of Frozen P&ID post AFC / AFD 24

XX4122P350 Develop and Maintain P&ID Filing System 6

XX4122P360 Develop FECs : Issued For Review

XX4122P370 Develop FECs : Issued For HAZOP

XX4122P380 Develop FECs : Issued For Design

XX4122P390 Develop FECs : Issued For Construction

XX4122P400 PFD / UFD Preparation & Maintenance

XX4122P410 Calculations - General Process & Verification checks by others 110

XX4122P420 Calculations - Flare / Blowdown & Verification checks by others 59

XX4122P430 Prepare Process Equipment Data Sheets for off plot 69

XX4122P440 Utility Equipment Datasheets - Chemical Injection

XX4122P450 Utility Equipment Datasheets - Gas System 2

XX4122P460 Utility Equipment Datasheets - Water Gas System 10

XX4122P470 Utility Equipment Datasheets - Air Systems 4

XX4122P480 Utility Equipment Datasheets - Oil Systems 6

XX4122P490 Process input to Instrument Data Sheets 74

XX4122P500 Schedules and Lists 24

PHASE 4 & 5

P75 Subcontracts - Engineering / Specialists for Off-plot equipment, Devco

XX4122P75A Enquiry Package - Eng. / Specialist Services 25

XX4122P75B Prepare P.O. Package - Eng. / Specialist Services 20

XX4122P75C Vendor Liaison - Eng. / Specialist Services 15

XX4122P850 Construction Support, queries, inspection, punch list verification 220

XX4122P860

XX4122P900 Formal Operator Training (refer On-plot)

Overall Totals 1594 1594

Inspection, Testing, Operator Training & Commissioning Support (refer On-plot)

Page 11: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: PROCESS

Page 11 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

P34122P000 Default - total is less than 200 hoursP34122P000 4P00-01A 1.00 100% 0%P34122P000 4P00-02A 1.00 100% 0%P34122P000 4P00-03A 1.00 100% 0%P34122P000 4P00-04A 1.00 100% 0%

Sub Totals

Activity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

P34122P100 General Coordination & Job Preparation & meetings 128 128P34122P100 4P10-01A General Coordination & Job Preparation : Meetings 10 2 1.00 100% 0% 20P34122P100 4P10-02A General Coordination & Job Preparation : Project Reports - Weekly or Monthly 0.3 1.00 100% 0%P34122P100 4P10-03A General Coordination & Job Preparation : Supervision 2 1.00 100% 0%P34122P100 4P10-04A General Coordination & Job Preparation : Site Visits 10 2 1.00 100% 0% 20P34122P100 4P10-05A General Coordination & Job Preparation : Inter-discipline Squad Checks 1.00 100% 0% 22

General Coordination & Job Preparation : 05.01 - P&IDs 10 0.2 1.00 100% 0% 2General Coordination & Job Preparation : 05.02 - Demolition P&IDs 0.2 1.00 100% 0%General Coordination & Job Preparation : 05.03 - Equipment Location Plans / Layouts 5 0.5 1.00 100% 0% 3General Coordination & Job Preparation : 05.04 - Piping Studies 5 0.5 1.00 100% 0% 3General Coordination & Job Preparation : 05.05 - 3D CAD Model 4 1.00 100% 0%General Coordination & Job Preparation : 05.06 - Piping Plans 5 0.5 1.00 100% 0% 3General Coordination & Job Preparation : 05.07 - Instrument Logic Diagrams 2 2 1.00 100% 0% 4General Coordination & Job Preparation : 05.08 - Control / ESD Functional Specifications 2 4 1.00 100% 0% 8General Coordination & Job Preparation : 05.09 - Escape Route Drawings 0.5 1.00 100% 0%General Coordination & Job Preparation : 05.10 - Life Saving Equipment Drawings 0.5 1.00 100% 0%General Coordination & Job Preparation : 05.11 - Fire Protection 1 0.5 1.00 100% 0% 1

P34122P100 4P10-06A General Coordination & Job Preparation : Inter-discipline Review Meetings 5 2 1.00 100% 0% 10P34122P100 4P10-07A General Coordination & Job Preparation : Project Closeout 6 1.00 100% 0%P34122P100 4P10-08A General Coordination & Job Preparation : Data Acquisition / Project Data Review 5 10 1.00 100% 0% 50P34122P100 4P10-09A General Coordination & Job Preparation : Process Plan 1 1 1.00 100% 0% 1P34122P100 4P10-10A General Coordination & Job Preparation : Filing Index and System 1 4 1.00 100% 0% 4P34122P100 4P10-11A General Coordination & Job Preparation : Certifying Authority Liaison 10 1.00 100% 0%P34122P100 4P10-12A General Coordination & Job Preparation : Quality Assurance 1 1 1.00 100% 0% 1P34122P110 Bid Evaluation of Off plot equipment 29 29P34122P110 4P10-21A Bid Evaluation Assistance : Mechanical Packages; eg: conveyor, load out, load in facilities as below 1 5 1.00 100% 0% 5P34122P110 4P10-22A Bid Evaluation Assistance : Major Equipment Specs 2 2 1.00 100% 0% 4P34122P110 4P10-23A Bid Evaluation Assistance : Minor Equipment Specs 2 1 1.00 100% 0% 2P34122P110 4P10-24A Bid Evaluation Assistance : Control Valves 5 0.5 1.00 100% 0% 3P34122P110 4P10-25A Bid Evaluation Assistance : Actuated Valves 5 0.5 1.00 100% 0% 3P34122P110 4P10-26A Bid Evaluation Assistance : PSVs 5 0.5 1.00 100% 0% 3P34122P110 4P10-27A Bid Evaluation Assistance : Instruments 20 0.5 1.00 100% 0% 10P34122P120 Communication with Vendor, input to contractor / incorporation, emails 28 28P34122P120 4P10-31A Vendor Data Review Input / Incorporation : Mechanical Packages 5 1.00 100% 0%P34122P120 4P10-32A Vendor Data Review Input / Incorporation : Major Equipment Specs 2 2 1.00 100% 0% 4P34122P120 4P10-33A Vendor Data Review Input / Incorporation : Minor Equipment Specs 2 1 1.00 100% 0% 2P34122P120 4P10-34A Vendor Data Review Input / Incorporation : Control Valves 5 0.5 1.00 100% 0% 3P34122P120 4P10-35A Vendor Data Review Input / Incorporation : Actuated Valves 5 0.5 1.00 100% 0% 3P34122P120 4P10-36A Vendor Data Review Input / Incorporation : PSVs 5 0.5 1.00 100% 0% 3P34122P120 4P10-37A Vendor Data Review Input / Incorporation : Instruments 2 0.5 1.00 100% 0% 1P34122P120 4P10-38A Vendor Data Review Input / Incorporation : Vendor Data Incorporation 13

Vendor Data Review Input / Incorporation : 8.01 - P&IDs 2 1 1.00 100% 0% 2Vendor Data Review Input / Incorporation : 8.02 - Process Data Sheets 2 0.5 1.00 100% 0% 1Vendor Data Review Input / Incorporation : 8.03 - Line Lists 1 5 1.00 100% 0% 5Vendor Data Review Input / Incorporation : 8.04 - Equipment Lists 1 5 1.00 100% 0% 5

P34122P200 Various design Studies for Off-plot 130 130P34122P200 4P20-01A Studies : Basis of Design 1 10 1.00 100% 0% 10P34122P200 4P20-02A Studies : Conceptual Study 10 1.00 100% 0%P34122P200 4P20-03A Studies : Control / ESD Philosophy 1 10 1.00 100% 0% 10P34122P200 4P20-04A Studies : Design Criteria 1 10 1.00 100% 0% 10P34122P200 4P20-05A Studies : Overpressure Protection 1 10 1.00 100% 0% 10P34122P200 4P20-06A Studies : Emergency Shutdown 1 10 1.00 100% 0% 10P34122P200 4P20-07A Studies : Relief and Blowdown 1 10 1.00 100% 0% 10P34122P200 4P20-08A Studies : Process Control 1 10 1.00 100% 0% 10P34122P200 4P20-09A Studies : Fire Protection 1 10 1.00 100% 0% 10P34122P200 4P20-10A Studies : Line Sizing 1 10 1.00 100% 0% 10P34122P200 4P20-11A Studies : Maintenance Isolation 1 10 1.00 100% 0% 10P34122P200 4P20-12A Studies : Vent and Drains 1 10 1.00 100% 0% 10P34122P200 4P20-13A Studies : Insulation 1 10 1.00 100% 0% 10P34122P200 4P20-14A Studies : Chemical Injection / Flushing / Drain 1 10 1.00 100% 0% 10P34122P210 Process Simulations (HYSYS)P34122P210 4P20-21A Process Simulations (HYSYS) : Develop Simulation 25 1.00 100% 0%P34122P210 4P20-22A Process Simulations (HYSYS) : Maintain Simulation 25 1.00 100% 0%P34122P210 4P20-23A Process Simulations (HYSYS) : Develop Mass & Energy Balances 25 1.00 100% 0%P34122P210 4P20-24A Process Simulations (HYSYS) : Maintain Mass & Energy Balances 25 1.00 100% 0%P34122P220 Materials Selection / Corrosion Protection 40 40P34122P220 4P20-25A Materials Selection / Corrosion Protection : Material Selection/Review 1 30 1.00 100% 0% 30P34122P220 4P20-26A Materials Selection / Corrosion Protection : Material Selection PFD 1 10 1.00 100% 0% 10P34122P230 Safety / Loss Prevention / Hazard Identification / Ergonomics 70 70P34122P230 4P20-31A Safety / Loss Prevention : Process Safety Diagram 15 1.00 100% 0%P34122P230 4P20-32A Safety / Loss Prevention : Risk Management Plan 1 10 1.00 100% 0% 10P34122P230 4P20-33A Safety / Loss Prevention : Hazard Identification/Assessment 5 8 1.00 100% 0% 40P34122P230 4P20-34A Safety / Loss Prevention : Critical Layout Drawings 8 1.00 100% 0%P34122P230 4P20-35A Safety / Loss Prevention : Safety Measures/Procedures 1 10 1.00 100% 0% 10P34122P230 4P20-36A Safety / Loss Prevention : Safety Case Support 1 10 1.00 100% 0% 10P34122P240 Process Input to HAZOP 128 128P34122P240 4P20-41A Process Input to HAZOP : 27.01 - Preparation for HAZOP 4 8 1.00 100% 0% 32P34122P240 4P20-42A Process Input to HAZOP : 27.02 - Attendance at HAZOP 4 10 1.00 100% 0% 40P34122P240 4P20-43A Process Input to HAZOP : 27.03 - Follow-up on HAZOP 4 12 1.00 100% 0% 48P34122P240 4P20-44A Process Input to HAZOP : 27.04 - Closeout of HAZOP 4 2 1.00 100% 0% 8P34122P250 Process Input to Design Review 112 112P34122P250 4P20-51A Process Input to Design Review : 28.01 - Preparation for Design Review 4 8 1.00 100% 0% 32P34122P250 4P20-52A Process Input to Design Review : 28.02 - Attendance at Design Review 4 10 1.00 100% 0% 40P34122P250 4P20-53A Process Input to Design Review : 28.03 - Follow-up on Design Review 4 10 1.00 100% 0% 40P34122P260 Pipeline Simulations (PIPESIM)P34122P260 4P20-61A Pipeline Simulations (PIPESIM) : 29.01 - Develop PIPESIM Model 8 1.00 100% 0%P34122P260 4P20-62A Pipeline Simulations (PIPESIM) : 29.02 - Maintain PIPESIM Model 12 1.00 100% 0%P34122P260 4P20-63A Pipeline Simulations (PIPESIM) : 29.03 - Analysis of Pipeline Results 15 1.00 100% 0%P34122P270 Technical NotesP34122P270 4P20-71A 15 1.00 100% 0%P34122P270 4P20-72A 15 1.00 100% 0%P34122P270 4P20-73A 15 1.00 100% 0%P34122P270 4P20-74A 15 1.00 100% 0%P34122P270 4P20-75A 15 1.00 100% 0%P34122P300 Develop P&ID - Issued For Review 196 196P34122P300 4P25-01A Develop P&ID - Issued For Review : 1.01 - New Drawing - Complex 3 30 1.00 100% 0% 90P34122P300 4P25-02A Develop P&ID - Issued For Review : 1.02 - New Drawing - Simple 3 20 1.00 100% 0% 60P34122P300 4P25-03A Develop P&ID - Issued For Review : 1.03 - Existing Drawing - Minor Modification 5 2 1.00 100% 0% 10P34122P300 4P25-04A Develop P&ID - Issued For Review : 1.04 - Existing Drawing - Major Modification 3 12 1.00 100% 0% 36P34122P300 4P25-05A Develop P&ID - Issued For Review : 1.05 - Demolition P&ID - Minor Modification 2 1.00 100% 0%P34122P300 4P25-06A Develop P&ID - Issued For Review : 1.06 - Demolition P&ID - Major Modification 8 1.00 100% 0%P34122P310 Develop P&ID - Issued For HAZOP 30 30P34122P310 4P25-07A Develop P&ID - Issued For HAZOP : 2.01 - Construction P&ID - Minor Modification 6 2 1.00 100% 0% 12P34122P310 4P25-08A Develop P&ID - Issued For HAZOP : 2.02 - Construction P&ID - Major Modification 3 6 1.00 100% 0% 18P34122P310 4P25-09A Develop P&ID - Issued For HAZOP : 2.03 - Demolition P&ID - Minor Modification 1 1.00 100% 0%P34122P310 4P25-10A Develop P&ID - Issued For HAZOP : 2.04 - Demolition P&ID - Major Modification 2 1.00 100% 0%

Split Eng/Design

Split Eng/Design

Page 12: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: PROCESS

Page 12 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34122P320 Develop P&ID - Issued For Design 18 18P34122P320 4P25-11A Develop P&ID - Issued For Design : 3.01 - Construction P&ID - Minor Modification 6 1 1.00 100% 0% 6P34122P320 4P25-12A Develop P&ID - Issued For Design : 3.02 - Construction P&ID - Major Modification 3 4 1.00 100% 0% 12P34122P320 4P25-13A Develop P&ID - Issued For Design : 3.03 - Demolition P&ID - Minor Modification 1 1.00 100% 0%P34122P320 4P25-14A Develop P&ID - Issued For Design : 3.04 - Demolition P&ID - Major Modification 2 1.00 100% 0%P34122P330 Develop P&ID - Issued For Construction 18 18P34122P330 4P25-15A Develop P&ID - Issued For Construction : 4.01 - Construction P&ID - Minor Modification 6 1 1.00 100% 0% 6P34122P330 4P25-16A Develop P&ID - Issued For Construction : 4.02 - Construction P&ID - Major Modification 3 4 1.00 100% 0% 12P34122P330 4P25-17A Develop P&ID - Issued For Construction : 4.03 - Demolition P&ID - Minor Modification 1 1.00 100% 0%P34122P330 4P25-18A Develop P&ID - Issued For Construction : 4.04 - Demolition P&ID - Major Modification 2 1.00 100% 0%P34122P340 Maintenance of Frozen P&ID post AFC / AFD 24 24P34122P340 4P25-19A Maintenance of Frozen P&ID post AFC / AFD : 5.01 - Construction P&ID 6 4 1.00 100% 0% 24P34122P340 4P25-20A Maintenance of Frozen P&ID post AFC / AFD : 5.02 - Demolition P&ID 2 1.00 100% 0%P34122P350 Develop and Maintain P&ID Filing System 6 6P34122P350 4P25-21A Develop and Maintain P&ID Filing System : 6.01 - Maintain P&ID Filing System 6 1 1.00 100% 0% 6P34122P360 Develop FECs - Issued For ReviewP34122P360 4P25-51A Develop FECs - Issued For Review : 11.01 - FEC - Complex 2 1.00 100% 0%P34122P360 4P25-52A Develop FECs - Issued For Review : 11.02 - FEC - Simple 1 1.00 100% 0%P34122P370 Develop FECs - Issued For HAZOPP34122P370 4P25-53A Develop FECs - Issued For HAZOP : 12.01 - FEC - Complex 1 1.00 100% 0%P34122P370 4P25-54A Develop FECs - Issued For HAZOP : 12.02 - FEC - Simple 0.5 1.00 100% 0%P34122P380 Develop FECs - Issued For DesignP34122P380 4P25-55A Develop FECs - Issued For Design : 13.01 - FEC - Complex 1 1.00 100% 0%P34122P380 4P25-56A Develop FECs - Issued For Design : 13.02 - FEC - Simple 0.5 1.00 100% 0%P34122P390 Develop FECs - Issued For ConstructionP34122P390 4P25-57A Develop FECs - Issued For Construction : 14.01 - FEC - Complex 1 1.00 100% 0%P34122P390 4P25-58A Develop FECs - Issued For Construction : 14.02 - FEC - Simple 0.5 1.00 100% 0%P34122P400 PFD / UFD Preparation & MaintenanceP34122P400 4P25-59A PFD / UFD Preparation & Maintenance : 21.01 - Develop PFDs 8 1.00 100% 0%P34122P400 4P25-60A PFD / UFD Preparation & Maintenance : 21.02 - Develop UFDs 8 1.00 100% 0%P34122P400 4P25-61A PFD / UFD Preparation & Maintenance : 21.03 - Develop Design Pressure/Temperature Diagram 8 1.00 100% 0%P34122P400 4P25-62A PFD / UFD Preparation & Maintenance : 21.04 - Maintain PFDs 4 1.00 100% 0%P34122P400 4P25-63A PFD / UFD Preparation & Maintenance : 21.05 - Maintain UFDs 4 1.00 100% 0%P34122P400 4P25-64A PFD / UFD Preparation & Maintenance : 21.06 - Maintain Design Pressure/Temperature Diagram 4 1.00 100% 0%P34122P410 Calculations - General Process & Verification checks 110 110P34122P410 4P30-01A Calculations - General Process : Equipment Sizing 2 0.1 1.00 100% 0% 0P34122P410 4P30-02A Calculations - General Process : Line Sizing - Prelim 2 0.5 1.00 100% 0% 1P34122P410 4P30-03A Calculations - General Process : Line Sizing - Detailed 2 4 1.00 100% 0% 8P34122P410 4P30-04A Calculations - General Process : Loop Seal Sizing 2 1.00 100% 0%P34122P410 4P30-05A Calculations - General Process : Control Valve Sizing 2 1 1.00 100% 0% 2P34122P410 4P30-06A Calculations - General Process : Restriction Orifice Plate Sizing 2 3 1.00 100% 0% 6P34122P410 4P30-07A Calculations - General Process : Control System / Field instrument Setpoints 2 20 1.00 100% 0% 40P34122P410 4P30-08A Calculations - General Process : Deluge and Firewater Requirement Calculation 50 1.00 100% 0%P34122P410 4P30-09A Calculations - General Process : Static Pressure Drop Calculations 2 20 1.00 100% 0% 40P34122P410 4P30-10A Calculations - General Process : Corrosion Rates 20 1.00 100% 0%P34122P410 4P30-11A Calculations - General Process : Utility Consumptions 3 1 1.00 100% 0% 3P34122P410 4P30-12A Calculations - General Process : Miscellaneous 2 5 1.00 100% 0% 10P34122P420 Calculations - Flare / Blowdown & Verification checks by others 59 59P34122P420 4P30-21A Calculations - Flare / Blowdown : Relief Contingency Tables 20 1.00 100% 0%P34122P420 4P30-22A Calculations - Flare / Blowdown : Relief Valve Sizing Calculations 3 2 1.00 100% 0% 6P34122P420 4P30-23A Calculations - Flare / Blowdown : Relief Valve Data Sheets 3 2 1.00 100% 0% 6P34122P420 4P30-24A Calculations - Flare / Blowdown : Pressure Settle-out Calculations 5 1.00 100% 0%P34122P420 4P30-25A Calculations - Flare / Blowdown : Depressuring Calculations 4 1.00 100% 0%P34122P420 4P30-26A Calculations - Flare / Blowdown : Flare System Network Evaluation 1 30 1.00 100% 0% 30P34122P420 4P30-27A Calculations - Flare / Blowdown : Flare Header Sizing - Prelim 1 2 1.00 100% 0% 2P34122P420 4P30-28A Calculations - Flare / Blowdown : Flare Header Sizing - Detail 1 5 1.00 100% 0% 5P34122P420 4P30-29A Calculations - Flare / Blowdown : PSV Inlet / Outlet Piping Sizing - Prelim 3 0.5 1.00 100% 0% 2P34122P420 4P30-30A Calculations - Flare / Blowdown : PSV Inlet / Outlet Piping Sizing - Detail 3 1 1.00 100% 0% 3P34122P420 4P30-31A Calculations - Flare / Blowdown : Flare Tip Specification 10 1.00 100% 0%P34122P420 4P30-32A Calculations - Flare / Blowdown : Flare Radiation / Surface Temperatures 20 1.00 100% 0%P34122P420 4P30-33A Calculations - Flare / Blowdown : Materials Selection 1 5 1.00 100% 0% 5P34122P420 4P30-34A Calculations - Flare / Blowdown : Technical Notes 40 1.00 100% 0%P34122P420 4P30-35A Calculations - Flare / Blowdown : FLARENET Model Preparation 12 1.00 100% 0%P34122P420 4P30-36A Calculations - Flare / Blowdown : FLARESIM Model Preparation 8 1.00 100% 0%P34122P430 Prepare Process Equipment Data Sheets for off plot 69 69P34122P430 4P36-01A Process Equipment Data Sheets : Vessels/Drums 10 1.00 100% 0%P34122P430 4P36-02A Process Equipment Data Sheets : Columns 15 1.00 100% 0%P34122P430 4P36-03A Process Equipment Data Sheets : Column Internals, Reactors 10 1.00 100% 0%P34122P430 4P36-04A Process Equipment Data Sheets : Fired Heaters 15 1.00 100% 0%P34122P430 4P36-05A Process Equipment Data Sheets : Heat Exchangers 8 1.00 100% 0%P34122P430 4P36-06A Process Equipment Data Sheets : Heat Exchanger Thermal/Hydraulic Rating 10 1.00 100% 0%P34122P430 4P36-07A Process Equipment Data Sheets : Pumps - Major 2 8 1.00 100% 0% 16P34122P430 4P36-08A Process Equipment Data Sheets : Pumps - Minor 4 4 1.00 100% 0% 16P34122P430 4P36-09A Process Equipment Data Sheets : Compressors / Expanders 30 1.00 100% 0%P34122P430 4P36-10A Process Equipment Data Sheets : Tanks 2 6 1.00 100% 0% 12P34122P430 4P36-11A Process Equipment Data Sheets : Filters 6 1.00 100% 0%P34122P430 4P36-12A Process Equipment Data Sheets : Pig Launcher / Receiver 2 1.00 100% 0%P34122P430 4P36-13A Process Equipment Data Sheets : Packaged Units / Vaccum belt filter 1 15 1.00 100% 0% 15P34122P430 4P36-14A Process Equipment Data Sheets : Miscellaneous / conveyor etc…. 2 5 1.00 100% 0% 10P34122P440 Utility Equipment Datasheets - Chemical InjectionP34122P440 4P36-21A Utility Equipment Datasheets - Chemical Injection : Hydrate Suppression / ARI 340 2 1.00 100% 0%P34122P440 4P36-22A Utility Equipment Datasheets - Chemical Injection : Corrosion Inhibition / ARI 350 2 1.00 100% 0%P34122P440 4P36-23A Utility Equipment Datasheets - Chemical Injection : Emulsion Breaking / ARI 400 2 1.00 100% 0%P34122P440 4P36-24A Utility Equipment Datasheets - Chemical Injection : Defoaming / ARI 600 2 1.00 100% 0%P34122P440 4P36-25A Utility Equipment Datasheets - Chemical Injection : Flow Improvers / 15% Caustic 2 1.00 100% 0%P34122P450 Utility Equipment Datasheets - Gas System 2 2P34122P450 4P36-26A Utility Equipment Datasheets - Gas System : Fuel Gas System 1 2 1.00 100% 0% 2P34122P450 4P36-27A Utility Equipment Datasheets - Gas System : Power Gas System 2 1.00 100% 0%P34122P450 4P36-28A Utility Equipment Datasheets - Gas System : Fuel Gas Cooler 2 1.00 100% 0%P34122P450 4P36-29A Utility Equipment Datasheets - Gas System : Fuel Gas Outlet Scrubber 2 1.00 100% 0%P34122P450 4P36-30A Utility Equipment Datasheets - Gas System : Fuel Gas Suction Scrubber 2 1.00 100% 0%P34122P450 4P36-31A Utility Equipment Datasheets - Gas System : Fuel Gas Superheater 2 1.00 100% 0%P34122P460 Utility Equipment Datasheets - Water Gas System 10 10P34122P460 4P36-32A Utility Equipment Datasheets - Water Gas System : Potable Water 1 2 1.00 100% 0% 2P34122P460 4P36-33A Utility Equipment Datasheets - Water Gas System : Fire Water System 1 2 1.00 100% 0% 2P34122P460 4P36-34A Utility Equipment Datasheets - Water Gas System : Washdown Water 1 2 1.00 100% 0% 2P34122P460 4P36-35A Utility Equipment Datasheets - Water Gas System : Hot Water 1 2 1.00 100% 0% 2P34122P460 4P36-36A Utility Equipment Datasheets - Water Gas System : Steam 1 2 1.00 100% 0% 2P34122P470 Utility Equipment Datasheets - Air Systems 4 4P34122P470 4P36-37A Utility Equipment Datasheets - Air Systems : Instrument Air 1 2 1.00 100% 0% 2P34122P470 4P36-38A Utility Equipment Datasheets - Air Systems : Service Air 1 2 1.00 100% 0% 2P34122P470 4P36-39A Utility Equipment Datasheets - Air Systems : HVAC & Pressurisation Fans 2 1.00 100% 0%P34122P480 Utility Equipment Datasheets - Oil Systems 6 6P34122P480 4P36-41A Utility Equipment Datasheets - Oil Systems : Lubricating Oils 2 1.00 100% 0%P34122P480 4P36-42A Utility Equipment Datasheets - Oil Systems : Hydraulic Oil 2 1.00 100% 0%P34122P480 4P36-43A Utility Equipment Datasheets - Oil Systems : Deaerator Air Blower 1 2 1.00 100% 0% 2P34122P480 4P36-44A Utility Equipment Datasheets - Oil Systems : Deluge Skid 2 1.00 100% 0%P34122P480 4P36-45A Utility Equipment Datasheets - Oil Systems : Diesel Filter Package 2 1.00 100% 0%P34122P480 4P36-46A Utility Equipment Datasheets - Oil Systems : Diesel Storage Tank 2 1.00 100% 0%P34122P480 4P36-47A Utility Equipment Datasheets - Oil Systems : Diesel Transfer Pump 2 1.00 100% 0%P34122P480 4P36-48A Utility Equipment Datasheets - Oil Systems : Fine Filter Package (Water Injection) 2 1.00 100% 0%P34122P480 4P36-49A Utility Equipment Datasheets - Oil Systems : Flare Tip / Igniter Package 2 1.00 100% 0%P34122P480 4P36-50A Utility Equipment Datasheets - Oil Systems : Generator 2 1.00 100% 0%P34122P480 4P36-51A Utility Equipment Datasheets - Oil Systems : Hydraulic Power Package 2 1.00 100% 0%P34122P480 4P36-52A Utility Equipment Datasheets - Oil Systems : Instrument Air Package 2 1.00 100% 0%P34122P480 4P36-53A Utility Equipment Datasheets - Oil Systems : Instrument Air Receiver 2 1.00 100% 0%P34122P480 4P36-54A Utility Equipment Datasheets - Oil Systems : Open Drain Pump (Haz) 2 1.00 100% 0%P34122P480 4P36-55A Utility Equipment Datasheets - Oil Systems : Open Drain Pump (Non Haz) 1 2 1.00 100% 0% 2

Page 13: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: PROCESS

Page 13 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34122P480 4P36-56A Utility Equipment Datasheets - Oil Systems : Open Drain Tank (Haz) 10 1.00 100% 0%P34122P480 4P36-57A Utility Equipment Datasheets - Oil Systems : Open Drain Tank (Non Haz) 2 1.00 100% 0%P34122P480 4P36-58A Utility Equipment Datasheets - Oil Systems : Sea Water Lift Caisson 2 1.00 100% 0%P34122P480 4P36-59A Utility Equipment Datasheets - Oil Systems : Sea Water Lift Pump 2 1.00 100% 0%P34122P480 4P36-60A Utility Equipment Datasheets - Oil Systems : Service Air Receiver 1 2 1.00 100% 0% 2P34122P480 4P36-61A Utility Equipment Datasheets - Oil Systems : Skimmer Pile 2 1.00 100% 0%P34122P480 4P36-62A Utility Equipment Datasheets - Oil Systems : Skimmer Pile Pump 2 1.00 100% 0%P34122P480 4P36-63A Utility Equipment Datasheets - Oil Systems : Sparge Gas Vessels 2 1.00 100% 0%P34122P480 4P36-64A Utility Equipment Datasheets - Oil Systems : Test Separator 2 1.00 100% 0%P34122P480 4P36-65A Utility Equipment Datasheets - Oil Systems : Water Injection 2 1.00 100% 0%P34122P480 4P36-66A Utility Equipment Datasheets - Oil Systems : Water Injection Booster Pump 2 1.00 100% 0%P34122P480 4P36-67A Utility Equipment Datasheets - Oil Systems : Water Injection Pump 2 1.00 100% 0%P34122P480 4P36-68A Utility Equipment Datasheets - Oil Systems : Well Equalisation Pump 2 1.00 100% 0%P34122P480 4P36-69A Utility Equipment Datasheets - Oil Systems : Wellhead Hydraulic Package 2 1.00 100% 0%P34122P490 Process input to Instrument Data Sheets 74 74P34122P490 4P36-81A Process Instrument Data Sheets : Control Valve Data Sheets 2 3 1.00 100% 0% 6P34122P490 4P36-82A Process Instrument Data Sheets : Actuated Valve Data Sheets 2 2 1.00 100% 0% 4P34122P490 4P36-83A Process Instrument Data Sheets : PSV Data Sheets 2 2 1.00 100% 0% 4P34122P490 4P36-84A Process Instrument Data Sheets : Restriction Orifice Plate Data Sheets 2 2 1.00 100% 0% 4P34122P490 4P36-85A Process Instrument Data Sheets : Specialty Piping Items List (per item) 1 1.00 100% 0%P34122P490 4P36-86A Process Instrument Data Sheets : Flowmeter Data Sheets 3 2 1.00 100% 0% 6P34122P490 4P36-87A Process Instrument Data Sheets : Pressure Instruments 10 2 1.00 100% 0% 20P34122P490 4P36-88A Process Instrument Data Sheets : Temperature Instruments 5 2 1.00 100% 0% 10P34122P490 4P36-89A Process Instrument Data Sheets : Level Instruments 6 2 1.00 100% 0% 12P34122P490 4P36-90A Process Instrument Data Sheets : Analysers 2 2 1.00 100% 0% 4P34122P490 4P36-91A Process Instrument Data Sheets : Other Instruments 2 2 1.00 100% 0% 4P34122P500 Process input to Schedules and Lists 24 24P34122P500 4P40-01A Schedules and Lists : Equipment List - Develop 1 5 1.00 100% 0% 5P34122P500 4P40-02A Schedules and Lists : Equipment List - Maintain 1 15 1.00 100% 0% 15P34122P500 4P40-03A Schedules and Lists : Line List - Develop - x lines 20 0.1 1.00 100% 0% 2P34122P500 4P40-04A Schedules and Lists : Line List - Maintain - x lines 20 0.1 1.00 100% 0% 2P34122P500 4P40-05A Schedules and Lists : Safe Charts 5 1.00 100% 0%P34122P500 4P40-06A Schedules and Lists : Cause & Effects Matrices (FECs) 3 1.00 100% 0%

P75 Subcontracts - Engineering / Specialists for Off-plot equipment, DevcoP34122P75A Enquiry Package - Eng. / Specialist Services 25 25P34122P75A 4P75-01A Enquiry Package - Eng. / Specialist Services : Scope of Work 1 15 1.00 100% 0% 15P34122P75A 4P75-02A Enquiry Package - Eng. / Specialist Services : Requisition 1 10 1.00 100% 0% 10P34122P75B Prepare P.O. Package - Eng. / Specialist Services 20 20P34122P75B 4P75-03A Prepare P.O. Package - Eng. / Specialist Services : Prepare Technical Bid Analysis 1 10 1.00 100% 0% 10P34122P75B 4P75-04A Prepare P.O. Package - Eng. / Specialist Services : Update package documents for P.O. issue 1 10 1.00 100% 0% 10P34122P75C Vendor Liaison - Eng. / Specialist Services 15 15P34122P75C 4P75-05A Vendor Liaison - Eng. / Specialist Services : Vendor Liaison - Eng. / Specialist Services 1 15 1.00 100% 0% 15

P34122P850 Construction Support, queries, inspection, punch list verification 220 220P34122P850 4P85-01A Construction Support : Construction Support 1 100 1.00 100% 0% 100P34122P850 4P85-02A Construction Support : Commissioning Support 1 100 1.00 100% 0% 100P34122P850 4P85-03A Construction Support : Site Query Responses 20 1 1.00 100% 0% 20

P34122P860 Inspection, Testing, Operator Training & Commissioning Support (refer On-plot)P34122P860 4P86-01A Inspection, Testing, Operator Training & Commissioning Support : Definition of Commissioning Method 1 1.00 100% 0%P34122P860 4P86-01A Inspection, Testing, Operator Training & Commissioning Support : Input to Precommissioning Procedures & Checks 40 1.00 100% 0%P34122P860 4P86-01A Inspection, Testing, Operator Training & Commissioning Support : Input to Commissioning Procedures & CFTs 1 1.00 100% 0%P34122P860 4P86-01A Inspection, Testing, Operator Training & Commissioning Support : Input to Operating Manuals 60 1.00 100% 0%P34122P860 4P86-01A Inspection, Testing, Operator Training & Commissioning Support : Input to Training 10 1.00 100% 0%P34122P900 Formal Operator Training (refer On-plot)P34122P900 4P90-01A Formal Operator Training : Attendance at Training Sessions 8 1.00 100% 0%P34122P900 4P90-02A 1.00 100% 0%

Page 14: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 14 of 73 04/17/2023

MECHANICAL ENGINEERING / DESIGN - STAFFHOUR ESTIMATE PH4

Project No : 359/Y5066Title : Sulphur Dioxide Reduction Project

Workpack Ref. : Lo-Cat Licensed technologyDescription : Phase 3 cost estimate - Off plot - Lo-Cat process

EngineeringEngineering Design

Hrs HrsCat Hours 0 0

Rate 110.0 95.0

% Of Total #DIV/0! #DIV/0!

Total Hrs 0Total Cost $0

Rev Description Prepared By Reviewed By DateA Issued For Estimate

Notes on Using this Estimate Sheet

1 Activities (WBS Nos.) are included as prompts for guidance. It is not necessary to complete all categories.2 Additional activities may be added as required.3 Norms (Unit Hours) may be adjusted to suit project requirements.4 Generally M00 is to be used on proposals and small FEED projects.5 Electronic copy of this template is stored in the following directory - G:\Engineering_Intranet\Mechanical\Estimate_Sheets\6 Please advise the Engineering Manager of any additions, changes or adjustments required to norms or activities.

Notes on Using 'Insert New Row' button1 Position cursor in any cell - a new row will always be inserted below2 This function will also copy previous row fomulas and text to new row - please modify text accordingly

Notes on Using 'Delete Row' button1 Position cursor in a cell of the row you want to delete

Notes on Using 'View' & 'Hide' buttons1 Position cursor in a cell (or cells) that you want the '0' to be visible or not

Assumptions and Clarifications for this Estimate:

1 Project duration is XX weeks23456789101112131415

Activity IDCost Time & Resources Summary Engineering Design Total

(CTR)

XX4120M000 Default - total is less than 200 hours (& Proposals)

XX4120M100 General Coordination & Job Preparation

XX4120M110 Professional Dimensional Site Surveys

XX4120M200 Studies

Page 15: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 15 of 73 04/17/2023

XX4120M300 Calculations

XX4120M400 Schedules and Lists

XX4120M500 Plot Plans & Site Layouts

XX4120M520 Planning Studies & Conceptual Layouts

M60 Procurement - Mechanical Bulks

XX4120M0A1 Enquiry Package - Mechanical Bulks

XX4120M0A2 Prepare P.O. Package - Mechanical Bulks

XX4120M0B1 Enquiry Package - Mechanical Bulks- Contingencies

XX4120M0B2 Prepare P.O. Package - Mechanical Bulks - Contingencies

M61 Procurement - Heat Exchangers

XX4120M1A1 Enquiry Package - Heat Exch. - Shell & Tube

XX4120M1A2 Prepare P.O. Package - Heat Exch. - Shell & Tube

XX4120M1A3 Vendor Data Review - Heat Exch. - Shell & Tube

XX4120M1B1 Enquiry Package - Heat Exch. - Plate & Frame

XX4120M1B2 Prepare P.O. Package - Heat Exch. - Plate & Frame

XX4120M1B3 Vendor Data Review - Heat Exch. - Plate & Frame

XX4120M1C1 Enquiry Package - Heat Exch. - Air Cooled

XX4120M1C2 Prepare P.O. Package - Heat Exch. - Air Cooled

XX4120M1C3 Vendor Data Review - Heat Exch. - Air Cooled

XX4120M1D1 Enquiry Package - Heat Exch. - Electric

XX4120M1D2 Prepare P.O. Package - Heat Exch. - Electric

XX4120M1D3 Vendor Data Review - Heat Exch. - Electric

XX4120M1E1 Enquiry Package - Heat Exch. - Printed Circuit

XX4120M1E2 Prepare P.O. Package - Heat Exch. - Printed Circuit

XX4120M1E3 Vendor Data Review - Heat Exch. - Printed Circuit

XX4120M1F1 Enquiry Package - Heat Exch. - Double Pipe

XX4120M1F2 Prepare P.O. Package - Heat Exch. - Double Pipe

XX4120M1F3 Vendor Data Review - Heat Exch. - Double Pipe

XX4120M1G1 Enquiry Package - Heat Exch. - Kettle Reboiler

XX4120M1G2 Prepare P.O. Package - Heat Exch. - Kettle Reboiler

XX4120M1G3 Vendor Data Review - Heat Exch. - Kettle Reboiler

XX4120M1H1 Enquiry Package - Heat Exch. - Air to Air

XX4120M1H2 Prepare P.O. Package - Heat Exch. - Air to Air

XX4120M1H3 Vendor Data Review - Heat Exch. - Air to Air

XX4120M1J1 Enquiry Package - Heat Exch. - Vertical Thermo Syphons

XX4120M1J2 Prepare P.O. Package - Heat Exch. - Vertical Thermo Syphons

XX4120M1J3 Vendor Data Review - Heat Exch. - Vertical Thermo Syphons

M62 Procurement - Vessels, Tanks & Internals

XX4120M2A1 Enquiry Package - Vessel (Pressure) - Plain

XX4120M2A2 Prepare P.O. Package - Vessel (Pressure) - Plain

XX4120M2A3 Vendor Data Review - Vessel (Pressure) - Plain

XX4120M2B1 Enquiry Package - Vessel (Pressure) - Column

XX4120M2B2 Prepare P.O. Package - Vessel (Pressure) - Column

XX4120M2B3 Vendor Data Review - Vessel (Pressure) - Column

XX4120M2C1 Enquiry Package - Vessel (Pressure) - Pig Launcher / Receiver

XX4120M2C2 Prepare P.O. Package - Vessel (Pressure) - Pig Launcher / Receiver

XX4120M2C3 Vendor Data Review - Vessel (Pressure) - Pig Launcher / Receiver

XX4120M2D1 Enquiry Package - Vessel (Pressure) - Hydrocyclone

XX4120M2D2 Prepare P.O. Package - Vessel (Pressure) - Hydrocyclone

XX4120M2D3 Vendor Data Review - Vessel (Pressure) - Hydrocyclone

XX4120M2E1 Enquiry Package - Vessel (Pressure) - Cyclone

XX4120M2E2 Prepare P.O. Package - Vessel (Pressure) - Cyclone

XX4120M2E3 Vendor Data Review - Vessel (Pressure) - Cyclone

XX4120M2F1 Enquiry Package - Vessel (Pressure) - Air Dryer

XX4120M2F2 Prepare P.O. Package - Vessel (Pressure) - Air Dryer

XX4120M2F3 Vendor Data Review - Vessel (Pressure) - Air Dryer

XX4120M2G1 Enquiry Package - Vessel (Atmos.) - Tank

XX4120M2G2 Prepare P.O. Package - Vessel (Atmos.) - Tank

XX4120M2G3 Vendor Data Review - Vessel (Atmos.) - Tank

XX4120M2H1 Enquiry Package - Vessel (Atmos.) - Bins & Hoppers

XX4120M2H2 Prepare P.O. Package - Vessel (Atmos.) - Bins & Hoppers

XX4120M2H3 Vendor Data Review - Vessel (Atmos.) - Bins & Hoppers

XX4120M2J1 Enquiry Package - Vessel (Atmos.) - Silos

XX4120M2J2 Prepare P.O. Package - Vessel (Atmos.) - Silos

XX4120M2J3 Vendor Data Review - Vessel (Atmos.) - Silos

XX4120M2K1 Enquiry Package - Vessel (Atmos.) - Thickener / Clarifier

XX4120M2K2 Prepare P.O. Package - Vessel (Atmos.) - Thickener / Clarifier

XX4120M2K3 Vendor Data Review - Vessel (Atmos.) - Thickener / Clarifier

Page 16: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 16 of 73 04/17/2023

XX4120M2L1 Enquiry Package - Vessel (Internals) - Inlet Devices

XX4120M2L2 Prepare P.O. Package - Vessel (Internals) - Inlet Devices

XX4120M2L3 Vendor Data Review - Vessel (Internals) - Inlet Devices

XX4120M2M1 Enquiry Package - Vessel (Internals) - Vortex Breaker

XX4120M2M2 Prepare P.O. Package - Vessel (Internals) - Vortex Breaker

XX4120M2M3 Vendor Data Review - Vessel (Internals) - Vortex Breaker

XX4120M2N1 Enquiry Package - Vessel (Internals) - Trays

XX4120M2N2 Prepare P.O. Package - Vessel (Internals) - Trays

XX4120M2N3 Vendor Data Review - Vessel (Internals) - Trays

XX4120M2P1 Enquiry Package - Vessel (Internals) - Agitator / Mixer

XX4120M2P2 Prepare P.O. Package - Vessel (Internals) - Agitator / Mixer

XX4120M2P3 Vendor Data Review - Vessel (Internals) - Agitator / Mixer

XX4120M2R1 Enquiry Package - Vessel (Internals) - Steam Coil

XX4120M2R2 Prepare P.O. Package - Vessel (Internals) - Steam Coil

XX4120M2R3 Vendor Data Review - Vessel (Internals) - Steam Coil

M63 Procurement - Pumps

XX4120M3A1 Enquiry Package - Pumps - Positive Displacement

XX4120M3A2 Prepare P.O. Package - Pumps - Positive Displacement

XX4120M3A3 Vendor Data Review - Pumps - Positive Displacement

XX4120M3B1 Enquiry Package - Pumps - Centrifugal - API

XX4120M3B2 Prepare P.O. Package - Pumps - Centrifugal - API

XX4120M3B3 Vendor Data Review - Pumps - Centrifugal API

XX4120M3C1 Enquiry Package - Pumps - Centrifugal - Fire

XX4120M3C2 Prepare P.O. Package - Pumps - Centrifugal - Fire

XX4120M3C3 Vendor Data Review - Pumps - Centrifugal - Fire

XX4120M3D1 Enquiry Package - Pumps - Centrifugal - Non-API

XX4120M3D2 Prepare P.O. Package - Pumps - Centrifugal - Non-API

XX4120M3D3 Vendor Data Review - Pumps - Centrifugal - Non-API

XX4120M3E1 Enquiry Package - Pumps - Centrifugal - Slurry

XX4120M3E2 Prepare P.O. Package - Pumps - Centrifugal - Slurry

XX4120M3E3 Vendor Data Review - Pumps - Centrifugal - Slurry

XX4120M3F1 Enquiry Package - Pumps - Centrifugal - Hot Oil

XX4120M3F2 Prepare P.O. Package - Pumps - Centrifugal - Hot Oil

XX4120M3F3 Vendor Data Review - Pumps - Centrifugal - Hot Oil

XX4120M3G1 Enquiry Package - Pumps - Reciprocating

XX4120M3G2 Prepare P.O. Package - Pumps - Reciprocating

XX4120M3G3 Vendor Data Review - Pumps - Reciprocating

XX4120M3H1 Enquiry Package - Pumps - Metering / Injection

XX4120M3H2 Prepare P.O. Package - Pumps - Metering / Injection

XX4120M3H3 Vendor Data Review - Pumps - Metering / Injection

XX4120M3J1 Enquiry Package - Pumps - Sump

XX4120M3J2 Prepare P.O. Package - Pumps - Sump

XX4120M3J3 Vendor Data Review - Pumps - Sump

XX4120M3K1 Enquiry Package - Pumps - Vacuum

XX4120M3K2 Prepare P.O. Package - Pumps - Vacuum

XX4120M3K3 Vendor Data Review - Pumps - Vacuum

M64 Procurement - Compressors / Turbines

XX4120M4A1 Enquiry Package - Compressors - Centrifugal / Axial

XX4120M4A2 Prepare P.O. Package - Compressors - Centrifugal / Axial

XX4120M4A3 Vendor Data Review - Compressors - Centrifugal / Axial

XX4120M4B1 Enquiry Package - Compressors - Reciprocating

XX4120M4B2 Prepare P.O. Package - Compressors - Reciprocating

XX4120M4B3 Vendor Data Review - Compressors - Reciprocating

XX4120M4C1 Enquiry Package - Compressors - Screw / Vane

XX4120M4C2 Prepare P.O. Package - Compressors - Screw / Vane

XX4120M4C3 Vendor Data Review - Compressors - Screw / Vane

XX4120M4D1 Enquiry Package - Compressors - Turbo-Expander

XX4120M4D2 Prepare P.O. Package - Compressors - Turbo-Expander

XX4120M4D3 Vendor Data Review - Compressors - Turbo-Expander

XX4120M4E1 Enquiry Package - Compressors - Liquid Ring

XX4120M4E2 Prepare P.O. Package - Compressors - Liquid Ring

XX4120M4E3 Vendor Data Review - Compressors - Liquid Ring

XX4120M4F1 Enquiry Package - Compressors - Blowers

XX4120M4F2 Prepare P.O. Package - Compressors - Blowers

XX4120M4F3 Vendor Data Review - Compressors - Blowers

XX4120M4G1 Enquiry Package - Compressors - Air

XX4120M4G2 Prepare P.O. Package - Compressors - Air

XX4120M4G3 Vendor Data Review - Compressors - Air

Page 17: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 17 of 73 04/17/2023

XX4120M4H1 Enquiry Package - Gas Turbines

XX4120M4H2 Prepare P.O. Package - Gas Turbines

XX4120M4H3 Vendor Data Review - Gas Turbines

M65 Procurement - Filters

XX4120M5A1 Enquiry Package - Filters - Cartridge

XX4120M5A2 Prepare P.O. Package - Filters - Cartridge

XX4120M5A3 Vendor Data Review - Filters - Cartridge

XX4120M5B1 Enquiry Package - Filters - Coalescers

XX4120M5B2 Prepare P.O. Package - Filters - Coalescers

XX4120M5B3 Vendor Data Review - Filters - Coalescers

XX4120M5C1 Enquiry Package - Filters - Belt

XX4120M5C2 Prepare P.O. Package - Filters - Belt

XX4120M5C3 Vendor Data Review - Filters - Belt

XX4120M5D1 Enquiry Package - Filters - Vacuum

XX4120M5D2 Prepare P.O. Package - Filters - Vacuum

XX4120M5D3 Vendor Data Review - Filters - Vacuum

XX4120M5E1 Enquiry Package - Filters - High Rate Pressure

XX4120M5E2 Prepare P.O. Package - Filters - High Rate Pressure

XX4120M5E3 Vendor Data Review - Filters - High Rate Pressure

XX4120M5F1 Enquiry Package - Filters - Separator

XX4120M5F2 Prepare P.O. Package - Filters - Separator

XX4120M5F3 Vendor Data Review - Filters - Separator

XX4120M5G1 Enquiry Package - Filters - Strainer

XX4120M5G2 Prepare P.O. Package - Filters - Strainer

XX4120M5G3 Vendor Data Review - Filters - Strainer

M66 Procurement - Fans

XX4120M6A1 Enquiry Package - Centrifugal Fans

XX4120M6A2 Prepare P.O. Package - Centrifugal Fans

XX4120M6A3 Vendor Data Review - Centrifugal Fans

XX4120M6B1 Enquiry Package - Axial Fans

XX4120M6B2 Prepare P.O. Package - Axial Fans

XX4120M6B3 Vendor Data Review - Axial Fans

M67 Procurement - Machinery

XX4120M7A1 Enquiry Package - Internal Combustion Engine

XX4120M7A2 Prepare P.O. Package - Internal Combustion Engine

XX4120M7A3 Vendor Data Review - Internal Combustion Engine

XX4120M7B1 Enquiry Package - Gearbox

XX4120M7B2 Prepare P.O. Package - Gearbox

XX4120M7B3 Vendor Data Review - Gearbox

XX4120M7C1 Enquiry Package - Coupling

XX4120M7C2 Prepare P.O. Package - Coupling

XX4120M7C3 Vendor Data Review - Coupling

XX4120M7D1 Enquiry Package - Air Motor

XX4120M7D2 Prepare P.O. Package - Air Motor

XX4120M7D3 Vendor Data Review - Air Motor

XX4120M7E1 Enquiry Package - Seals

XX4120M7E2 Prepare P.O. Package - Seals

XX4120M7E3 Vendor Data Review - Seals

XX4120M7F1 Enquiry Package - Lube & Seal Oil Systems

XX4120M7F2 Prepare P.O. Package - Lube & Seal Oil Systems

XX4120M7F3 Vendor Data Review - Lube & Seal OilSystems

M68 Procurement - Fired Equipment

XX4120M8A1 Enquiry Package - Heater

XX4120M8A2 Prepare P.O. Package - Heater

XX4120M8A3 Vendor Data Review - Heater

XX4120M8B1 Enquiry Package - Flare Tip

XX4120M8B2 Prepare P.O. Package - Flare Tip

XX4120M8B3 Vendor Data Review - Flare Tip

XX4120M8C1 Enquiry Package - Flame Arrestor

XX4120M8C2 Prepare P.O. Package - Flame Arrestor

XX4120M8C3 Vendor Data Review - Flame Arrestor

XX4120M8D1 Enquiry Package - Burner

XX4120M8D2 Prepare P.O. Package - Burner

XX4120M8D3 Vendor Data Review - Burner

XX4120M8E1 Enquiry Package - Boiler Package

Page 18: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 18 of 73 04/17/2023

XX4120M8E2 Prepare P.O. Package - Boiler Package

XX4120M8E3 Vendor Data Review - Boiler Package

XX4120M8F1 Enquiry Package - Waste Heat Recovery Unit

XX4120M8F2 Prepare P.O. Package - Waste Heat Recovery Unit

XX4120M8F3 Vendor Data Review - Waste Heat Recovery Unit

M75 Subcontracts - Engineering / Specialists

XX4120M75A Enquiry Package - Eng. / Specialist Services

XX4120M75B Prepare P.O. Package - Eng. / Specialist Services

XX4120M75C Vendor Liaison - Eng. / Specialist Services

M76 Subcontracts - Fabrication

XX4120M76A Enquiry Package - Fabrication

XX4120M76B Prepare P.O. Package - Fabrication

XX4120M76C Vendor Liaison - Fabrication

M77 Subcontracts - Construction

XX4120M77A Enquiry Package - Construction

XX4120M77B Prepare P.O. Package - Construction

XX4120M77C Vendor Liaison - Construction

XX4120M77D Enquiry Package - Inspection Services

XX4120M77E Prepare P.O. Package - Inspection Services

XX4120M77F Vendor Liaison - Inspection Services

XX4120M77G Enquiry Package - Scaffolding

XX4120M77H Prepare P.O. Package - Scaffolding

XX4120M77I Vendor Liaison - Scaffolding

XX4120M77J Enquiry Package - Construction Cranes

XX4120M77K Prepare P.O. Package - Construction Cranes

XX4120M77L Vendor Liaison - Construction Cranes

XX4120M77M Enquiry Package - Insulation

XX4120M77N Prepare P.O. Package - Insulation

XX4120M77O Vendor Liaison - Insulation

XX4120M77P Enquiry Package - Painting

XX4210M77R Prepare P.O. Package - Painting

XX4120M77S Vendor Liaison - Painting

XX4120M800 Construction Support

XX4120M860

XX4120M870 Design Reports / Job Books

XX4120M900 Formal Operator Training

XX4120M950 As-Building

Overall Totals

Inspection, Testing, Operator Training & Commissioning Support

Page 19: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: MECHANICAL

Page 19 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

P34120M000 Default - total is less than 200 hoursP34120M000 4M00-01A 1.00 50% 50%P34120M000 4M00-02A 1.00 50% 50%P34120M000 4M00-03A 1.00 50% 50%P34120M000 4M00-04A 1.00 50% 50%

Sub Totals

Activity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

P34120M100 General Coordination & Job PreparationP34120M100 4M10-01A General Coordination & Job Preparation : Meetings & Reports - Weekly 6 1.00 75% 25%P34120M100 4M10-02A General Coordination & Job Preparation : Supervision - Engineering (10%) 1.00 100% 0%P34120M100 4M10-03A General Coordination & Job Preparation : Supervision - Design (10%) 1.00 100%P34120M100 4M10-04A General Coordination & Job Preparation : Site Visits - Engineers 10 1.00 100% 0%P34120M100 4M10-05A General Coordination & Job Preparation : Site Visits - Designers 10 1.00 100%P34120M100 4M10-06A General Coordination & Job Preparation : Travel Time To / From Site 10 1.00 100% 0%P34120M100 4M10-07A General Coordination & Job Preparation : HAZOP Attendance 8 1.00 100% 0%P34120M100 4M10-08A General Coordination & Job Preparation : Inter-discipline Squad Checks 2 1.00 25% 75%P34120M100 4M10-09A General Coordination & Job Preparation : Construction Review Meetings 4 1.00 50% 50%P34120M100 4M10-10A General Coordination & Job Preparation : Data Acquisition / Project Data Review 10 1.00 50% 50%P34120M100 4M10-11A General Coordination & Job Preparation : Input To Design Basis Document 5 1.00 100% 0%P34120M100 4M10-12A General Coordination & Job Preparation : Customise Planning Study Procedure 10 1.00 100%P34120M100 4M10-13A General Coordination & Job Preparation : Customise Construction View Procedure 10 1.00 100%P34120M100 4M10-14A General Coordination & Job Preparation : Spare Parts Summary 20 1.00 100% 0%P34120M100 4M10-15A General Coordination & Job Preparation : Statutory Authority Liaison 8 1.00 100% 0%P34120M100 4M10-16A General Coordination & Job Preparation : Package Compilation 10 1.00 50% 50%P34120M110 Professional Dimensional Site SurveysP34120M110 4M10-21A Professional Dimensional Site Surveys : Site Surveys 20 1.00 100% 0%P34120M200 StudiesP34120M200 4M20-01A Studies : Weight Report Input 100 1.00 100% 0%P34120M200 4M20-02A Studies : Site Installation & Handling Philosophy Input 100 1.00 100% 0%

Mechanical Design Basis / Philosophy InputP34120M200 4M20-05A Mechanical Design Basis / Philosophy Input : Mechanical Design Criteria 10 1.00 100% 0%P34120M200 4M20-06A Mechanical Design Basis / Philosophy Input : Project Design Basis 10 1.00 100% 0%P34120M200 4M20-07A Mechanical Design Basis / Philosophy Input : Project Standard Specifications 10 1.00 100% 0%P34120M200 4M20-08A Mechanical Design Basis / Philosophy Input : Project Execution Plan 10 1.00 100% 0%P34120M200 4M20-09A Mechanical Design Basis / Philosophy Input : Construction Philosophy 10 1.00 100% 0%P34120M200 4M20-10A Mechanical Design Basis / Philosophy Input : Installation Philosophy 10 1.00 100% 0%P34120M200 4M20-11A Mechanical Design Basis / Philosophy Input : Commissioning Philosophy 10 1.00 100% 0%P34120M200 4M20-12A Mechanical Design Basis / Philosophy Input : Operation Philosophy 10 1.00 100% 0%P34120M200 4M20-13A Mechanical Design Basis / Philosophy Input : HAZOP Report & Actions 40 1.00 100% 0%

Mechanical Design StudiesP34120M200 4M20-21A Mechanical Design Studies : Low Temperature Study 40 1.00 100% 0%P34120M200 4M20-22A Mechanical Design Studies : Mechanical Handling Study 60 1.00 100% 0%P34120M200 4M20-23A Mechanical Design Studies : Spare Parts & Equipment Life Cycle Costing 40 1.00 100% 0%P34120M200 4M20-24A Mechanical Design Studies : FMECA study (per critical equipment item) 40 1.00 100% 0%P34120M200 4M20-25A Mechanical Design Studies : Materials & Corrosion Study 80 1.00 100% 0%P34120M200 4M20-26A Mechanical Design Studies : Major Equipment Functional Specifications 20 1.00 100% 0%P34120M200 4M20-27A Mechanical Design Studies : HVAC Technical Note 40 1.00 100% 0%P34120M200 4M20-28A Mechanical Design Studies : Electrical Load List 5 1.00 100% 0%P34120M200 4M20-29A Mechanical Design Studies : Utilities Philosophy 40 1.00 100% 0%P34120M200 4M20-30A Mechanical Design Studies : Equipment List 25 1.00 100% 0%P34120M200 4M20-31A Mechanical Design Studies : Noise study 60 1.00 100% 0%P34120M200 4M20-32A Mechanical Design Studies : Technical Report 40 1.00 100% 0%

Safety & Loss Prevention StudyP34120M200 4M20-41A Safety & Loss Prevention Study : Fire & Gas Detection 10 1.00 100% 0%P34120M200 4M20-42A Safety & Loss Prevention Study : Emergency Shutdown & Blowdown 10 1.00 100% 0%P34120M200 4M20-43A Safety & Loss Prevention Study : Fire Protection 60 1.00 100% 0%P34120M200 4M20-44A Safety & Loss Prevention Study : Blast Protection 10 1.00 100% 0%P34120M200 4M20-45A Safety & Loss Prevention Study : Fire Pump Sizing 20 1.00 100% 0%P34120M200 4M20-46A Safety & Loss Prevention Study : Deluge Calculations & Layout 60 1.00 100% 0%P34120M200 4M20-47A Safety & Loss Prevention Study : Passive Fire Protection 10 1.00 100% 0%P34120M200 4M20-48A Safety & Loss Prevention Study : Emergency Escape Routes 10 1.00 100% 0%P34120M200 4M20-49A Safety & Loss Prevention Study : Safety Equipment List 20 1.00 100% 0%P34120M200 4M20-50A Safety & Loss Prevention Study : 100% 0%P34120M300 CalculationsP34120M300 4M30-01A Calculations : Conveyor calculations 40 1.00 100% 0%P34120M300 4M30-02A Calculations : Heat Exchanger - new design 40 1.00 100% 0%P34120M300 4M30-03A Calculations : Heat Exchanger - rerate design using software 20 1.00 100% 0%P34120M300 4M30-04A Calculations : HVAC Calculation 30 1.00 100% 0%P34120M300 4M30-05A Calculations : Launder calculation 15 1.00 100% 0%P34120M300 4M30-06A Calculations : Pressure Vessel - new design 40 1.00 100% 0%P34120M300 4M30-07A Calculations : Pressure Vessel - rerate design using software 20 1.00 100% 0%P34120M300 4M30-08A Calculations : Pressure Vessel - fitness for service level II 40 1.00 100% 0%P34120M300 4M30-09A Calculations : Pump Calculations 20 1.00 100% 0%P34120M300 4M30-10A Calculations : Tank - new design 30 1.00 100% 0%P34120M400 Schedules and ListsP34120M400 4M40-01A Schedules and Lists : Document Register (per document) 10 1.00 100%P34120M400 4M40-02A Schedules and Lists : Equipment List (per equipment item) 0.5 1.00 100%P34120M400 4M40-03A Schedules and Lists : Safety Equipment List (per item) 1 1.00 100%P34120M400 4M40-04A Schedules and Lists : 1.00 100%P34120M500 Plot Plans & Site LayoutsP34120M500 4M51-01A Plot Plans & Site Layouts : Overall Site Plan 150 1.00 100%P34120M500 4M51-02A Plot Plans & Site Layouts : Plot Plans ( Break Up Of Site Plan ) 40 1.00 100%P34120M500 4M51-03A Plot Plans & Site Layouts : Plot Plan Elevations 20 1.00 100%P34120M500 4M51-04A Plot Plans & Site Layouts : Equipment Location Plans 60 1.00 100%P34120M500 4M51-05A Plot Plans & Site Layouts : Equipment Location Elevations 50 1.00 100%P34120M500 4M51-06A Plot Plans & Site Layouts : Jacket Interface Drawing 50 1.00 100%P34120M500 4M51-07A Plot Plans & Site Layouts : Escape Route Drawings 25 1.00 100%P34120M520 Planning Studies & Conceptual LayoutsP34120M520 4M52-01A Planning Studies & Conceptual Layouts : Key Plan of Planning Studies 10 1.00 100%P34120M520 4M52-02A Planning Studies & Conceptual Layouts : Planning Studies Simple 40 1.00 100%P34120M520 4M52-03A Planning Studies & Conceptual Layouts : Planning Studies Average 80 1.00 100%P34120M520 4M52-04A Planning Studies & Conceptual Layouts : Planning Studies Complex 120 1.00 100%P34120M520 4M52-05A Planning Studies & Conceptual Layouts : Fire Protection Layouts 40 1.00 100%

M60 Procurement - Mechanical BulksP34120M0A1 Enquiry Package - Mechanical BulksP34120M0A1 XX4120M0-01AEnquiry Package - Mechanical Bulks : Requisition 10 1.00 100% 0%P34120M0A2 Prepare P.O. Package - Mechanical BulksP34120M0A2 XX4120M0-02APrepare P.O. Package - Mechanical Bulks : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M0A2 XX4120M0-03APrepare P.O. Package - Mechanical Bulks : Update package documents for P.O. issue 10 1.00 100% 0%P34120M0B1 Enquiry Package - Mechanical Bulks- ContingenciesP34120M0B1 XX4120M0-04AEnquiry Package - Mechanical Bulks- Contingencies : Requisition 10 1.00 100% 0%P34120M0B2 Prepare P.O. Package - Mechanical Bulks - ContingenciesP34120M0B2 XX4120M0-05APrepare P.O. Package - Mechanical Bulks - Contingencies : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M0B2 XX4120M0-06APrepare P.O. Package - Mechanical Bulks - Contingencies : Update package documents for P.O. issue 10 1.00 100% 0%

M61 Procurement - Heat ExchangersP34120M1A1 Enquiry Package - Heat Exch. - Shell & TubeP34120M1A1 XX4120M1-01AEnquiry Package - Heat Exch. - Shell & Tube : Technical Specification 10 1.00 100% 0%P34120M1A1 XX4120M1-01AEnquiry Package - Heat Exch. - Shell & Tube : Scope of Work Specification 10 1.00 100% 0%P34120M1A1 XX4120M1-01AEnquiry Package - Heat Exch. - Shell & Tube : Datasheet 10 1.00 100% 0%

Split Eng/Design

Split Eng/Design

Page 20: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: MECHANICAL

Page 20 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34120M1A1 XX4120M1-01AEnquiry Package - Heat Exch. - Shell & Tube : Requisition 10 1.00 100% 0%P34120M1A2 Prepare P.O. Package - Heat Exch. - Shell & TubeP34120M1A2 XX4120M1-01APrepare P.O. Package - Heat Exch. - Shell & Tube : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M1A2 XX4120M1-01APrepare P.O. Package - Heat Exch. - Shell & Tube : Prepare ITP 10 1.00 100% 0%P34120M1A2 XX4120M1-01APrepare P.O. Package - Heat Exch. - Shell & Tube : Update package documents for P.O. issue 10 1.00 100% 0%P34120M1A3 Vendor Data Review - Heat Exch. - Shell & TubeP34120M1A3 XX4120M1-01AVendor Data Review - Heat Exch. - Shell & Tube : Vendor Data Review 50 1.00 100% 0%P34120M1B1 Enquiry Package - Heat Exch. - Plate & FrameP34120M1B1 XX4120M1-01AEnquiry Package - Heat Exch. - Plate & Frame : Technical Specification 10 1.00 100% 0%P34120M1B1 XX4120M1-02AEnquiry Package - Heat Exch. - Plate & Frame : Scope of Work Specification 10 1.00 100% 0%P34120M1B1 XX4120M1-03AEnquiry Package - Heat Exch. - Plate & Frame : Datasheet 10 1.00 100% 0%P34120M1B1 XX4120M1-04AEnquiry Package - Heat Exch. - Plate & Frame : Requisition 10 1.00 100% 0%P34120M1B2 Prepare P.O. Package - Heat Exch. - Plate & FrameP34120M1B2 XX4120M1-05APrepare P.O. Package - Heat Exch. - Plate & Frame : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M1B2 XX4120M1-06APrepare P.O. Package - Heat Exch. - Plate & Frame : Prepare ITP 10 1.00 100% 0%P34120M1B2 XX4120M1-07APrepare P.O. Package - Heat Exch. - Plate & Frame : Update package documents for P.O. issue 10 1.00 100% 0%P34120M1B3 Vendor Data Review - Heat Exch. - Plate & FrameP34120M1B3 XX4120M1-08AVendor Data Review - Heat Exch. - Plate & Frame : Vendor Data Review 50 1.00 100% 0%P34120M1C1 Enquiry Package - Heat Exch. - Air CooledP34120M1C1 XX4120M1-09AEnquiry Package - Heat Exch. - Air Cooled : Technical Specification 10 1.00 100% 0%P34120M1C1 XX4120M1-10AEnquiry Package - Heat Exch. - Air Cooled : Scope of Work Specification 10 1.00 100% 0%P34120M1C1 XX4120M1-11AEnquiry Package - Heat Exch. - Air Cooled : Datasheet 10 1.00 100% 0%P34120M1C1 XX4120M1-12AEnquiry Package - Heat Exch. - Air Cooled : Requisition 10 1.00 100% 0%P34120M1C2 Prepare P.O. Package - Heat Exch. - Air CooledP34120M1C2 XX4120M1-13APrepare P.O. Package - Heat Exch. - Air Cooled : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M1C2 XX4120M1-14APrepare P.O. Package - Heat Exch. - Air Cooled : Prepare ITP 10 1.00 100% 0%P34120M1C2 XX4120M1-15APrepare P.O. Package - Heat Exch. - Air Cooled : Update package documents for P.O. issue 10 1.00 100% 0%P34120M1C3 Vendor Data Review - Heat Exch. - Air CooledP34120M1C3 XX4120M1-16AVendor Data Review - Heat Exch. - Air Cooled : Vendor Data Review 50 1.00 100% 0%P34120M1D1 Enquiry Package - Heat Exch. - ElectricP34120M1D1 XX4120M1-17AEnquiry Package - Heat Exch. - Electric : Technical Specification 10 1.00 100% 0%P34120M1D1 XX4120M1-18AEnquiry Package - Heat Exch. - Electric : Scope of Work Specification 10 1.00 100% 0%P34120M1D1 XX4120M1-19AEnquiry Package - Heat Exch. - Electric : Datasheet 10 1.00 100% 0%P34120M1D1 XX4120M1-20AEnquiry Package - Heat Exch. - Electric : Requisition 10 1.00 100% 0%P34120M1D2 Prepare P.O. Package - Heat Exch. - ElectricP34120M1D2 XX4120M1-21APrepare P.O. Package - Heat Exch. - Electric : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M1D2 XX4120M1-22APrepare P.O. Package - Heat Exch. - Electric : Prepare ITP 10 1.00 100% 0%P34120M1D2 XX4120M1-23APrepare P.O. Package - Heat Exch. - Electric : Update package documents for P.O. issue 10 1.00 100% 0%P34120M1D3 Vendor Data Review - Heat Exch. - ElectricP34120M1D3 XX4120M1-24AVendor Data Review - Heat Exch. - Electric : Vendor Data Review 50 1.00 100% 0%P34120M1E1 Enquiry Package - Heat Exch. - Printed CircuitP34120M1E1 XX4120M1-25AEnquiry Package - Heat Exch. - Printed Circuit : Technical Specification 10 1.00 100% 0%P34120M1E1 XX4120M1-26AEnquiry Package - Heat Exch. - Printed Circuit : Scope of Work Specification 10 1.00 100% 0%P34120M1E1 XX4120M1-27AEnquiry Package - Heat Exch. - Printed Circuit : Datasheet 10 1.00 100% 0%P34120M1E1 XX4120M1-28AEnquiry Package - Heat Exch. - Printed Circuit : Requisition 10 1.00 100% 0%P34120M1E2 Prepare P.O. Package - Heat Exch. - Printed CircuitP34120M1E2 XX4120M1-29APrepare P.O. Package - Heat Exch. - Printed Circuit : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M1E2 XX4120M1-30APrepare P.O. Package - Heat Exch. - Printed Circuit : Prepare ITP 10 1.00 100% 0%P34120M1E2 XX4120M1-31APrepare P.O. Package - Heat Exch. - Printed Circuit : Update package documents for P.O. issue 10 1.00 100% 0%P34120M1E3 Vendor Data Review - Heat Exch. - Printed CircuitP34120M1E3 XX4120M1-32AVendor Data Review - Heat Exch. - Printed Circuit : Vendor Data Review 50 1.00 100% 0%P34120M1F1 Enquiry Package - Heat Exch. - Double PipeP34120M1F1 XX4120M1-33AEnquiry Package - Heat Exch. - Double Pipe : Technical Specification 10 1.00 100% 0%P34120M1F1 XX4120M1-34AEnquiry Package - Heat Exch. - Double Pipe : Scope of Work Specification 10 1.00 100% 0%P34120M1F1 XX4120M1-35AEnquiry Package - Heat Exch. - Double Pipe : Datasheet 10 1.00 100% 0%P34120M1F1 XX4120M1-36AEnquiry Package - Heat Exch. - Double Pipe : Requisition 10 1.00 100% 0%P34120M1F2 Prepare P.O. Package - Heat Exch. - Double PipeP34120M1F2 XX4120M1-37APrepare P.O. Package - Heat Exch. - Double Pipe : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M1F2 XX4120M1-38APrepare P.O. Package - Heat Exch. - Double Pipe : Prepare ITP 10 1.00 100% 0%P34120M1F2 XX4120M1-39APrepare P.O. Package - Heat Exch. - Double Pipe : Update package documents for P.O. issue 10 1.00 100% 0%P34120M1F3 Vendor Data Review - Heat Exch. - Double PipeP34120M1F3 XX4120M1-40AVendor Data Review - Heat Exch. - Double Pipe : Vendor Data Review 50 1.00 100% 0%P34120M1G1 Enquiry Package - Heat Exch. - Kettle ReboilerP34120M1G1 XX4120M1-41AEnquiry Package - Heat Exch. - Kettle Reboiler : Technical Specification 10 1.00 100% 0%P34120M1G1 XX4120M1-42AEnquiry Package - Heat Exch. - Kettle Reboiler : Scope of Work Specification 10 1.00 100% 0%P34120M1G1 XX4120M1-43AEnquiry Package - Heat Exch. - Kettle Reboiler : Datasheet 10 1.00 100% 0%P34120M1G1 XX4120M1-44AEnquiry Package - Heat Exch. - Kettle Reboiler : Requisition 10 1.00 100% 0%P34120M1G2 Prepare P.O. Package - Heat Exch. - Kettle ReboilerP34120M1G2 XX4120M1-45APrepare P.O. Package - Heat Exch. - Kettle Reboiler : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M1G2 XX4120M1-46APrepare P.O. Package - Heat Exch. - Kettle Reboiler : Prepare ITP 10 1.00 100% 0%P34120M1G2 XX4120M1-47APrepare P.O. Package - Heat Exch. - Kettle Reboiler : Update package documents for P.O. issue 10 1.00 100% 0%P34120M1G3 Vendor Data Review - Heat Exch. - Kettle ReboilerP34120M1G3 XX4120M1-48AVendor Data Review - Heat Exch. - Kettle Reboiler : Vendor Data Review 50 1.00 100% 0%P34120M1H1 Enquiry Package - Heat Exch. - Air to AirP34120M1H1 XX4120M1-49AEnquiry Package - Heat Exch. - Air to Air : Technical Specification 10 1.00 100% 0%P34120M1H1 XX4120M1-50AEnquiry Package - Heat Exch. - Air to Air : Scope of Work Specification 10 1.00 100% 0%P34120M1H1 XX4120M1-51AEnquiry Package - Heat Exch. - Air to Air : Datasheet 10 1.00 100% 0%P34120M1H1 XX4120M1-52AEnquiry Package - Heat Exch. - Air to Air : Requisition 10 1.00 100% 0%P34120M1H2 Prepare P.O. Package - Heat Exch. - Air to AirP34120M1H2 XX4120M1-53APrepare P.O. Package - Heat Exch. - Air to Air : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M1H2 XX4120M1-54APrepare P.O. Package - Heat Exch. - Air to Air : Prepare ITP 10 1.00 100% 0%P34120M1H2 XX4120M1-55APrepare P.O. Package - Heat Exch. - Air to Air : Update package documents for P.O. issue 10 1.00 100% 0%P34120M1H3 Vendor Data Review - Heat Exch. - Air to AirP34120M1H3 XX4120M1-56AVendor Data Review - Heat Exch. - Air to Air : Vendor Data Review 50 1.00 100% 0%P34120M1J1 Enquiry Package - Heat Exch. - Vertical Thermo SyphonsP34120M1J1 XX4120M1-57AEnquiry Package - Heat Exch. - Vertical Thermo Syphons : Technical Specification 10 1.00 100% 0%P34120M1J1 XX4120M1-58AEnquiry Package - Heat Exch. - Vertical Thermo Syphons : Scope of Work Specification 10 1.00 100% 0%P34120M1J1 XX4120M1-59AEnquiry Package - Heat Exch. - Vertical Thermo Syphons : Datasheet 10 1.00 100% 0%P34120M1J1 XX4120M1-60AEnquiry Package - Heat Exch. - Vertical Thermo Syphons : Requisition 10 1.00 100% 0%P34120M1J2 Prepare P.O. Package - Heat Exch. - Vertical Thermo SyphonsP34120M1J2 XX4120M1-61APrepare P.O. Package - Heat Exch. - Vertical Thermo Syphons : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M1J2 XX4120M1-62APrepare P.O. Package - Heat Exch. - Vertical Thermo Syphons : Prepare ITP 10 1.00 100% 0%P34120M1J2 XX4120M1-63APrepare P.O. Package - Heat Exch. - Vertical Thermo Syphons : Update package documents for P.O. issue 10 1.00 100% 0%P34120M1J3 Vendor Data Review - Heat Exch. - Vertical Thermo SyphonsP34120M1J3 XX4120M1-64AVendor Data Review - Heat Exch. - Vertical Thermo Syphons : Vendor Data Review 50 1.00 100% 0%

M62 Procurement - Vessels, Tanks & InternalsP34120M2A1 Enquiry Package - Vessel (Pressure) - PlainP34120M2A1 XX4120M2-01AEnquiry Package - Vessel (Pressure) - Plain : Technical Specification 10 1.00 100% 0%P34120M2A1 XX4120M2-02AEnquiry Package - Vessel (Pressure) - Plain : Scope of Work Specification 10 1.00 100% 0%P34120M2A1 XX4120M2-03AEnquiry Package - Vessel (Pressure) - Plain : Datasheet 10 1.00 100% 0%P34120M2A1 XX4120M2-04AEnquiry Package - Vessel (Pressure) - Plain : Requisition 10 1.00 100% 0%P34120M2A2 Prepare P.O. Package - Vessel (Pressure) - PlainP34120M2A2 XX4120M2-05APrepare P.O. Package - Vessel (Pressure) - Plain : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2A2 XX4120M2-06APrepare P.O. Package - Vessel (Pressure) - Plain : Prepare ITP 10 1.00 100% 0%P34120M2A2 XX4120M2-07APrepare P.O. Package - Vessel (Pressure) - Plain : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2A3 Vendor Data Review - Vessel (Pressure) - PlainP34120M2A3 XX4120M2-08AVendor Data Review - Vessel (Pressure) - Plain : Vendor Data Review 40 1.00 100% 0%P34120M2B1 Enquiry Package - Vessel (Pressure) - ColumnP34120M2B1 XX4120M2-09AEnquiry Package - Vessel (Pressure) - Column : Technical Specification 10 1.00 100% 0%P34120M2B1 XX4120M2-10AEnquiry Package - Vessel (Pressure) - Column : Scope of Work Specification 10 1.00 100% 0%P34120M2B1 XX4120M2-11AEnquiry Package - Vessel (Pressure) - Column : Datasheet 10 1.00 100% 0%P34120M2B1 XX4120M2-12AEnquiry Package - Vessel (Pressure) - Column : Requisition 10 1.00 100% 0%P34120M2B2 Prepare P.O. Package - Vessel (Pressure) - ColumnP34120M2B2 XX4120M2-13APrepare P.O. Package - Vessel (Pressure) - Column : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2B2 XX4120M2-14APrepare P.O. Package - Vessel (Pressure) - Column : Prepare ITP 10 1.00 100% 0%P34120M2B2 XX4120M2-15APrepare P.O. Package - Vessel (Pressure) - Column : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2B3 Vendor Data Review - Vessel (Pressure) - ColumnP34120M2B3 XX4120M2-16AVendor Data Review - Vessel (Pressure) - Column : Vendor Data Review 40 1.00 100% 0%

Page 21: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: MECHANICAL

Page 21 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34120M2C1 Enquiry Package - Vessel (Pressure) - Pig Launcher / ReceiverP34120M2C1 XX4120M2-17AEnquiry Package - Vessel (Pressure) - Pig Launcher / Receiver : Technical Specification 10 1.00 100% 0%P34120M2C1 XX4120M2-18AEnquiry Package - Vessel (Pressure) - Pig Launcher / Receiver : Scope of Work Specification 10 1.00 100% 0%P34120M2C1 XX4120M2-19AEnquiry Package - Vessel (Pressure) - Pig Launcher / Receiver : Datasheet 10 1.00 100% 0%P34120M2C1 XX4120M2-20AEnquiry Package - Vessel (Pressure) - Pig Launcher / Receiver : Requisition 10 1.00 100% 0%P34120M2C2 Prepare P.O. Package - Vessel (Pressure) - Pig Launcher / ReceiverP34120M2C2 XX4120M2-21APrepare P.O. Package - Vessel (Pressure) - Pig Launcher / Receiver : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2C2 XX4120M2-22APrepare P.O. Package - Vessel (Pressure) - Pig Launcher / Receiver : Prepare ITP 10 1.00 100% 0%P34120M2C2 XX4120M2-23APrepare P.O. Package - Vessel (Pressure) - Pig Launcher / Receiver : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2C3 Vendor Data Review - Vessel (Pressure) - Pig Launcher / ReceiverP34120M2C3 XX4120M2-24AVendor Data Review - Vessel (Pressure) - Pig Launcher / Receiver : Vendor Data Review 40 1.00 100% 0%P34120M2D1 Enquiry Package - Vessel (Pressure) - HydrocycloneP34120M2D1 XX4120M2-25AEnquiry Package - Vessel (Pressure) - Hydrocyclone : Technical Specification 10 1.00 100% 0%P34120M2D1 XX4120M2-26AEnquiry Package - Vessel (Pressure) - Hydrocyclone : Scope of Work Specification 10 1.00 100% 0%P34120M2D1 XX4120M2-27AEnquiry Package - Vessel (Pressure) - Hydrocyclone : Datasheet 10 1.00 100% 0%P34120M2D1 XX4120M2-28AEnquiry Package - Vessel (Pressure) - Hydrocyclone : Requisition 10 1.00 100% 0%P34120M2D2 Prepare P.O. Package - Vessel (Pressure) - HydrocycloneP34120M2D2 XX4120M2-29APrepare P.O. Package - Vessel (Pressure) - Hydrocyclone : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2D2 XX4120M2-30APrepare P.O. Package - Vessel (Pressure) - Hydrocyclone : Prepare ITP 10 1.00 100% 0%P34120M2D2 XX4120M2-31APrepare P.O. Package - Vessel (Pressure) - Hydrocyclone : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2D3 Vendor Data Review - Vessel (Pressure) - HydrocycloneP34120M2D3 XX4120M2-32AVendor Data Review - Vessel (Pressure) - Hydrocyclone : Vendor Data Review 40 1.00 100% 0%P34120M2E1 Enquiry Package - Vessel (Pressure) - CycloneP34120M2E1 XX4120M2-33AEnquiry Package - Vessel (Pressure) - Cyclone : Technical Specification 10 1.00 100% 0%P34120M2E1 XX4120M2-34AEnquiry Package - Vessel (Pressure) - Cyclone : Scope of Work Specification 10 1.00 100% 0%P34120M2E1 XX4120M2-35AEnquiry Package - Vessel (Pressure) - Cyclone : Datasheet 10 1.00 100% 0%P34120M2E1 XX4120M2-36AEnquiry Package - Vessel (Pressure) - Cyclone : Requisition 10 1.00 100% 0%P34120M2E2 Prepare P.O. Package - Vessel (Pressure) - CycloneP34120M2E2 XX4120M2-37APrepare P.O. Package - Vessel (Pressure) - Cyclone : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2E2 XX4120M2-38APrepare P.O. Package - Vessel (Pressure) - Cyclone : Prepare ITP 10 1.00 100% 0%P34120M2E2 XX4120M2-39APrepare P.O. Package - Vessel (Pressure) - Cyclone : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2E3 Vendor Data Review - Vessel (Pressure) - CycloneP34120M2E3 XX4120M2-40AVendor Data Review - Vessel (Pressure) - Cyclone : Vendor Data Review 40 1.00 100% 0%P34120M2F1 Enquiry Package - Vessel (Pressure) - Air DryerP34120M2F1 XX4120M2-41AEnquiry Package - Vessel (Pressure) - Air Dryer : Technical Specification 10 1.00 100% 0%P34120M2F1 XX4120M2-42AEnquiry Package - Vessel (Pressure) - Air Dryer : Scope of Work Specification 10 1.00 100% 0%P34120M2F1 XX4120M2-43AEnquiry Package - Vessel (Pressure) - Air Dryer : Datasheet 10 1.00 100% 0%P34120M2F1 XX4120M2-44AEnquiry Package - Vessel (Pressure) - Air Dryer : Requisition 10 1.00 100% 0%P34120M2F2 Prepare P.O. Package - Vessel (Pressure) - Air DryerP34120M2F2 XX4120M2-45APrepare P.O. Package - Vessel (Pressure) - Air Dryer : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2F2 XX4120M2-46APrepare P.O. Package - Vessel (Pressure) - Air Dryer : Prepare ITP 10 1.00 100% 0%P34120M2F2 XX4120M2-47APrepare P.O. Package - Vessel (Pressure) - Air Dryer : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2F3 Vendor Data Review - Vessel (Pressure) - Air DryerP34120M2F3 XX4120M2-48AVendor Data Review - Vessel (Pressure) - Air Dryer : Vendor Data Review 40 1.00 100% 0%P34120M2G1 Enquiry Package - Vessel (Atmos.) - TankP34120M2G1 XX4120M2-49AEnquiry Package - Vessel (Atmos.) - Tank : Technical Specification 10 1.00 100% 0%P34120M2G1 XX4120M2-50AEnquiry Package - Vessel (Atmos.) - Tank : Scope of Work Specification 10 1.00 100% 0%P34120M2G1 XX4120M2-51AEnquiry Package - Vessel (Atmos.) - Tank : Datasheet 10 1.00 100% 0%P34120M2G1 XX4120M2-52AEnquiry Package - Vessel (Atmos.) - Tank : Requisition 10 1.00 100% 0%P34120M2G2 Prepare P.O. Package - Vessel (Atmos.) - TankP34120M2G2 XX4120M2-53APrepare P.O. Package - Vessel (Atmos.) - Tank : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2G2 XX4120M2-54APrepare P.O. Package - Vessel (Atmos.) - Tank : Prepare ITP 10 1.00 100% 0%P34120M2G2 XX4120M2-55APrepare P.O. Package - Vessel (Atmos.) - Tank : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2G3 Vendor Data Review - Vessel (Atmos.) - TankP34120M2G3 XX4120M2-56AVendor Data Review - Vessel (Atmos.) - Tank : Vendor Data Review 40 1.00 100% 0%P34120M2H1 Enquiry Package - Vessel (Atmos.) - Bins & HoppersP34120M2H1 XX4120M2-57AEnquiry Package - Vessel (Atmos.) - Bins & Hoppers : Technical Specification 10 1.00 100% 0%P34120M2H1 XX4120M2-58AEnquiry Package - Vessel (Atmos.) - Bins & Hoppers : Scope of Work Specification 10 1.00 100% 0%P34120M2H1 XX4120M2-59AEnquiry Package - Vessel (Atmos.) - Bins & Hoppers : Datasheet 10 1.00 100% 0%P34120M2H1 XX4120M2-60AEnquiry Package - Vessel (Atmos.) - Bins & Hoppers : Requisition 10 1.00 100% 0%P34120M2H2 Prepare P.O. Package - Vessel (Atmos.) - Bins & HoppersP34120M2H2 XX4120M2-61APrepare P.O. Package - Vessel (Atmos.) - Bins & Hoppers : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2H2 XX4120M2-62APrepare P.O. Package - Vessel (Atmos.) - Bins & Hoppers : Prepare ITP 10 1.00 100% 0%P34120M2H2 XX4120M2-63APrepare P.O. Package - Vessel (Atmos.) - Bins & Hoppers : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2H3 Vendor Data Review - Vessel (Atmos.) - Bins & HoppersP34120M2H3 XX4120M2-64AVendor Data Review - Vessel (Atmos.) - Bins & Hoppers : Vendor Data Review 40 1.00 100% 0%P34120M2J1 Enquiry Package - Vessel (Atmos.) - SilosP34120M2J1 XX4120M2-65AEnquiry Package - Vessel (Atmos.) - Silos : Technical Specification 10 1.00 100% 0%P34120M2J1 XX4120M2-66AEnquiry Package - Vessel (Atmos.) - Silos : Scope of Work Specification 10 1.00 100% 0%P34120M2J1 XX4120M2-67AEnquiry Package - Vessel (Atmos.) - Silos : Datasheet 10 1.00 100% 0%P34120M2J1 XX4120M2-68AEnquiry Package - Vessel (Atmos.) - Silos : Requisition 10 1.00 100% 0%P34120M2J2 Prepare P.O. Package - Vessel (Atmos.) - SilosP34120M2J2 XX4120M2-69APrepare P.O. Package - Vessel (Atmos.) - Silos : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2J2 XX4120M2-70APrepare P.O. Package - Vessel (Atmos.) - Silos : Prepare ITP 10 1.00 100% 0%P34120M2J2 XX4120M2-71APrepare P.O. Package - Vessel (Atmos.) - Silos : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2J3 Vendor Data Review - Vessel (Atmos.) - SilosP34120M2J3 XX4120M2-72AVendor Data Review - Vessel (Atmos.) - Silos : Vendor Data Review 40 1.00 100% 0%P34120M2K1 Enquiry Package - Vessel (Atmos.) - Thickener / ClarifierP34120M2K1 XX4120M2-73AEnquiry Package - Vessel (Atmos.) - Thickener / Clarifier : Technical Specification 10 1.00 100% 0%P34120M2K1 XX4120M2-74AEnquiry Package - Vessel (Atmos.) - Thickener / Clarifier : Scope of Work Specification 10 1.00 100% 0%P34120M2K1 XX4120M2-75AEnquiry Package - Vessel (Atmos.) - Thickener / Clarifier : Datasheet 10 1.00 100% 0%P34120M2K1 XX4120M2-76AEnquiry Package - Vessel (Atmos.) - Thickener / Clarifier : Requisition 10 1.00 100% 0%P34120M2K2 Prepare P.O. Package - Vessel (Atmos.) - Thickener / ClarifierP34120M2K2 XX4120M2-77APrepare P.O. Package - Vessel (Atmos.) - Thickener / Clarifier : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2K2 XX4120M2-78APrepare P.O. Package - Vessel (Atmos.) - Thickener / Clarifier : Prepare ITP 10 1.00 100% 0%P34120M2K2 XX4120M2-79APrepare P.O. Package - Vessel (Atmos.) - Thickener / Clarifier : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2K3 Vendor Data Review - Vessel (Atmos.) - Thickener / ClarifierP34120M2K3 XX4120M2-80AVendor Data Review - Vessel (Atmos.) - Thickener / Clarifier : Vendor Data Review 40 1.00 100% 0%P34120M2L1 Enquiry Package - Vessel (Internals) - Inlet DevicesP34120M2L1 XX4120M2-81AEnquiry Package - Vessel (Internals) - Inlet Devices : Technical Specification 10 1.00 100% 0%P34120M2L1 XX4120M2-82AEnquiry Package - Vessel (Internals) - Inlet Devices : Scope of Work Specification 10 1.00 100% 0%P34120M2L1 XX4120M2-83AEnquiry Package - Vessel (Internals) - Inlet Devices : Datasheet 10 1.00 100% 0%P34120M2L1 XX4120M2-84AEnquiry Package - Vessel (Internals) - Inlet Devices : Requisition 10 1.00 100% 0%P34120M2L2 Prepare P.O. Package - Vessel (Internals) - Inlet DevicesP34120M2L2 XX4120M2-85APrepare P.O. Package - Vessel (Internals) - Inlet Devices : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2L2 XX4120M2-86APrepare P.O. Package - Vessel (Internals) - Inlet Devices : Prepare ITP 10 1.00 100% 0%P34120M2L2 XX4120M2-87APrepare P.O. Package - Vessel (Internals) - Inlet Devices : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2L3 Vendor Data Review - Vessel (Internals) - Inlet DevicesP34120M2L3 XX4120M2-88AVendor Data Review - Vessel (Internals) - Inlet Devices : Vendor Data Review 40 1.00 100% 0%P34120M2M1 Enquiry Package - Vessel (Internals) - Vortex BreakerP34120M2M1 XX4120M2-89AEnquiry Package - Vessel (Internals) - Vortex Breaker : Technical Specification 10 1.00 100% 0%P34120M2M1 XX4120M2-90AEnquiry Package - Vessel (Internals) - Vortex Breaker : Scope of Work Specification 10 1.00 100% 0%P34120M2M1 XX4120M2-91AEnquiry Package - Vessel (Internals) - Vortex Breaker : Datasheet 10 1.00 100% 0%P34120M2M1 XX4120M2-92AEnquiry Package - Vessel (Internals) - Vortex Breaker : Requisition 10 1.00 100% 0%P34120M2M2 Prepare P.O. Package - Vessel (Internals) - Vortex BreakerP34120M2M2 XX4120M2-93APrepare P.O. Package - Vessel (Internals) - Vortex Breaker : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2M2 XX4120M2-94APrepare P.O. Package - Vessel (Internals) - Vortex Breaker : Prepare ITP 10 1.00 100% 0%P34120M2M2 XX4120M2-95APrepare P.O. Package - Vessel (Internals) - Vortex Breaker : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2M3 Vendor Data Review - Vessel (Internals) - Vortex BreakerP34120M2M3 XX4120M2-96AVendor Data Review - Vessel (Internals) - Vortex Breaker : Vendor Data Review 40 1.00 100% 0%P34120M2N1 Enquiry Package - Vessel (Internals) - TraysP34120M2N1 XX4120M2-97AEnquiry Package - Vessel (Internals) - Trays : Technical Specification 10 1.00 100% 0%P34120M2N1 XX4120M2-98AEnquiry Package - Vessel (Internals) - Trays : Scope of Work Specification 10 1.00 100% 0%P34120M2N1 XX4120M2-99AEnquiry Package - Vessel (Internals) - Trays : Datasheet 10 1.00 100% 0%P34120M2N1 XX4120M2-100AEnquiry Package - Vessel (Internals) - Trays : Requisition 10 1.00 100% 0%P34120M2N2 Prepare P.O. Package - Vessel (Internals) - TraysP34120M2N2 XX4120M2-101APrepare P.O. Package - Vessel (Internals) - Trays : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2N2 XX4120M2-102APrepare P.O. Package - Vessel (Internals) - Trays : Prepare ITP 10 1.00 100% 0%P34120M2N2 XX4120M2-103APrepare P.O. Package - Vessel (Internals) - Trays : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2N3 Vendor Data Review - Vessel (Internals) - Trays

Page 22: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: MECHANICAL

Page 22 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34120M2N3 XX4120M2-104AVendor Data Review - Vessel (Internals) - Trays : Vendor Data Review 40 1.00 100% 0%P34120M2P1 Enquiry Package - Vessel (Internals) - Agitator / MixerP34120M2P1 XX4120M2-105AEnquiry Package - Vessel (Internals) - Agitator / Mixer : Technical Specification 10 1.00 100% 0%P34120M2P1 XX4120M2-106AEnquiry Package - Vessel (Internals) - Agitator / Mixer : Scope of Work Specification 10 1.00 100% 0%P34120M2P1 XX4120M2-107AEnquiry Package - Vessel (Internals) - Agitator / Mixer : Datasheet 10 1.00 100% 0%P34120M2P1 XX4120M2-108AEnquiry Package - Vessel (Internals) - Agitator / Mixer : Requisition 10 1.00 100% 0%P34120M2P2 Prepare P.O. Package - Vessel (Internals) - Agitator / MixerP34120M2P2 XX4120M2-109APrepare P.O. Package - Vessel (Internals) - Agitator / Mixer : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2P2 XX4120M2-110APrepare P.O. Package - Vessel (Internals) - Agitator / Mixer : Prepare ITP 10 1.00 100% 0%P34120M2P2 XX4120M2-111APrepare P.O. Package - Vessel (Internals) - Agitator / Mixer : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2P3 Vendor Data Review - Vessel (Internals) - Agitator / MixerP34120M2P3 XX4120M2-112AVendor Data Review - Vessel (Internals) - Agitator / Mixer : Vendor Data Review 40 1.00 100% 0%P34120M2R1 Enquiry Package - Vessel (Internals) - Steam CoilP34120M2R1 XX4120M2-113AEnquiry Package - Vessel (Internals) - Steam Coil : Technical Specification 10 1.00 100% 0%P34120M2R1 XX4120M2-114AEnquiry Package - Vessel (Internals) - Steam Coil : Scope of Work Specification 10 1.00 100% 0%P34120M2R1 XX4120M2-115AEnquiry Package - Vessel (Internals) - Steam Coil : Datasheet 10 1.00 100% 0%P34120M2R1 XX4120M2-116AEnquiry Package - Vessel (Internals) - Steam Coil : Requisition 10 1.00 100% 0%P34120M2R2 Prepare P.O. Package - Vessel (Internals) - Steam CoilP34120M2R2 XX4120M2-117APrepare P.O. Package - Vessel (Internals) - Steam Coil : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M2R2 XX4120M2-118APrepare P.O. Package - Vessel (Internals) - Steam Coil : Prepare ITP 10 1.00 100% 0%P34120M2R2 XX4120M2-119APrepare P.O. Package - Vessel (Internals) - Steam Coil : Update package documents for P.O. issue 10 1.00 100% 0%P34120M2R3 Vendor Data Review - Vessel (Internals) - Steam CoilP34120M2R3 XX4120M2-120AVendor Data Review - Vessel (Internals) - Steam Coil : Vendor Data Review 40 1.00 100% 0%

M63 Procurement - PumpsP34120M3A1 Enquiry Package - Pumps - Positive DisplacementP34120M3A1 XX4120M3-01AEnquiry Package - Pumps - Positive Displacement : Technical Specification 10 1.00 100% 0%P34120M3A1 XX4120M3-02AEnquiry Package - Pumps - Positive Displacement : Scope of Work Specification 10 1.00 100% 0%P34120M3A1 XX4120M3-03AEnquiry Package - Pumps - Positive Displacement : Datasheet 10 1.00 100% 0%P34120M3A1 XX4120M3-04AEnquiry Package - Pumps - Positive Displacement : Requisition 10 1.00 100% 0%P34120M3A2 Prepare P.O. Package - Pumps - Positive DisplacementP34120M3A2 XX4120M3-05APrepare P.O. Package - Pumps - Positive Displacement : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M3A2 XX4120M3-06APrepare P.O. Package - Pumps - Positive Displacement : Prepare ITP 10 1.00 100% 0%P34120M3A2 XX4120M3-07APrepare P.O. Package - Pumps - Positive Displacement : Update package documents for P.O. issue 10 1.00 100% 0%P34120M3A3 Vendor Data Review - Pumps - Positive DisplacementP34120M3A3 XX4120M3-08AVendor Data Review - Pumps - Positive Displacement : Vendor Data Review 40 1.00 100% 0%P34120M3B1 Enquiry Package - Pumps - Centrifugal - APIP34120M3B1 XX4120M3-09AEnquiry Package - Pumps - Centrifugal - API : Technical Specification 10 1.00 100% 0%P34120M3B1 XX4120M3-10AEnquiry Package - Pumps - Centrifugal - API : Scope of Work Specification 10 1.00 100% 0%P34120M3B1 XX4120M3-11AEnquiry Package - Pumps - Centrifugal - API : Datasheet 10 1.00 100% 0%P34120M3B1 XX4120M3-12AEnquiry Package - Pumps - Centrifugal - API : Requisition 10 1.00 100% 0%P34120M3B2 Prepare P.O. Package - Pumps - Centrifugal - APIP34120M3B2 XX4120M3-13APrepare P.O. Package - Pumps - Centrifugal - API : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M3B2 XX4120M3-14APrepare P.O. Package - Pumps - Centrifugal - API : Prepare ITP 10 1.00 100% 0%P34120M3B2 XX4120M3-15APrepare P.O. Package - Pumps - Centrifugal - API : Update package documents for P.O. issue 10 1.00 100% 0%P34120M3B3 Vendor Data Review - Pumps - Centrifugal APIP34120M3B3 XX4120M3-16AVendor Data Review - Pumps - Centrifugal API : Vendor Data Review 40 1.00 100% 0%P34120M3C1 Enquiry Package - Pumps - Centrifugal - FireP34120M3C1 XX4120M3-17AEnquiry Package - Pumps - Centrifugal - Fire : Technical Specification 10 1.00 100% 0%P34120M3C1 XX4120M3-18AEnquiry Package - Pumps - Centrifugal - Fire : Scope of Work Specification 10 1.00 100% 0%P34120M3C1 XX4120M3-19AEnquiry Package - Pumps - Centrifugal - Fire : Datasheet 10 1.00 100% 0%P34120M3C1 XX4120M3-20AEnquiry Package - Pumps - Centrifugal - Fire : Requisition 10 1.00 100% 0%P34120M3C2 Prepare P.O. Package - Pumps - Centrifugal - FireP34120M3C2 XX4120M3-21APrepare P.O. Package - Pumps - Centrifugal - Fire : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M3C2 XX4120M3-22APrepare P.O. Package - Pumps - Centrifugal - Fire : Prepare ITP 10 1.00 100% 0%P34120M3C2 XX4120M3-23APrepare P.O. Package - Pumps - Centrifugal - Fire : Update package documents for P.O. issue 10 1.00 100% 0%P34120M3C3 Vendor Data Review - Pumps - Centrifugal - FireP34120M3C3 XX4120M3-24AVendor Data Review - Pumps - Centrifugal - Fire : Vendor Data Review 40 1.00 100% 0%P34120M3D1 Enquiry Package - Pumps - Centrifugal - Non-APIP34120M3D1 XX4120M3-25AEnquiry Package - Pumps - Centrifugal - Non-API : Technical Specification 10 1.00 100% 0%P34120M3D1 XX4120M3-26AEnquiry Package - Pumps - Centrifugal - Non-API : Scope of Work Specification 10 1.00 100% 0%P34120M3D1 XX4120M3-27AEnquiry Package - Pumps - Centrifugal - Non-API : Datasheet 10 1.00 100% 0%P34120M3D1 XX4120M3-28AEnquiry Package - Pumps - Centrifugal - Non-API : Requisition 10 1.00 100% 0%P34120M3D2 Prepare P.O. Package - Pumps - Centrifugal - Non-APIP34120M3D2 XX4120M3-29APrepare P.O. Package - Pumps - Centrifugal - Non-API : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M3D2 XX4120M3-30APrepare P.O. Package - Pumps - Centrifugal - Non-API : Prepare ITP 10 1.00 100% 0%P34120M3D2 XX4120M3-31APrepare P.O. Package - Pumps - Centrifugal - Non-API : Update package documents for P.O. issue 10 1.00 100% 0%P34120M3D3 Vendor Data Review - Pumps - Centrifugal - Non-APIP34120M3D3 XX4120M3-32AVendor Data Review - Pumps - Centrifugal - Non-API : Vendor Data Review 40 1.00 100% 0%P34120M3E1 Enquiry Package - Pumps - Centrifugal - SlurryP34120M3E1 XX4120M3-33AEnquiry Package - Pumps - Centrifugal - Slurry : Technical Specification 10 1.00 100% 0%P34120M3E1 XX4120M3-34AEnquiry Package - Pumps - Centrifugal - Slurry : Scope of Work Specification 10 1.00 100% 0%P34120M3E1 XX4120M3-35AEnquiry Package - Pumps - Centrifugal - Slurry : Datasheet 10 1.00 100% 0%P34120M3E1 XX4120M3-36AEnquiry Package - Pumps - Centrifugal - Slurry : Requisition 10 1.00 100% 0%P34120M3E2 Prepare P.O. Package - Pumps - Centrifugal - SlurryP34120M3E2 XX4120M3-37APrepare P.O. Package - Pumps - Centrifugal - Slurry : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M3E2 XX4120M3-38APrepare P.O. Package - Pumps - Centrifugal - Slurry : Prepare ITP 10 1.00 100% 0%P34120M3E2 XX4120M3-39APrepare P.O. Package - Pumps - Centrifugal - Slurry : Update package documents for P.O. issue 10 1.00 100% 0%P34120M3E3 Vendor Data Review - Pumps - Centrifugal - SlurryP34120M3E3 XX4120M3-40AVendor Data Review - Pumps - Centrifugal - Slurry : Vendor Data Review 40 1.00 100% 0%P34120M3F1 Enquiry Package - Pumps - Centrifugal - Hot OilP34120M3F1 XX4120M3-41AEnquiry Package - Pumps - Centrifugal - Hot Oil : Technical Specification 10 1.00 100% 0%P34120M3F1 XX4120M3-42AEnquiry Package - Pumps - Centrifugal - Hot Oil : Scope of Work Specification 10 1.00 100% 0%P34120M3F1 XX4120M3-43AEnquiry Package - Pumps - Centrifugal - Hot Oil : Datasheet 10 1.00 100% 0%P34120M3F1 XX4120M3-44AEnquiry Package - Pumps - Centrifugal - Hot Oil : Requisition 10 1.00 100% 0%P34120M3F2 Prepare P.O. Package - Pumps - Centrifugal - Hot OilP34120M3F2 XX4120M3-45APrepare P.O. Package - Pumps - Centrifugal - Hot Oil : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M3F2 XX4120M3-46APrepare P.O. Package - Pumps - Centrifugal - Hot Oil : Prepare ITP 10 1.00 100% 0%P34120M3F2 XX4120M3-47APrepare P.O. Package - Pumps - Centrifugal - Hot Oil : Update package documents for P.O. issue 10 1.00 100% 0%P34120M3F3 Vendor Data Review - Pumps - Centrifugal - Hot OilP34120M3F3 XX4120M3-48AVendor Data Review - Pumps - Centrifugal - Hot Oil : Vendor Data Review 40 1.00 100% 0%P34120M3G1 Enquiry Package - Pumps - ReciprocatingP34120M3G1 XX4120M3-49AEnquiry Package - Pumps - Reciprocating : Technical Specification 10 1.00 100% 0%P34120M3G1 XX4120M3-50AEnquiry Package - Pumps - Reciprocating : Scope of Work Specification 10 1.00 100% 0%P34120M3G1 XX4120M3-51AEnquiry Package - Pumps - Reciprocating : Datasheet 10 1.00 100% 0%P34120M3G1 XX4120M3-52AEnquiry Package - Pumps - Reciprocating : Requisition 10 1.00 100% 0%P34120M3G2 Prepare P.O. Package - Pumps - ReciprocatingP34120M3G2 XX4120M3-53APrepare P.O. Package - Pumps - Reciprocating : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M3G2 XX4120M3-54APrepare P.O. Package - Pumps - Reciprocating : Prepare ITP 10 1.00 100% 0%P34120M3G2 XX4120M3-55APrepare P.O. Package - Pumps - Reciprocating : Update package documents for P.O. issue 10 1.00 100% 0%P34120M3G3 Vendor Data Review - Pumps - ReciprocatingP34120M3G3 XX4120M3-56AVendor Data Review - Pumps - Reciprocating : Vendor Data Review 40 1.00 100% 0%P34120M3H1 Enquiry Package - Pumps - Metering / InjectionP34120M3H1 XX4120M3-57AEnquiry Package - Pumps - Metering / Injection : Technical Specification 10 1.00 100% 0%P34120M3H1 XX4120M3-58AEnquiry Package - Pumps - Metering / Injection : Scope of Work Specification 10 1.00 100% 0%P34120M3H1 XX4120M3-59AEnquiry Package - Pumps - Metering / Injection : Datasheet 10 1.00 100% 0%P34120M3H1 XX4120M3-60AEnquiry Package - Pumps - Metering / Injection : Requisition 10 1.00 100% 0%P34120M3H2 Prepare P.O. Package - Pumps - Metering / InjectionP34120M3H2 XX4120M3-61APrepare P.O. Package - Pumps - Metering / Injection : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M3H2 XX4120M3-62APrepare P.O. Package - Pumps - Metering / Injection : Prepare ITP 10 1.00 100% 0%P34120M3H2 XX4120M3-63APrepare P.O. Package - Pumps - Metering / Injection : Update package documents for P.O. issue 10 1.00 100% 0%P34120M3H3 Vendor Data Review - Pumps - Metering / InjectionP34120M3H3 XX4120M3-64AVendor Data Review - Pumps - Metering / Injection : Vendor Data Review 40 1.00 100% 0%P34120M3J1 Enquiry Package - Pumps - SumpP34120M3J1 XX4120M3-65AEnquiry Package - Pumps - Sump : Technical Specification 10 1.00 100% 0%P34120M3J1 XX4120M3-66AEnquiry Package - Pumps - Sump : Scope of Work Specification 10 1.00 100% 0%P34120M3J1 XX4120M3-67AEnquiry Package - Pumps - Sump : Datasheet 10 1.00 100% 0%P34120M3J1 XX4120M3-68AEnquiry Package - Pumps - Sump : Requisition 10 1.00 100% 0%P34120M3J2 Prepare P.O. Package - Pumps - Sump

Page 23: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: MECHANICAL

Page 23 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34120M3J2 XX4120M3-69APrepare P.O. Package - Pumps - Sump : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M3J2 XX4120M3-70APrepare P.O. Package - Pumps - Sump : Prepare ITP 10 1.00 100% 0%P34120M3J2 XX4120M3-71APrepare P.O. Package - Pumps - Sump : Update package documents for P.O. issue 10 1.00 100% 0%P34120M3J3 Vendor Data Review - Pumps - SumpP34120M3J3 XX4120M3-72AVendor Data Review - Pumps - Sump : Vendor Data Review 40 1.00 100% 0%P34120M3K1 Enquiry Package - Pumps - VacuumP34120M3K1 XX4120M3-73AEnquiry Package - Pumps - Vacuum : Technical Specification 10 1.00 100% 0%P34120M3K1 XX4120M3-74AEnquiry Package - Pumps - Vacuum : Scope of Work Specification 10 1.00 100% 0%P34120M3K1 XX4120M3-75AEnquiry Package - Pumps - Vacuum : Datasheet 10 1.00 100% 0%P34120M3K1 XX4120M3-76AEnquiry Package - Pumps - Vacuum : Requisition 10 1.00 100% 0%P34120M3K2 Prepare P.O. Package - Pumps - VacuumP34120M3K2 XX4120M3-77APrepare P.O. Package - Pumps - Vacuum : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M3K2 XX4120M3-78APrepare P.O. Package - Pumps - Vacuum : Prepare ITP 10 1.00 100% 0%P34120M3K2 XX4120M3-79APrepare P.O. Package - Pumps - Vacuum : Update package documents for P.O. issue 10 1.00 100% 0%P34120M3K3 Vendor Data Review - Pumps - VacuumP34120M3K3 XX4120M3-80AVendor Data Review - Pumps - Vacuum : Vendor Data Review 40 1.00 100% 0%

M64 Procurement - Compressors / TurbinesP34120M4A1 Enquiry Package - Compressors - Centrifugal / AxialP34120M4A1 XX4120M4-01AEnquiry Package - Compressors - Centrifugal / Axial : Technical Specification 10 1.00 100% 0%P34120M4A1 XX4120M4-02AEnquiry Package - Compressors - Centrifugal / Axial : Scope of Work Specification 10 1.00 100% 0%P34120M4A1 XX4120M4-03AEnquiry Package - Compressors - Centrifugal / Axial : Datasheet 10 1.00 100% 0%P34120M4A1 XX4120M4-04AEnquiry Package - Compressors - Centrifugal / Axial : Requisition 10 1.00 100% 0%P34120M4A2 Prepare P.O. Package - Compressors - Centrifugal / AxialP34120M4A2 XX4120M4-05APrepare P.O. Package - Compressors - Centrifugal / Axial : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M4A2 XX4120M4-06APrepare P.O. Package - Compressors - Centrifugal / Axial : Prepare ITP 10 1.00 100% 0%P34120M4A2 XX4120M4-07APrepare P.O. Package - Compressors - Centrifugal / Axial : Update package documents for P.O. issue 10 1.00 100% 0%P34120M4A3 Vendor Data Review - Compressors - Centrifugal / AxialP34120M4A3 XX4120M4-08AVendor Data Review - Compressors - Centrifugal / Axial : Vendor Data Review 150 1.00 100% 0%P34120M4B1 Enquiry Package - Compressors - ReciprocatingP34120M4B1 XX4120M4-09AEnquiry Package - Compressors - Reciprocating : Technical Specification 10 1.00 100% 0%P34120M4B1 XX4120M4-10AEnquiry Package - Compressors - Reciprocating : Scope of Work Specification 10 1.00 100% 0%P34120M4B1 XX4120M4-11AEnquiry Package - Compressors - Reciprocating : Datasheet 10 1.00 100% 0%P34120M4B1 XX4120M4-12AEnquiry Package - Compressors - Reciprocating : Requisition 10 1.00 100% 0%P34120M4B2 Prepare P.O. Package - Compressors - ReciprocatingP34120M4B2 XX4120M4-13APrepare P.O. Package - Compressors - Reciprocating : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M4B2 XX4120M4-14APrepare P.O. Package - Compressors - Reciprocating : Prepare ITP 10 1.00 100% 0%P34120M4B2 XX4120M4-15APrepare P.O. Package - Compressors - Reciprocating : Update package documents for P.O. issue 10 1.00 100% 0%P34120M4B3 Vendor Data Review - Compressors - ReciprocatingP34120M4B3 XX4120M4-16AVendor Data Review - Compressors - Reciprocating : Vendor Data Review 150 1.00 100% 0%P34120M4C1 Enquiry Package - Compressors - Screw / VaneP34120M4C1 XX4120M4-17AEnquiry Package - Compressors - Screw / Vane : Technical Specification 10 1.00 100% 0%P34120M4C1 XX4120M4-18AEnquiry Package - Compressors - Screw / Vane : Scope of Work Specification 10 1.00 100% 0%P34120M4C1 XX4120M4-19AEnquiry Package - Compressors - Screw / Vane : Datasheet 10 1.00 100% 0%P34120M4C1 XX4120M4-20AEnquiry Package - Compressors - Screw / Vane : Requisition 10 1.00 100% 0%P34120M4C2 Prepare P.O. Package - Compressors - Screw / VaneP34120M4C2 XX4120M4-21APrepare P.O. Package - Compressors - Screw / Vane : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M4C2 XX4120M4-22APrepare P.O. Package - Compressors - Screw / Vane : Prepare ITP 10 1.00 100% 0%P34120M4C2 XX4120M4-23APrepare P.O. Package - Compressors - Screw / Vane : Update package documents for P.O. issue 10 1.00 100% 0%P34120M4C3 Vendor Data Review - Compressors - Screw / VaneP34120M4C3 XX4120M4-24AVendor Data Review - Compressors - Screw / Vane : Vendor Data Review 150 1.00 100% 0%P34120M4D1 Enquiry Package - Compressors - Turbo-ExpanderP34120M4D1 XX4120M4-25AEnquiry Package - Compressors - Turbo-Expander : Technical Specification 10 1.00 100% 0%P34120M4D1 XX4120M4-26AEnquiry Package - Compressors - Turbo-Expander : Scope of Work Specification 10 1.00 100% 0%P34120M4D1 XX4120M4-27AEnquiry Package - Compressors - Turbo-Expander : Datasheet 10 1.00 100% 0%P34120M4D1 XX4120M4-28AEnquiry Package - Compressors - Turbo-Expander : Requisition 10 1.00 100% 0%P34120M4D2 Prepare P.O. Package - Compressors - Turbo-ExpanderP34120M4D2 XX4120M4-29APrepare P.O. Package - Compressors - Turbo-Expander : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M4D2 XX4120M4-30APrepare P.O. Package - Compressors - Turbo-Expander : Prepare ITP 10 1.00 100% 0%P34120M4D2 XX4120M4-31APrepare P.O. Package - Compressors - Turbo-Expander : Update package documents for P.O. issue 10 1.00 100% 0%P34120M4D3 Vendor Data Review - Compressors - Turbo-ExpanderP34120M4D3 XX4120M4-32AVendor Data Review - Compressors - Turbo-Expander : Vendor Data Review 150 1.00 100% 0%P34120M4E1 Enquiry Package - Compressors - Liquid RingP34120M4E1 XX4120M4-33AEnquiry Package - Compressors - Liquid Ring : Technical Specification 10 1.00 100% 0%P34120M4E1 XX4120M4-34AEnquiry Package - Compressors - Liquid Ring : Scope of Work Specification 10 1.00 100% 0%P34120M4E1 XX4120M4-35AEnquiry Package - Compressors - Liquid Ring : Datasheet 10 1.00 100% 0%P34120M4E1 XX4120M4-36AEnquiry Package - Compressors - Liquid Ring : Requisition 10 1.00 100% 0%P34120M4E2 Prepare P.O. Package - Compressors - Liquid RingP34120M4E2 XX4120M4-37APrepare P.O. Package - Compressors - Liquid Ring : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M4E2 XX4120M4-38APrepare P.O. Package - Compressors - Liquid Ring : Prepare ITP 10 1.00 100% 0%P34120M4E2 XX4120M4-39APrepare P.O. Package - Compressors - Liquid Ring : Update package documents for P.O. issue 10 1.00 100% 0%P34120M4E3 Vendor Data Review - Compressors - Liquid RingP34120M4E3 XX4120M4-40AVendor Data Review - Compressors - Liquid Ring : Vendor Data Review 150 1.00 100% 0%P34120M4F1 Enquiry Package - Compressors - BlowersP34120M4F1 XX4120M4-41AEnquiry Package - Compressors - Blowers : Technical Specification 10 1.00 100% 0%P34120M4F1 XX4120M4-42AEnquiry Package - Compressors - Blowers : Scope of Work Specification 10 1.00 100% 0%P34120M4F1 XX4120M4-43AEnquiry Package - Compressors - Blowers : Datasheet 10 1.00 100% 0%P34120M4F1 XX4120M4-44AEnquiry Package - Compressors - Blowers : Requisition 10 1.00 100% 0%P34120M4F2 Prepare P.O. Package - Compressors - BlowersP34120M4F2 XX4120M4-45APrepare P.O. Package - Compressors - Blowers : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M4F2 XX4120M4-46APrepare P.O. Package - Compressors - Blowers : Prepare ITP 10 1.00 100% 0%P34120M4F2 XX4120M4-47APrepare P.O. Package - Compressors - Blowers : Update package documents for P.O. issue 10 1.00 100% 0%P34120M4F3 Vendor Data Review - Compressors - BlowersP34120M4F3 XX4120M4-48AVendor Data Review - Compressors - Blowers : Vendor Data Review 150 1.00 100% 0%P34120M4G1 Enquiry Package - Compressors - AirP34120M4G1 XX4120M4-49AEnquiry Package - Compressors - Air : Technical Specification 10 1.00 100% 0%P34120M4G1 XX4120M4-50AEnquiry Package - Compressors - Air : Scope of Work Specification 10 1.00 100% 0%P34120M4G1 XX4120M4-51AEnquiry Package - Compressors - Air : Datasheet 10 1.00 100% 0%P34120M4G1 XX4120M4-52AEnquiry Package - Compressors - Air : Requisition 10 1.00 100% 0%P34120M4G2 Prepare P.O. Package - Compressors - AirP34120M4G2 XX4120M4-53APrepare P.O. Package - Compressors - Air : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M4G2 XX4120M4-54APrepare P.O. Package - Compressors - Air : Prepare ITP 10 1.00 100% 0%P34120M4G2 XX4120M4-55APrepare P.O. Package - Compressors - Air : Update package documents for P.O. issue 10 1.00 100% 0%P34120M4G3 Vendor Data Review - Compressors - AirP34120M4G3 XX4120M4-56AVendor Data Review - Compressors - Air : Vendor Data Review 150 1.00 100% 0%P34120M4H1 Enquiry Package - Gas TurbinesP34120M4H1 XX4120M4-57AEnquiry Package - Gas Turbines : Technical Specification 10 1.00 100% 0%P34120M4H1 XX4120M4-58AEnquiry Package - Gas Turbines : Scope of Work Specification 10 1.00 100% 0%P34120M4H1 XX4120M4-59AEnquiry Package - Gas Turbines : Datasheet 10 1.00 100% 0%P34120M4H1 XX4120M4-60AEnquiry Package - Gas Turbines : Requisition 10 1.00 100% 0%P34120M4H2 Prepare P.O. Package - Gas TurbinesP34120M4H2 XX4120M4-61APrepare P.O. Package - Gas Turbines : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M4H2 XX4120M4-62APrepare P.O. Package - Gas Turbines : Prepare ITP 10 1.00 100% 0%P34120M4H2 XX4120M4-63APrepare P.O. Package - Gas Turbines : Update package documents for P.O. issue 10 1.00 100% 0%P34120M4H3 Vendor Data Review - Gas TurbinesP34120M4H3 XX4120M4-64AVendor Data Review - Gas Turbines : Vendor Data Review 150 1.00 100% 0%

M65 Procurement - FiltersP34120M5A1 Enquiry Package - Filters - CartridgeP34120M5A1 XX4120M5-01AEnquiry Package - Filters - Cartridge : Technical Specification 10 1.00 100% 0%P34120M5A1 XX4120M5-02AEnquiry Package - Filters - Cartridge : Scope of Work Specification 10 1.00 100% 0%P34120M5A1 XX4120M5-03AEnquiry Package - Filters - Cartridge : Datasheet 10 1.00 100% 0%P34120M5A1 XX4120M5-04AEnquiry Package - Filters - Cartridge : Requisition 10 1.00 100% 0%P34120M5A2 Prepare P.O. Package - Filters - CartridgeP34120M5A2 XX4120M5-05APrepare P.O. Package - Filters - Cartridge : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M5A2 XX4120M5-06APrepare P.O. Package - Filters - Cartridge : Prepare ITP 10 1.00 100% 0%P34120M5A2 XX4120M5-07APrepare P.O. Package - Filters - Cartridge : Update package documents for P.O. issue 10 1.00 100% 0%P34120M5A3 Vendor Data Review - Filters - CartridgeP34120M5A3 XX4120M5-08AVendor Data Review - Filters - Cartridge : Vendor Data Review 150 1.00 100% 0%

Page 24: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: MECHANICAL

Page 24 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34120M5B1 Enquiry Package - Filters - CoalescersP34120M5B1 XX4120M5-09AEnquiry Package - Filters - Coalescers : Technical Specification 10 1.00 100% 0%P34120M5B1 XX4120M5-10AEnquiry Package - Filters - Coalescers : Scope of Work Specification 10 1.00 100% 0%P34120M5B1 XX4120M5-11AEnquiry Package - Filters - Coalescers : Datasheet 10 1.00 100% 0%P34120M5B1 XX4120M5-12AEnquiry Package - Filters - Coalescers : Requisition 10 1.00 100% 0%P34120M5B2 Prepare P.O. Package - Filters - CoalescersP34120M5B2 XX4120M5-13APrepare P.O. Package - Filters - Coalescers : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M5B2 XX4120M5-14APrepare P.O. Package - Filters - Coalescers : Prepare ITP 10 1.00 100% 0%P34120M5B2 XX4120M5-15APrepare P.O. Package - Filters - Coalescers : Update package documents for P.O. issue 10 1.00 100% 0%P34120M5B3 Vendor Data Review - Filters - CoalescersP34120M5B3 XX4120M5-16AVendor Data Review - Filters - Coalescers : Vendor Data Review 150 1.00 100% 0%P34120M5C1 Enquiry Package - Filters - BeltP34120M5C1 XX4120M5-17AEnquiry Package - Filters - Belt : Technical Specification 10 1.00 100% 0%P34120M5C1 XX4120M5-18AEnquiry Package - Filters - Belt : Scope of Work Specification 10 1.00 100% 0%P34120M5C1 XX4120M5-19AEnquiry Package - Filters - Belt : Datasheet 10 1.00 100% 0%P34120M5C1 XX4120M5-20AEnquiry Package - Filters - Belt : Requisition 10 1.00 100% 0%P34120M5C2 Prepare P.O. Package - Filters - BeltP34120M5C2 XX4120M5-21APrepare P.O. Package - Filters - Belt : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M5C2 XX4120M5-22APrepare P.O. Package - Filters - Belt : Prepare ITP 10 1.00 100% 0%P34120M5C2 XX4120M5-23APrepare P.O. Package - Filters - Belt : Update package documents for P.O. issue 10 1.00 100% 0%P34120M5C3 Vendor Data Review - Filters - BeltP34120M5C3 XX4120M5-24AVendor Data Review - Filters - Belt : Vendor Data Review 150 1.00 100% 0%P34120M5D1 Enquiry Package - Filters - VacuumP34120M5D1 XX4120M5-25AEnquiry Package - Filters - Vacuum : Technical Specification 10 1.00 100% 0%P34120M5D1 XX4120M5-26AEnquiry Package - Filters - Vacuum : Scope of Work Specification 10 1.00 100% 0%P34120M5D1 XX4120M5-27AEnquiry Package - Filters - Vacuum : Datasheet 10 1.00 100% 0%P34120M5D1 XX4120M5-28AEnquiry Package - Filters - Vacuum : Requisition 10 1.00 100% 0%P34120M5D2 Prepare P.O. Package - Filters - VacuumP34120M5D2 XX4120M5-29APrepare P.O. Package - Filters - Vacuum : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M5D2 XX4120M5-30APrepare P.O. Package - Filters - Vacuum : Prepare ITP 10 1.00 100% 0%P34120M5D2 XX4120M5-31APrepare P.O. Package - Filters - Vacuum : Update package documents for P.O. issue 10 1.00 100% 0%P34120M5D3 Vendor Data Review - Filters - VacuumP34120M5D3 XX4120M5-32AVendor Data Review - Filters - Vacuum : Vendor Data Review 150 1.00 100% 0%P34120M5E1 Enquiry Package - Filters - High Rate PressureP34120M5E1 XX4120M5-33AEnquiry Package - Filters - High Rate Pressure : Technical Specification 10 1.00 100% 0%P34120M5E1 XX4120M5-34AEnquiry Package - Filters - High Rate Pressure : Scope of Work Specification 10 1.00 100% 0%P34120M5E1 XX4120M5-35AEnquiry Package - Filters - High Rate Pressure : Datasheet 10 1.00 100% 0%P34120M5E1 XX4120M5-36AEnquiry Package - Filters - High Rate Pressure : Requisition 10 1.00 100% 0%P34120M5E2 Prepare P.O. Package - Filters - High Rate PressureP34120M5E2 XX4120M5-37APrepare P.O. Package - Filters - High Rate Pressure : Prepare Technical Bid Analysis 50 1.00 100% 0%P34120M5E2 XX4120M5-38APrepare P.O. Package - Filters - High Rate Pressure : Prepare ITP 10 1.00 100% 0%P34120M5E2 XX4120M5-39APrepare P.O. Package - Filters - High Rate Pressure : Update package documents for P.O. issue 10 1.00 100% 0%P34120M5E3 Vendor Data Review - Filters - High Rate PressureP34120M5E3 XX4120M5-40AVendor Data Review - Filters - High Rate Pressure : Vendor Data Review 100 1.00 100% 0%P34120M5F1 Enquiry Package - Filters - SeparatorP34120M5F1 XX4120M5-41AEnquiry Package - Filters - Separator : Technical Specification 10 1.00 100% 0%P34120M5F1 XX4120M5-42AEnquiry Package - Filters - Separator : Scope of Work Specification 10 1.00 100% 0%P34120M5F1 XX4120M5-43AEnquiry Package - Filters - Separator : Datasheet 10 1.00 100% 0%P34120M5F1 XX4120M5-44AEnquiry Package - Filters - Separator : Requisition 10 1.00 100% 0%P34120M5F2 Prepare P.O. Package - Filters - SeparatorP34120M5F2 XX4120M5-45APrepare P.O. Package - Filters - Separator : Prepare Technical Bid Analysis 50 1.00 100% 0%P34120M5F2 XX4120M5-46APrepare P.O. Package - Filters - Separator : Prepare ITP 10 1.00 100% 0%P34120M5F2 XX4120M5-47APrepare P.O. Package - Filters - Separator : Update package documents for P.O. issue 10 1.00 100% 0%P34120M5F3 Vendor Data Review - Filters - SeparatorP34120M5F3 XX4120M5-48AVendor Data Review - Filters - Separator : Vendor Data Review 100 1.00 100% 0%P34120M5G1 Enquiry Package - Filters - StrainerP34120M5G1 XX4120M5-49AEnquiry Package - Filters - Strainer : Technical Specification 10 1.00 100% 0%P34120M5G1 XX4120M5-50AEnquiry Package - Filters - Strainer : Scope of Work Specification 10 1.00 100% 0%P34120M5G1 XX4120M5-51AEnquiry Package - Filters - Strainer : Datasheet 10 1.00 100% 0%P34120M5G1 XX4120M5-52AEnquiry Package - Filters - Strainer : Requisition 10 1.00 100% 0%P34120M5G2 Prepare P.O. Package - Filters - StrainerP34120M5G2 XX4120M5-53APrepare P.O. Package - Filters - Strainer : Prepare Technical Bid Analysis 50 1.00 100% 0%P34120M5G2 XX4120M5-54APrepare P.O. Package - Filters - Strainer : Prepare ITP 10 1.00 100% 0%P34120M5G2 XX4120M5-55APrepare P.O. Package - Filters - Strainer : Update package documents for P.O. issue 10 1.00 100% 0%P34120M5G3 Vendor Data Review - Filters - StrainerP34120M5G3 XX4120M5-56AVendor Data Review - Filters - Strainer : Vendor Data Review 100 1.00 100% 0%

M66 Procurement - FansP34120M6A1 Enquiry Package - Centrifugal FansP34120M6A1 XX4120M6-01AEnquiry Package - Centrifugal Fans : Technical Specification 10 1.00 100% 0%P34120M6A1 XX4120M6-02AEnquiry Package - Centrifugal Fans : Scope of Work Specification 10 1.00 100% 0%P34120M6A1 XX4120M6-03AEnquiry Package - Centrifugal Fans : Datasheet 10 1.00 100% 0%P34120M6A1 XX4120M6-04AEnquiry Package - Centrifugal Fans : Requisition 10 1.00 100% 0%P34120M6A2 Prepare P.O. Package - Centrifugal FansP34120M6A2 XX4120M6-05APrepare P.O. Package - Centrifugal Fans : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M6A2 XX4120M6-06APrepare P.O. Package - Centrifugal Fans : Prepare ITP 10 1.00 100% 0%P34120M6A2 XX4120M6-07APrepare P.O. Package - Centrifugal Fans : Update package documents for P.O. issue 10 1.00 100% 0%P34120M6A3 Vendor Data Review - Centrifugal FansP34120M6A3 XX4120M6-08AVendor Data Review - Centrifugal Fans : Vendor Data Review 150 1.00 100% 0%P34120M6B1 Enquiry Package - Axial FansP34120M6B1 XX4120M6-09AEnquiry Package - Axial Fans : Technical Specification 10 1.00 100% 0%P34120M6B1 XX4120M6-10AEnquiry Package - Axial Fans : Scope of Work Specification 10 1.00 100% 0%P34120M6B1 XX4120M6-11AEnquiry Package - Axial Fans : Datasheet 10 1.00 100% 0%P34120M6B1 XX4120M6-12AEnquiry Package - Axial Fans : Requisition 10 1.00 100% 0%P34120M6B2 Prepare P.O. Package - Axial FansP34120M6B2 XX4120M6-13APrepare P.O. Package - Axial Fans : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M6B2 XX4120M6-14APrepare P.O. Package - Axial Fans : Prepare ITP 10 1.00 100% 0%P34120M6B2 XX4120M6-15APrepare P.O. Package - Axial Fans : Update package documents for P.O. issue 10 1.00 100% 0%P34120M6B3 Vendor Data Review - Axial FansP34120M6B3 XX4120M6-16AVendor Data Review - Axial Fans : Vendor Data Review 150 1.00 100% 0%

M67 Procurement - MachineryP34120M7A1 Enquiry Package - Internal Combustion EngineP34120M7A1 XX4120M7-01AEnquiry Package - Internal Combustion Engine : Technical Specification 10 1.00 100% 0%P34120M7A1 XX4120M7-02AEnquiry Package - Internal Combustion Engine : Scope of Work Specification 10 1.00 100% 0%P34120M7A1 XX4120M7-03AEnquiry Package - Internal Combustion Engine : Datasheet 10 1.00 100% 0%P34120M7A1 XX4120M7-04AEnquiry Package - Internal Combustion Engine : Requisition 10 1.00 100% 0%P34120M7A2 Prepare P.O. Package - Internal Combustion EngineP34120M7A2 XX4120M7-05APrepare P.O. Package - Internal Combustion Engine : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M7A2 XX4120M7-06APrepare P.O. Package - Internal Combustion Engine : Prepare ITP 10 1.00 100% 0%P34120M7A2 XX4120M7-07APrepare P.O. Package - Internal Combustion Engine : Update package documents for P.O. issue 10 1.00 100% 0%P34120M7A3 Vendor Data Review - Internal Combustion EngineP34120M7A3 XX4120M7-08AVendor Data Review - Internal Combustion Engine : Vendor Data Review 150 1.00 100% 0%P34120M7B1 Enquiry Package - GearboxP34120M7B1 XX4120M7-09AEnquiry Package - Gearbox : Technical Specification 10 1.00 100% 0%P34120M7B1 XX4120M7-10AEnquiry Package - Gearbox : Scope of Work Specification 10 1.00 100% 0%P34120M7B1 XX4120M7-11AEnquiry Package - Gearbox : Datasheet 10 1.00 100% 0%P34120M7B1 XX4120M7-12AEnquiry Package - Gearbox : Requisition 10 1.00 100% 0%P34120M7B2 Prepare P.O. Package - GearboxP34120M7B2 XX4120M7-13APrepare P.O. Package - Gearbox : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M7B2 XX4120M7-14APrepare P.O. Package - Gearbox : Prepare ITP 10 1.00 100% 0%P34120M7B2 XX4120M7-15APrepare P.O. Package - Gearbox : Update package documents for P.O. issue 10 1.00 100% 0%P34120M7B3 Vendor Data Review - GearboxP34120M7B3 XX4120M7-16AVendor Data Review - Gearbox : Vendor Data Review 150 1.00 100% 0%P34120M7C1 Enquiry Package - CouplingP34120M7C1 XX4120M7-17AEnquiry Package - Coupling : Technical Specification 10 1.00 100% 0%P34120M7C1 XX4120M7-18AEnquiry Package - Coupling : Scope of Work Specification 10 1.00 100% 0%P34120M7C1 XX4120M7-19AEnquiry Package - Coupling : Datasheet 10 1.00 100% 0%P34120M7C1 XX4120M7-20AEnquiry Package - Coupling : Requisition 10 1.00 100% 0%

Page 25: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: MECHANICAL

Page 25 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34120M7C2 Prepare P.O. Package - CouplingP34120M7C2 XX4120M7-21APrepare P.O. Package - Coupling : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M7C2 XX4120M7-22APrepare P.O. Package - Coupling : Prepare ITP 10 1.00 100% 0%P34120M7C2 XX4120M7-23APrepare P.O. Package - Coupling : Update package documents for P.O. issue 10 1.00 100% 0%P34120M7C3 Vendor Data Review - CouplingP34120M7C3 XX4120M7-24AVendor Data Review - Coupling : Vendor Data Review 150 1.00 100% 0%P34120M7D1 Enquiry Package - Air MotorP34120M7D1 XX4120M7-25AEnquiry Package - Air Motor : Technical Specification 10 1.00 100% 0%P34120M7D1 XX4120M7-26AEnquiry Package - Air Motor : Scope of Work Specification 10 1.00 100% 0%P34120M7D1 XX4120M7-27AEnquiry Package - Air Motor : Datasheet 10 1.00 100% 0%P34120M7D1 XX4120M7-28AEnquiry Package - Air Motor : Requisition 10 1.00 100% 0%P34120M7D2 Prepare P.O. Package - Air MotorP34120M7D2 XX4120M7-29APrepare P.O. Package - Air Motor : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M7D2 XX4120M7-30APrepare P.O. Package - Air Motor : Prepare ITP 10 1.00 100% 0%P34120M7D2A XX4120M7-31APrepare P.O. Package - Air Motor : Update package documents for P.O. issue 10 1.00 100% 0%P34120M7D3 Vendor Data Review - Air MotorP34120M7D3 XX4120M7-32AVendor Data Review - Air Motor : Vendor Data Review 150 1.00 100% 0%P34120M7E1A Enquiry Package - SealsP34120M7E1 XX4120M7-33AEnquiry Package - Seals : Technical Specification 10 1.00 100% 0%P34120M7E1 XX4120M7-34AEnquiry Package - Seals : Scope of Work Specification 10 1.00 100% 0%P34120M7E1 XX4120M7-35AEnquiry Package - Seals : Datasheet 10 1.00 100% 0%P34120M7E1 XX4120M7-36AEnquiry Package - Seals : Requisition 10 1.00 100% 0%P34120M7E2 Prepare P.O. Package - SealsP34120M7E2 XX4120M7-37APrepare P.O. Package - Seals : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M7E2 XX4120M7-38APrepare P.O. Package - Seals : Prepare ITP 10 1.00 100% 0%P34120M7E2 XX4120M7-39APrepare P.O. Package - Seals : Update package documents for P.O. issue 10 1.00 100% 0%P34120M7E3 Vendor Data Review - SealsP34120M7E3 XX4120M7-40AVendor Data Review - Seals : Vendor Data Review 150 1.00 100% 0%P34120M7F1 Enquiry Package - Lube & Seal Oil SystemsP34120M7F1 XX4120M7-41AEnquiry Package - Lube & Seal Oil Systems : Technical Specification 10 1.00 100% 0%P34120M7F1 XX4120M7-42AEnquiry Package - Lube & Seal Oil Systems : Scope of Work Specification 10 1.00 100% 0%P34120M7F1 XX4120M7-43AEnquiry Package - Lube & Seal Oil Systems : Datasheet 10 1.00 100% 0%P34120M7F1 XX4120M7-44AEnquiry Package - Lube & Seal Oil Systems : Requisition 10 1.00 100% 0%P34120M7F2 Prepare P.O. Package - Lube & Seal Oil SystemsP34120M7F2 XX4120M7-45APrepare P.O. Package - Lube & Seal Oil Systems : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M7F2 XX4120M7-46APrepare P.O. Package - Lube & Seal Oil Systems : Prepare ITP 10 1.00 100% 0%P34120M7F2 XX4120M7-47APrepare P.O. Package - Lube & Seal Oil Systems : Update package documents for P.O. issue 10 1.00 100% 0%P34120M7F3 Vendor Data Review - Lube & Seal OilSystemsP34120M7F3 XX4120M7-48AVendor Data Review - Lube & Seal OilSystems : Vendor Data Review 150 1.00 100% 0%

M68 Procurement - Fired EquipmentP34120M8A1 Enquiry Package - HeaterP34120M8A1 XX4120M8-01AEnquiry Package - Heater : Technical Specification 10 1.00 100% 0%P34120M8A1 XX4120M8-02AEnquiry Package - Heater : Scope of Work Specification 10 1.00 100% 0%P34120M8A1 XX4120M8-03AEnquiry Package - Heater : Datasheet 10 1.00 100% 0%P34120M8A1 XX4120M8-04AEnquiry Package - Heater : Requisition 10 1.00 100% 0%P34120M8A2 Prepare P.O. Package - HeaterP34120M8A2 XX4120M8-05APrepare P.O. Package - Heater : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M8A2 XX4120M8-06APrepare P.O. Package - Heater : Prepare ITP 10 1.00 100% 0%P34120M8A2 XX4120M8-07APrepare P.O. Package - Heater : Update package documents for P.O. issue 10 1.00 100% 0%P34120M8A3 Vendor Data Review - HeaterP34120M8A3 XX4120M8-08AVendor Data Review - Heater : Vendor Data Review 150 1.00 100% 0%P34120M8B1 Enquiry Package - Flare TipP34120M8B1 XX4120M8-09AEnquiry Package - Flare Tip : Technical Specification 10 1.00 100% 0%P34120M8B1 XX4120M8-10AEnquiry Package - Flare Tip : Scope of Work Specification 10 1.00 100% 0%P34120M8B1 XX4120M8-11AEnquiry Package - Flare Tip : Datasheet 10 1.00 100% 0%P34120M8B1 XX4120M8-12AEnquiry Package - Flare Tip : Requisition 10 1.00 100% 0%P34120M8B2 Prepare P.O. Package - Flare TipP34120M8B2 XX4120M8-13APrepare P.O. Package - Flare Tip : Prepare Technical Bid Analysis 40 1.00 100% 0%P34120M8B2 XX4120M8-14APrepare P.O. Package - Flare Tip : Prepare ITP 10 1.00 100% 0%P34120M8B2 XX4120M8-15APrepare P.O. Package - Flare Tip : Update package documents for P.O. issue 10 1.00 100% 0%P34120M8B3 Vendor Data Review - Flare TipP34120M8B3 XX4120M8-16AVendor Data Review - Flare Tip : Vendor Data Review 60 1.00 100% 0%P34120M8C1 Enquiry Package - Flame ArrestorP34120M8C1 XX4120M8-17AEnquiry Package - Flame Arrestor : Technical Specification 10 1.00 100% 0%P34120M8C1 XX4120M8-18AEnquiry Package - Flame Arrestor : Scope of Work Specification 10 1.00 100% 0%P34120M8C1 XX4120M8-19AEnquiry Package - Flame Arrestor : Datasheet 10 1.00 100% 0%P34120M8C1 XX4120M8-20AEnquiry Package - Flame Arrestor : Requisition 10 1.00 100% 0%P34120M8C2 Prepare P.O. Package - Flame ArrestorP34120M8C2 XX4120M8-21APrepare P.O. Package - Flame Arrestor : Prepare Technical Bid Analysis 40 1.00 100% 0%P34120M8C2 XX4120M8-22APrepare P.O. Package - Flame Arrestor : Prepare ITP 10 1.00 100% 0%P34120M8C2 XX4120M8-23APrepare P.O. Package - Flame Arrestor : Update package documents for P.O. issue 10 1.00 100% 0%P34120M8C3 Vendor Data Review - Flame ArrestorP34120M8C3 XX4120M8-24AVendor Data Review - Flame Arrestor : Vendor Data Review 60 1.00 100% 0%P34120M8D1 Enquiry Package - BurnerP34120M8D1 XX4120M8-25AEnquiry Package - Burner : Technical Specification 10 1.00 100% 0%P34120M8D1 XX4120M8-26AEnquiry Package - Burner : Scope of Work Specification 10 1.00 100% 0%P34120M8D1 XX4120M8-27AEnquiry Package - Burner : Datasheet 10 1.00 100% 0%P34120M8D1 XX4120M8-28AEnquiry Package - Burner : Requisition 10 1.00 100% 0%P34120M8D2 Prepare P.O. Package - BurnerP34120M8D2 XX4120M8-29APrepare P.O. Package - Burner : Prepare Technical Bid Analysis 40 1.00 100% 0%P34120M8D2 XX4120M8-30APrepare P.O. Package - Burner : Prepare ITP 10 1.00 100% 0%P34120M8D2 XX4120M8-31APrepare P.O. Package - Burner : Update package documents for P.O. issue 10 1.00 100% 0%P34120M8D3 Vendor Data Review - BurnerP34120M8D3 XX4120M8-32AVendor Data Review - Burner : Vendor Data Review 60 1.00 100% 0%P34120M8E1 Enquiry Package - Boiler PackageP34120M8E1 XX4120M8-33AEnquiry Package - Boiler Package : Technical Specification 10 1.00 100% 0%P34120M8E1 XX4120M8-34AEnquiry Package - Boiler Package : Scope of Work Specification 10 1.00 100% 0%P34120M8E1 XX4120M8-35AEnquiry Package - Boiler Package : Datasheet 10 1.00 100% 0%P34120M8E1 XX4120M8-36AEnquiry Package - Boiler Package : Requisition 10 1.00 100% 0%P34120M8E2 Prepare P.O. Package - Boiler PackageP34120M8E2 XX4120M8-37APrepare P.O. Package - Boiler Package : Prepare Technical Bid Analysis 40 1.00 100% 0%P34120M8E2 XX4120M8-38APrepare P.O. Package - Boiler Package : Prepare ITP 10 1.00 100% 0%P34120M8E2 XX4120M8-39APrepare P.O. Package - Boiler Package : Update package documents for P.O. issue 10 1.00 100% 0%P34120M8E3 Vendor Data Review - Boiler PackageP34120M8E3 XX4120M8-40AVendor Data Review - Boiler Package : Vendor Data Review 60 1.00 100% 0%P34120M8F1 Enquiry Package - Waste Heat Recovery UnitP34120M8F1 XX4120M8-41AEnquiry Package - Waste Heat Recovery Unit : Technical Specification 10 1.00 100% 0%P34120M8F1 XX4120M8-42AEnquiry Package - Waste Heat Recovery Unit : Scope of Work Specification 10 1.00 100% 0%P34120M8F1 XX4120M8-43AEnquiry Package - Waste Heat Recovery Unit : Datasheet 10 1.00 100% 0%P34120M8F1 XX4120M8-44AEnquiry Package - Waste Heat Recovery Unit : Requisition 10 1.00 100% 0%P34120M8F2 Prepare P.O. Package - Waste Heat Recovery UnitP34120M8F2 XX4120M8-45APrepare P.O. Package - Waste Heat Recovery Unit : Prepare Technical Bid Analysis 100 1.00 100% 0%P34120M8F2 XX4120M8-46APrepare P.O. Package - Waste Heat Recovery Unit : Prepare ITP 10 1.00 100% 0%P34120M8F2 XX4120M8-47APrepare P.O. Package - Waste Heat Recovery Unit : Update package documents for P.O. issue 10 1.00 100% 0%P34120M8F3 Vendor Data Review - Waste Heat Recovery UnitP34120M8F3 XX4120M8-48AVendor Data Review - Waste Heat Recovery Unit : Vendor Data Review 150 1.00 100% 0%

M75 Subcontracts - Engineering / SpecialistsP34120M75A Enquiry Package - Eng. / Specialist Services

P34120M75A 01 Enquiry Package - Eng. / Specialist Services : Scope of Work 30 1.00 100% 0%P34120M75A 02 Enquiry Package - Eng. / Specialist Services : Requisition 20 1.00 100% 0%P34120M75B Prepare P.O. Package - Eng. / Specialist ServicesP34120M75B 03 Prepare P.O. Package - Eng. / Specialist Services : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120M75B 04 Prepare P.O. Package - Eng. / Specialist Services : Update package documents for P.O. issue 20 1.00 100% 0%P34120M75C Vendor Liaison - Eng. / Specialist ServicesP34120M75C 05 Vendor Liaison - Eng. / Specialist Services : Vendor Liaison - Eng. / Specialist Services 30 1.00 100% 0%

Page 26: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: MECHANICAL

Page 26 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

M76 Subcontracts - FabricationP34120M76A Enquiry Package - Fabrication

P34120M76A 01 Enquiry Package - Fabrication : Fabrication Specification 20 1.00 100% 0%

P34120M76A 02 Enquiry Package - Fabrication : Scope of Work 30 1.00 100% 0%

P34120M76A 03 Enquiry Package - Fabrication : Requisition 20 1.00 100% 0%

P34120M76B Prepare P.O. Package - Fabrication

P34120M76B 04 Prepare P.O. Package - Fabrication : Prepare Technical Bid Analysis 20 1.00 100% 0%

P34120M76B 05 Prepare P.O. Package - Fabrication : Update package documents for P.O. issue 20 1.00 100% 0%

P34120M76C Vendor Liaison - Fabrication

P34120M76C 06 Vendor Liaison - Fabrication : Vendor Liaison - Fabrication 30 1.00 100% 0%

M77 Subcontracts - ConstructionP34120M77A Enquiry Package - Construction

P34120M77A 01 Enquiry Package - Construction : Construction Specification 20 1.00 100% 0%

P34120M77A 02 Enquiry Package - Construction : Construction Scope of Work 30 1.00 100% 0%

P34120M77A 03 Enquiry Package - Construction : Requisition 20 1.00 100% 0%

P34120M77B Prepare P.O. Package - Construction

P34120M77B 04 Prepare P.O. Package - Construction : Prepare Technical Bid Analysis 80 1.00 100% 0%

P34120M77B 05 Prepare P.O. Package - Construction : Update package documents for P.O. issue 20 1.00 100% 0%

P34120M77C Vendor Liaison - Construction

P34120M77C 06 Vendor Liaison - Construction : Vendor Liaison - Construction 120 1.00 100% 0%

P34120M77D Enquiry Package - Inspection Services

P34120M77D 01 Enquiry Package - Inspection Services : Inspection Services - Scope of Work Specification 20 1.00 100% 0%

P34120M77D 02 Enquiry Package - Inspection Services : Requisition 20 1.00 100% 0%

P34120M77E Prepare P.O. Package - Inspection Services

P34120M77E 03 Prepare P.O. Package - Inspection Services : Prepare Technical Bid Analysis 40 1.00 100% 0%

P34120M77E 04 Prepare P.O. Package - Inspection Services : Update package documents for P.O. issue 20 1.00 100% 0%

P34120M77F Vendor Liaison - Inspection Services

P34120M77F 05 Vendor Liaison - Inspection Services : Vendor Liaison - Inspection Services 80 1.00 100% 0%

P34120M77G Enquiry Package - Scaffolding

P34120M77G 01 Enquiry Package - Scaffolding : Scaffolding - Scope of Work Specification 20 1.00 100% 0%

P34120M77G 02 Enquiry Package - Scaffolding : Requisition 20 1.00 100% 0%

P34120M77H Prepare P.O. Package - Scaffolding

P34120M77H 03 Prepare P.O. Package - Scaffolding : Prepare Technical Bid Analysis 50 1.00 100% 0%

P34120M77H 04 Prepare P.O. Package - Scaffolding : Update package documents for P.O. issue 20 1.00 100% 0%

P34120M77I Vendor Liaison - Scaffolding

P34120M77I 05 Vendor Liaison - Scaffolding : Vendor Liaison - Construction 80 1.00 100% 0%

P34120M77J Enquiry Package - Construction Cranes

P34120M77J 01 Enquiry Package - Construction Cranes : Construction Cranes - Scope of Work Specification 20 1.00 100% 0%

P34120M77J 02 Enquiry Package - Construction Cranes : Requisition 20 1.00 100% 0%

P34120M77K Prepare P.O. Package - Construction Cranes

P34120M77K 03 Prepare P.O. Package - Construction Cranes : Prepare Technical Bid Analysis 60 1.00 100% 0%

P34120M77K 04 Prepare P.O. Package - Construction Cranes : Update package documents for P.O. issue 20 1.00 100% 0%

P34120M77L Vendor Liaison - Construction Cranes

P34120M77L 05 Vendor Liaison - Construction Cranes : Vendor Liaison - Construction 80 1.00 100% 0%

P34120M77M Enquiry Package - Insulation

P34120M77M 01 Enquiry Package - Insulation : Insulation - Scope of Work Specification 20 1.00 100% 0%

P34120M77M 02 Enquiry Package - Insulation : Requisition 20 1.00 100% 0%

P34120M77N Prepare P.O. Package - Insulation

P34120M77N 03 Prepare P.O. Package - Insulation : Prepare Technical Bid Analysis 40 1.00 100% 0%

P34120M77N 04 Prepare P.O. Package - Insulation : Update package documents for P.O. issue 20 1.00 100% 0%

P34120M77O Vendor Liaison - Insulation

P34120M77O 05 Vendor Liaison - Insulation : Vendor Liaison - Construction 80 1.00 100% 0%

P34120M77P Enquiry Package - Painting

P34120M77P 01 Enquiry Package - Painting : Insulation - Scope of Work Specification 20 1.00 100% 0%

P34120M77P 02 Enquiry Package - Painting : Requisition 20 1.00 100% 0%

P34120M77R Prepare P.O. Package - Painting

P34120M77R 03 Prepare P.O. Package - Painting : Prepare Technical Bid Analysis 40 1.00 100% 0%

P34120M77R 04 Prepare P.O. Package - Painting : Update package documents for P.O. issue 20 1.00 100% 0%

P34120M77S Vendor Liaison - Painting

P34120M77S 05 Vendor Liaison - Painting : Vendor Liaison - Construction 80 1.00 100% 0%

P34120M850 Construction SupportP34120M850 01 Construction Support : Construction Support 50 1.00 50% 50%P34120M850 02 Construction Support : 1.00 50% 50%P34120M860 Inspection, Testing, Operator Training & Commissioning SupportP34120M860 01 Inspection, Testing, Operator Training & Commissioning Support : Precommissioning Check Sheets 10 1.00 100% 0%P34120M860 02 Inspection, Testing, Operator Training & Commissioning Support : Commissioning Check Sheets 10 1.00 100% 0%P34120M860 03 Inspection, Testing, Operator Training & Commissioning Support : Commissioning Procedures 40 1.00 100% 0%P34120M860 04 Inspection, Testing, Operator Training & Commissioning Support : Commissioning Hazard Review 20 1.00 100% 0%P34120M860 05 Inspection, Testing, Operator Training & Commissioning Support : Commissioning Support 10 1.00 100% 0%P34120M870 Design Reports / Job BooksP34120M870 01 Design Reports / Job Books : Job Books 60 1.00 100% 0%P34120M870 02 Design Reports / Job Books : Design Reports 1.00 100% 0%P34120M870 1.00 100% 0%P34120M900 Formal Operator TrainingP34120M900 01 Formal Operator Training : 1.00 100% 0%P34120M900 02 Formal Operator Training : 1.00 100% 0%P34120M950 As-BuildingP34120M950 01 As-Building : As-Building (Refer attached sheet for details) 1.00P34120M950 02 As-Building : Closeout 10 1.00 20% 80%P34120M950 1.00 100%

Page 27: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

As Built Staffhour EstimateOn Shore

This estimate is based on minimal changes to as built documents

Discipline Mechanical /Piping

Project drawings descriptions No Off

Isometrics Easy

Isometrics Moderate

Isometrics Hard

Piping plans

Piping Elevations

No Pieces of Equipment

P&ID's

FEC's

Project Drawing Schedules

Equipment Schedules

Vessels

Pumps and Compressors

As built activities

Description No. Drgs Hrs/Drg Total Hrs

Project Drawing schedule 0 2 0

Drawing sheet check 0 0.25 0

Electronic Critical drg check 0 0.33 0

Project Drg archive 0.17 0

Archive Electronic drg files 0 0.08 0

Raster burn Back=60% Total 0 0.08 0

Unused masterdrgs returned 0.08 0

Unused drg numbers returned 0.08 0

Unused Equip numbers returned 0.08 0

Unused Line numbers returned 0.08 0

Cd Verification against Drawing register 0.25 0

A3 wet signature hard copy 0 0.08 0

Request Drawings 0.5 0

As built Mark up review 0 0.03 0

P&ID's 0 2 0

FEC's 0 1.5 0

Isometrics Easy 0 1.5 0

Isometrics Moderate 0 3 0

Isometrics Hard 0 4 0

Equipment Location Drgs 0 0.2 0

Equipment Schedules 0 0.2 0

Equipment Schedules 0 2 0

Vessel Drawings 0 2 0

Pumps and Compressors 0 2 0

Sub total 0

Supervision2.5% 0

Total Hrs 0.0 Hours

Page 28: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Project Std Details 0 2 0

Static Earthing 0 1.5 0

Hazardous Area and Determination Drgs 0 5 0

Cathodic protection Drgs 0 2 0

Dist board summary Sht 0 1.5 0

Cable Schedules 0 2.5 0

Sub Total 0.0

Supervision 2.5% 0

Total Hrs 0.0 Hours

Page 29: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 29 of 73 04/17/2023

PIPING ENGINEERING / DESIGN - STAFFHOUR ESTIMATE PH4

Project No : 359/Y5066Title : Sulphur Dioxide Reduction Project

Workpack Ref. : Lo-Cat Licensed technologyDescription : Phase 3 cost estimate - Off plot - Lo-Cat process

EngineeringEngineering Design

Hrs HrsCat Hours 0 0

Rate 110.0 95.0

% Of Total #DIV/0! #DIV/0!

Total Hrs 0Total Cost $0

Rev Description Prepared By Reviewed By DateA Issued For Estimate

Notes on Using this Estimate Sheet

1 Activities (WBS Nos.) are included as prompts for guidance. It is not necessary to complete all categories.2 Additional activities may be added as required.3 Norms (Unit Hours) may be adjusted to suit project requirements.4 Generally L00 is to be used on proposals and small FEED projects.5 Electronic copy of this template is stored in the following directory - G:\Engineering_Intranet\Piping\Estimate_Sheets\6 Please advise the Engineering Manager of any additions, changes or adjustments required to norms or activities.

Notes on Using 'Insert New Row' button1 Position cursor in any cell - a new row will always be inserted below2 This function will also copy previous row fomulas and text to new row - please modify text accordingly

Notes on Using 'Delete Row' button1 Position cursor in a cell of the row you want to delete

Notes on Using 'View' & 'Hide' buttons1 Position cursor in a cell (or cells) that you want the '0' to be visible or not

Assumptions and Clarifications for this Estimate:

1 Project duration is XX weeks No. of Lines2 Iso. Factor 2.653 No. Equip. Items4 Duration (wks)5 Av. No. Staff #DIV/0!678 Est. Includes P&ID Issues:9 Issue Type : No. Off :10 Prelim. Review 111 HAZOP 112 Design 113 Squad Check 114 AFC 115

Activity ID Del.Cost Time & Resources Summary Engineering Design Total

(CTR) or Task

XX4120L000 Default - total is less than 200 hours (& Proposals)

XXX4120L100 General Coordination & Job Preparation

XX4120L110 Professional Dimensional Site Surveys

XX4120L200 Studies

Page 30: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 30 of 73 04/17/2023

XX4120L210 Piping Design Basis Preparation

XX4120L250 PFD / P&ID Mark-ups & Maintenance

XX4120L300 Engineering Calculations

XX4120L310 Pipe Stressing

XX4120L350 Specifications

XX4120L400 Schedules and Lists

XX4120L450 MTOs - Preliminary

XX4120L460 MTOs - Intermediate

XX4120L470 MTOs - Final

XX4120L500 PFDs / P&IDs - Drafting

XX4120L510 Plot Plans & Site Layouts

XX4120L520 Planning Studies & Conceptual Layouts

XX4120L530 3D CAD Modelling - Set-up & Input

XX4120L540 3D CAD Modelling - Check / Backdraft

XX4120L550 3D CAD Modelling - Finalise / Issue Iso. Package

XX4120L560 Drawings - Arrangements & Details

XX4120L570 Isometric Work - Non-3D CAD

XX4120L580 PipeSupports

XX4120L590 Pipe Heat Tracing

L60 Procurement - Piping Bulks

XX4120L0A1 Enquiry Package - Piping Bulks

XX4120L0A2 Prepare P.O. Package - Piping Bulks

XX4120L0B1 Enquiry Package - Piping Bulks- Contingencies

XX4120L0B2 Prepare P.O. Package - Piping Bulks - Contingencies

L61 Procurement - Valves

XX4120L1A1 Enquiry Package - Ball valves

XX4120L1A2 Prepare P.O. Package - Ball Valves

XX4120L1A3 Vendor Data Review - Ball Valves

XX4120L1B1 Enquiry Package - Gate Valves

XX4120L1B2 Prepare P.O. Package - Gate Valves

XX4120L1B3 Vendor Data Review - Gate Valves

XX4120L1C1 Enquiry Package - Globe Valves

XX4120L1C2 Prepare P.O. Package - Globe Valves

XX4120L1C3 Vendor Data Review - Globe Valves

XX4120L1D1 Enquiry Package - Check Valves

XX4120L1D2 Prepare P.O. Package - Check Valves

XX4120L1D3 Vendor Data Review - Check Valves

XX4120L1E1 Enquiry Package - Plug Valves

XX4120L1E2 Prepare P.O. Package - Plug Valves

XX4120L1E3 Vendor Data Review - Plug Valves

XX4120L1F1 Enquiry Package - Butterfly Valves

XX4120L1F2 Prepare P.O. Package - Butterfly Valves

XX4120L1F3 Vendor Data Review - Butterfly Valves

L62 Procurement - SP Items

XX4120L2A1 Enquiry Package - Strainers (in-line)

XX4120L2A2 Prepare P.O. Package - Strainers (in-line)

XX4120L2A3 Vendor Data Review - Strainers (in-line)

XX4120L2B1 Enquiry Package - Strainers (temporary)

XX4120L2B2 Prepare P.O. Package - Strainers (temporary)

XX4120L2B3 Vendor Data Review - Strainers (temporary)

XX4120L2C1 Enquiry Package - Steam Traps

XX4120L2C2 Prepare P.O. Package - Steam Traps

XX4120L2C3 Vendor Data Review - Steam Traps

XX4120L2D1 Enquiry Package - Flexible Hoses

XX4120L2D2 Prepare P.O. Package - Flexible Hoses

XX4120L2D3 Vendor Data Review - Flexible Hoses

XX4120L2E1 Enquiry Package - Special Purpose Hoses

XX4120L2E2 Prepare P.O. Package - Special Purpose Hoses

XX4120L2E3 Vendor Data Review - Special Purpose Hoses

XX4120L2F1 Enquiry Package - Expansion Joints

XX4120L2F2 Prepare P.O. Package - Expansion Joints

XX4120L2F3 Vendor Data Review - Expansion Joints

XX4120L2G1 Enquiry Package - Static Mixer

XX4120L2G2 Prepare P.O. Package - Static Mixer

XX4120L2G3 Vendor Data Review - Static Mixer

XX4120L2H1 Enquiry Package - Jet Mixing Eductor

XX4120L2H2 Prepare P.O. Package - Jet Mixing Eductor

XX4120L2H3 Vendor Data Review - Jet Mixing Eductor

Page 31: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 31 of 73 04/17/2023

XX4120L2J1 Enquiry Package - Air Eliminator

XX4120L2J2 Prepare P.O. Package - Air Eliminator

XX4120L2J3 Vendor Data Review - Air Eliminator

XX4120L2K1 Enquiry Package - Loading Arm

XX4120L2K2 Prepare P.O. Package - Loading Arm

XX4120L2K3 Vendor Data Review - Loading Arm

XX4120L2L1 Enquiry Package - Vent Noise Attenuator

XX4120L2L2 Prepare P.O. Package - Vent Noise Attenuator

XX4120L2L3 Vendor Data Review - Vent Noise Attenuator

XX4120L2M1 Enquiry Package - Hose Couplings

XX4120L2M2 Prepare P.O. Package - Hose Couplings

XX4120L2M3 Vendor Data Review - Hose Couplings

XX4120L2N1 Enquiry Package - Safety Showers

XX4120L2N2 Prepare P.O. Package - Safety Showers

XX4120L2N3 Vendor Data Review - Safety Showers

XX4120L2P1 Enquiry Package - Insulation Gaskets

XX4120L2P2 Prepare P.O. Package - Insulation Gaskets

XX4120L2P3 Vendor Data Review - Insulation Gaskets

XX4120L2R1 Enquiry Package - Special Pipe / Fittings / Flanges

XX4120L2R2 Prepare P.O. Package - Special Pipe / Fittings / Flanges

XX4120L2R3 Vendor Data Review - Special Pipe / Fittings / Flanges

L63 Procurement - Pipe Supports

XX4120L3A1 Enquiry Package - Pipe Supports

XX4120L3A2 Prepare P.O. Package - Pipe Supports

XX4120L3A3 Vendor Data Review - Pipe Supports

L75 Subcontracts - Engineering / Specialists

XX4120L75A Enquiry Package - Eng. / Specialist Services

XX4120L75B Prepare P.O. Package - Eng. / Specialist Services

XX4120L75C Vendor Liaison - Eng. / Specialist Services

L76 Subcontracts - Fabrication

XX4120L76A Enquiry Package - Fabrication

XX4120L76B Prepare P.O. Package - Fabrication

XX4120L76C Vendor Liaison - Fabrication

L77 Subcontracts - Construction

XX4120L77A Enquiry Package - Construction

XX4120L77B Prepare P.O. Package - Construction

XX4120L77C Vendor Liaison - Construction

XX4120L850 Construction Support

XX4120L860

XX4120L870 Design Reports / Job Books

XX4120L900 Formal Operator Training

XX4120L950 As-Building

TOTAL

Inspection, Testing, Operator Training & Commissioning Support

Page 32: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: PIPING

Page 32 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

P34120L000 Default - total is less than 200 hoursP34120L000 4L00-01A 1.00 50% 50%P34120L000 4L00-02A 1.00 50% 50%P34120L000 4L00-03A 1.00 50% 50%P34120L000 4L00-04A 1.00 50% 50%

Sub Totals

Activity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

P34120L100 General Coordination & Job PreparationP34120L100 4L10-01A General Coordination & Job Preparation : Meetings & Reports - Weekly 6 1.00 75% 25%P34120L100 4L10-02A General Coordination & Job Preparation : Supervision - Engineering (10%) 1.00 100% 0%P34120L100 4L10-03A General Coordination & Job Preparation : Supervision - Design (10%) 1.00 100%P34120L100 4L10-04A General Coordination & Job Preparation : Site Visits - Engineers 10 1.00 100% 0%P34120L100 4L10-05A General Coordination & Job Preparation : Site Visits - Designers 10 1.00 100%P34120L100 4L10-06A General Coordination & Job Preparation : Travel Time To / From Site 10 1.00 50% 50%P34120L100 4L10-07A General Coordination & Job Preparation : HAZOP Attendance 8 1.00 100% 0%P34120L100 4L10-08A General Coordination & Job Preparation : Inter-discipline Squad Checks 2 1.00 25% 75%P34120L100 4L10-09A General Coordination & Job Preparation : Construction Review Meetings 4 1.00 50% 50%P34120L100 4L10-10A General Coordination & Job Preparation : Data Acquisition / Project Data Review 10 1.00 50% 50%P34120L100 4L10-11A General Coordination & Job Preparation : Package Compilation 10 1.00 50% 50%P34120L110 Professional Dimensional Site SurveysP34120L110 4L10-21A Professional Dimensional Site Surveys : Site Surveys 20 1.00 100% 0%P34120L110 4L10-22A Professional Dimensional Site Surveys : Laser Scanning Site Surveys 20 1.00 100% 0%P34120L200 Studies

Design Basis / Philosophy InputP34120L200 4L20-01A Studies Design Basis / Philosophy Input : Design Criteria 10 1.00 100% 0%P34120L200 4L20-02A Studies Design Basis / Philosophy Input : Project Design Basis 10 1.00 100% 0%P34120L200 4L20-03A Studies Design Basis / Philosophy Input : Project Execution Plan 10 1.00 80% 20%P34120L200 4L20-04A Studies Design Basis / Philosophy Input : Construction Philosophy 10 1.00 80% 20%P34120L200 4L20-05A Studies Design Basis / Philosophy Input : Installation Philosophy 10 1.00 100% 0%P34120L200 4L20-06A Studies Design Basis / Philosophy Input : Commissioning Philosophy 10 1.00 100% 0%P34120L200 4L20-07A Studies Design Basis / Philosophy Input : Operation Philosophy 10 1.00 100% 0%P34120L200 4L20-08A Studies Design Basis / Philosophy Input : HAZOP Report 40 1.00 100% 0%P34120L200 4L20-09A Studies Design Basis / Philosophy Input : HAZOP Actions 10 1.00 100% 0%P34120L210 Piping Design Basis PreparationP34120L210 4L20-21A Studies Piping Design Basis Preparation : Customise Piping Design Criteria, Design Guide & Job Book 20 1.00 100%P34120L210 4L20-22A Studies Piping Design Basis Preparation : Customise Std & Tab Pipe Support Detail Package 20 1.00 100%P34120L210 4L20-23A Studies Piping Design Basis Preparation : Customise Planning Study Procedure 10 1.00 100%P34120L210 4L20-24A Studies Piping Design Basis Preparation : Customise Construction View Procedure 10 1.00 100%P34120L210 4L20-25A Studies Piping Design Basis Preparation : Customise 3D CAD / Isometrics Input Procedure 10 1.00 100%P34120L210 4L20-26A Studies Piping Design Basis Preparation : Customise Pipe Tracing Design Criteria 10 1.00 50% 50%P34120L250 PFD / P&ID Mark-ups & MaintenanceP34120L250 4L25-01A PFD / P&ID Mark-ups & Maintenance : PFD / UFD (Master) Preparation & Maintenance 10 1.00 10% 90%P34120L250 4L25-02A PFD / P&ID Mark-ups & Maintenance : P&ID / U&ID (Master) Preparation & Maintenance 10 1.00 10% 90%P34120L250 4L25-03A PFD / P&ID Mark-ups & Maintenance : Demolition (Master) P&ID's / U&ID's Prep. & Maintenance 10 1.00 10% 90%P34120L250 4L25-04A PFD / P&ID Mark-ups & Maintenance : P&ID Legend Sheets (Master) Preparation & Maintenance 10 1.00 10% 90%P34120L250 4L25-05A 1.00 0% 100%

No. of Cycles Allowed (from front sheet) : 5P34120L300 Engineering CalculationsP34120L300 4L30-01A Engineering Calculations : Hydraulic Analysis & Sizing 20 1.00 100% 0%P34120L300 4L30-02A Engineering Calculations : Reaction Force Analysis 20 1.00 100% 0%P34120L300 4L30-03A Engineering Calculations : Nozzle Specification 10 1.00 100% 0%P34120L300 4L30-04A Engineering Calculations : Pump Calculations 20 1.00 100% 0%P34120L300 4L30-05A Engineering Calculations : Line Sizing Calculations 5 1.00 100% 0%P34120L300 4L30-06A Engineering Calculations : Hot Tap Calculations 20 1.00 100% 0%P34120L300 4L30-07A Engineering Calculations : Pipe Wall Thickness Calculations 5 1.00 100% 0%P34120L300 4L30-08A Engineering Calculations : Simple Water Hammer - snap shut valve 8 1.00 100% 0%P34120L300 4L30-09A Engineering Calculations : Insulation Calculations - Piping 8 1.00 100% 0%P34120L300 4L30-10A Engineering Calculations : Non-std Pipe Support Selection Calculations 12 1.00 100% 0%P34120L310 Pipe StressingP34120L310 4L30-21A Pipe Stressing : Planning Study Support Review 5 1.00 100% 0%P34120L310 4L30-22A Pipe Stressing : Pipe Rack Loop Identification 3 1.00 100% 0%P34120L310 4L30-23A Pipe Stressing : Piping Stress Isometrics 4 1.00 25% 75%P34120L310 4L30-24A Pipe Stressing : Category A Detailed Analysis (high temp per line) 24 1.00 100% 0%P34120L310 4L30-25A Pipe Stressing : Category B Detailed Analysis (pumps per line) 16 1.00 100% 0%P34120L310 4L30-26A Pipe Stressing : Category C Detailed Analysis (general per line) 6 1.00 100% 0%P34120L310 4L30-27A Pipe Stressing : Isometric Review A/B/C Lines (per iso) 0.25 1.00 100% 0%P34120L310 4L30-28A Pipe Stressing : Isometric Review Non Analysed Lines (per iso) 0.15 1.00 100% 0%P34120L310 4L30-29A Pipe Stressing : Piping Dynamic Analysis (per system) 40 1.00 100% 0%P34120L310 4L30-30A Pipe Stressing : Compressor Analog Study (per system) 40 1.00 100% 0%P34120L310 4L30-31A Pipe Stressing : Compile Stress Calculations 2 1.00 100% 0%P34120L310 4L30-32A 1.00 100% 0%P34120L350 SpecificationsP34120L350 4L35-01A Specifications : Piping Material Specification Creation New 30 1.00 100% 0%P34120L350 4L35-02A Specifications : Pipe Material Spec Modification To Existing 10 1.00 100% 0%P34120L350 4L35-03A Specifications : Valve Data Sheet Creation 3 1.00 100% 0%P34120L350 4L35-04A Specifications : Pipe Material Size Dependant Table Generation Per Spec. 13 1.00 100% 0%P34120L350 4L35-05A Specifications : Project Standard Specifications 10 1.00 100% 0%P34120L350 4L35-06A Specifications : Weight Tables 13 1.00 100% 0%P34120L400 Schedules and ListsP34120L400 4L40-01A Schedules and Lists : Document Register (per document) 10 1.00 100%P34120L400 4L40-02A Schedules and Lists : Line Designation List (per line) 0.5 1.00 10% 90%P34120L400 4L40-03A Schedules and Lists : Critical Line List - Stress & Criticality Categorisation 0.1 1.00 75% 25%P34120L400 4L40-04A Schedules and Lists : Tie-in Schedule (per tie-in ) 0.5 1.00 10% 90%P34120L400 4L40-05A Schedules and Lists : Pipe Testing Schedule 0.5 1.00 100%P34120L400 4L40-06A Schedules and Lists : Safety Equipment List (per item) 1 1.00 100%P34120L400 4L40-07A Schedules and Lists : Speciality Piping Items List (per item) 0.5 1.00 80% 20%P34120L400 4L40-08A Schedules and Lists : Demolition Schedule 0.5 1.00 100%P34120L450 MTOs - PreliminaryP34120L450 4L45-01A MTOs - Preliminary : Count Preliminary MTO (per line) 0 0.75 1.00 100%P34120L450 4L45-02A MTOs - Preliminary : Input Preliminary Bulk MTO (per line) 0 0.1 1.00 100%P34120L460 MTOs - IntermediateP34120L460 4L45-11A MTOs - Intermediate : Count Intermediate MTO (per line) 0 0.75 1.00 100%P34120L460 4L45-12A MTOs - Intermediate : Input Intermediate Bulk MTO (per line) 0 0.1 1.00 100%P34120L470 MTOs - FinalP34120L470 4L45-21A MTOs - Final : Count Final MTO (per line) 0 0.75 1.00 100%P34120L470 4L45-22A MTOs - Final : Input Final Bulk MTO (per line) 0 0.1 1.00 100%P34120L500 PFDs / P&IDs - DraftingP34120L500 4L50-01A PFDs / P&IDs - Drafting : PFD's - New 8 1.00 100%P34120L500 4L50-03A PFDs / P&IDs - Drafting : P&ID / U&ID - New 8 1.00 100%P34120L500 4L50-04A PFDs / P&IDs - Drafting : PFD's - Existing 2 1.00 100%P34120L500 4L50-05A PFDs / P&IDs - Drafting : P&ID / U&ID - Existing 4 1.00 100%P34120L500 4L50-06A PFDs / P&IDs - Drafting : P&ID Legend Sheets 10 1.00 100%P34120L500 4L50-07A PFDs / P&IDs - Drafting : Revision Updates 0 2 1.00 100%

Number of Cycles : 5 100%P34120L510 Plot Plans & Site LayoutsP34120L510 4L51-01A Plot Plans & Site Layouts : Overall Site Plan 150 1.00 10% 90%P34120L510 4L51-02A Plot Plans & Site Layouts : Plot Plans ( Break Up Of Site Plan ) 40 1.00 10% 90%P34120L510 4L51-03A Plot Plans & Site Layouts : Plot Plan Elevations 20 1.00 100%P34120L510 4L51-04A Plot Plans & Site Layouts : Equipment Location Plans 60 1.00 10% 90%

Split Eng/Design

Split Eng/Design

Page 33: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: PIPING

Page 33 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34120L510 4L51-05A Plot Plans & Site Layouts : Equipment Location Elevations 50 1.00 100%P34120L510 4L51-06A Plot Plans & Site Layouts : Jacket Interface Drawing 50 1.00 100%P34120L510 4L51-07A Plot Plans & Site Layouts : Escape Route Drawings 25 1.00 100%P34120L510 4L51-08A Plot Plans & Site Layouts : Safety Equipment Plan 15 1.00 100%P34120L510 4L51-09A Plot Plans & Site Layouts : Utility Location Plan 10 1.00 100%P34120L510 4L51-10A Plot Plans & Site Layouts : Tie-in Location Plan 20 1.00 100%P34120L520 Planning Studies & Conceptual LayoutsP34120L520 4L52-01A Planning Studies & Conceptual Layouts : Piping Transposition (Overall Pipe Routing Diagram) 20 1.00 100%P34120L520 4L52-02A Planning Studies & Conceptual Layouts : Key Plan of Planning Studies 10 1.00 100%P34120L520 4L52-03A Planning Studies & Conceptual Layouts : Planning Studies Simple 40 1.00 5% 95%P34120L520 4L52-04A Planning Studies & Conceptual Layouts : Planning Studies Average 80 1.00 5% 95%P34120L520 4L52-05A Planning Studies & Conceptual Layouts : Planning Studies Complex 120 1.00 5% 95%P34120L520 4L52-06A Planning Studies & Conceptual Layouts : Manual Handling Studies 40 1.00 5% 95%P34120L520 4L52-07A Planning Studies & Conceptual Layouts : Fire Protection Layouts 40 1.00 5% 95%P34120L530 3D CAD Modelling - Set-up & InputP34120L530 4L53-01A 3D CAD Modelling - Set-up & Input : Project Establishment in PDS 20 1.00 100%P34120L530 4L53-02A 3D CAD Modelling - Set-up & Input : Key Plan Of 3D CAD Models 10 1.00 100%P34120L530 4L53-03A 3D CAD Modelling - Set-up & Input : Create Models 0.25 1.00 100%P34120L530 4L53-04A 3D CAD Modelling - Set-up & Input : Pipe Spec Input To PDS 10 1.00 100%P34120L530 4L53-05A 3D CAD Modelling - Set-up & Input : New Spec Geometry Input To PDS 20 1.00 100%P34120L530 4L53-06A 3D CAD Modelling - Set-up & Input : Collate SP Item Dimensions for CAD Input (per item) 0.3 1.00 100%P34120L530 4L53-07A 3D CAD Modelling - Set-up & Input : Collate Inline Instruments for CAD Input (per item) 0.3 1.00 100%P34120L530 4L53-08A 3D CAD Modelling - Set-up & Input : Isometric Input To PDS 0 3 1.00 100%P34120L530 4L53-09A 3D CAD Modelling - Set-up & Input : Construct Equipment Models 4 1.00 100%P34120L530 4L53-10A 3D CAD Modelling - Set-up & Input : Construct Steel Models 20 1.00 100%P34120L530 4L53-11A 3D CAD Modelling - Set-up & Input : Equipment Training 10 1.00 100%P34120L530 4L53-12A 3D CAD Modelling - Set-up & Input : Piping Training 80 1.00 100%P34120L530 4L53-13A 3D CAD Modelling - Set-up & Input : Steelwork Training 30 1.00 100%P34120L530 4L53-14A 3D CAD Modelling - Set-up & Input : Drawing Manager Training 10 1.00 100%P34120L530 4L53-15A 3D CAD Modelling - Set-up & Input : 3D CAD System Administration Support ( Per Week ) 10 1.00 100%P34120L530 4L53-16A 3D CAD Modelling - Set-up & Input : Reporting From PDS 2 1.00 100%P34120L540 3D CAD Modelling - Check / BackdraftP34120L540 4L53-21A 3D CAD Modelling - Check / Backdraft : Isometric Back Modelling 0 1 1.00 100%P34120L540 4L53-22A 3D CAD Modelling - Check / Backdraft : Check Equipment Models 2 1.00 100%P34120L540 4L53-23A 3D CAD Modelling - Check / Backdraft : Check Steelwork Models 10 1.00 100%P34120L540 4L53-24A 3D CAD Modelling - Check / Backdraft : Clash Checking 30 1.00 100%P34120L540 4L53-25A 3D CAD Modelling - Check / Backdraft : Interface Checking 20 1.00 100%P34120L550 3D CAD Modelling - Finalise / Issue Iso. PackageP34120L550 4L53-31A 3D CAD Modelling - Finalise / Issue Iso. Package : Finalise and issue package 2 1.00 100%P34120L560 Drawings - Arrangements & DetailsP34120L560 4L54-01A Drawings - Arrangements & Details : 3D CAD Piping Plans Simple 8 1.00 100%P34120L560 4L54-02A Drawings - Arrangements & Details : 3D CAD Piping Plans Average 15 1.00 100%P34120L560 4L54-03A Drawings - Arrangements & Details : 3D CAD Piping Plans Complex 20 1.00 100%P34120L560 4L54-04A Drawings - Arrangements & Details : 3D CAD Elevations Simple 5 1.00 100%P34120L560 4L54-05A Drawings - Arrangements & Details : 3D CAD Elevations Average 10 1.00 100%P34120L560 4L54-06A Drawings - Arrangements & Details : 3D CAD Elevations Complex 15 1.00 100%P34120L560 4L54-07A Drawings - Arrangements & Details : 3D CAD Isometric Views 4 1.00 100%P34120L560 4L54-08A Drawings - Arrangements & Details : Manual Revamp Piping Plans 40 1.00 100%P34120L560 4L54-09A Drawings - Arrangements & Details : Manual Revamp Piping Elevations 20 1.00 100%P34120L560 4L54-10A Drawings - Arrangements & Details : Demolition Piping Plans / Elevations 12 1.00 100%P34120L560 4L54-11A Drawings - Arrangements & Details : Mechanical Detail Drawings 30 1.00 100%P34120L570 Isometric Work - Non-3D CADP34120L570 4L55-01A Isometric Work - Non-3D CAD : Hydraulic Hand Sketch Isometrics 4 1.00 100%P34120L570 4L55-02A Isometric Work - Non-3D CAD : AutoCad Isometrics Inc BOM 5 1.00 100%P34120L570 4L55-03A Isometric Work - Non-3D CAD : AutoCad Isometric Backdrafting 1 1.00 100%P34120L570 4L55-04A Isometric Work - Non-3D CAD : Isometric Checking (AutoCad & PDS) 0 2 1.00 100%P34120L570 4L55-05A Isometric Work - Non-3D CAD : Isometric Site Checking & Review 1 1.00 100%P34120L570 4L55-06A Isometric Work - Non-3D CAD : Isometric Point to Point Check On P&ID's 0 0.1 1.00 100%P34120L580 PipeSupportsP34120L580 4L56-01A PipeSupports : Pipe Support Package Compilation For Issue 10 1.00 100%P34120L580 4L56-02A PipeSupports : Pipe Support Special Details (per detail) 5 1.00 25% 75%P34120L590 Pipe Heat TracingP34120L590 4L56-11A Pipe Heat Tracing : Pipe Trace Heating Schedule (per line) 0.5 1.00 100%P34120L590 4L56-12A Pipe Heat Tracing : Pipe Trace Arrangements 30 1.00 10% 90%P34120L590 4L56-13A Pipe Heat Tracing : Pipe Trace Isometric Drafting 2 1.00 100%P34120L590 4L56-14A Pipe Heat Tracing : Pipe Trace Isometrics Checking 1 1.00 100%P34120L590 4L56-15A 100%

L60 Procurement - Piping BulksP34120L0A1 Enquiry Package - Piping BulksP34120L0A1 XX4120L0-01AEnquiry Package - Piping Bulks : Requisition 10 1.00 100% 0%P34120L0A2 Prepare P.O. Package - Piping BulksP34120L0A2 XX4120L0-02APrepare P.O. Package - Piping Bulks : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L0A2 XX4120L0-03APrepare P.O. Package - Piping Bulks : Update package documents for P.O. issue 10 1.00 100% 0%P34120L0B1 Enquiry Package - Piping Bulks- ContingenciesP34120L0B1 XX4120L0-11AEnquiry Package - Piping Bulks- Contingencies : Requisition 10 1.00 100% 0%P34120L0B2 Prepare P.O. Package - Piping Bulks - ContingenciesP34120L0B2 XX4120L0-12APrepare P.O. Package - Piping Bulks - Contingencies : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L0B2 XX4120L0-13APrepare P.O. Package - Piping Bulks - Contingencies : Update package documents for P.O. issue 10 1.00 100% 0%

L61 Procurement - ValvesP34120L1A1 Enquiry Package - Ball valvesP34120L1A1 XX4120L1-01AEnquiry Package - Ball valves : Data Sheet 3 1.00 100% 0%P34120L1A1 XX4120L1-02AEnquiry Package - Ball valves : Requisition 10 1.00 100% 0%P34120L1A2 Prepare P.O. Package - Ball ValvesP34120L1A2 XX4120L1-03APrepare P.O. Package - Ball Valves : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L1A2 XX4120L1-04APrepare P.O. Package - Ball Valves : Update package documents for P.O. issue 10 1.00 100% 0%P34120L1A3 Vendor Data Review - Ball ValvesP34120L1A3 XX4120L1-05AVendor Data Review - Ball Valves : Vendor Data Review 20 1.00 80% 20%P34120L1B1 Enquiry Package - Gate ValvesP34120L1B1 XX4120L1-06AEnquiry Package - Gate Valves : Data Sheet 3 1.00 100% 0%P34120L1B1 XX4120L1-07AEnquiry Package - Gate Valves : Requisition 10 1.00 100% 0%P34120L1B2 Prepare P.O. Package - Gate ValvesP34120L1B2 XX4120L1-08APrepare P.O. Package - Gate Valves : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L1B2 XX4120L1-09APrepare P.O. Package - Gate Valves : Update package documents for P.O. issue 10 1.00 100% 0%P34120L1B3 Vendor Data Review - Gate ValvesP34120L1B3 XX4120L1-10AVendor Data Review - Gate Valves : Vendor Data Review 20 1.00 80% 20%P34120L1C1 Enquiry Package - Globe ValvesP34120L1C1 XX4120L1-11AEnquiry Package - Globe Valves : Data Sheet 3 1.00 100% 0%P34120L1C1 XX4120L1-12AEnquiry Package - Globe Valves : Requisition 10 1.00 100% 0%P34120L1C2 Prepare P.O. Package - Globe ValvesP34120L1C2 XX4120L1-13APrepare P.O. Package - Globe Valves : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L1C2 XX4120L1-14APrepare P.O. Package - Globe Valves : Update package documents for P.O. issue 10 1.00 100% 0%P34120L1C3 Vendor Data Review - Globe ValvesP34120L1C3 XX4120L1-15AVendor Data Review - Globe Valves : Vendor Data Review 20 1.00 80% 20%P34120L1D1 Enquiry Package - Check ValvesP34120L1D1 XX4120L1-16AEnquiry Package - Check Valves : Data Sheet 3 1.00 100% 0%P34120L1D1 XX4120L1-17AEnquiry Package - Check Valves : Requisition 10 1.00 100% 0%P34120L1D2 Prepare P.O. Package - Check ValvesP34120L1D2 XX4120L1-18APrepare P.O. Package - Check Valves : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L1D2 XX4120L1-19APrepare P.O. Package - Check Valves : Update package documents for P.O. issue 10 1.00 100% 0%P34120L1D3 Vendor Data Review - Check ValvesP34120L1D3 XX4120L1-20AVendor Data Review - Check Valves : Vendor Data Review 20 1.00 80% 20%P34120L1E1 Enquiry Package - Plug Valves

Page 34: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: PIPING

Page 34 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34120L1E1 XX4120L1-21AEnquiry Package - Plug Valves : Data Sheet 3 1.00 100% 0%P34120L1E1 XX4120L1-22AEnquiry Package - Plug Valves : Requisition 10 1.00 100% 0%P34120L1E2 Prepare P.O. Package - Plug ValvesP34120L1E2 XX4120L1-23APrepare P.O. Package - Plug Valves : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L1E2 XX4120L1-24APrepare P.O. Package - Plug Valves : Update package documents for P.O. issue 10 1.00 100% 0%P34120L1E3 Vendor Data Review - Plug ValvesP34120L1E3 XX4120L1-25AVendor Data Review - Plug Valves : Vendor Data Review 20 1.00 80% 20%P34120L1F1 Enquiry Package - Butterfly ValvesP34120L1F1 XX4120L1-26AEnquiry Package - Butterfly Valves : Data Sheet 3 1.00 100% 0%P34120L1F1 XX4120L1-27AEnquiry Package - Butterfly Valves : Requisition 10 1.00 100% 0%P34120L1F2 Prepare P.O. Package - Butterfly ValvesP34120L1F2 XX4120L1-28APrepare P.O. Package - Butterfly Valves : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L1F2 XX4120L1-29APrepare P.O. Package - Butterfly Valves : Update package documents for P.O. issue 10 1.00 100% 0%P34120L1F3 Vendor Data Review - Butterfly ValvesP34120L1F3 XX4120L1-30AVendor Data Review - Butterfly Valves : Vendor Data Review 20 1.00 80% 20%

L62 Procurement - SP ItemsP34120L2A1 Enquiry Package - Strainers (in-line)P34120L2A1 XX4120L2-01AEnquiry Package - Strainers (in-line) : Data Sheet 3 1.00 100% 0%P34120L2A1 XX4120L2-02AEnquiry Package - Strainers (in-line) : Requisition 10 1.00 100% 0%P34120L2A2 Prepare P.O. Package - Strainers (in-line)P34120L2A2 XX4120L2-03APrepare P.O. Package - Strainers (in-line) : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2A2 XX4120L2-04APrepare P.O. Package - Strainers (in-line) : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2A3 Vendor Data Review - Strainers (in-line)P34120L2A3 XX4120L2-05AVendor Data Review - Strainers (in-line) : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2B1 Enquiry Package - Strainers (temporary)P34120L2B1 XX4120L2-06AEnquiry Package - Strainers (temporary) : Data Sheet 3 1.00 100% 0%P34120L2B1 XX4120L2-07AEnquiry Package - Strainers (temporary) : Requisition 10 1.00 100% 0%P34120L2B2 Prepare P.O. Package - Strainers (temporary)P34120L2B2 XX4120L2-08APrepare P.O. Package - Strainers (temporary) : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2B2 XX4120L2-09APrepare P.O. Package - Strainers (temporary) : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2B3 Vendor Data Review - Strainers (temporary)P34120L2B3 XX4120L2-10AVendor Data Review - Strainers (temporary) : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2C1 Enquiry Package - Steam TrapsP34120L2C1 XX4120L2-11AEnquiry Package - Steam Traps : Data Sheet 3 1.00 100% 0%P34120L2C1 XX4120L2-12AEnquiry Package - Steam Traps : Requisition 10 1.00 100% 0%P34120L2C2 Prepare P.O. Package - Steam TrapsP34120L2C2 XX4120L2-13APrepare P.O. Package - Steam Traps : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2C2 XX4120L2-14APrepare P.O. Package - Steam Traps : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2C3 Vendor Data Review - Steam TrapsP34120L2C3 XX4120L2-15AVendor Data Review - Steam Traps : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2D1 Enquiry Package - Flexible HosesP34120L2D1 XX4120L2-16AEnquiry Package - Flexible Hoses : Data Sheet 3 1.00 100% 0%P34120L2D1 XX4120L2-17AEnquiry Package - Flexible Hoses : Requisition 10 1.00 100% 0%P34120L2D2 Prepare P.O. Package - Flexible HosesP34120L2D2 XX4120L2-18APrepare P.O. Package - Flexible Hoses : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2D2 XX4120L2-19APrepare P.O. Package - Flexible Hoses : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2D3 Vendor Data Review - Flexible HosesP34120L2D3 XX4120L2-20AVendor Data Review - Flexible Hoses : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2E1 Enquiry Package - Special Purpose HosesP34120L2E1 XX4120L2-21AEnquiry Package - Special Purpose Hoses : Data Sheet 3 1.00 100% 0%P34120L2E1 XX4120L2-22AEnquiry Package - Special Purpose Hoses : Requisition 10 1.00 100% 0%P34120L2E2 Prepare P.O. Package - Special Purpose HosesP34120L2E2 XX4120L2-23APrepare P.O. Package - Special Purpose Hoses : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2E2 XX4120L2-24APrepare P.O. Package - Special Purpose Hoses : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2E3 Vendor Data Review - Special Purpose HosesP34120L2E3 XX4120L2-25AVendor Data Review - Special Purpose Hoses : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2F1 Enquiry Package - Expansion JointsP34120L2F1 XX4120L2-26AEnquiry Package - Expansion Joints : Data Sheet 3 1.00 100% 0%P34120L2F1 XX4120L2-27AEnquiry Package - Expansion Joints : Requisition 10 1.00 100% 0%P34120L2F2 Prepare P.O. Package - Expansion JointsP34120L2F2 XX4120L2-28APrepare P.O. Package - Expansion Joints : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2F2 XX4120L2-29APrepare P.O. Package - Expansion Joints : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2F3 Vendor Data Review - Expansion JointsP34120L2F3 XX4120L2-30AVendor Data Review - Expansion Joints : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2G1 Enquiry Package - Static MixerP34120L2G1 XX4120L2-31AEnquiry Package - Static Mixer : Data Sheet 3 1.00 100% 0%P34120L2G1 XX4120L2-32AEnquiry Package - Static Mixer : Requisition 10 1.00 100% 0%P34120L2G2 Prepare P.O. Package - Static MixerP34120L2G2 XX4120L2-33APrepare P.O. Package - Static Mixer : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2G2 XX4120L2-34APrepare P.O. Package - Static Mixer : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2G3 Vendor Data Review - Static MixerP34120L2G3 XX4120L2-35AVendor Data Review - Static Mixer : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2H1 Enquiry Package - Jet Mixing EductorP34120L2H1 XX4120L2-36AEnquiry Package - Jet Mixing Eductor : Data Sheet 3 1.00 100% 0%P34120L2H1 XX4120L2-37AEnquiry Package - Jet Mixing Eductor : Requisition 10 1.00 100% 0%P34120L2H2 Prepare P.O. Package - Jet Mixing EductorP34120L2H2 XX4120L2-38APrepare P.O. Package - Jet Mixing Eductor : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2H2 XX4120L2-39APrepare P.O. Package - Jet Mixing Eductor : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2H3 Vendor Data Review - Jet Mixing EductorP34120L2H3 XX4120L2-40AVendor Data Review - Jet Mixing Eductor : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2J1 Enquiry Package - Air EliminatorP34120L2J1 XX4120L2-41AEnquiry Package - Air Eliminator : Data Sheet 3 1.00 100% 0%P34120L2J1 XX4120L2-42AEnquiry Package - Air Eliminator : Requisition 10 1.00 100% 0%P34120L2J2 Prepare P.O. Package - Air EliminatorP34120L2J2 XX4120L2-43APrepare P.O. Package - Air Eliminator : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2J2 XX4120L2-44APrepare P.O. Package - Air Eliminator : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2J3 Vendor Data Review - Air EliminatorP34120L2J3 XX4120L2-45AVendor Data Review - Air Eliminator : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2K1 Enquiry Package - Loading ArmP34120L2K1 XX4120L2-46AEnquiry Package - Loading Arm : Data Sheet 3 1.00 100% 0%P34120L2K1 XX4120L2-47AEnquiry Package - Loading Arm : Requisition 10 1.00 100% 0%P34120L2K2 Prepare P.O. Package - Loading ArmP34120L2K2 XX4120L2-48APrepare P.O. Package - Loading Arm : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2K2 XX4120L2-49APrepare P.O. Package - Loading Arm : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2K3 Vendor Data Review - Loading ArmP34120L2K3 XX4120L2-50AVendor Data Review - Loading Arm : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2L1 Enquiry Package - Vent Noise AttenuatorP34120L2L1 XX4120L2-51AEnquiry Package - Vent Noise Attenuator : Data Sheet 3 1.00 100% 0%P34120L2L1 XX4120L2-52AEnquiry Package - Vent Noise Attenuator : Requisition 10 1.00 100% 0%P34120L2L2 Prepare P.O. Package - Vent Noise AttenuatorP34120L2L2 XX4120L2-53APrepare P.O. Package - Vent Noise Attenuator : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2L2 XX4120L2-54APrepare P.O. Package - Vent Noise Attenuator : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2L3 Vendor Data Review - Vent Noise AttenuatorP34120L2L3 XX4120L2-55AVendor Data Review - Vent Noise Attenuator : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2M1 Enquiry Package - Hose CouplingsP34120L2M1 XX4120L2-56AEnquiry Package - Hose Couplings : Data Sheet 3 1.00 100% 0%P34120L2M1 XX4120L2-57AEnquiry Package - Hose Couplings : Requisition 10 1.00 100% 0%P34120L2M2 Prepare P.O. Package - Hose CouplingsP34120L2M2 XX4120L2-58APrepare P.O. Package - Hose Couplings : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2M2 XX4120L2-59APrepare P.O. Package - Hose Couplings : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2M3 Vendor Data Review - Hose CouplingsP34120L2M3 XX4120L2-60AVendor Data Review - Hose Couplings : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2N1 Enquiry Package - Safety Showers

Page 35: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: PIPING

Page 35 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34120L2N1 XX4120L2-61AEnquiry Package - Safety Showers : Data Sheet 3 1.00 100% 0%P34120L2N1A XX4120L2-62AEnquiry Package - Safety Showers : Requisition 10 1.00 100% 0%P34120L2N2 Prepare P.O. Package - Safety ShowersP34120L2N2 XX4120L2-63APrepare P.O. Package - Safety Showers : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2N2 XX4120L2-64APrepare P.O. Package - Safety Showers : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2N3 Vendor Data Review - Safety ShowersP34120L2N3 XX4120L2-65AVendor Data Review - Safety Showers : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2P1 Enquiry Package - Insulation GasketsP34120L2P1 XX4120L2-66AEnquiry Package - Insulation Gaskets : Data Sheet 3 1.00 100% 0%P34120L2P1 XX4120L2-67AEnquiry Package - Insulation Gaskets : Requisition 10 1.00 100% 0%P34120L2P2 Prepare P.O. Package - Insulation GasketsP34120L2P2 XX4120L2-68APrepare P.O. Package - Insulation Gaskets : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2P2 XX4120L2-69APrepare P.O. Package - Insulation Gaskets : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2P3 Vendor Data Review - Insulation GasketsP34120L2P3 XX4120L2-70AVendor Data Review - Insulation Gaskets : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2R1 Enquiry Package - Special Pipe / Fittings / FlangesP34120L2R1 XX4120L2-71AEnquiry Package - Special Pipe / Fittings / Flanges : Data Sheet 3 1.00 100% 0%P34120L2R1 XX4120L2-72AEnquiry Package - Special Pipe / Fittings / Flanges : Requisition 10 1.00 100% 0%P34120L2R2 Prepare P.O. Package - Special Pipe / Fittings / FlangesP34120L2R2 XX4120L2-73APrepare P.O. Package - Special Pipe / Fittings / Flanges : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L2R2 XX4120L2-74APrepare P.O. Package - Special Pipe / Fittings / Flanges : Update package documents for P.O. issue 10 1.00 100% 0%P34120L2R3 Vendor Data Review - Special Pipe / Fittings / FlangesP34120L2R3 XX4120L2-75AVendor Data Review - Special Pipe / Fittings / Flanges : Prepare Technical Bid Analysis 20 1.00 100% 0%

L63 Procurement - Pipe SupportsP34120L3A1 Enquiry Package - Pipe SupportsP34120L3A1 XX4120L3-01AEnquiry Package - Pipe Supports : Data Sheet 3 1.00 100% 0%P34120L3A1 XX4120L3-02AEnquiry Package - Pipe Supports : Requisition 10 1.00 100% 0%P34120L3A2 Prepare P.O. Package - Pipe SupportsP34120L3A2 XX4120L3-03APrepare P.O. Package - Pipe Supports : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L3A2 XX4120L3-04APrepare P.O. Package - Pipe Supports : Update package documents for P.O. issue 10 1.00 100% 0%P34120L3A3 Vendor Data Review - Pipe SupportsP34120L3A3 XX4120L3-05AVendor Data Review - Pipe Supports : Vendor Data Review 20 1.00 80% 20%

L75 Subcontracts - Engineering / SpecialistsP34120L75A Enquiry Package - Eng. / Specialist Services

P34120L75A 4L75-01A Enquiry Package - Eng. / Specialist Services : Scope of Work 30 1.00 100% 0%P34120L75A 4L75-02A Enquiry Package - Eng. / Specialist Services : Requisition 20 1.00 100% 0%P34120L75B Prepare P.O. Package - Eng. / Specialist ServicesP34120L75B 4L75-03A Prepare P.O. Package - Eng. / Specialist Services : Prepare Technical Bid Analysis 20 1.00 100% 0%P34120L75B 4L75-04A Prepare P.O. Package - Eng. / Specialist Services : Update package documents for P.O. issue 20 1.00 100% 0%P34120L75C Vendor Liaison - Eng. / Specialist ServicesP34120L75C 4L75-05A Vendor Liaison - Eng. / Specialist Services : Vendor Liaison - Eng. / Specialist Services 30 1.00 100% 0%

L76 Subcontracts - FabricationP34120L76A Enquiry Package - Fabrication

P34120L76A 4L76-01A Enquiry Package - Fabrication : Fabrication Specification 20 1.00 100% 0%

P34120L76A 4L76-02A Enquiry Package - Fabrication : Scope of Work 30 1.00 100% 0%

P34120L76A 4L76-03A Enquiry Package - Fabrication : Requisition 20 1.00 100% 0%

P34120L76B Prepare P.O. Package - Fabrication

P34120L76B 4L76-04A Prepare P.O. Package - Fabrication : Prepare Technical Bid Analysis 20 1.00 100% 0%

P34120L76B 4L76-05A Prepare P.O. Package - Fabrication : Update package documents for P.O. issue 20 1.00 100% 0%

P34120L76C Vendor Liaison - Fabrication

P34120L76C 4L76-06A Vendor Liaison - Fabrication : Vendor Liaison - Fabrication 30 1.00 100% 0%

L77 Subcontracts - ConstructionP34120L77A Enquiry Package - Construction

P34120L77A 4L77-01A Enquiry Package - Construction : Construction Specification 20 1.00 100% 0%

P34120L77A 4L77-02A Enquiry Package - Construction : Construction Scope of Work 30 1.00 100% 0%

P34120L77A 4L77-03A Enquiry Package - Construction : Requisition 20 1.00 100% 0%

P34120L77B Prepare P.O. Package - Construction

P34120L77B 4L77-04A Prepare P.O. Package - Construction : Prepare Technical Bid Analysis 40 1.00 100% 0%

P34120L77B 4L77-05A Prepare P.O. Package - Construction : Update package documents for P.O. issue 20 1.00 100% 0%

P34120L77C Vendor Liaison - Construction

P34120L77C 4L77-06A Vendor Liaison - Construction : Vendor Liaison - Construction 30 1.00 100% 0%

P34120L850 Construction SupportP34120L850 4L85-01A Construction Support : Construction Support 50 1.00 50% 50%P34120L850 4L85-02A Construction Support : Prepare Construction Discrete Workpack (DWP) 30 1.00 90% 10%P34120L860 Inspection, Testing, Operator Training & Commissioning SupportP34120L860 4L86-01A Inspection, Testing, Operator Training & Commissioning Support : Precommissioning Check Sheets 10 1.00 100% 0%P34120L860 4L86-02A Inspection, Testing, Operator Training & Commissioning Support : Commissioning Check Sheets 10 1.00 100% 0%P34120L860 4L86-03A Inspection, Testing, Operator Training & Commissioning Support : Commissioning Procedures 40 1.00 100% 0%P34120L860 4L86-04A Inspection, Testing, Operator Training & Commissioning Support : Commissioning Hazard Review 20 1.00 100% 0%P34120L860 4L86-05A Inspection, Testing, Operator Training & Commissioning Support : Commissioning Support 10 1.00 100% 0%P34120L860 4L86-06A 1.00 100% 0%P34120L870 Design Reports / Job BooksP34120L870 4L87-01A Design Reports / Job Books : Job Books 60 1.00 100% 0%P34120L870 4L87-02A Design Reports / Job Books : Design Reports 1.00 100% 0%P34120L870 4L87-03A 1.00 100% 0%P34120L900 Formal Operator TrainingP34120L900 4L90-01A 1.00 100% 0%P34120L900 4L90-02A 1.00 100% 0%P34120L950 As-BuildingP34120L950 4L95-01A As-Building : As-Building (Refer attached sheet for details) 1.00P34120L950 4L95-02A As-Building : Closeout 10 1.00 20% 80%P34120L950 4L95-03A 1.00 100%

Page 36: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

As Built Staffhour EstimateOn Shore

This estimate is based on minimal changes to as built documents

Discipline Mechanical /Piping

Project drawings descriptions No Off

Isometrics Easy

Isometrics Moderate

Isometrics Hard

Piping plans

Piping Elevations

No Pieces of Equipment

P&ID's

FEC's

Project Drawing Schedules

Equipment Schedules

Vessels

Pumps and Compressors

As built activities

Description No. Drgs Hrs/Drg Total Hrs

Project Drawing schedule 0 2 0

Drawing sheet check 0 0.25 0

Electronic Critical drg check 0 0.33 0

Project Drg archive 0.17 0

Archive Electronic drg files 0 0.08 0

Raster burn Back=60% Total 0 0.08 0

Unused masterdrgs returned 0.08 0

Unused drg numbers returned 0.08 0

Unused Equip numbers returned 0.08 0

Unused Line numbers returned 0.08 0

Cd Verification against Drawing register 0.25 0

A3 wet signature hard copy 0 0.08 0

Request Drawings 0.5 0

As built Mark up review 0 0.03 0

P&ID's 0 2 0

FEC's 0 1.5 0

Isometrics Easy 0 1.5 0

Isometrics Moderate 0 3 0

Isometrics Hard 0 4 0

Equipment Location Drgs 0 0.2 0

Equipment Schedules 0 0.2 0

Equipment Schedules 0 2 0

Vessel Drawings 0 2 0

Pumps and Compressors 0 2 0

Sub total 0

Supervision2.5% 0

Total Hrs 0.0 Hours

Page 37: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Project Std Details 0 2 0

Static Earthing 0 1.5 0

Hazardous Area and Determination Drgs 0 5 0

Cathodic protection Drgs 0 2 0

Dist board summary Sht 0 1.5 0

Cable Schedules 0 2.5 0

Sub Total 0.0

Supervision 2.5% 0

Total Hrs 0.0 Hours

Page 38: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 38 of 73 04/17/2023

ELECTRICAL ENGINEERING / DESIGN - STAFFHOUR ESTIMATE PH4

Project No : 359/Y5066Title : Sulphur Dioxide Reduction Project

Workpack Ref. : Lo-Cat Licensed technologyDescription : Phase 3 cost estimate - Off plot - Lo-Cat process

EngineeringEngineering Design

Hrs HrsCat Hours 0 0

Rate 110.0 95.0

% Of Total #DIV/0! #DIV/0!

Total Hrs 0Total Cost $0

Rev Description Prepared By Reviewed By DateA Issued For Estimate

Notes on Using this Estimate Sheet

1 Activities (WBS Nos.) are included as prompts for guidance. It is not necessary to complete all categories.2 Additional activities may be added as required.3 Norms (Unit Hours) may be adjusted to suit project requirements.4 Generally E00 is to be used on proposals and small FEED projects.5 Electronic copy of this template is stored in the following directory - G:\Engineering_Intranet\Electrical\Estimate_Sheets\6 Please advise the Engineering Manager of any additions, changes or adjustments required to norms or activities.

Notes on Using 'Insert New Row' button1 Position cursor in any cell - a new row will always be inserted below2 This function will also copy previous row fomulas and text to new row - please modify text accordingly

Notes on Using 'Delete Row' button1 Position cursor in a cell of the row you want to delete

Notes on Using 'View' & 'Hide' buttons1 Position cursor in a cell (or cells) that you want the '0' to be visible or not

Assumptions and Clarifications for this Estimate:

1 Project duration is XX weeks23456789101112131415

Activity ID Del.Cost Time & Resources Summary Engineering Design Total

(CTR) or Task

XX4121E000 Default - total is less than 200 hours (& Proposals)

XX4121E100 General Coordination & Job Preparation

XX4121E200 Studies

XX4121E300 Calculations

XX4121E350 Specifications

XX4121E400 Schedules and Lists

XX4121E410 Electrical Load List

Page 39: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 39 of 73 04/17/2023

XX4121E440 Preliminary MTOs - Cables

XX4121E450 Intermediate MTOs - Cables

XX4121E460 Final MTOs - Cables

XX4121E470 Preliminary MTOs - Bulk Items

XX4121E480 Intermediate MTOs - Bulk Items

XX4121E490 Final MTOs - Bulk Items

XX4121E500 Systems Planning & Layouts

XX4121E510 Single Line Diagrams

XX4121E520 3D CAD Modelling - Set-up & Input

XX4121E530 3D CAD Modelling - Checking / Backdrafting

XX4121E540 3D CAD Modelling - Finalise / Issue Outputs

XX4121E550 Drawings - Layouts

XX4121E560 Demolition Drawings

XX4121E570 Schematic & Connection Diagrams

XX4121E580 Installation Details

E60 Procurement - Electrical Bulks

XX4121EA10 Prepare Enquiry Package - Cables

XX4121EA20 Prepare P.O. Package - Cables

XX4121EA30 Vendor Data Review - Cables

XX4121EA40 Prepare Enquiry Package - Cable Ladder & Fittings

XX4121EA50 Prepare P.O. Package - Cable Ladder & Fittings

XX4121EA60 Vendor Data Review - Cable Ladder & Fittings

XX4121EA70 Prepare Enquiry Package - Cable Glands & Fittings

XX4121EA80 Prepare P.O. Package - Cable Glands & Fittings

XX4121EA90 Vendor Data Review - Cable Glands & Fittings

XX4121EB10 Prepare Enquiry Package - Labels

XX4121EB20 Prepare P.O. Package - Labels

XX4121EB30 Vendor Data Review - Labels

XX4121EB40 Prepare Enquiry Package - Construction Bulks

XX4121EB50 Prepare P.O. Package - Construction Bulks

E61 Procurement - Electrical Equipment

XX4121EC10 Prepare Enquiry Package - HV Switchgear

XX4121EC20 Prepare P.O. Package - HV Switchgear

XX4121EC30 Vendor Data Review - HV Switchgear

XX4121EC40 Prepare Enquiry Package - HV Motor Control Centre

XX4121EC50 Prepare P.O. Package - HV Motor Control Centre

XX4121EC60 Vendor Data Review - HV Motor Control Centre

XX4121EC70 Prepare Enquiry Package - HV AC Motors

XX4121EC80 Prepare P.O. Package - HV AC Motors

XX4121EC90 Vendor Data Review - HV AC Motors

XX4121ED10 Prepare Enquiry Package - Power Transformers

XX4121ED20 Prepare P.O. Package - Power Transformers

XX4121ED30 Vendor Data Review - Power Transformers

XX4121ED40 Prepare Enquiry Package - Distribution Transformer

XX4121ED50 Prepare P.O. Package - Distribution Transformer

XX4121ED60 Vendor Data Review - Distribution Transformer

XX4121ED70 Prepare Enquiry Package - Motor Control Centre

XX4121ED80 Prepare P.O. Package - Motor Control Centre

XX4121ED90 Vendor Data Review - Motor Control Centre

XX4121EE10 Prepare Enquiry Package - AC Variable Speed Drives

XX4121EE20 Prepare P.O. Package - AC Variable Speed Drives

XX4121EE30 Vendor Data Review - AC Variable Speed Drives

XX4121EE40 Prepare Enquiry Package - Soft Starters

XX4121EE50 Prepare P.O. Package - Soft Starters

XX4121EE60 Vendor Data Review - Soft Starters

XX4121EE70 Prepare Enquiry Package - AC Motors

XX4121EE80 Prepare P.O. Package - AC Motors

XX4121EE90 Vendor Data Review - AC Motors

XX4121EF10 Prepare Enquiry Package - Generators

XX4121EF20 Prepare P.O. Package - Generators

XX4121EF30 Vendor Data Review - Generators

XX4121EF40 Prepare Enquiry Package - AC Distribution Boards

XX4121EF50 Prepare P.O. Package - AC Distribution Boards

XX4121EF60 Vendor Data Review - AC Distribution Boards

XX4121EF70 Prepare Enquiry Package - DC Distribution Boards

XX4121EF80 Prepare P.O. Package - DC Distribution Boards

XX4121EF90 Vendor Data Review - DC Distribution Boards

XX4121EG10 Prepare Enquiry Package - UPS

XX4121EG20 Prepare P.O. Package - UPS

XX4121EG30 Vendor Data Review - UPS

XX4121EG40 Prepare Enquiry Package - 24V DC Supplies

Page 40: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 40 of 73 04/17/2023

XX4121EG50 Prepare P.O. Package - 24V DC Supplies

XX4121EG60 Vendor Data Review - 24V DC Supplies

XX4121EG70 Prepare Enquiry Package - Control Panels

XX4121EG80 Prepare P.O. Package - Control Panels

XX4121EG90 Vendor Data Review - Control Panels

E62 Procurement - Electrical Systems / Miscellaneous Items

XX4121EH10 Prepare Enquiry Package - CCTV Systems

XX4121EH20 Prepare P.O. Package - CCTV Systems

XX4121EH30 Vendor Data Review - CCTV Systems

XX4121EH40 Prepare Enquiry Package - Telephone Systems

XX4121EH50 Prepare P.O. Package - Telephone Systems

XX4121EH60 Vendor Data Review - Telephone Systems

XX4121EH70 Prepare Enquiry Package - PA Systems

XX4121EH80 Prepare P.O. Package - PA Systems

XX4121EH90 Vendor Data Review - PA Systems

XX4121EJ10 Prepare Enquiry Package - Lighting Fixtures

XX4121EJ20 Prepare P.O. Package - Lighting Fixtures

XX4121EJ30 Vendor Data Review - Lighting Fixtures

XX4121EJ40 Prepare Enquiry Package - Control Stations

XX4121EJ50 Prepare P.O. Package - Control Stations

XX4121EJ60 Vendor Data Review - Control Stations

XX4121EJ70 Prepare Enquiry Package - Heat Tracing

XX4121EJ80 Prepare P.O. Package - Heat Tracing

XX4121EJ90 Vendor Data Review - Heat Tracing

XX4121EK10 Prepare Enquiry Package - Cathodic Protection

XX4121EK20 Prepare P.O. Package - Cathodic Protection

XX4121EK30 Vendor Data Review - Cathodic Protection

XX4121EK40 Prepare Enquiry Package - HVAC Systems

XX4121EK50 Prepare P.O. Package - HVAC Systems

XX4121EK60 Vendor Data Review - HVAC Systems

XX4121EK70 Prepare Enquiry Package - Earthing Systems

XX4121EK80 Prepare P.O. Package - Earthing Systems

XX4121EK90 Vendor Data Review - Earthing Systems

XX4121EL10 Prepare Enquiry Package - Power Management Systems

XX4121EL20 Prepare P.O. Package - Power Management Systems

XX4121EL30 Vendor Data Review - Power Management Systems

XX4121EL40 Prepare Enquiry Package - Navigational Aids

XX4121EL50 Prepare P.O. Package - Navigational Aids

XX4121EL60 Vendor Data Review - Navigational Aids

XX4121EL70 Prepare Enquiry Package - PLCs

XX4121EL80 Prepare P.O. Package - PLCs

XX4121EL90 Vendor Data Review - PLCs

E75 Subcontracts - Engineering / Specialists

XX4121EM10 Enquiry Package - Eng. / Specialist Services

XX4121EM20 Prepare P.O. Package - Eng. / Specialist Services

XX4121EM30 Vendor Data Review - Eng. / Specialist Services

E76 Subcontracts - Fabrication

XX4121EN10 Enquiry Package - Fabrication

XX4121EN20 Prepare P.O. Package - Fabrication

XX4121EN30 Vendor Data Review - Fabrication

E77 Subcontracts - Construction

XX4121EP10 Enquiry Package - Construction

XX4121EP20 Prepare P.O. Package - Construction

XX4121EP30 Vendor Data Review - Construction

XX4121E800 Hazardous Area Certification

XX4121E850 Construction Support

XX4121E860

XX4121E870 Design Reports / Job Books

XX4121E900 Formal Operator Training

XX4121E950 As-Building

Overall Totals

Inspection, Testing, Operator Training & Commissioning Support

Page 41: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: ELECTRICAL

Page 41 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

P34121E000 Default - total is less than 200 hoursP34121E000 4E00-01A 1.00 50% 50%P34121E000 4E00-02A 1.00 50% 50%P34121E000 4E00-03A 1.00 50% 50%P34121E000 4E00-04A 1.00 50% 50%

Sub Totals

Activity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

P34121E100 General Coordination & Job PreparationP34121E100 4E10-01A General Coordination & Job Preparation : Meetings 1 1.00 60% 40%P34121E100 4E10-02A General Coordination & Job Preparation : Project Reports - Weekly 1.00 100% 0%P34121E100 4E10-03A General Coordination & Job Preparation : Supervision - Engineering (10%) 1.00 100% 0%P34121E100 4E10-04A General Coordination & Job Preparation : Supervision - Design (10%) 1.00 100%P34121E100 4E10-04A General Coordination & Job Preparation : Site Visits - Engineering 12 1.00 100% 0%P34121E100 4E10-05A General Coordination & Job Preparation : Site Visits - Design 12 1.00 100%P34121E100 4E10-06A General Coordination & Job Preparation : Travel to / from site 10 1.00 50% 50%P34121E100 4E10-07A General Coordination & Job Preparation : HAZOP Attendance/Close-out 8 1.00 100% 0%P34121E100 4E10-08A General Coordination & Job Preparation : Inter-discipline Squad Checks 1 1.00 50% 50%P34121E100 4E10-09A General Coordination & Job Preparation : Inter-discipline Review Meetings 1 1.00 50% 50%P34121E100 4E10-10A General Coordination & Job Preparation : Project Closeout 16 1.00 50% 50%P34121E100 4E10-11A General Coordination & Job Preparation : Data Acquisition / Project Data Review 16 1.00 50% 50%

P34121E200 StudiesP34121E200 4E20-01A Studies : Weight Control Input 27 1.00 100% 0%P34121E200 4E20-02A Studies : Power System - Faults Levels 30 1.00 100% 0%P34121E200 4E20-03A Studies : Power System - Load Flow 30 1.00 100% 0%P34121E200 4E20-04A Studies : Power System - Stability 30 1.00 100% 0%P34121E200 4E20-05A Studies : Power System - Harmonics 30 1.00 100% 0%P34121E200 4E20-06A Studies : 415 V MCC - Load Studies 30 1.00 100% 0%P34121E200 4E20-07A Studies : Hazardous Area Determination 30 1.00 100% 0%P34121E200 4E20-08A Studies : Hazardous Area Equipment Assessment 30 1.00 100% 0%

P34121E300 CalculationsP34121E300 4E30-01A Calculations : Load Analysis 60 1.00 100% 0%P34121E300 4E30-02A Calculations : Cable Sizing 10 1.00 100% 0%P34121E300 4E30-03A Calculations : AC Load Table 60 1.00 100% 0%P34121E300 4E30-04A Calculations : DC Load Table 60 1.00 100% 0%P34121E300 4E30-05A Calculations : Generator Sizing 60 1.00 100% 0%P34121E300 4E30-06A Calculations : Fault Level Study 60 1.00 100% 0%P34121E300 4E30-07A Calculations : Motor Starting Voltage Drop Study 60 1.00 100% 0%P34121E300 4E30-08A Calculations : Lighting Calculations 30 1.00 100% 0%P34121E300 4E30-09A Calculations : System Voltage Calculations 30 1.00 100% 0%P34121E300 4E30-10A Calculations : Earthing Calculations 30 1.00 100% 0%P34121E300 4E30-11A Calculations : Heat Tracing 50 1.00 100% 0%P34121E300 4E30-12A Calculations : Cathodic Protection Calculations 30 1.00 100% 0%P34121E300 4E30-13A Calculations : Voltage Drop Calculations 30 1.00 100% 0%

P34121E350 SpecificationsP34121E350 4E35-01A Specifications : Design Criteria 45 1.00 100% 0%P34121E350 4E35-02A Specifications : Electrical input to Package Plant specs. (per package) 20 1.00 100% 0%P34121E350 4E35-03A Specifications : Installation Specifications 40 1.00 100% 0%P34121E350 4E35-04A Specifications : Commissioning Specification 40 1.00 100% 0%P34121E350 4E35-05A Specifications : Commissioning Scope of Work 40 1.00 100% 0%

P34121E400 Schedules and ListsP34121E400 4E40-01A Schedules and Lists : Drawing Register 5 1.00 5% 95%P34121E400 4E40-02A Schedules and Lists : Drawing Schedule 5 1.00 5% 95%P34121E400 4E40-03A Schedules and Lists : Electrical Equipment List 10 1.00 5% 95%P34121E400 4E40-04A Schedules and Lists : AC Distribution Board Equipment Schedule 10 1.00 5% 95%P34121E400 4E40-05A Schedules and Lists : DC Distribution Board Equipment Schedule 10 1.00 5% 95%P34121E400 4E40-06A Schedules and Lists : Cable Schedule - Power / Control 10 1.00 5% 95%P34121E400 4E40-07A Schedules and Lists : Miscellaneous Equipment Schedule 10 1.00 5% 95%

P34121E410 Electrical Load ListP34121E410 4E40-11A Electrical Load List : Load List 10 1.00 50% 50%

P34121E440 Preliminary MTOs - CablesP34121E440 4E45-01A Preliminary MTOs - Cables : Preliminary MTO - Cables 10 1.00 10% 90%

P34121E450 Intermediate MTOs - CablesP34121E450 4E45-02A Intermediate MTOs - Cables : Intermediate MTO - Cables 10 1.00 10% 90%

P34121E460 Final MTOs - CablesP34121E460 4E45-03A Final MTOs - Cables : Final MTO - Cables 10 1.00 10% 90%

P34121E470 Preliminary MTOs - Bulk ItemsP34121E470 4E45-11A Preliminary MTOs - Bulk Items : Preliminary MTO - Bulk Items 25 1.00 10% 90%

P34121E480 Intermediate MTOs - Bulk ItemsP34121E480 4E45-12A Intermediate MTOs - Bulk Items : Intermediate MTO - Bulk Items 25 1.00 10% 90%

P34121E490 Final MTOs - Bulk ItemsP34121E490 4E45-13A Final MTOs - Bulk Items : Final MTO - Bulk Items 25 1.00 10% 90%

P34121E500 Systems Planning & LayoutsP34121E500 4E52-01A Systems Planning & Layouts : Cables / Routing Layouts 20 1.00 5% 95%P34121E500 4E52-02A Systems Planning & Layouts : Switchroom / Equipment Room Layouts 20 1.00 5% 95%P34121E500 4E52-03A Systems Planning & Layouts : Cable Block Diagrams 22 1.00 5% 95%P34121E500 4E52-04A Systems Planning & Layouts : Hazardous Area Layouts and Determination/Schedules 30 1.00 50% 50%P34121E500 4E52-05A Systems Planning & Layouts : Overall Site Key Plans 10 1.00 5% 95%P34121E500 4E52-06A Systems Planning & Layouts : HV Protection 15 1.00 5% 95%P34121E500 4E52-07A Systems Planning & Layouts : Key Plans for AC Systems 15 1.00 5% 95%P34121E500 4E52-08A Systems Planning & Layouts : Key Plans for DC Systems 15 1.00 5% 95%

P34121E510 Single Line DiagramsP34121E510 4E52-11A Single Line Diagrams : Single Line Diagrams 15 1.00 5% 95%P34121E510 4E52-12A Single Line Diagrams : HV Single Line Diagrams 15 1.00 5% 95%

P34121E520 3D CAD Modelling - Set-up & InputP34121E520 4E53-01A 3D CAD Modelling - Set-up & Input : Equipment Modelling in Field J.Boxes / Enclosures 8 1.00 5% 95%P34121E520 4E53-02A 3D CAD Modelling - Set-up & Input : Equipment Modelling Sw/Rms SubStations Control Rooms 40 1.00 5% 95%P34121E520 4E53-03A 3D CAD Modelling - Set-up & Input : Raceways - Ladder Design incl. maintenance 80 1.00 5% 95%P34121E520 4E53-04A 3D CAD Modelling - Set-up & Input : Spec. Development - dumb 25 1.00 5% 95%P34121E520 4E53-05A 3D CAD Modelling - Set-up & Input : Spec. Development - project specific 150 1.00 5% 95%P34121E520 4E53-06A 3D CAD Modelling - Set-up & Input : Cable Ladder between platforms 40 1.00 5% 95%

P34121E530 3D CAD Modelling - Checking / BackdraftingP34121E530 4E53-21A 3D CAD Modelling - Checking / Backdrafting : Model Checking / Backdrafting 40 1.00 5% 95%

P34121E540 3D CAD Modelling - Finalise / Issue OutputsP34121E540 4E53-31A 3D CAD Modelling - Finalise / Issue Outputs : Finalise Model / Issue Drawings 40 1.00 5% 95%

P34121E550 Drawings - LayoutsP34121E550 4E54-01A Drawings - Layouts : Equipment Layouts 30 1.00 5% 95%

Split Eng/Design

Split Eng/Design

Page 42: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: ELECTRICAL

Page 42 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34121E550 4E54-02A Drawings - Layouts : Cable Ladders 30 1.00 5% 95%P34121E550 4E54-03A Drawings - Layouts : Panel Layouts 20 1.00 5% 95%P34121E550 4E54-04A Drawings - Layouts : Junction box Layouts 20 1.00 5% 95%P34121E550 4E54-05A Drawings - Layouts : Lighting & Power Layouts - External 20 1.00 5% 95%P34121E550 4E54-06A Drawings - Layouts : Lighting & Power Layouts - Internal 20 1.00 5% 95%P34121E550 4E54-07A Drawings - Layouts : Earthing Layouts - Switchrooms / Generators 20 1.00 5% 95%P34121E550 4E54-08A Drawings - Layouts : Earthing Layouts - Distribution System 20 1.00 5% 95%P34121E550 4E54-09A Drawings - Layouts : Vendor Data Incorporation 12 1.00 5% 95%P34121E550 4E54-10A Drawings - Layouts : Underground Services Layouts 22 1.00 5% 95%P34121E550 4E54-11A Drawings - Layouts : Static Earthing Layouts 12 1.00 5% 95%

P34121E560 Demolition DrawingsP34121E560 4E57-01A Demolition Drawings : Single Line Drawings / DB Schedules 4 1.00 5% 95%P34121E560 4E57-02A Demolition Drawings : Control Schematics / Wiring Diagrams 4 1.00 5% 95%P34121E560 4E57-03A Demolition Drawings : Equipment Layout Drawings 4 1.00 5% 95%P34121E560 4E57-04A Demolition Drawings : Lighting & Power Layouts 4 1.00 5% 95%P34121E560 4E57-05A Demolition Drawings : Earthing Layouts 4 1.00 5% 95%P34121E560 4E57-06A Demolition Drawings : Cable Schedules 4 1.00 5% 95%P34121E560 4E57-07A Demolition Drawings : Cable/Conduit 4 1.00 5% 95%P34121E560 4E57-08A Demolition Drawings : Equipment Location Plans 4 1.00 5% 95%

P34121E570 Schematic & Connection DiagramsP34121E570 4E58-01A Schematic & Connection Diagrams : Standard Schedules 20 1.00 5% 95%P34121E570 4E58-02A Schematic & Connection Diagrams : D/B SLDs 20 1.00 5% 95%P34121E570 4E58-03A Schematic & Connection Diagrams : DB Schedules 20 1.00 5% 95%P34121E570 4E58-04A Schematic & Connection Diagrams : System / Cable Block Diagrams 20 1.00 5% 95%P34121E570 4E58-05A Schematic & Connection Diagrams : MCC Control Schematics 10 1.00 5% 95%P34121E570 4E58-06A Schematic & Connection Diagrams : MOV's Control Schematics 10 1.00 5% 95%P34121E570 4E58-07A Schematic & Connection Diagrams : Package Equipment Schematics 10 1.00 5% 95%P34121E570 4E58-08A Schematic & Connection Diagrams : Field Controls Schematics 10 1.00 5% 95%P34121E570 4E58-09A Schematic & Connection Diagrams : Wiring Diagrams 10 1.00 5% 95%P34121E570 4E58-10A Schematic & Connection Diagrams : Field JB Connection Diagrams 10 1.00 5% 95%P34121E570 4E58-11A Schematic & Connection Diagrams : Marshalling / MCC Connection Diagrams 10 1.00 5% 95%P34121E570 4E58-12A Schematic & Connection Diagrams : DCS Schematics/Connections 10 1.00 5% 95%P34121E570 4E58-13A Schematic & Connection Diagrams : ESD Schematics Connections 10 1.00 5% 95%P34121E570 4E58-14A Schematic & Connection Diagrams : Site Survey/As Build for Design 5 1.00 5% 95%P34121E570 4E58-15A Schematic & Connection Diagrams : UPS System - Single Line Diagram 15 1.00 5% 95%P34121E570 4E58-16A Schematic & Connection Diagrams : UPS Distribution Board Equipment Schedule 15 1.00 5% 95%P34121E570 4E58-17A Schematic & Connection Diagrams : Cathodic Protection System Equipment Schedule 15 1.00 5% 95%

P34121E580 Installation DetailsP34121E580 4E59-01A Installation Details : Electrical Terminations 15 1.00 100%P34121E580 4E59-02A Installation Details : Gland Plate / Transit Block Details 12 1.00 100%P34121E580 4E59-03A Installation Details : Equipment Mounting 15 1.00 100%P34121E580 4E59-04A Installation Details : Earthing Details 15 1.00 100%P34121E580 4E59-05A Installation Details : Light Fittings 15 1.00 100%P34121E580 4E59-06A Installation Details : Symbols Legend 15 1.00 100%

E60 Procurement - Electrical BulksP34121EA10 Prepare Enquiry Package - CablesP34121EA10 4E60-01A Prepare Enquiry Package - Cables : Data Sheet(s) 5 1.00 100% 0%P34121EA10 4E60-02A Prepare Enquiry Package - Cables : Requisition 15 1.00 100% 0%

P34121EA20 Prepare P.O. Package - CablesP34121EA20 4E60-03A Prepare P.O. Package - Cables : Bid Evaluation 5 1.00 100% 0%P34121EA20 4E60-04A Prepare P.O. Package - Cables : Prepare P.O. Package 5 1.00 100% 0%

P34121A30 Vendor Data Review - CablesP34121A30 4E60-05A Vendor Data Review - Cables : Vendor Data Review 30 1.00 100% 0%

P34121EA40 Prepare Enquiry Package - Cable Ladder & FittingsP34121EA40 4E60-06A Prepare Enquiry Package - Cable Ladder & Fittings : Data Sheet(s) 5 1.00 100% 0%P34121EA40 4E60-07A Prepare Enquiry Package - Cable Ladder & Fittings : Requisition 15 1.00 100% 0%

P34121EA50 Prepare P.O. Package - Cable Ladder & FittingsP34121EA50 4E60-08A Prepare P.O. Package - Cable Ladder & Fittings : Bid Evaluation 5 1.00 100% 0%P34121EA50 4E60-09A Prepare P.O. Package - Cable Ladder & Fittings : Prepare P.O. Package 5 1.00 100% 0%

P34121EA60 Vendor Data Review - Cable Ladder & FittingsP34121EA60 4E60-10A Vendor Data Review - Cable Ladder & Fittings : Vendor Data Review 30 1.00 100% 0%

P34121EA70 Prepare Enquiry Package - Cable Glands & FittingsP34121EA70 4E60-11A Prepare Enquiry Package - Cable Glands & Fittings : Data Sheet(s) 5 1.00 100% 0%P34121EA70 4E60-12A Prepare Enquiry Package - Cable Glands & Fittings : Requisition 15 1.00 100% 0%

P34121EA80 Prepare P.O. Package - Cable Glands & FittingsP34121EA80 4E60-13A Prepare P.O. Package - Cable Glands & Fittings : Bid Evaluation 5 1.00 100% 0%P34121EA80 4E60-14A Prepare P.O. Package - Cable Glands & Fittings : Prepare P.O. Package 5 1.00 100% 0%

P34121EA90 Vendor Data Review - Cable Glands & FittingsP34121EA90 4E60-15A Vendor Data Review - Cable Glands & Fittings : Vendor Data Review 30 1.00 100% 0%

P34121EB10 Prepare Enquiry Package - LabelsP34121EB10 4E60-16A Prepare Enquiry Package - Labels : Data Sheet(s) 5 1.00 100% 0%P34121EB10 4E60-16A Prepare Enquiry Package - Labels : Requisition 15 1.00 100% 0%

P34121EB20 Prepare P.O. Package - LabelsP34121EB20 4E60-17A Prepare P.O. Package - Labels : Bid Evaluation 5 1.00 100% 0%P34121EB20 4E60-18A Prepare P.O. Package - Labels : Prepare P.O. Package 5 1.00 100% 0%

P34121EB30 Vendor Data Review - LabelsP34121EB30 4E60-19A Vendor Data Review - Labels : Vendor Data Review 30 1.00 100% 0%

P34121EB40 Prepare Enquiry Package - Construction BulksP34121EB40 4E60-20A Prepare Enquiry Package - Construction Bulks : Data Sheet(s) 5 1.00 100% 0%P34121EB40 4E60-21A Prepare Enquiry Package - Construction Bulks : Requisition 15 1.00 100% 0%

P34121EB50 Prepare P.O. Package - Construction BulksP34121EB50 4E60-22A Prepare P.O. Package - Construction Bulks : Bid Evaluation 5 1.00 100% 0%P34121EB50 4E60-23A Prepare P.O. Package - Construction Bulks : Prepare P.O. Package 5 1.00 100% 0%

E61 Procurement - Electrical EquipmentP34121EC10 Prepare Enquiry Package - HV SwitchgearP34121EC10 4E61-01A Prepare Enquiry Package - HV Switchgear : Specification 20 1.00 100% 0%P34121EC10 4E61-02A Prepare Enquiry Package - HV Switchgear : Data Sheet(s) 8 1.00 100% 0%P34121EC10 4E61-03A Prepare Enquiry Package - HV Switchgear : Requisition 15 1.00 100% 0%

P34121EC20 Prepare P.O. Package - HV SwitchgearP34121EC20 4E61-04A Prepare P.O. Package - HV Switchgear : Bid Evaluation 5 1.00 100% 0%P34121EC20 4E61-05A Prepare P.O. Package - HV Switchgear : Prepare P.O. Package 5 1.00 100% 0%

P34121EC30 Vendor Data Review - HV SwitchgearP34121EC30 4E61-06A Vendor Data Review - HV Switchgear : Vendor Data Review 30 1.00 100% 0%

P34121EC40 Prepare Enquiry Package - HV Motor Control CentreP34121EC40 4E61-07A Prepare Enquiry Package - HV Motor Control Centre : Specification 20 1.00 100% 0%P34121EC40 4E61-08A Prepare Enquiry Package - HV Motor Control Centre : Data Sheet(s) 5 1.00 100% 0%P34121EC40 4E61-09A Prepare Enquiry Package - HV Motor Control Centre : Requisition 15 1.00 100% 0%

Page 43: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: ELECTRICAL

Page 43 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34121EC50 Prepare P.O. Package - HV Motor Control CentreP34121EC50 4E61-10A Prepare P.O. Package - HV Motor Control Centre : Bid Evaluation 5 1.00 100% 0%P34121EC50 4E61-11A Prepare P.O. Package - HV Motor Control Centre : Prepare P.O. Package 5 1.00 100% 0%

P34121EC60 Vendor Data Review - HV Motor Control CentreP34121EC60 4E61-12A Vendor Data Review - HV Motor Control Centre : Vendor Data Review 30 1.00 100% 0%

P34121EC70 Prepare Enquiry Package - HV AC MotorsP34121EC70 4E61-13A Prepare Enquiry Package - HV AC Motors : Specification 20 1.00 100% 0%P34121EC70 4E61-14A Prepare Enquiry Package - HV AC Motors : Data Sheet(s) 5 1.00 100% 0%P34121EC70 4E61-15A Prepare Enquiry Package - HV AC Motors : Requisition 15 1.00 100% 0%

P34121EC80 Prepare P.O. Package - HV AC MotorsP34121EC80 4E61-16A Prepare P.O. Package - HV AC Motors : Bid Evaluation 5 1.00 100% 0%P34121EC80 4E61-17A Prepare P.O. Package - HV AC Motors : Prepare P.O. Package 5 1.00 100% 0%

P34121EC90 Vendor Data Review - HV AC MotorsP34121EC90 4E61-18A Vendor Data Review - HV AC Motors : Vendor Data Review 30 1.00 100% 0%

P34121ED10 Prepare Enquiry Package - Power TransformersP34121ED10 4E61-19A Prepare Enquiry Package - Power Transformers : Specification 20 1.00 100% 0%P34121ED10 4E61-20A Prepare Enquiry Package - Power Transformers : Data Sheet(s) 5 1.00 100% 0%P34121ED10 4E61-21A Prepare Enquiry Package - Power Transformers : Requisition 15 1.00 100% 0%

P34121ED20 Prepare P.O. Package - Power TransformersP34121ED20 4E61-22A Prepare P.O. Package - Power Transformers : Bid Evaluation 5 1.00 100% 0%P34121ED20 4E61-23A Prepare P.O. Package - Power Transformers : Prepare P.O. Package 5 1.00 100% 0%

P34121ED30 Vendor Data Review - Power TransformersP34121ED30 4E61-24A Vendor Data Review - Power Transformers : Vendor Data Review 30 1.00 100% 0%

P34121ED40 Prepare Enquiry Package - Disribution TransformersP34121ED40 4E61-25A Prepare Enquiry Package - Disribution Transformers : Specification 20 1.00 100% 0%P34121ED40 4E61-26A Prepare Enquiry Package - Disribution Transformers : Data Sheet(s) 5 1.00 100% 0%P34121ED40 4E61-27A Prepare Enquiry Package - Disribution Transformers : Requisition 15 1.00 100% 0%

P34121ED50 Prepare P.O. Package - Distribution TransformersP34121ED50 4E61-28A Prepare P.O. Package - Distribution Transformers : Bid Evaluation 5 1.00 100% 0%P34121ED50 4E61-29A Prepare P.O. Package - Distribution Transformers : Prepare P.O. Package 5 1.00 100% 0%

P34121ED60 Vendor Data Review - Distribution TransformersP34121ED60 4E61-30A Vendor Data Review - Distribution Transformers : Vendor Data Review 30 1.00 100% 0%

P34121ED70 Prepare Enquiry Package - Motor Control CentreP34121ED70 4E61-31A Prepare Enquiry Package - Motor Control Centre : Specification 20 1.00 100% 0%P34121ED70 4E61-32A Prepare Enquiry Package - Motor Control Centre : Data Sheet(s) 8 1.00 100% 0%P34121ED70 4E61-33A Prepare Enquiry Package - Motor Control Centre : Requisition 15 1.00 100% 0%

P34121ED80 Prepare P.O. Package - Motor Control CentreP34121ED80 4E61-34A Prepare P.O. Package - Motor Control Centre : Bid Evaluation 5 1.00 100% 0%P34121ED80 4E61-35A Prepare P.O. Package - Motor Control Centre : Prepare P.O. Package 5 1.00 100% 0%

P34121ED90 Vendor Data Review - Motor Control CentreP34121ED90 4E61-36A Vendor Data Review - Motor Control Centre : Vendor Data Review 30 1.00 100% 0%

P34121EE10 Prepare Enquiry Package - AC Variable Speed DrivesP34121EE10 4E61-37A Prepare Enquiry Package - AC Variable Speed Drives : Specification 20 1.00 100% 0%P34121EE10 4E61-38A Prepare Enquiry Package - AC Variable Speed Drives : Data Sheet(s) 5 1.00 100% 0%P34121EE10 4E61-39A Prepare Enquiry Package - AC Variable Speed Drives : Requisition 15 1.00 100% 0%

P34121EE20 Prepare P.O. Package - AC Variable Speed DrivesP34121EE20 4E61-40A Prepare P.O. Package - AC Variable Speed Drives : Bid Evaluation 5 1.00 100% 0%P34121EE20 4E61-41A Prepare P.O. Package - AC Variable Speed Drives : Prepare P.O. Package 5 1.00 100% 0%

P34121EE30 Vendor Data Review - AC Variable Speed DrivesP34121EE30 4E61-42A Vendor Data Review - AC Variable Speed Drives : Vendor Data Review 30 1.00 100% 0%

P34121EE40 Prepare Enquiry Package - Soft StartersP34121EE40 4E61-43A Prepare Enquiry Package - Soft Starters : Specification 20 1.00 100% 0%P34121EE40 4E61-44A Prepare Enquiry Package - Soft Starters : Data Sheet(s) 5 1.00 100% 0%P34121EE40 4E61-45A Prepare Enquiry Package - Soft Starters : Requisition 15 1.00 100% 0%

P34121EE50 Prepare P.O. Package - Soft StartersP34121EE50 4E61-46A Prepare P.O. Package - Soft Starters : Bid Evaluation 5 1.00 100% 0%P34121EE50 4E61-47A Prepare P.O. Package - Soft Starters : Prepare P.O. Package 5 1.00 100% 0%

P34121EE60 Vendor Data Review - Soft StartersP34121EE60 4E61-48A Vendor Data Review - Soft Starters : Vendor Data Review 30 1.00 100% 0%

P34121EE70 Prepare Enquiry Package - AC MotorsP34121EE70 4E61-49A Prepare Enquiry Package - AC Motors : Specification 20 1.00 100% 0%P34121EE70 4E61-50A Prepare Enquiry Package - AC Motors : Data Sheet(s) 2 1.00 100% 0%P34121EE70 4E61-51A Prepare Enquiry Package - AC Motors : Requisition 15 1.00 100% 0%

P34121EE80 Prepare P.O. Package - AC MotorsP34121EE80 4E61-52A Prepare P.O. Package - AC Motors : Bid Evaluation 5 1.00 100% 0%P34121EE80 4E61-53A Prepare P.O. Package - AC Motors : Prepare P.O. Package 5 1.00 100% 0%

P34121EE90 Vendor Data Review - AC MotorsP34121EE90 4E61-54A Vendor Data Review - AC Motors : Vendor Data Review 30 1.00 100% 0%

P34121EF10 Prepare Enquiry Package - GeneratorsP34121EF10 4E61-55A Prepare Enquiry Package - Generators : Specification 20 1.00 100% 0%P34121EF10 4E61-56A Prepare Enquiry Package - Generators : Data Sheet(s) 8 1.00 100% 0%P34121EF10 4E61-57A Prepare Enquiry Package - Generators : Requisition 15 1.00 100% 0%

P34121EF20 Prepare P.O. Package - GeneratorsP34121EF20 4E61-58A Prepare P.O. Package - Generators : Bid Evaluation 5 1.00 100% 0%P34121EF20 4E61-59A Prepare P.O. Package - Generators : Prepare P.O. Package 5 1.00 100% 0%

P34121EF30 Vendor Data Review - GeneratorsP34121EF30 4E61-60A Vendor Data Review - Generators : Vendor Data Review 30 1.00 100% 0%

P34121EF40 Prepare Enquiry Package - AC Distribution BoardsP34121EF40 4E61-61A Prepare Enquiry Package - AC Distribution Boards : Specification 20 1.00 100% 0%P34121EF40 4E61-62A Prepare Enquiry Package - AC Distribution Boards : Data Sheet(s) 5 1.00 100% 0%P34121EF40 4E61-63A Prepare Enquiry Package - AC Distribution Boards : Requisition 15 1.00 100% 0%

P34121EF50 Prepare P.O. Package - AC Distribution BoardsP34121EF50 4E61-64A Prepare P.O. Package - AC Distribution Boards : Bid Evaluation 5 1.00 100% 0%P34121EF50 4E61-65A Prepare P.O. Package - AC Distribution Boards : Prepare P.O. Package 5 1.00 100% 0%

P34121EF60 Vendor Data Review - AC Distribution BoardsP34121EF60 4E61-66A Vendor Data Review - AC Distribution Boards : Vendor Data Review 30 1.00 100% 0%

P34121EF70 Prepare Enquiry Package - DC Distribution BoardsP34121EF70 4E61-67A Prepare Enquiry Package - DC Distribution Boards : Specification 20 1.00 100% 0%P34121EF70 4E61-68A Prepare Enquiry Package - DC Distribution Boards : Data Sheet(s) 5 1.00 100% 0%P34121EF70 4E61-69A Prepare Enquiry Package - DC Distribution Boards : Requisition 15 1.00 100% 0%

Page 44: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: ELECTRICAL

Page 44 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34121EF80 Prepare P.O. Package - DC Distribution BoardsP34121EF80 4E61-70A Prepare P.O. Package - DC Distribution Boards : Bid Evaluation 5 1.00 100% 0%P34121EF80 4E61-71A Prepare P.O. Package - DC Distribution Boards : Prepare P.O. Package 5 1.00 100% 0%

P34121EF90 Vendor Data Review - DC Distribution BoardsP34121EF90 4E61-72A Vendor Data Review - DC Distribution Boards : Vendor Data Review 30 1.00 100% 0%

P34121EG10 Prepare Enquiry Package - UPSP34121EG10 4E61-73A Prepare Enquiry Package - UPS : Specification 20 1.00 100% 0%P34121EG10 4E61-74A Prepare Enquiry Package - UPS : Data Sheet(s) 5 1.00 100% 0%P34121EG10 4E61-75A Prepare Enquiry Package - UPS : Requisition 15 1.00 100% 0%

P34121EG20 Prepare P.O. Package - UPSP34121EG20 4E61-76A Prepare P.O. Package - UPS : Bid Evaluation 5 1.00 100% 0%P34121EG20 4E61-77A Prepare P.O. Package - UPS : Prepare P.O. Package 5 1.00 100% 0%P34121EG30 Vendor Data Review - UPSP34121EG30 4E61-78A Vendor Data Review - UPS : Vendor Data Review 30 1.00 100% 0%P34121EG40 Prepare Enquiry Package - 24V DC SuppliesP34121EG40 4E61-79A Prepare Enquiry Package - 24V DC Supplies : Specification 20 1.00 100% 0%P34121EG40 4E61-80A Prepare Enquiry Package - 24V DC Supplies : Data Sheet(s) 5 1.00 100% 0%P34121EG40 4E61-81A Prepare Enquiry Package - 24V DC Supplies : Requisition 15 1.00 100% 0%P34121EG50 Prepare P.O. Package - 24V DC SuppliesP34121EG50 4E61-82A Prepare P.O. Package - 24V DC Supplies : Bid Evaluation 5 1.00 100% 0%P34121EG50 4E61-83A Prepare P.O. Package - 24V DC Supplies : Prepare P.O. Package 5 1.00 100% 0%P34121EG60 Vendor Data Review - 24V DC SuppliesP34121EG60 4E61-84A Vendor Data Review - 24V DC Supplies : Vendor Data Review 30 1.00 100% 0%P34121EG70 Prepare Enquiry Package - Control PanelsP34121EG70 4E61-85A Prepare Enquiry Package - Control Panels : Specification 20 1.00 100% 0%P34121EG70 4E61-86A Prepare Enquiry Package - Control Panels : Data Sheet(s) 5 1.00 100% 0%P34121EG70 4E61-87A Prepare Enquiry Package - Control Panels : Requisition 15 1.00 100% 0%P34121EG80 Prepare P.O. Package - Control PanelsP34121EG80 4E61-88A Prepare P.O. Package - Control Panels : Bid Evaluation 5 1.00 100% 0%P34121EG80 4E61-89A Prepare P.O. Package - Control Panels : Prepare P.O. Package 5 1.00 100% 0%P34121EG90 Vendor Data Review - Control PanelsP34121EG90 4E61-90A Vendor Data Review - Control Panels : Vendor Data Review 30 1.00 100% 0%

E62 Procurement - Electrical Systems / Miscellaneous ItemsP34121EH10 Prepare Enquiry Package - CCTV SystemsP34121EH10 4E62-01A Prepare Enquiry Package - CCTV Systems : Specification 20 1.00 100% 0%P34121EH10 4E62-02A Prepare Enquiry Package - CCTV Systems : Data Sheet(s) 5 1.00 100% 0%P34121EH10 4E62-03A Prepare Enquiry Package - CCTV Systems : Requisition 15 1.00 100% 0%P34121EH20 Prepare P.O. Package - CCTV SystemsP34121EH20 4E62-04A Prepare P.O. Package - CCTV Systems : Bid Evaluation 5 1.00 100% 0%P34121EH20 4E62-05A Prepare P.O. Package - CCTV Systems : Prepare P.O. Package 5 1.00 100% 0%P34121EH30 Vendor Data Review - CCTV SystemsP34121EH30 4E62-06A Vendor Data Review - CCTV Systems : Vendor Data Review 30 1.00 100% 0%P34121EH40 Prepare Enquiry Package - Telephone SystemsP34121EH40 4E62-07A Prepare Enquiry Package - Telephone Systems : Specification 20 1.00 100% 0%P34121EH40 4E62-08A Prepare Enquiry Package - Telephone Systems : Data Sheet(s) 5 1.00 100% 0%P34121EH40 4E62-09A Prepare Enquiry Package - Telephone Systems : Requisition 15 1.00 100% 0%P34121EH50 Prepare P.O. Package - Telephone SystemsP34121EH50 4E62-10A Prepare P.O. Package - Telephone Systems : Bid Evaluation 5 1.00 100% 0%P34121EH50 4E62-11A Prepare P.O. Package - Telephone Systems : Prepare P.O. Package 5 1.00 100% 0%P34121EH60 Vendor Data Review - Telephone SystemsX4121EH60 4E62-12A Vendor Data Review - Telephone Systems : Vendor Data Review 30 1.00 100% 0%P34121EH70 Prepare Enquiry Package - PA SystemsP34121EH70 4E62-13A Prepare Enquiry Package - PA Systems : Specification 20 1.00 100% 0%P34121EH70 4E62-14A Prepare Enquiry Package - PA Systems : Data Sheet(s) 5 1.00 100% 0%P34121EH70 4E62-15A Prepare Enquiry Package - PA Systems : Requisition 15 1.00 100% 0%P34121EH80 Prepare P.O. Package - PA SystemsP34121EH80 4E62-16A Prepare P.O. Package - PA Systems : Bid Evaluation 5 1.00 100% 0%P34121EH80 4E62-17A Prepare P.O. Package - PA Systems : Prepare P.O. Package 5 1.00 100% 0%P34121EH90 Vendor Data Review - PA SystemsP34121EH90 4E62-18A Vendor Data Review - PA Systems : Vendor Data Review 30 1.00 100% 0%P34121EJ10 Prepare Enquiry Package - Lighting FixturesP34121EJ10 4E62-19A Prepare Enquiry Package - Lighting Fixtures : Specification 20 1.00 100% 0%P34121EJ10 4E62-20A Prepare Enquiry Package - Lighting Fixtures : Data Sheet(s) 5 1.00 100% 0%P34121EJ10 4E62-21A Prepare Enquiry Package - Lighting Fixtures : Requisition 15 1.00 100% 0%P34121EJ20 Prepare P.O. Package - Lighting FixturesP34121EJ20 4E62-22A Prepare P.O. Package - Lighting Fixtures : Bid Evaluation 5 1.00 100% 0%P34121EJ20 4E62-23A Prepare P.O. Package - Lighting Fixtures : Prepare P.O. Package 5 1.00 100% 0%P34121EJ30 Vendor Data Review - Lighting FixturesP34121EJ30 4E62-24A Vendor Data Review - Lighting Fixtures : Vendor Data Review 30 1.00 100% 0%P34121EJ40 Prepare Enquiry Package - Control StationsP34121EJ40 4E62-25A Prepare Enquiry Package - Control Stations : Specification 20 1.00 100% 0%P34121EJ40 4E62-26A Prepare Enquiry Package - Control Stations : Data Sheet(s) 5 1.00 100% 0%P34121EJ40 4E62-27A Prepare Enquiry Package - Control Stations : Requisition 15 1.00 100% 0%P34121EJ50 Prepare P.O. Package - Control StationsP34121EJ50 4E62-28A Prepare P.O. Package - Control Stations : Bid Evaluation 5 1.00 100% 0%P34121EJ50 4E62-29A Prepare P.O. Package - Control Stations : Prepare P.O. Package 5 1.00 100% 0%P34121EJ60 Vendor Data Review - Control StationsP34121EJ60 4E62-30A Vendor Data Review - Control Stations : Vendor Data Review 30 1.00 100% 0%P34121EJ70 Prepare Enquiry Package - Heat TracingP34121EJ70 4E62-31A Prepare Enquiry Package - Heat Tracing : Specification 40 1.00 100% 0%P34121EJ70 4E62-32A Prepare Enquiry Package - Heat Tracing : Data Sheet(s) 5 1.00 100% 0%P34121EJ70 4E62-33A Prepare Enquiry Package - Heat Tracing : Requisition 15 1.00 100% 0%P34121EJ80 Prepare P.O. Package - Heat TracingP34121EJ80 4E62-34A Prepare P.O. Package - Heat Tracing : Bid Evaluation 5 1.00 100% 0%P34121EJ80 4E62-35A Prepare P.O. Package - Heat Tracing : Prepare P.O. Package 5 1.00 100% 0%P34121EJ90 Vendor Data Review - Heat TracingP34121EJ90 4E62-36A Vendor Data Review - Heat Tracing : Vendor Data Review 30 1.00 100% 0%P34121EK10 Prepare Enquiry Package - Cathodic ProtectionP34121EK10 4E62-37A Prepare Enquiry Package - Cathodic Protection : Specification 20 1.00 100% 0%P34121EK10 4E62-38A Prepare Enquiry Package - Cathodic Protection : Data Sheet(s) 5 1.00 100% 0%P34121EK10 4E62-39A Prepare Enquiry Package - Cathodic Protection : Requisition 15 1.00 100% 0%P34121EK20 Prepare P.O. Package - Cathodic ProtectionP34121EK20 4E62-40A Prepare P.O. Package - Cathodic Protection : Bid Evaluation 5 1.00 100% 0%P34121EK20 4E62-41A Prepare P.O. Package - Cathodic Protection : Prepare P.O. Package 5 1.00 100% 0%P34121EK30 Vendor Data Review - Cathodic ProtectionP34121EK30 4E62-42A Vendor Data Review - Cathodic Protection : Vendor Data Review 30 1.00 100% 0%P34121EK40 Prepare Enquiry Package - HVAC SystemsP34121EK40 4E62-43A Prepare Enquiry Package - HVAC Systems : Specification 20 1.00 100% 0%P34121EK40 4E62-44A Prepare Enquiry Package - HVAC Systems : Data Sheet(s) 5 1.00 100% 0%P34121EK40 4E62-45A Prepare Enquiry Package - HVAC Systems : Requisition 15 1.00 100% 0%P34121EK50 Prepare P.O. Package - HVAC SystemsP34121EK50 4E62-46A Prepare P.O. Package - HVAC Systems : Bid Evaluation 5 1.00 100% 0%P34121EK50 4E62-47A Prepare P.O. Package - HVAC Systems : Prepare P.O. Package 5 1.00 100% 0%P34121EK60 Vendor Data Review - HVAC SystemsP34121EK60 4E62-48A Vendor Data Review - HVAC Systems : Vendor Data Review 30 1.00 100% 0%P34121EK70 Prepare Enquiry Package - Earthing SystemsP34121EK70 4E62-49A Prepare Enquiry Package - Earthing Systems : Specification 20 1.00 100% 0%P34121EK70 4E62-50A Prepare Enquiry Package - Earthing Systems : Data Sheet(s) 5 1.00 100% 0%P34121EK70 4E62-51A Prepare Enquiry Package - Earthing Systems : Requisition 15 1.00 100% 0%P34121EK80 Prepare P.O. Package - Earthing SystemsP34121EK80 4E62-52A Prepare P.O. Package - Earthing Systems : Bid Evaluation 5 1.00 100% 0%P34121EK80 4E62-53A Prepare P.O. Package - Earthing Systems : Prepare P.O. Package 5 1.00 100% 0%P34121EK90 Vendor Data Review - Earthing SystemsP34121EK90 4E62-54A Vendor Data Review - Earthing Systems : Vendor Data Review 30 1.00 100% 0%

Page 45: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: ELECTRICAL

Page 45 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34121EL10 Prepare Enquiry Package - Power Management SystemsP34121EL10 4E62-55A Prepare Enquiry Package - Power Management Systems : Specification 40 1.00 100% 0%P34121EL10 4E62-56A Prepare Enquiry Package - Power Management Systems : Data Sheet(s) 5 1.00 100% 0%P34121EL10 4E62-57A Prepare Enquiry Package - Power Management Systems : Requisition 15 1.00 100% 0%P34121EL20 Prepare P.O. Package - Power Management SystemsP34121EL20 4E62-58A Prepare P.O. Package - Power Management Systems : Bid Evaluation 5 1.00 100% 0%P34121EL20 4E62-59A Prepare P.O. Package - Power Management Systems : Prepare P.O. Package 5 1.00 100% 0%P34121EL30 Vendor Data Review - Power Management SystemsP34121EL30 4E62-60A Vendor Data Review - Power Management Systems : Vendor Data Review 30 1.00 100% 0%P34121EL40 Prepare Enquiry Package - Navigational AidsP34121EL40 4E62-61A Prepare Enquiry Package - Navigational Aids : Specification 40 1.00 100% 0%P34121EL40 4E62-62A Prepare Enquiry Package - Navigational Aids : Data Sheet(s) 5 1.00 100% 0%P34121EL40 4E62-63A Prepare Enquiry Package - Navigational Aids : Requisition 15 1.00 100% 0%P34121EL50 Prepare P.O. Package - Navigational AidsP34121EL50 4E62-64A Prepare P.O. Package - Navigational Aids : Bid Evaluation 5 1.00 100% 0%P34121EL50 4E62-65A Prepare P.O. Package - Navigational Aids : Prepare P.O. Package 5 1.00 100% 0%P34121EL60 Vendor Data Review - Navigational AidsP34121EL60 4E62-66A Vendor Data Review - Navigational Aids : Vendor Data Review 30 1.00 100% 0%P34121EL70 Prepare Enquiry Package - PLCsP34121EL70 4E62-67A Prepare Enquiry Package - PLCs : Specification 40 1.00 100% 0%P34121EL70 4E62-68A Prepare Enquiry Package - PLCs : Data Sheet(s) 5 1.00 100% 0%P34121EL70 4E62-69A Prepare Enquiry Package - PLCs : Requisition 15 1.00 100% 0%P34121EL80 Prepare P.O. Package - PLCsP34121El80 4E62-70A Prepare P.O. Package - PLCs : Bid Evaluation 5 1.00 100% 0%P34121El80 4E62-71A Prepare P.O. Package - PLCs : Prepare P.O. Package 5 1.00 100% 0%P34121EL90 Vendor Data Review - PLCsP34121EL90 4E62-72A Vendor Data Review - PLCs : Vendor Data Review 30 1.00 100% 0%

E75 Subcontracts - Engineering / SpecialistsP34121EM10 Enquiry Package - Eng. / Specialist ServicesP34121EM10 4E75-01A Enquiry Package - Eng. / Specialist Services : Specification 30 1.00 100% 0%P34121EM10 4E75-02A Enquiry Package - Eng. / Specialist Services : Requisition 20 1.00 100% 0%P34121EM20 Prepare P.O. Package - Eng. / Specialist ServicesP34121EM20 4E75-03A Prepare P.O. Package - Eng. / Specialist Services : Prepare Technical Bid Analysis 20 1.00 100% 0%P34121EM20 4E75-04A Prepare P.O. Package - Eng. / Specialist Services : Update package documents for P.O. issue 20 1.00 100% 0%P34121EM30 Vendor Data Review - Eng. / Specialist ServicesP34121EM30 4E75-05A Vendor Data Review - Eng. / Specialist Services : Vendor Data Review 30 1.00 100% 0%

E76 Subcontracts - FabricationP34121EN10 Enquiry Package - FabricationP34121EN10 4E76-01A Enquiry Package - Fabrication : Specification 30 1.00 100% 0%P34121EN10 4E76-02A Enquiry Package - Fabrication : Requisition 20 1.00 100% 0%P34121EN20 Prepare P.O. Package - FabricationP34121EN20 4E76-03A Prepare P.O. Package - Fabrication : Prepare Technical Bid Analysis 20 1.00 100% 0%P34121EN20 4E76-04A Prepare P.O. Package - Fabrication : Update package documents for P.O. issue 20 1.00 100% 0%P34121EN30 Vendor Data Review - FabricationP34121EN30 4E76-05A Vendor Data Review - Fabrication : Vendor Data Review 30 1.00 100% 0%

E77 Subcontracts - ConstructionP34121EP10 Enquiry Package - ConstructionP34121EP10 4E77-01A Enquiry Package - Construction : Specification 30 1.00 100% 0%P34121EP10 4E77-02A Enquiry Package - Construction : Requisition 20 1.00 100% 0%

P34121EP20 Prepare P.O. Package - ConstructionP34121EP20 4E77-03A Prepare P.O. Package - Construction : Prepare Technical Bid Analysis 20 1.00 100% 0%P34121EP20 4E77-04A Prepare P.O. Package - Construction : Update package documents for P.O. issue 20 1.00 100% 0%

P34121EP30 Vendor Data Review - ConstructionP34121EP30 4E77-05A Vendor Data Review - Construction : Vendor Data Review 30 1.00 100% 0%

P34121E800 Hazardous Area CertificationP34121E800 4E80-01A Hazardous Area Certification : Add certification details to Electrical Equipment List 0.2 1.00 100% 0%P34121E800 4E80-02A Hazardous Area Certification : Add certified items to Cable Block diagram 40 1.00 25% 75%P34121E800 4E80-03A Hazardous Area Certification : Obtain certificates for existing equipment 2 1.00 100% 0%P34121E800 4E80-04A Hazardous Area Certification : Visual inspection of existing equipment on site 1 1.00 100% 0%P34121E800 4E80-05A Hazardous Area Certification : Suitability reports - non AS equipment 2 1.00 100% 0%P34121E800 4E80-06A Hazardous Area Certification : Suitability reports - existing equipment 3 1.00 100% 0%P34121E800 4E80-07A Hazardous Area Certification : Liaison with Haz area equipment consultant/OCEI 30 1.00 100% 0%P34121E800 4E80-08A Hazardous Area Certification : Haz area consultant review of suitability reports 0.5 1.00 100% 0%P34121E800 4E80-09A Hazardous Area Certification : Input different types into haz area database 2 1.00 100% 0%P34121E800 4E80-10A Hazardous Area Certification : Input repeated items into haz area database 0.2 1.00 100% 0%P34121E800 4E80-11A Hazardous Area Certification : Review of status 5 1.00 100% 0%P34121E800 4E80-12A Hazardous Area Certification : Issue Hazardous Area Certification Report 20 1.00 100% 0%P34121E800 4E80-13A Hazardous Area Certification : Senior Engineer Review/approval 0.5 1.00 100% 0%

P34121E850 Construction SupportP34121E850 4E85-01A Construction Support : Response to Site Queries 10 1.00 50% 50%P34121E850 4E85-02A Construction Support : Commissioning Support - Office 10 1.00 50% 50%P34121E850 4E85-03A Construction Support : Commissioning Support - Site 10 1.00 50% 50%P34121E850 4E85-04A Construction Support : Prepare Discrete Workpacks (DWPs) 20 1.00 50% 50%

P34121E860 Inspection, Testing, Operator Training & Commissioning SupportP34121E860 4E86-01A Inspection, Testing, Operator Training & Commissioning Support : Switchgear / MCC - FAT 30 1.00 100% 0%P34121E860 4E86-02A Inspection, Testing, Operator Training & Commissioning Support : Packaged Systems - FAT 30 1.00 100% 0%P34121E860 4E86-03A Inspection, Testing, Operator Training & Commissioning Support : Panels - FAT 30 1.00 100% 0%P34121E860 4E86-04A Inspection, Testing, Operator Training & Commissioning Support : Protection Settings Data Sheets 30 1.00 100% 0%P34121E860 4E86-05A Inspection, Testing, Operator Training & Commissioning Support : VSD Control Settings Data Sheet 20 1.00 100% 0%P34121E860 4E86-06A Inspection, Testing, Operator Training & Commissioning Support : Commissioning Procedure 30 1.00 100% 0%P34121E860 4E86-07A Inspection, Testing, Operator Training & Commissioning Support : Check Sheets 5 1.00 100% 0%P34121E860 4E86-08A Inspection, Testing, Operator Training & Commissioning Support : Inspection & Test Plan 5 1.00 100% 0%P34121E860 4E86-09A Inspection, Testing, Operator Training & Commissioning Support : Inspection & Test Method 10 1.00 100% 0%P34121E860 4E86-10A Inspection, Testing, Operator Training & Commissioning Support : Inspection/Test Record Sheets 5 1.00 100% 0%

P34121E870 Design Reports / Job BooksP34121E870 4E87-01A Design Reports / Job Books : Haz Area Equipment Dossier 40 1.00 100% 0%P34121E870 4E87-02A Design Reports / Job Books : Job Books 40 1.00 100% 0%P34121E870 4E87-03A Design Reports / Job Books : Serviceablity Reports - Existing Equipment 30 1.00 100% 0%P34121E870 4E87-04A Design Reports / Job Books : Serviceability Reports - Non AS certified equipment 20 1.00 100% 0%

P34121E900 Formal Operator TrainingP34121E900 4E90-01A Formal Operator Training : Training Plan for O & M 24 1.00 100% 0%P34121E900 4E90-02A Formal Operator Training : Training Modules 80 1.00 100% 0%P34121E900 4E90-03A Formal Operator Training : Prepare Update POMs 16 1.00 100% 0%P34121E900 4E90-04A Formal Operator Training : Operations Training Modules 40 1.00 100% 0%P34121E900 4E90-05A Formal Operator Training : Maintenance Training Modules 40 1.00 100% 0%P34121E900 4E90-06A Formal Operator Training : Deliver Operations Training ( 6 sessions) 30 1.00 100% 0%P34121E900 4E90-07A Formal Operator Training : Deliver Maintenance Training (2 sessions) 12 1.00 100% 0%

P34121E950 As-BuildingP34121E950 4E95-01A As-Building : As-Building of Drawings 1.00 0% 100%

Page 46: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

As Built Staffhour EstimateOn Shore

This estimate is based on minimal changes to as built documents

Discipline Electrical

Project drawings descriptions No Off

Project Drawing Schedule

Key Plans

Single Line Diag,s

Electrical Plot Plans

Electrical Layouts

Electrical Cable Racks

Cables U/G

Equipment Schedules

Schematics

Connection Diags

Communication Drgs

Project Std Details

Static Earthing

Hazardous Area and Determination Drgs

Cathodic protection Drgs

Dist board summary Sht

Cable Schedules

As built activities

Description No. Drgs Hrs/Drg Total Hrs

Drawing sheet check 0 0.25 0

Electronic Critical drg check 0 0.33 0

Project Drg archive 0.17 0

Archive Electronic drg files 0.08 0

Raster burn Back=60% Total 0 0.08 0

Unused masterdrgs returned 0.08 0

Unused drg numbers returned 0.08 0

List all used Inst Tags 0.08 0

Unused wire and grid Nos returned 0.08 0

Unused data/Spec sheet Nos returned 0.08 0

Cd Verification against Drawing register 0.25 0

A3 wet signature hard copy 0 0.08 0

Request Drawings 0.5 0

As built Mark up review 0 0.03 0

Project Drawing Schedule 0 2 0

Key Plans 0 1.5 0

Single Line Diag,s 0 2 0

Electrical Plot Plans 0 2.5 0

Electrical Layouts 0 2.5 0

Electrical Cable Racks 0 3 0

Cables U/G 0 3 0

Equipment Schedules 0 3 0

Schematics 0 3 0

Connection Diags 0 3 0

Page 47: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Communication Drgs 0 1.5 0

Project Std Details 0 2 0

Static Earthing 0 1.5 0

Hazardous Area and Determination Drgs 0 5 0

Cathodic protection Drgs 0 2 0

Dist board summary Sht 0 1.5 0

Cable Schedules 0 2.5 0

Sub Total 0

Supervision 2.5% 0

Total Hrs 0.0 Hours

Page 48: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 48 of 73 04/17/2023

INSTRUMENT ENGINEERING / DESIGN - STAFFHOUR ESTIMATE PH4

Project No : 359/Y5066Title : Sulphur Dioxide Reduction Project

Workpack Ref. : Lo-Cat Licensed technologyDescription : Phase 3 cost estimate - Off plot - Lo-Cat process

EngineeringEngineering Design

Hrs HrsCat Hours 0 0

Rate 110.0 95.0

% Of Total #DIV/0! #DIV/0!

Total Hrs 0Total Cost $0

Rev Description Prepared By Reviewed By DateA Issued For Estimate

Notes on Using this Estimate Sheet

1 Activities (WBS Nos.) are included as prompts for guidance. It is not necessary to complete all categories.2 Additional activities may be added as required.3 Norms (Unit Hours) may be adjusted to suit project requirements.4 Generally J00 is to be used on proposals and small FEED projects.5 Electronic copy of this template is stored in the following directory - G:\Engineering_Intranet\Instruments\Estimate_Sheets\6 Please advise the Engineering Manager of any additions, changes or adjustments required to norms or activities.

Notes on Using 'Insert New Row' button1 Position cursor in any cell - a new row will always be inserted below2 This function will also copy previous row fomulas and text to new row - please modify text accordingly

Notes on Using 'Delete Row' button1 Position cursor in a cell of the row you want to delete

Notes on Using 'View' & 'Hide' buttons1 Position cursor in a cell (or cells) that you want the '0' to be visible or not

12 Identify any new/missing activities/deliverables3 Split of activities within each discipline group from point of view of how it should be scheduled4 Focus is on detailed/design (execute - EPC)5 As-building estimate outside of InControl6 Different work packs eg early design, detailed design789101112131415

Activity ID Del.Cost Time & Resources Summary Engineering Design Total

(CTR) or Task

XX4121J000 Default - total is less than 200 hours (& Proposals)

XX4121J100 General Coordination & Job Preparation

Assumptions and Clarifications for this Estimate: Revised to provide activity based estimating > schedule development >historical vailidation of Norms

Project duration is XX weeks - Review Norms

Page 49: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 49 of 73 04/17/2023

XX4121J200 Studies

XX4121J250 PFD / P&ID Preparation & Maintenance (P&ID drafting in Piping Estimate)

XX4121J300 Calculations

XX4121J350 Specifications

XX4121J400 Schedules & Lists

XX4121J410 INtools Database Setup & Input

XX4121J420 Intools Database - Check/Backdraft

XX4121J430 Intools Database - Finalise/Issue Reports

XX4121J450 MTO - Preliminary

XX4121J460 MTO - Intermediate

XX4121J470 MTO - Final

XX4121J500 Plot Plans & Site Layouts

XX4121J510 Planning Studies

XX4121J520 3D CAD Modelling Set-up & Input

XX4121J530 3D CAD Modelling - Check / Back Model

XX4121J540 3D CAD Modelling - Finalise

XX4121J550

XX4121J560

XX4121J570 Demolition Drawings

XX4121J580 Diagrams

XX4121J590 Schematics

XX4121J600 Connection / Termination Diagrams

XX4121J610 Logic Diagrams

XX4121J620 SFDs - Preliminary Issue

XX4121J630 SFDs - Intermediate / CHAZOP Issue

XX4121J640 SFDs - Finalise & Issue

XX4121J650 Installation Details

J60 Procurement - Instrument Bulks

XX4121J0A1 Enquiry Package - Valves & Fittings

XX4121J0A2 Prepare P.O. Package - Valves & Fittings

XX4121J0B1 Enquiry Package - Instrument Tubing

XX4121J0B2 Prepare P.O. Package - Instrument Tubing

XX4121J0C1 Enquiry Package - Instrument Electrical Bulks

XX4121J0C2 Prepare P.O. Package - Instrument Electrical Bulks

XX4121J0D1 Enquiry Package - Instrument Stands

XX4121J0D2 Prepare P.O. Package - Instrument Stands

XX4121J0E1 Enquiry Package - Instrument Cable

XX4121J0E2 Prepare P.O. Package - Instrument Cable

XX4121J0F1 Enquiry Package - Instrument Labels

XX4121J0F2 Prepare P.O. Package - Labels

XX4121J0G1 Enquiry Package - Contingencies

XX4121J0G2 Prepare P.O. Package - Contingencies

XX4121J0H1 Enquiry Package - Bulks - Special (1)

XX4121J0H2 Prepare P.O. Package - Bulks - Special (1)

XX4121J0I1 Enquiry Package - Bulks - Special (2)

XX4121J0I2 Prepare P.O. Package - Bulks - Special (2)

XX4121J0J1 Enquiry Package - Bulks - Special (3)

XX4121J0J2 Prepare P.O. Package - Bulks - Special (3)

J61 Procurement - Valves

XX4121J1A1 Enquiry Package - Control Valves & Regulators

XX4121J1A2 Prepare P.O. Package - Control Valves & Regulators

XX4121J1A3 Vendor Data Review - Control Valves & Regulators

XX4121J1B1 Enquiry Package - Actuated Valves

XX4121J1B2 Prepare P.O. Package - Actuated Valves

XX4121J1B3 Vendor Data Review - Actuated Valves

XX4121J1C1 Enquiry Package - Relief Valves

XX4121J1C2 Prepare P.O. Package - Relief Valves

XX4121J1C3 Vendor Data Review - Relief Valves

XX4121J1D1 Enquiry Package - Choke Valves

XX4121J1D2 Prepare P.O. Package - Choke Valves

XX4121J1D3 Vendor Data Review - Choke Valves

XX4121J1E1 Enquiry Package - Bursting Discs

XX4121J1E2 Prepare P.O. Package - Bursting Discs

XX4121J1E3 Vendor Data Review - Bursting Discs

XX4121J1F1 Enquiry Package - Severe Service Valves

XX4121J1F2 Prepare P.O. Package - Severe Service Valves

Drawings Arrangement & Details

Drawings - Layouts Onshore / Offshore

Page 50: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 50 of 73 04/17/2023

XX4121J1F3 Vendor Data Review - Severe Service Valves

XX4121J1G1 Enquiry Package - Deluge Valves

XX4121J1G2 Prepare P.O. Package - Deluge Valves

XX4121J1G3 Vendor Data Review - Deluge Valves

XX4121J1H1 Enquiry Package - Proximity Detectors

XX4121J1H2 Prepare P.O. Package - Proximity Detectors

XX4121J1H3 Vendor Data Review - Proximity Detectors

XX4121J1J1 Enquiry Package - Special Valves (1)

XX4121J1J2 Prepare P.O. Package - Special Valves (1)

XX4121J1J3 Vendor Data Review - Special Valves (1)

XX4121J1K1 Enquiry Package - Special Valves (2)

XX4121J1K2 Prepare P.O. Package - Special Valves (2)

XX4121J1K3 Vendor Data Review - Special Valves (2)

XX4121J1L1 Enquiry Package - Special Valves (3)

XX4121J1L2 Prepare P.O. Package - Special Valves (3)

XX4121J1L3 Vendor Data Review - Special Valves (3)

XX4121J1M1 Enquiry Package - Spare (1)

XX4121J1M2 Prepare P.O. Package - Spare (1)

XX4121J1M3 Vendor Data Review - Spare (1)

XX4121J1N1 Enquiry Package - Spare (2)

XX4121J1N2 Prepare P.O. Package - Spare (2)

XX4121J1N3 Vendor Data Review - Spare (2)

J62 Procurement - Flow Instruments

XX4121J2A1 Enquiry Package - Restriction & Flow Orifice Plates

XX4121J2A2 Prepare P.O. Package - Restriction & Flow Orifice Plates

XX4121J2A3 Vendor Data Review - Restriction & Flow Orifice Plates

XX4121J2B1 Enquiry Package - Senior Orifice Fittings

XX4121J2B2 Prepare P.O. Package - Senior Orifice Fittings

XX4121J2B3 Vendor Data Review - Senior Orifice Fittings

XX4121J2C1 Enquiry Package - Turbine Meters

XX4121J2C2 Prepare P.O. Package - Turbine Meters

XX4121J2C3 Vendor Data Review - Turbine Meters

XX4121J2D1 Enquiry Package - Mag Flow Meters

XX4121J2D2 Prepare P.O. Package - Mag Flow Meters

XX4121J2D3 Vendor Data Review - Mag Flow Meters

XX4121J2E1 Enquiry Package - Ultrasonic Flow Meters

XX4121J2E2 Prepare P.O. Package - Ultrasonic Flow Meters

XX4121J2E3 Vendor Data Review - Ultrasonic Flow Meters

XX4121J2F1 Enquiry Package - Multi-Phase Flow Meters

XX4121J2F2 Prepare P.O. Package - Multi-Phase Flow Meters

XX4121J2F3 Vendor Data Review - Multi-Phase Flow Meters

XX4121J2G1 Enquiry Package - Low Loss Dp Elements

XX4121J2G2 Prepare P.O. Package - Low Loss Dp Elements

XX4121J2G3 Vendor Data Review - Low Loss Dp Elements

XX4121J2H1 Enquiry Package - Annubars & Pilot Tubes

XX4121J2H2 Prepare P.O. Package - Annubars & Pilot Tubes

XX4121J2H3 Vendor Data Review - Annubars & Pilot Tubes

XX4121J2J1 Enquiry Package - Flow Switches

XX4121J2J2 Prepare P.O. Package - Flow Switches

XX4121J2J3 Vendor Data Review - Flow Switches

XX4121J2K1 Enquiry Package - Coriolis Meters

XX4121J2K2 Prepare P.O. Package - Coriolis Meters

XX4121J2K3 Vendor Data Review - Coriolis Meters

XX4121J2L1 Enquiry Package - V-Cone Flowmeters

XX4121J2L2 Prepare P.O. Package - V-Cone Flowmeters

XX4121J2L3 Vendor Data Review - V-Cone Flowmeters

XX4121J2M1 Enquiry Package - Vortex Meters

XX4121J2M2 Prepare P.O. Package - Vortex Meters

XX4121J2M3 Vendor Data Review - Vortex Meters

XX4121J2N1 Enquiry Package - Meter Provers / Skids

XX4121J2N2 Prepare P.O. Package - Meter Provers / Skids

XX4121J2N3 Vendor Data Review - Meter Provers / Skids

XX4121J2P1 Enquiry Package - Open Channel Flowmeters

XX4121J2P2 Prepare P.O. Package - Open Channel Flowmeters

XX4121J2P3 Vendor Data Review - Open Channel Flowmeters

XX4121J2R1 Enquiry Package - Positive Discplacement Meters

XX4121J2R2 Prepare P.O. Package - Positive Displacement Meters

XX4121J2R3 Vendor Data Review - Positive Displacement Meters

Page 51: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 51 of 73 04/17/2023

XX4121J2S1 Enquiry Package - Thermal Dispersion

XX4121J2S2 Prepare P.O. Package - Thermal Dispersion

XX4121J2S3 Vendor Data Review - Thermal Dispersion

XX4121J2T1 Enquiry Package - Spare (1)

XX4121J2T2 Prepare P.O. Package - Spare (1)

XX4121J2T3 Vendor Data Review - Spare (1)

XX4121J2U1 Enquiry Package - Spare (2)

XX4121J2U2 Prepare P.O. Package - Spare (2)

XX4121J2U3 Vendor Data Review - Spare (2)

XX4121J2V1 Enquiry Package - Spare (3)

XX4121J2V2 Prepare P.O. Package - Spare (3)

XX4121J2V3 Vendor Data Review - Spare (3)

J63 Procurement - Pressure Instruments

XX4121J3A1 Enquiry Package - Pressure Transmitters (All Types)

XX4121J3A2 Prepare P.O. Package - Pressure Transmitters (All Types)

XX4121J3A3 Vendor Data Review - Pressure Transmitters (All Types)

XX4121J3B1 Enquiry Package - Pressure Gauges

XX4121J3B2 Prepare P.O. Package - Pressure Gauges

XX4121J3B3 Vendor Data Review - Pressure Gauges

XX4121J3C1 Enquiry Package - Pressure Switches

XX4121J3C2 Prepare P.O. Package - Pressure Switches

XX4121J3C3 Vendor Data Review - Pressure Switches

XX4121J3D1 Enquiry Package - Spare (1)

XX4121J3D2 Prepare P.O. Package - Spare (1)

XX4121J3D3 Vendor Data Review - Spare (1)

XX4121J3E1 Enquiry Package - Spare (2)

XX4121J3E2 Prepare P.O. Package - Spare (2)

XX4121J3E3 Vendor Data Review - Spare (2)

XX4121J3E1 Enquiry Package - Spare (2)

XX4121J3E2 Prepare P.O. Package - Spare (2)

XX4121J3E3 Vendor Data Review - Spare (2)

J64 Procurement - Level Instruments

XX4121J4A1 Enquiry Package - Level Gauges

XX4121J4A2 Prepare P.O. Package - Level Gauges

XX4121J4A3 Vendor Data Review - Level Gauges

XX4121J4B1 Enquiry Package - Ultrasonic Level Transmitters

XX4121J4B2 Prepare P.O. Package - Ultrasonic Level Transmitters

XX4121J4B3 Vendor Data Review - Ultrasonic Level Transmitters

XX4121J4C1 Enquiry Package - Radar Level Transmitters

XX4121J4C2 Prepare P.O. Package - Radar Level Transmitters

XX4121J4C3 Vendor Data Review - Radar Level Transmitters

XX4121J4D1 Enquiry Package - Displacer Type Level Transmitters

XX4121J4D2 Prepare P.O. Package - Displacer Type Level Transmitters

XX4121J4D3 Vendor Data Review - Displacer Type Level Transmitters

XX4121J4E1 Enquiry Package - Float Type Transmitters

XX4121J4E2 Prepare P.O. Package - Float Type Transmitters

XX4121J4E3 Vendor Data Review - Float Type Transmitters

XX4121J4F1 Enquiry Package - Nucleonic Level Transmitters

XX4121J4F2 Prepare P.O. Package - Nucleonic Level Transmitters

XX4121J4F3 Vendor Data Review - Nucleonic Level Transmitters

XX4121J4G1 Enquiry Package - Capacitance / Admittance Level Transmitters

XX4121J4G2 Prepare P.O. Package - Capacitance / Admittance Level Transmitters

XX4121J4G3 Vendor Data Review - Capacitance / Admittance Level Transmitters

XX4121J4H1 Enquiry Package - Tank Gauges & Systems

XX4121J4H2 Prepare P.O. Package - Tank Gauges & Systems

XX4121J4H3 Vendor Data Review - Tank Gauges & Systems

XX4121J4J1 Enquiry Package - Level Switches (All Types)

XX4121J4J2 Prepare P.O. Package - Level Switches (All Types)

XX4121J4J3 Vendor Data Review - Level Switches (All Types)

XX4121J4K1 Enquiry Package - Level Instruments - Special (1)

XX4121J4K2 Prepare P.O. Package - Level Instruments - Special (1)

XX4121J4K3 Vendor Data Review - Level Instruments - Special (1)

XX4121J4L1 Enquiry Package - Level Instruments - Special (2)

XX4121J4L2 Prepare P.O. Package - Level Instruments - Special (2)

XX4121J4L3 Vendor Data Review - Level Instruments - Special (2)

XX4121J4M1 Enquiry Package - Level Instruments - Spare (1)

Page 52: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 52 of 73 04/17/2023

XX4121J4M2 Prepare P.O. Package - Level Instruments - Spare (1)

XX4121J4M3 Vendor Data Review - Level Instruments - Spare (1)

XX4121J4N1 Enquiry Package - Level Instruments - Spare (2)

XX4121J4N2 Prepare P.O. Package - Level Instruments - Spare (2)

XX4121J4N3 Vendor Data Review - Level Instruments - Spare (2)

J65 Procurement - Temperature Instruments

XX4121J5A1 Enquiry Package - Temperature Transmitters

XX4121J5A2 Prepare P.O. Package - Temperature Transmitters

XX4121J5A3 Vendor Data Review - Temperature Transmitters

XX4121J5B1 Enquiry Package - Temperature Gauges

XX4121J5B2 Prepare P.O. Package - Temperature Gauges

XX4121J5B3 Vendor Data Review - Temperature Gauges

XX4121J5C1 Enquiry Package - Thermowells

XX4121J5C2 Prepare P.O. Package - Thermowells

XX4121J5C3 Vendor Data Review - Thermowells

XX4121J5D1 Enquiry Package - Temperature Elements

XX4121J5D2 Prepare P.O. Package - Temperature Elements

XX4121J5D3 Vendor Data Review - Temperature Elements

XX4121J5E1 Enquiry Package - Pyrometers

XX4121J5E2 Prepare P.O. Package - Pyrometers

XX4121J5E3 Vendor Data Review - Pyrometers

XX4121J5F1 Enquiry Package - Temperature Equipment - Special (1)

XX4121J5F2 Prepare P.O. Package - Temperature Equipment - Special (1)

XX4121J5F3 Vendor Data Review - Temperature Equipment - Special (1)

XX4121J5G1 Enquiry Package - Temperature Equipment - Special (2)

XX4121J5G2 Prepare P.O. Package - Temperature Equipment - Special (2)

XX4121J5G3 Vendor Data Review - Temperature Equipment - Special (2)

XX4121J5H1 Enquiry Package - Temperature Instruments - Spare (1)

XX4121J5H2 Prepare P.O. Package - Temperature Instruments - Spare (1)

XX4121J5H3 Vendor Data Review - Temperature Instruments - Spare (1)

XX4121J5J1 Enquiry Package - Temperature Instruments - Spare (2)

XX4121J5J2 Prepare P.O. Package - Temperature Instruments - Spare (2)

XX4121J5J3 Vendor Data Review - Temperature Instruments - Spare (2)

XX4121J5K1 Enquiry Package - Temperature Instruments - Spare (3)

XX4121J5K2 Prepare P.O. Package - Temperature Instruments - Spare (3)

XX4121J5K3 Vendor Data Review - Temperature Instruments - Spare (3)

J66 Procurement - Systems

XX4121J6A1 Enquiry Package - DCS

XX4121J6A2 Prepare P.O. Package - DCS

XX4121J6A3 Vendor Data Review - DCS

XX4121J6B1 Enquiry Package - ESD System

XX4121J6B2 Prepare P.O. Package - ESD System

XX4121J6B3 Vendor Data Review - ESD System

XX4121J6C1 Enquiry Package - Fire & Gas System

XX4121J6C2 Prepare P.O. Package - Fire & Gas System

XX4121J6C3 Vendor Data Review - Fire & Gas System

XX4121J6D1 Enquiry Package - SCADA

XX4121J6D2 Prepare P.O. Package - SCADA

XX4121J6D3 Vendor Data Review - SCADA

XX4121J6E1 Enquiry Package - PLCs

XX4121J6E2 Prepare P.O. Package - PLCs

XX4121J6E3 Vendor Data Review - PLCs

XX4121J6F1 Enquiry Package - Burner Management System

XX4121J6F2 Prepare P.O. Package - Burner Management System

XX4121J6F3 Vendor Data Review - Burner Management System

XX4121J6G1 Enquiry Package - Control Panels

XX4121J6G2 Prepare P.O. Package - Control Panels

XX4121J6G3 Vendor Data Review - Control Panels

XX4121J6H1 Enquiry Package - Hydraulic (or Wellhead) Panel

XX4121J6H2 Prepare P.O. Package - Hydraulic (or Wellhead) Panel

XX4121J6H3 Vendor Data Review - Hydraulic (or Wellhead) Panel

XX4121J6J1 Enquiry Package - Pneumatic Panel

XX4121J6J2 Prepare P.O. Package - Pneumatic Panel

XX4121J6J3 Vendor Data Review - Pneumatic Panel

XX4121J6K1 Enquiry Package - Equipment Monitoring Panel

XX4121J6K2 Prepare P.O. Package - Equipment Monitoring Panel

Page 53: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 53 of 73 04/17/2023

XX4121J6K3 Vendor Data Review - Equipment Monitoring Panel

XX4121J6L1 Enquiry Package - Telemetry

XX4121J6L2 Prepare P.O. Package - Telemetry

XX4121J6L3 Vendor Data Review - Telemetry

XX4121J6M1 Enquiry Package - CCTV System

XX4121J6M2 Prepare P.O. Package - CCTV System

XX4121J6M3 Vendor Data Review - CCTV System

XX4121J6N1 Enquiry Package - PABX System

XX4121J6N2 Prepare P.O. Package - PABX System

XX4121J6N3 Vendor Data Review - PABX System

XX4121J6P1 Enquiry Package - Radios

XX4121J6P2 Prepare P.O. Package - Radios

XX4121J6P3 Vendor Data Review - Radios

XX4121J6R1 Enquiry Package - Satellite Communications System

XX4121J6R2 Prepare P.O. Package - Satellite Communications System

XX4121J6R3 Vendor Data Review - Satellite Communications System

XX4121J6S1 Enquiry Package - Entertainment System

XX4121J6S2 Prepare P.O. Package - Entertainment System

XX4121J6S3 Vendor Data Review - Entertainment System

XX4121J6T1 Enquiry Package - PA / GA System

XX4121J6T2 Prepare P.O. Package - PA / GA System

XX4121J6T3 Vendor Data Review - PA / GA System

XX4121J6U1 Enquiry Package - Marshalling Cabinets

XX4121J6U2 Prepare P.O. Package - Marshalling Cabinets

XX4121J6U3 Vendor Data Review - Marshalling Cabinets

XX4121J6V1 Enquiry Package - Systems - Spare (1)

XX4121J6V2 Prepare P.O. Package - Systems - Spare (1)

XX4121J6V3 Vendor Data Review - Systems - Spare (1)

XX4121J6W1 Enquiry Package - Systems - Spare (2)

XX4121J6W2 Prepare P.O. Package - Systems - Spare (2)

XX4121J6W3 Vendor Data Review - Systems - Spare (2)

XX4121J6X1 Enquiry Package - Systems - Spare (3)

XX4121J6X2 Prepare P.O. Package - Systems - Spare (3)

XX4121J6X3 Vendor Data Review - Systems - Spare (3)

J67 Procurement - Fire & Gas Equipment

XX4121J7A1 Enquiry Package - Fire & Gas Equipment

XX4121J7A2 Prepare P.O. Package - Fire & Gas Equipment

XX4121J7A3 Vendor Data Review - Fire & Gas Equipment

XX4121J7B1 Enquiry Package - Gas Detectors (Generic)

XX4121J7B2 Prepare P.O. Package - Gas Detectors (Generic)

XX4121J7B3 Vendor Data Review - Gas Detectors (Generic)

XX4121J7C1 Enquiry Package - Gas Detectors (Toxic / Other)

XX4121J7C2 Prepare P.O. Package - Gas Detectors (Toxic / Other)

XX4121J7C3 Vendor Data Review - GasDetectors (Toxic / Other)

XX4121J7D1 Enquiry Package - Flame Detectors

XX4121J7D2 Prepare P.O. Package - Flame Detectors

XX4121J7D3 Vendor Data Review - Flame Detectors

XX4121J7E1 Enquiry Package - Manual Alarm Call Points

XX4121J7E2 Prepare P.O. Package - Manual Alarm Call Points

XX4121J7E3 Vendor Data Review - Manual Alarm Call Points

XX4121J7F1 Enquiry Package - Visual & Audible Alarms

XX4121J7F2 Prepare P.O. Package - Visual & Audible Alarms

XX4121J7F3 Vendor Data Review - Visual & Audible Alarms

XX4121J7G1 Enquiry Package - Smoke Detectors

XX4121J7G2 Prepare P.O. Package - Smoke Detectors

XX4121J7G3 Vendor Data Review - Smoke Detectors

XX4121J7H1 Enquiry Package - Heat Detectors

XX4121J7H2 Prepare P.O. Package - Heat Detectors

XX4121J7H3 Vendor Data Review - Heat Detectors

XX4121J7J1 Enquiry Package - Fusible Loop Panels

XX4121J7J2 Prepare P.O. Package - Fusible Loop Panels

XX4121J7J3 Vendor Data Review - Fusible Loop Panels

XX4121J7K1 Enquiry Package - Fire & Gas Equipment - Spare (1)

XX4121J7K2 Prepare P.O. Package - Fire & Gas Equipment - Spare (1)

XX4121J7K3 Vendor Data Review - Fire & Gas Equipment - Spare (1)

XX4121J7L1 Enquiry Package - Fire & Gas Equipment - Spare (2)

XX4121J7L2 Prepare P.O. Package - Fire & Gas Equipment - Spare (2)

XX4121J7L3 Vendor Data Review - Fire & Gas Equipment - Spare (2)

Page 54: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 54 of 73 04/17/2023

XX4121J7M1 Enquiry Package - Fire & Gas Equipment - Spare (3)

XX4121J7M2 Prepare P.O. Package - Fire & Gas Equipment - Spare (3)

XX4121J7M3 Vendor Data Review - Fire & Gas Equipment - Spare (3)

J68 Procurement - Analytical

XX4121J8A1 Enquiry Package - Analyzer Systems

XX4121J8A2 Prepare P.O. Package - Analyzer Systems

XX4121J8A3 Vendor Data Review - Analyzer Systems

XX4121J8B1 Enquiry Package - Chromatographs

XX4121J8B2 Prepare P.O. Package - Chromatographs

XX4121J8B3 Vendor Data Review - Chromatographs

XX4121J8C1 Enquiry Package - pH Meters

XX4121J8C2 Prepare P.O. Package - pH Meters

XX4121J8C3 Vendor Data Review - pH Meters

XX4121J8D1 Enquiry Package - Density Analyzer

XX4121J8D2 Prepare P.O. Package - Density Analyzer

XX4121J8D3 Vendor Data Review - Density Analyzer

XX4121J8E1 Enquiry Package - Conductivity Analyzer

XX4121J8E2 Prepare P.O. Package - Conductivity Analyzer

XX4121J8E3 Vendor Data Review - Conductivity Analyzer

XX4121J8F1 Enquiry Package - Oxygen Analyzer

XX4121J8F2 Prepare P.O. Package - Oxygen Analyzer

XX4121J8F3 Vendor Data Review - Oxygen Analyzer

XX4121J8G1 Enquiry Package - Hydrogen Dew Point Analyzer

XX4121J8G2 Prepare P.O. Package - Hydrogen Dew Point Analyzer

XX4121J8G3 Vendor Data Review - Hydrogen Dew Point Analyzer

XX4121J8H1 Enquiry Package - Moisture Analyzer

XX4121J8H2 Prepare P.O. Package - Moisture Analyzer

XX4121J8H3 Vendor Data Review - Moisture Analyzer

XX4121J8J1 Enquiry Package - CO2 Analyzer

XX4121J8J2 Prepare P.O. Package - CO2 Analyzer

XX4121J8J3 Vendor Data Review - CO2 Analyzer

XX4121J8K1 Enquiry Package - H2S Analyzer

XX4121J8K2 Prepare P.O. Package - H2S Analyzer

XX4121J8K3 Vendor Data Review - H2S Analyzer

XX4121J8L1 Enquiry Package - Vibration Monitors

XX4121J8L2 Prepare P.O. Package - Vibration Monitors

XX4121J8L3 Vendor Data Review - Vibration Monitors

XX4121J8M1 Enquiry Package - Analyzer Sample Systems

XX4121J8M2 Prepare P.O. Package - Analyzer Sample Systems

XX4121J8M3 Vendor Data Review - Analyzer Sample Systems

XX4121J8N1 Enquiry Package - Analyzer - Special (1)

XX4121J8N2 Prepare P.O. Package - Analyzer - Special (1)

XX4121J8N3 Vendor Data Review - Analyzer - Special (1)

XX4121J8P1 Enquiry Package - Analyzer - Special (2)

XX4121J8P2 Prepare P.O. Package - Analyzer - Special (2)

XX4121J8P3 Vendor Data Review - Analyzer - Special (2)

XX4121J8R1 Enquiry Package - Analyzer - Special (3)

XX4121J8R2 Prepare P.O. Package - Analyzer - Special (3)

XX4121J8R3 Vendor Data Review - Analyzer - Special (3)

XX4121J8S1 Enquiry Package - Analyzer - Spare (1)

XX4121J8S2 Prepare P.O. Package - Analyzer - Spare (1)

XX4121J8S3 Vendor Data Review - Analyzer - Spare (1)

XX4121J8T1 Enquiry Package - Analyzer - Spare (2)

XX4121J8T2 Prepare P.O. Package - Analyzer - Spare (2)

XX4121J8T3 Vendor Data Review - Analyzer - Spare (2)

XX4121J8U1 Enquiry Package - Analyzer - Spare (3)

XX4121J8U2 Prepare P.O. Package - Analyzer - Spare (3)

XX4121J8U3 Vendor Data Review - Analyzer - Spare (3)

J69 Procurement - Miscellaneous

XX4121J9A1 Enquiry Package - Local Controllers / Recorders / Indicators

XX4121J9A2 Prepare P.O. Package - Local Controllers / Recorders / Indicators

XX4121J9A3 Vendor Data Review - Local Controllers / Recorders / Indicators

XX4121J9B1 Enquiry Package - Isolators & Barriers

XX4121J9B2 Prepare P.O. Package - Isolators & Barriers

XX4121J9B3 Vendor Data Review - Isolators & Barriers

XX4121J9C1 Enquiry Package - Junction Boxes

Page 55: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 55 of 73 04/17/2023

XX4121J9C2 Prepare P.O. Package - Junction Boxes

XX4121J9C3 Vendor Data Review - Junction Boxes

XX4121J9D1 Enquiry Package - Signal Conditioners

XX4121J9D2 Prepare P.O. Package - Signal Conditioners

XX4121J9D3 Vendor Data Review - Signal Conditioners

XX4121J9E1 Enquiry Package - Corrosion Monitors

XX4121J9E2 Prepare P.O. Package - Corrosion Monitors

XX4121J9E3 Vendor Data Review - Corrosion Monitors

XX4121J9F1 Enquiry Package - Instrument Test Equipment

XX4121J9F2 Prepare P.O. Package - Instrument Test Equipment

XX4121J9F3 Vendor Data Review - Instrument Test Equipment

XX4121J9G1 Enquiry Package - Weighing Systems

XX4121J9G2 Prepare P.O. Package - Weighing Systems

XX4121J9G3 Vendor Data Review - Weighing Systems

XX4121J9H1 Enquiry Package - Speed Transmitters

XX4121J9H2 Prepare P.O. Package - Speed Transmitters

XX4121J9H3 Vendor Data Review - Speed Transmitters

XX4121J9J1 Enquiry Package - Miscellaneous - Spare (1)

XX4121J9J2 Prepare P.O. Package - Miscellaneous - Spare (1)

XX4121J9J3 Vendor Data Review - Miscellaneous - Spare (1)

XX4121J9K1 Enquiry Package - Miscellaneous - Spare (2)

XX4121J9K2 Prepare P.O. Package - Miscellaneous - Spare (2)

XX4121J9K3 Vendor Data Review - Miscellaneous - Spare (2)

XX4121J9L1 Enquiry Package - Miscellaneous - Spare (3)

XX4121J9L2 Prepare P.O. Package - Miscellaneous - Spare (3)

XX4121J9L3 Vendor Data Review - Miscellaneous - Spare (3)

J75 Subcontracts - Engineering / Specialists

XX4121J710 Enquiry Package - Eng. / Specialist Services

XX4121J720 Prepare P.O. Package - Eng. / Specialist Services

XX4121J730 Vendor Data Review - Eng. / Specialist Services

J76 Subcontracts - Fabrication

XX4121J740 Enquiry Package - Fabrication

XX4121J750 Prepare P.O. Package - Fabrication

XX4121J760 Vendor Data Review - Fabrication

J77 Subcontracts - Construction

XX4121J770 Enquiry Package - Construction

XX4121J780 Prepare P.O. Package - Construction

XX4121J790 Vendor Data Review - Construction

XX4121J800 Hazardous Area Certification (non SAA certified equipment for use in Australia only)

XX4121J850 Construction Support

XX4121J860 Inspection, Testing & Commissioning Support

XX4121J870 Design Reports / Job Books

XX4121J900 Formal Operator Training

XX4121J910 Maintenance Procedures and Training

XX4121J950 As-Building

Overall Totals

Page 56: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: INSTRUMENTS

Page 56 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEng. Design Total(CTR) or Task Break Down Off (hrs) Factor

P34121J000 Default - total is less than 200 hoursP34121J000 01 1.00 50% 50%P34121J000 02 1.00 50% 50%P34121J000 03 1.00 50% 50%P34121J000 04 1.00 50% 50%

Sub Totals

Activity ID Del. Cost Time & Resources No. Norm LoadingEng. Design Total(CTR) or Task Break Down Off (hrs) Factor

P34121J100 General Coordination & Job PreparationP34121J100 01 General Coordination & Job Preparation : Meetings 1 1.00 50% 50%P34121J100 02 General Coordination & Job Preparation : Project Reports - Weekly 2 1.00 50% 50%P34121J100 03 General Coordination & Job Preparation : Supervision - Engineering (10%) 1.00 100% 0%P34121J100 04 General Coordination & Job Preparation : Supervision - Design (10%) 1.00 100%P34121J100 05 General Coordination & Job Preparation : Site Visits - Engineering 12 1.00 100% 0%P34121J100 06 General Coordination & Job Preparation : Site Visits - Design 12 1.00 100%P34121J100 07 General Coordination & Job Preparation : Travel Time To / From Site 10 1.00 50% 50%P34121J100 08 General Coordination & Job Preparation : HAZOP / CHAZOP Attendance 1 1.00 100% 0%P34121J100 09 General Coordination & Job Preparation : Inter-discipline Squad Checks 1 1.00 50% 50%P34121J100 10 General Coordination & Job Preparation : Inter-discipline Review Meetings 1 1.00 50% 50%P34121J100 11 General Coordination & Job Preparation : Vendor Data Incorporation 1 1.00 50% 50%P34121J100 12 General Coordination & Job Preparation : Project Closeout (return copy of mark-up files) 0.02 1.00 0% 100%P34121J100 13 General Coordination & Job Preparation : Data Acquisition / Project Data Review 1 1.00 0% 100%P34121J100 14 General Coordination & Job Preparation : Client Design Review Meetings 1 1.00 50% 50%P34121J100 15 General Coordination & Job Preparation : Order Master Drawings 0.02 1.00 0% 100%P34121J200 StudiesP34121J200 01 Studies : Weight Control Input 10 1.00 50% 50%P34121J200 02 Studies : Study Technical Notes 20 1.00 100% 0%P34121J200 03 Studies : SIL Review & Verification 20 1.00 100% 0%P34121J200 04 1.00 100% 0%P34121J200 05 1.00 100% 0%P34121J200 06 1.00 100% 0%P34121J200 07 1.00 100% 0%P34121J250 PFD / P&ID Preparation & Maintenance (P&ID drafting in Piping Estimate)P34121J250 01 PFD / P&ID Preparation & Maintenance (P&ID drafting in Piping Estimate) : PFD / UFD Preparation & Maintenance 1 1.00 100% 0%P34121J250 02 PFD / P&ID Preparation & Maintenance (P&ID drafting in Piping Estimate) : P&ID / U&ID Preparation & Maintenance 4 1.00 80% 20%P34121J250 03 PFD / P&ID Preparation & Maintenance (P&ID drafting in Piping Estimate) : Cause & effect 20 1.00 80% 20%P34121J250 04 PFD / P&ID Preparation & Maintenance (P&ID drafting in Piping Estimate) : Safe charts (FECs) 2 1.00 100% 0%P34121J250 05 PFD / P&ID Preparation & Maintenance (P&ID drafting in Piping Estimate) : P&ID key plan 4 1.00 80% 20%P34121J300 CalculationsP34121J300 01 Calculations : Control Valves / Valve Noise 2 1.00 100% 0%P34121J300 02 Calculations : Flow Elements & Meters 4 1.00 100% 0%P34121J300 03 Calculations : Relief Valves 2 1.00 100% 0%P34121J300 04 Calculations : Bursting Discs 2 1.00 100% 0%P34121J300 05 Calculations : Air Consumption 10 1.00 100% 0%P34121J300 06 Calculations : Instrument Cables Voltdrop 4 1.00 100% 0%P34121J300 07 Calculations : DP Level 4 1.00 100% 0%P34121J300 08 Calculations : Analyser Transport Lag Time 4 1.00 100% 0%P34121J300 09 Calculations : I S calculation 4 1.00 100% 0%P34121J350 SpecificationsP34121J350 01 Specifications : Functional Specification 50 1.00 100% 0%P34121J350 02 Specifications : Instrument Installation Specification 20 1.00 100% 0%P34121J350 03 Specifications : Installation Scope of Work 80 1.00 100% 0%P34121J350 04 0 1.00 100% 0%P34121J350 05 0 1.00 100% 0%P34121J350 06 0 1.00 100% 0%P34121J350 07 0 1.00 100% 0%P34121J350 08 0 1.00 100% 0%P34121J400 Schedules & ListsP34121J400 01 Schedules & Lists : Instrument Index 40 1.00 100% 0%P34121J400 02 Schedules & Lists : DCS I/O Allocation Schedule 16 1.00 80% 20%P34121J400 03 Schedules & Lists : PLC I/O Allocation Schedule 16 1.00 80% 20%P34121J400 04 Schedules & Lists : Alarm & Trip Schedule 20 1.00 80% 20%P34121J400 05 Schedules & Lists : Instrument Cable Schedule 10 1.00 10% 90%P34121J400 06 Schedules & Lists : Instrument Cable Schedule (Power) 10 1.00 10% 90%P34121J400 07 Schedules & Lists : System Cable Schedule 10 1.00 10% 90%P34121J400 08 Schedules & Lists : Spare Parts Listing 40 1.00 100% 0%P34121J400 09 Schedules & Lists : Alarm configuration 10 1.00 100% 0%P34121J400 10 Schedules & Lists : DCS point configuration 10 1.00 100% 0%P34121J400 11 Schedules & Lists : Drawing Register / Schedule 8 1.00 0% 100%P34121J410 INtools Database Setup & InputP34121J410 01 INtools Database Setup & Input : Project establishment - setup 40 1.00 100%P34121J410 02 INtools Database Setup & Input : Access rights 2 1.00 100%P34121J410 03 INtools Database Setup & Input : Instrument types 10 1.00 100%P34121J410 04 INtools Database Setup & Input : Cable specifications 10 1.00 100%P34121J410 05 INtools Database Setup & Input : Hook-ups 10 1.00 100%P34121J410 06 INtools Database Setup & Input : Specification sheet setup 10 1.00 100%P34121J410 07 INtools Database Setup & Input : Panel setup 10 1.00 100%P34121J410 08 1.00 100%P34121J410 09 1.00 100%P34121J410 10 INtools Database Setup & Input : INtools training - Designer 40 1.00 100%P34121J410 11 INtools Database Setup & Input : INtools training - Engineer 40 1.00 100% 0%P34121J410 12 INtools Database Setup & Input : Project claims (per tag) 0.15 1.00 100%P34121J410 13 INtools Database Setup & Input : Data Input (per tag) 2.5 1.00 20% 80%P34121J410 14 1.00 100%P34121J410 15 INtools Database Setup & Input : Administrative support 8 1.00 100%P34121J410 16 INtools Database Setup & Input : Watcom backup 8 1.00 100%P34121J410 17 1.00 100%P34121J410 18 INtools Database Setup & Input : Reporting from INtools 2 1.00 50% 50%P34121J410 19 INtools Database Setup & Input : Schedule update (per tag) 0.15 1.00 100%P34121J410 20 INtools Database Setup & Input : INtools merge reques (per tag) 0.15 1.00 100%P34121J410 21 INtools Database Setup & Input : INtools .pst check verification (per tag) 0.15 1.00 100%P34121J420 Intools Database - Check/BackdraftP34121J420 31 Intools Database - Check/Backdraft : Check loops (per tag) 0.25 1.00 20% 80%P34121J420 32 Intools Database - Check/Backdraft : Back drafting (per tag) 0.25 1.00 10% 90%P34121J430 Intools Database - Finalise/Issue ReportsP34121J430 41 Intools Database - Finalise/Issue Reports : AFC report issues (per tag) 0.15 1.00 100%P34121J430 42 Intools Database - Finalise/Issue Reports : Client export 8 1.00 100%P34121J450 MTO - PreliminaryP34121J450 01 MTO - Preliminary : Prepare Preliminary MTO 8 1.00 0% 100%P34121J460 MTO - IntermediateP34121J460 02 MTO - Intermediate : Prepare Intermediate MTO 8 1.00 0% 100%P34121J470 MTO - FinalP34121J470 03 MTO - Final : Vendor Data Review 8 1.00 0% 100%P34121J500 Plot Plans & Site LayoutsP34121J500 01 1.00 100%P34121J500 02 1.00 100%P34121J510 Planning StudiesP34121J510 01 6 1.00 100%P34121J510 02 6 1.00 100%P34121J510 03 7 1.00 100%P34121J510 04 5 1.00 100%P34121J520 3D CAD Modelling Set-up & InputP34121J520 01 3D CAD Modelling Set-up & Input : Equipment Modelling in Field (J/Boxes, Enclosures) 8 1.00 100%P34121J520 02 3D CAD Modelling Set-up & Input : Equipment Modelling in Rooms / Buildings 40 1.00 100%P34121J520 03 3D CAD Modelling Set-up & Input : Raceways Ladder Design (incl. Maintenance) 80 1.00 100%P34121J520 04 3D CAD Modelling Set-up & Input : Spec. development - generic 25 1.00 100%P34121J520 05 3D CAD Modelling Set-up & Input : Spec. development - project specific 15 1.00 100%P34121J520 06 3D CAD Modelling Set-up & Input : Cable Ladder Between Platforms 40 1.00 100%

Split Eng/Design

Split Eng/Design

C15
Enter time for project meetings. Nominally half an hour for at least 2 meetings per rpoject. Large projects should typically be allocated 1 hour for each weekly meeting.
C16
For input to project status reports - minimum 1 hour total for a small project and 30 mins per week for longer projects (Over 5,000 instrument hours).
C17
lAutomatically Calculated
C18
Automatically Calculated
C19
Minimum 12 Hours per visit
C20
Minimum 12 Hours per visit
C21
Minimum 10 Hours per visit
C22
Ensure HAZOP/CHAZOP is required. Range is from 4 hours to 3 days per project. Include hours for follow ups.
C23
Typically: P&ID Review ISO's review Mechanical Packages
C24
Big projects or those with Packaged specificatins only.
C25
Note: This is not for Data Review.
C28
Usually a design review is required. Ensure hours for offshore design review are included if required.
C29
Design hours - include 1 hour minimum
Page 57: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: INSTRUMENTS

Page 57 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEng. Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34121J530 3D CAD Modelling - Check / Back ModelP34121J530 11 3D CAD Modelling - Check / Back Model : Check Equipment Models 8 1.00 100%P34121J530 12 3D CAD Modelling - Check / Back Model : Check Ladder Design 20 1.00 100%P34121J530 13 3D CAD Modelling - Check / Back Model : Clash Checking 20 1.00 100%P34121J530 14 3D CAD Modelling - Check / Back Model : Interface Checking 20 1.00 100%P34121J540 3D CAD Modelling - FinaliseP34121J540 21 3D CAD Modelling - Finalise : Finalise and Issue Package 40 1.00 100%P34121J550P34121J550 01 Drawings Arrangement & Details : Instrument Location Drawings 14 1.00 10% 90%P34121J550 02 Drawings Arrangement & Details : Cable Routing Drawings 14 1.00 10% 90%P34121J550 03 Drawings Arrangement & Details : Control Room Layouts 12 1.00 30% 70%P34121J550 04 Drawings Arrangement & Details : Equipment Room Layouts 8 1.00 30% 70%P34121J550 05 Drawings Arrangement & Details : Control Panel Layouts 10 1.00 20% 80%P34121J550 06 Drawings Arrangement & Details : Marshalling Cabinet Layouts 12 1.00 10% 90%P34121J550 07 Drawings Arrangement & Details : Field Panel / Junction Box Layouts 12 1.00 10% 90%P34121J550 08 Drawings Arrangement & Details : Mimic Panel / Annunciator Layouts 10 1.00 20% 80%P34121J550 09 Drawings Arrangement & Details : Cable Transits / Gland Plate Layouts 12 1.00 10% 90%P34121J560P34121J560 21 Drawings - Layouts Onshore / Offshore : X-Refs / Base / Key Plan 12 1.00 100%P34121J560 22 Drawings - Layouts Onshore / Offshore : Equipment Location 12 1.00 100%P34121J560 23 Drawings - Layouts Onshore / Offshore : Hazardous Area 12 1.00 100%P34121J560 24 Drawings - Layouts Onshore / Offshore : Fire & Gas Detection - layout 12 1.00 100%P34121J560 25 Drawings - Layouts Onshore / Offshore : Fusible Loop Drawings - layout & panels 12 1.00 100%P34121J560 26 Drawings - Layouts Onshore / Offshore : Fire Water System Schematic - not Inst Eng. 12 1.00 100%P34121J560 27 Drawings - Layouts Onshore / Offshore : Noise Drawings - not Inst. Eng 12 1.00 100%P34121J560 28 Drawings - Layouts Onshore / Offshore : H2S Management 12 1.00 100%P34121J560 29 Drawings - Layouts Onshore / Offshore : Safety & First Aid 12 1.00 100%P34121J560 30 Drawings - Layouts Onshore / Offshore : Static Earthing - (Input to Electrical) 12 1.00 20% 80%P34121J560 31 Drawings - Layouts Onshore / Offshore : Site Drainage 12 1.00 100%P34121J560 32 Drawings - Layouts Onshore / Offshore : Colour Prints 1.5 1.00 100%P34121J560 33 1.00 100%P34121J560 34 1.00 100%P34121J570 Demolition DrawingsP34121J570 01 Demolition Drawings : Layout Drawings 4 1.00 100%P34121J570 02 Demolition Drawings : Cable Schedules 4 1.00 100%P34121J570 03 Demolition Drawings : I/O Allocation & Schedules 4 1.00 100%P34121J570 04 Demolition Drawings : Loop / Module Diagrams 4 1.00 100%P34121J570 05 Demolition Drawings : SFD / Logics 2.5 1.00 80% 20%P34121J570 06 Demolition Drawings : Block Diagrams 4 1.00 100%P34121J570 07 Demolition Drawings : Connection / Termination Drawings 4 1.00 100%P34121J570 08 Demolition Drawings : P&ID's / UFDs 5 1.00 10% 90%P34121J570 09 Demolition Drawings : Cause/effects - safe charts 4 1.00 20% 80%P34121J580 DiagramsP34121J580 01 Diagrams : Cable Block 12 1.00 100%P34121J580 02 Diagrams : DCS - Architecture 12 1.00 100%P34121J580 03 Diagrams : PLC - Architecture 12 1.00 100%P34121J580 04 Diagrams : F & G - Architecture 12 1.00 100%P34121J590 SchematicsP34121J590 14 Schematics : CFT / PFD Schematics 10 1.00 100%P34121J590 15 Schematics : Power Supply Schematics 8 1.00 100%P34121J600 Connection / Termination DiagramsP34121J600 21 Connection / Termination Diagrams : Junction Box 10 1.00 100%P34121J600 22 Connection / Termination Diagrams : Marshalling Racks / Panels 12 1.00 100%P34121J600 23 Connection / Termination Diagrams : I.S. Barrier Racks / Panels 12 1.00 100%P34121J600 24 Connection / Termination Diagrams : Relay Panels 10 1.00 100%P34121J600 25 Connection / Termination Diagrams : F & G Panel 10 1.00 100%P34121J600 26 Connection / Termination Diagrams : DCS Connections 10 1.00 100%P34121J600 27 Connection / Termination Diagrams : PLC Connections 10 1.00 100%P34121J600 28 Connection / Termination Diagrams : Alarms Connections 10 1.00 100%P34121J600 29 Connection / Termination Diagrams : Power Distribution Connections 10 1.00 100%P34121J600 30 Connection / Termination Diagrams : Loop / Module Diagrams 8 1.00 100%P34121J610 Logic DiagramsP34121J610 41 Logic Diagrams : Logic Diagrams - general 10 1.00 50% 50%P34121J610 42 Logic Diagrams : Operator Logics - A4s (Esso specific) 10 1.00 50% 50%P34121J610 43 Logic Diagrams : Pneumatic Logics 12 1.00 50% 50%P34121J610 44 Logic Diagrams : Relay Schematics 10 1.00 100%P34121J610 45 Logic Diagrams : Ladder Schematics (PLC) 10 1.00 100%P34121J620 SFDs - Preliminary IssueP34121J620 51 SFDs - Preliminary Issue : System Function Diagrams - Preliminary Issue 8 1.00 80% 20%P34121J630 SFDs - Intermediate / CHAZOP IssueP34121J630 52 SFDs - Intermediate / CHAZOP Issue : System Function Diagrams - CHAZOP Issue 3 1.00 80% 20%P34121J640 SFDs - Finalise & IssueP34121J640 53 SFDs - Finalise & Issue : System Function Diagrams - Finalise & Issue 3 1.00 80% 20%P34121J650 Installation DetailsP34121J650 03 Installation Details : Process Hookups 12 1.00 5% 95%P34121J650 04 Installation Details : Pneumatic Hookups 12 1.00 5% 95%P34121J650 05 Installation Details : Electrical Hookups 12 1.00 5% 95%P34121J650 06 Installation Details : Stands / Shelters Installation Details 12 1.00 100%P34121J650 07 Installation Details : Instr. Air Supply Installation Details 12 1.00 100%P34121J650 08 Installation Details : Analyser Fast Loops, etc. Installation Details 12 1.00 5% 95%P34121J650 09 Installation Details : Sample Conditioning Installation Details 12 1.00 5% 95%P34121J650 10 Installation Details : Gland Plate / Transit Block Details 12 1.00 100%

J60 Procurement - Instrument BulksP34121J0A1 Enquiry Package - Valves & FittingsP34121J0A1 01 Enquiry Package - Valves & Fittings : Requisition 10 1.00 100% 0%P34121J0A2 Prepare P.O. Package - Valves & FittingsP34121J0A2 02 Prepare P.O. Package - Valves & Fittings : Update package documents for P.O. issue 10 1.00 100% 0%

P34121J0B1 Enquiry Package - Instrument TubingP34121J0B1 01 Enquiry Package - Instrument Tubing : Requisition 10 1.00 100% 0%P34121J0B2 Prepare P.O. Package - Instrument TubingP34121J0B2 02 Prepare P.O. Package - Instrument Tubing : Update package documents for P.O. issue 10 1.00 100% 0%

P34121J0C1 Enquiry Package - Instrument Electrical BulksP34121J0C1 01 Enquiry Package - Instrument Electrical Bulks : Requisition 10 1.00 100% 0%P34121J0C2 Prepare P.O. Package - Instrument Electrical BulksP34121J0C2 02 Prepare P.O. Package - Instrument Electrical Bulks : Update package documents for P.O. issue 10 1.00 100% 0%

P34121J0D1 Enquiry Package - Instrument StandsP34121J0D1 01 Enquiry Package - Instrument Stands : Requisition 10 1.00 100% 0%P34121J0D2 Prepare P.O. Package - Instrument StandsP34121J0D2 02 Prepare P.O. Package - Instrument Stands : Update package documents for P.O. issue 10 1.00 100% 0%

P34121J0E1 Enquiry Package - Instrument CableP34121J0E1 01 Enquiry Package - Instrument Cable : Requisition 10 1.00 100% 0%P34121J0E2 Prepare P.O. Package - Instrument CableP34121J0E2 02 Prepare P.O. Package - Instrument Cable : Update package documents for P.O. issue 10 1.00 100% 0%

P34121J0F1 Enquiry Package - Instrument LabelsP34121J0F1 01 Enquiry Package - Instrument Labels : Requisition 10 1.00 100% 0%P34121J0F2 Prepare P.O. Package - LabelsP34121J0F2 02 Prepare P.O. Package - Labels : Update package documents for P.O. issue 10 1.00 100% 0%

P34121J0G1 Enquiry Package - ContingenciesP34121J0G1 01 Enquiry Package - Contingencies : Requisition 10 1.00 100% 0%P34121J0G2 Prepare P.O. Package - ContingenciesP34121J0G2 02 Prepare P.O. Package - Contingencies : Update package documents for P.O. issue 10 1.00 100% 0%

P34121J0H1 Enquiry Package - Bulks - Special (1)P34121J0H1 01 Enquiry Package - Bulks - Special (1) : Requisition 10 1.00 100% 0%P34121J0H2 Prepare P.O. Package - Bulks - Special (1)P34121J0H2 02 Prepare P.O. Package - Bulks - Special (1) : Update package documents for P.O. issue 10 1.00 100% 0%

P34121J0J1 Enquiry Package - Bulks - Special (2)P34121J0J1 01 Enquiry Package - Bulks - Special (2) : Requisition 10 1.00 100% 0%

Drawings Arrangement & Details

Drawings - Layouts Onshore / Offshore

Page 58: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: INSTRUMENTS

Page 58 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEng. Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34121J0J2 Prepare P.O. Package - Bulks - Special (2)P34121J0J2 02 Prepare P.O. Package - Bulks - Special (2) : Update package documents for P.O. issue 10 1.00 100% 0%

P34121J0K1 Enquiry Package - Bulks - Special (3)P34121J0K1 01 Enquiry Package - Bulks - Special (3) : Requisition 10 1.00 100% 0%P34121J0K2 Prepare P.O. Package - Bulks - Special (3)P34121J0K2 02 Prepare P.O. Package - Bulks - Special (3) : Update package documents for P.O. issue 10 1.00 100% 0%

J61 Procurement - ValvesP34121J1A1 Enquiry Package - Control Valves & Regulators

P34121J1A1 01 Enquiry Package - Control Valves & Regulators : Data Sheet 8 1.00 100% 0%P34121J1A1 02 Enquiry Package - Control Valves & Regulators : Requisition 10 1.00 100% 0%P34121J1A2 Prepare P.O. Package - Control Valves & RegulatorsP34121J1A2 03 Prepare P.O. Package - Control Valves & Regulators : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J1A2 04 Prepare P.O. Package - Control Valves & Regulators : Update package documents for P.O. issue 5 1.00 100% 0%P34121J1A3 Vendor Data Review - Control Valves & RegulatorsP34121J1A3 05 Vendor Data Review - Control Valves & Regulators : Vendor Data Review 4 1.00 100% 0%

P34121J1B1 Enquiry Package - Actuated Valves

P34121J1B1 01 Enquiry Package - Actuated Valves : Data Sheet 8 1.00 100% 0%P34121J1B1 02 Enquiry Package - Actuated Valves : Requisition 10 1.00 100% 0%P34121J1B2 Prepare P.O. Package - Actuated ValvesP34121J1B2 03 Prepare P.O. Package - Actuated Valves : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J1B2 04 Prepare P.O. Package - Actuated Valves : Update package documents for P.O. issue 5 1.00 100% 0%P34121J1B3 Vendor Data Review - Actuated ValvesP34121J1B3 05 Vendor Data Review - Actuated Valves : Vendor Data Review 4 1.00 100% 0%

P34121J1C1 Enquiry Package - Relief Valves

P34121J1C1 01 Enquiry Package - Relief Valves : Data Sheet 8 1.00 100% 0%P34121J1C1 02 Enquiry Package - Relief Valves : Requisition 10 1.00 100% 0%P34121J1C2 Prepare P.O. Package - Relief ValvesP34121J1C2 03 Prepare P.O. Package - Relief Valves : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J1C2 04 Prepare P.O. Package - Relief Valves : Update package documents for P.O. issue 5 1.00 100% 0%P34121J1C3 Vendor Data Review - Relief ValvesP34121J1C3 05 Vendor Data Review - Relief Valves : Vendor Data Review 4 1.00 100% 0%

P34121J1D1 Enquiry Package - Choke Valves

P34121J1D1 01 Enquiry Package - Choke Valves : Data Sheet 8 1.00 100% 0%P34121J1D1 02 Enquiry Package - Choke Valves : Requisition 10 1.00 100% 0%P34121J1D2 Prepare P.O. Package - Choke ValvesP34121J1D2 03 Prepare P.O. Package - Choke Valves : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J1D2 04 Prepare P.O. Package - Choke Valves : Update package documents for P.O. issue 5 1.00 100% 0%P34121J1D3 Vendor Data Review - Choke ValvesP34121J1D3 05 Vendor Data Review - Choke Valves : Vendor Data Review 4 1.00 100% 0%

P34121J1E1 Enquiry Package - Bursting Discs

P34121J1E1 01 Enquiry Package - Bursting Discs : Data Sheet 8 1.00 100% 0%P34121J1E1 02 Enquiry Package - Bursting Discs : Requisition 10 1.00 100% 0%P34121J1E2 Prepare P.O. Package - Bursting DiscsP34121J1E2 03 Prepare P.O. Package - Bursting Discs : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J1E2 04 Prepare P.O. Package - Bursting Discs : Update package documents for P.O. issue 5 1.00 100% 0%P34121J1E3 Vendor Data Review - Bursting DiscsP34121J1E3 05 Vendor Data Review - Bursting Discs : Vendor Data Review 4 1.00 100% 0%

P34121J1F1 Enquiry Package - Severe Service Valves

P34121J1F1 01 Enquiry Package - Severe Service Valves : Data Sheet 8 1.00 100% 0%P34121J1F1 02 Enquiry Package - Severe Service Valves : Requisition 10 1.00 100% 0%P34121J1F2 Prepare P.O. Package - Severe Service ValvesP34121J1F2 03 Prepare P.O. Package - Severe Service Valves : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J1F2 04 Prepare P.O. Package - Severe Service Valves : Update package documents for P.O. issue 5 1.00 100% 0%P34121J1F3 Vendor Data Review - Severe Service ValvesP34121J1F3 05 Vendor Data Review - Severe Service Valves : Vendor Data Review 4 1.00 100% 0%

P34121J1G1 Enquiry Package - Deluge Valves

P34121J1G1 01 Enquiry Package - Deluge Valves : Data Sheet 8 1.00 100% 0%P34121J1G1 02 Enquiry Package - Deluge Valves : Requisition 10 1.00 100% 0%P34121J1G2 Prepare P.O. Package - Deluge ValvesP34121J1G2 03 Prepare P.O. Package - Deluge Valves : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J1G2 04 Prepare P.O. Package - Deluge Valves : Update package documents for P.O. issue 5 1.00 100% 0%P34121J1G3 Vendor Data Review - Deluge ValvesP34121J1G3 05 Vendor Data Review - Deluge Valves : Vendor Data Review 4 1.00 100% 0%

P34121J1H1 Enquiry Package - Proximity Detectors

P34121J1H1 01 Enquiry Package - Proximity Detectors : Data Sheet 8 1.00 100% 0%P34121J1H1 02 Enquiry Package - Proximity Detectors : Requisition 10 1.00 100% 0%P34121J1H2 Prepare P.O. Package - Proximity DetectorsP34121J1H2 03 Prepare P.O. Package - Proximity Detectors : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J1H2 04 Prepare P.O. Package - Proximity Detectors : Update package documents for P.O. issue 5 1.00 100% 0%P34121J1H3 Vendor Data Review - Proximity DetectorsP34121J1H3 05 Vendor Data Review - Proximity Detectors : Vendor Data Review 4 1.00 100% 0%

P34121J1J1 Enquiry Package - Special Valves (1)

P34121J1J1 01 Enquiry Package - Special Valves (1) : Data Sheet 8 1.00 100% 0%P34121J1J1 02 Enquiry Package - Special Valves (1) : Requisition 10 1.00 100% 0%P34121J1J2 Prepare P.O. Package - Special Valves (1)P34121J1J2 03 Prepare P.O. Package - Special Valves (1) : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J1J2 04 Prepare P.O. Package - Special Valves (1) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J1J3 Vendor Data Review - Special Valves (1)P34121J1J3 05 Vendor Data Review - Special Valves (1) : Vendor Data Review 4 1.00 100% 0%

P34121J1K1 Enquiry Package - Special Valves (2)

P34121J1K1 01 Enquiry Package - Special Valves (2) : Data Sheet 8 1.00 100% 0%P34121J1K1 02 Enquiry Package - Special Valves (2) : Requisition 10 1.00 100% 0%P34121J1K2 Prepare P.O. Package - Special Valves (2)P34121J1K2 03 Prepare P.O. Package - Special Valves (2) : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J1K2 04 Prepare P.O. Package - Special Valves (2) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J1K3 Vendor Data Review - Special Valves (2)P34121J1K3 05 Vendor Data Review - Special Valves (2) : Vendor Data Review 4 1.00 100% 0%

P34121J1L1 Enquiry Package - Special Valves (3)

P34121J1L1 01 Enquiry Package - Special Valves (3) : Data Sheet 8 1.00 100% 0%P34121J1L1 02 Enquiry Package - Special Valves (3) : Requisition 10 1.00 100% 0%P34121J1L2 Prepare P.O. Package - Special Valves (3)P34121J1L2 03 Prepare P.O. Package - Special Valves (3) : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J1L2 04 Prepare P.O. Package - Special Valves (3) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J1L3 Vendor Data Review - Special Valves (3)P34121J1L3 05 Vendor Data Review - Special Valves (3) : Vendor Data Review 4 1.00 100% 0%

P34121J1M1 Enquiry Package - Spare (1)

P34121J1M1 01 Enquiry Package - Spare (1) : Data Sheet 8 1.00 100% 0%P34121J1M1 02 Enquiry Package - Spare (1) : Requisition 10 1.00 100% 0%P34121J1M2 Prepare P.O. Package - Spare (1)P34121J1M2 03 Prepare P.O. Package - Spare (1) : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J1M2 04 Prepare P.O. Package - Spare (1) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J1M3 Vendor Data Review - Spare (1)P34121J1M3 05 Vendor Data Review - Spare (1) : Vendor Data Review 4 1.00 100% 0%

P34121J1N1 Enquiry Package - Spare (2)

P34121J1N1 01 Enquiry Package - Spare (2) : Data Sheet 8 1.00 100% 0%P34121J1N1 02 Enquiry Package - Spare (2) : Requisition 10 1.00 100% 0%P34121J1N2 Prepare P.O. Package - Spare (2)P34121J1N2 03 Prepare P.O. Package - Spare (2) : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J1N2 04 Prepare P.O. Package - Spare (2) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J1N3 Vendor Data Review - Spare (2)P34121J1N3 05 Vendor Data Review - Spare (2) : Vendor Data Review 4 1.00 100% 0%

Page 59: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: INSTRUMENTS

Page 59 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEng. Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

J62 Procurement - Flow InstrumentsP34121J2A1 Enquiry Package - Restriction & Flow Orifice Plates

P34121J2A1 01 Enquiry Package - Restriction & Flow Orifice Plates : Data Sheet 4 1.00 100% 0%P34121J2A1 02 Enquiry Package - Restriction & Flow Orifice Plates : Requisition 10 1.00 100% 0%P34121J2A2 Prepare P.O. Package - Restriction & Flow Orifice PlatesP34121J2A2 03 Prepare P.O. Package - Restriction & Flow Orifice Plates : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2A2 04 Prepare P.O. Package - Restriction & Flow Orifice Plates : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2A3 Vendor Data Review - Restriction & Flow Orifice PlatesP34121J2A3 05 Vendor Data Review - Restriction & Flow Orifice Plates : Vendor Data Review 4 1.00 100% 0%

P34121J2B1 Enquiry Package - Senior Orifice Fittings

P34121J2B1 01 Enquiry Package - Senior Orifice Fittings : Data Sheet 4 1.00 100% 0%P34121J2B1 02 Enquiry Package - Senior Orifice Fittings : Requisition 10 1.00 100% 0%P34121J2B2 Prepare P.O. Package - Senior Orifice FittingsP34121J2B2 03 Prepare P.O. Package - Senior Orifice Fittings : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2B2 04 Prepare P.O. Package - Senior Orifice Fittings : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2B3 Vendor Data Review - Senior Orifice FittingsP34121J2B3 05 Vendor Data Review - Senior Orifice Fittings : Vendor Data Review 4 1.00 100% 0%

P34121J2C1 Enquiry Package - Turbine Meters

P34121J2C1 01 Enquiry Package - Turbine Meters : Data Sheet 4 1.00 100% 0%P34121J2C1 02 Enquiry Package - Turbine Meters : Requisition 10 1.00 100% 0%P34121J2C2 Prepare P.O. Package - Turbine MetersP34121J2C2 03 Prepare P.O. Package - Turbine Meters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2C2 04 Prepare P.O. Package - Turbine Meters : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2C3 Vendor Data Review - Turbine MetersP34121J2C3 05 Vendor Data Review - Turbine Meters : Vendor Data Review 4 1.00 100% 0%

P34121J2D1 Enquiry Package - Mag Flow Meters

P34121J2D1 01 Enquiry Package - Mag Flow Meters : Data Sheet 4 1.00 100% 0%P34121J2D1 02 Enquiry Package - Mag Flow Meters : Requisition 10 1.00 100% 0%P34121J2D2 Prepare P.O. Package - Mag Flow MetersP34121J2D2 03 Prepare P.O. Package - Mag Flow Meters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2D2 04 Prepare P.O. Package - Mag Flow Meters : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2D3 Vendor Data Review - Mag Flow MetersP34121J2D3 05 Vendor Data Review - Mag Flow Meters : Vendor Data Review 4 1.00 100% 0%

P34121J2E1 Enquiry Package - Ultrasonic Flow Meters

P34121J2E1 01 Enquiry Package - Ultrasonic Flow Meters : Data Sheet 4 1.00 100% 0%P34121J2E1 02 Enquiry Package - Ultrasonic Flow Meters : Requisition 10 1.00 100% 0%P34121J2E2 Prepare P.O. Package - Ultrasonic Flow MetersP34121J2E2 03 Prepare P.O. Package - Ultrasonic Flow Meters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2E2 04 Prepare P.O. Package - Ultrasonic Flow Meters : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2E3 Vendor Data Review - Ultrasonic Flow MetersP34121J2E3 05 Vendor Data Review - Ultrasonic Flow Meters : Vendor Data Review 4 1.00 100% 0%

P34121J2F1 Enquiry Package - Multi-Phase Flow Meters

P34121J2F1 01 Enquiry Package - Multi-Phase Flow Meters : Data Sheet 4 1.00 100% 0%P34121J2F1 02 Enquiry Package - Multi-Phase Flow Meters : Requisition 10 1.00 100% 0%P34121J2F2 Prepare P.O. Package - Multi-Phase Flow MetersP34121J2F2 03 Prepare P.O. Package - Multi-Phase Flow Meters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2F2 04 Prepare P.O. Package - Multi-Phase Flow Meters : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2F3 Vendor Data Review - Multi-Phase Flow MetersP34121J2F3 05 Vendor Data Review - Multi-Phase Flow Meters : Vendor Data Review 4 1.00 100% 0%

P34121J2G1 Enquiry Package - Low Loss Dp Elements

P34121J2G1 01 Enquiry Package - Low Loss Dp Elements : Data Sheet 4 1.00 100% 0%P34121J2G1 02 Enquiry Package - Low Loss Dp Elements : Requisition 10 1.00 100% 0%P34121J2G2 Prepare P.O. Package - Low Loss Dp ElementsP34121J2G2 03 Prepare P.O. Package - Low Loss Dp Elements : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2G2 04 Prepare P.O. Package - Low Loss Dp Elements : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2G3 Vendor Data Review - Low Loss Dp ElementsP34121J2G3 05 Vendor Data Review - Low Loss Dp Elements : Vendor Data Review 4 1.00 100% 0%

P34121J2H1 Enquiry Package - Annubars & Pilot Tubes

P34121J2H1 01 Enquiry Package - Annubars & Pilot Tubes : Data Sheet 4 1.00 100% 0%P34121J2H1 02 Enquiry Package - Annubars & Pilot Tubes : Requisition 10 1.00 100% 0%P34121J2H2 Prepare P.O. Package - Annubars & Pilot TubesP34121J2H2 03 Prepare P.O. Package - Annubars & Pilot Tubes : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2H2 04 Prepare P.O. Package - Annubars & Pilot Tubes : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2H3 Vendor Data Review - Annubars & Pilot TubesP34121J2H3 05 Vendor Data Review - Annubars & Pilot Tubes : Vendor Data Review 4 1.00 100% 0%

P34121J2J1 Enquiry Package - Flow Switches

P34121J2J1 01 Enquiry Package - Flow Switches : Data Sheet 4 1.00 100% 0%P34121J2J1 02 Enquiry Package - Flow Switches : Requisition 10 1.00 100% 0%P34121J2J2 Prepare P.O. Package - Flow SwitchesP34121J2J2 03 Prepare P.O. Package - Flow Switches : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2J2 04 Prepare P.O. Package - Flow Switches : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2J3 Vendor Data Review - Flow SwitchesP34121J2J3 05 Vendor Data Review - Flow Switches : Vendor Data Review 4 1.00 100% 0%

P34121J2K1 Enquiry Package - Coriolis Meters

P34121J2K1 01 Enquiry Package - Coriolis Meters : Data Sheet 4 1.00 100% 0%P34121J2K1 02 Enquiry Package - Coriolis Meters : Requisition 10 1.00 100% 0%P34121J2K2 Prepare P.O. Package - Coriolis MetersP34121J2K2 03 Prepare P.O. Package - Coriolis Meters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2K2 04 Prepare P.O. Package - Coriolis Meters : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2K3 Vendor Data Review - Coriolis MetersP34121J2K3 05 Vendor Data Review - Coriolis Meters : Vendor Data Review 4 1.00 100% 0%

P34121J2L1 Enquiry Package - V-Cone Flowmeters

P34121J2L1 01 Enquiry Package - V-Cone Flowmeters : Data Sheet 4 1.00 100% 0%P34121J2L1 02 Enquiry Package - V-Cone Flowmeters : Requisition 10 1.00 100% 0%P34121J2L2 Prepare P.O. Package - V-Cone FlowmetersP34121J2L2 03 Prepare P.O. Package - V-Cone Flowmeters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2L2 04 Prepare P.O. Package - V-Cone Flowmeters : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2L3 Vendor Data Review - V-Cone FlowmetersP34121J2L3 05 Vendor Data Review - V-Cone Flowmeters : Vendor Data Review 4 1.00 100% 0%

P34121J2M1 Enquiry Package - Vortex Meters

P34121J2M1 01 Enquiry Package - Vortex Meters : Data Sheet 4 1.00 100% 0%P34121J2M1 02 Enquiry Package - Vortex Meters : Requisition 10 1.00 100% 0%P34121J2M2 Prepare P.O. Package - Vortex MetersP34121J2M2 03 Prepare P.O. Package - Vortex Meters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2M2 04 Prepare P.O. Package - Vortex Meters : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2M3 Vendor Data Review - Vortex MetersP34121J2M3 05 Vendor Data Review - Vortex Meters : Vendor Data Review 4 1.00 100% 0%

P34121J2N1 Enquiry Package - Meter Provers / Skids

P34121J2N1 01 Enquiry Package - Meter Provers / Skids : Data Sheet 4 1.00 100% 0%P34121J2N1 02 Enquiry Package - Meter Provers / Skids : Requisition 10 1.00 100% 0%P34121J2N2 Prepare P.O. Package - Meter Provers / SkidsP34121J2N2 03 Prepare P.O. Package - Meter Provers / Skids : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2N2 04 Prepare P.O. Package - Meter Provers / Skids : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2N3 Vendor Data Review - Meter Provers / SkidsP34121J2N3 05 Vendor Data Review - Meter Provers / Skids : Vendor Data Review 4 1.00 100% 0%

P34121J2P1 Enquiry Package - Open Channel Flowmeters

P34121J2P1 01 Enquiry Package - Open Channel Flowmeters : Data Sheet 4 1.00 100% 0%P34121J2P1 02 Enquiry Package - Open Channel Flowmeters : Requisition 10 1.00 100% 0%P34121J2P2 Prepare P.O. Package - Open Channel FlowmetersP34121J2P2 03 Prepare P.O. Package - Open Channel Flowmeters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2P2 04 Prepare P.O. Package - Open Channel Flowmeters : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2P3 Vendor Data Review - Open Channel FlowmetersP34121J2P3 05 Vendor Data Review - Open Channel Flowmeters : Vendor Data Review 4 1.00 100% 0%

P34121J2R1 Enquiry Package - Positive Discplacement Meters

P34121J2R1 01 Enquiry Package - Positive Discplacement Meters : Data Sheet 4 1.00 100% 0%P34121J2R1 02 Enquiry Package - Positive Discplacement Meters : Requisition 10 1.00 100% 0%

Page 60: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: INSTRUMENTS

Page 60 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEng. Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34121J2R2 Prepare P.O. Package - Positive Displacement MetersP34121J2R2 03 Prepare P.O. Package - Positive Displacement Meters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2R2 04 Prepare P.O. Package - Positive Displacement Meters : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2R3 Vendor Data Review - Positive Displacement MetersP34121J2R3 05 Vendor Data Review - Positive Displacement Meters : Vendor Data Review 4 1.00 100% 0%

P34121J2S1 Enquiry Package - Thermal Dispersion

P34121J2S1 01 Enquiry Package - Thermal Dispersion : Data Sheet 4 1.00 100% 0%P34121J2S1 02 Enquiry Package - Thermal Dispersion : Requisition 10 1.00 100% 0%P34121J2S2 Prepare P.O. Package - Thermal DispersionP34121J2S2 03 Prepare P.O. Package - Thermal Dispersion : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2S2 04 Prepare P.O. Package - Thermal Dispersion : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2S3 Vendor Data Review - Thermal DispersionP34121J2S3 05 Vendor Data Review - Thermal Dispersion : Vendor Data Review 4 1.00 100% 0%

P34121J2T1 Enquiry Package - Spare (1)

P34121J2T1 01 Enquiry Package - Spare (1) : Data Sheet 4 1.00 100% 0%P34121J2T1 02 Enquiry Package - Spare (1) : Requisition 10 1.00 100% 0%P34121J2T2 Prepare P.O. Package - Spare (1)P34121J2T2 03 Prepare P.O. Package - Spare (1) : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2T2 04 Prepare P.O. Package - Spare (1) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2T3 Vendor Data Review - Spare (1)P34121J2T3 05 Vendor Data Review - Spare (1) : Vendor Data Review 4 1.00 100% 0%

P34121J2U1 Enquiry Package - Spare (2)

P34121J2U1 01 Enquiry Package - Spare (2) : Data Sheet 4 1.00 100% 0%P34121J2U1 02 Enquiry Package - Spare (2) : Requisition 10 1.00 100% 0%P34121J2U2 Prepare P.O. Package - Spare (2)P34121J2U2 03 Prepare P.O. Package - Spare (2) : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2U2 04 Prepare P.O. Package - Spare (2) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2U3 Vendor Data Review - Spare (2)P34121J2U3 05 Vendor Data Review - Spare (2) : Vendor Data Review 4 1.00 100% 0%

P34121J2V1 Enquiry Package - Spare (3)

P34121J2V1 01 Enquiry Package - Spare (3) : Data Sheet 4 1.00 100% 0%P34121J2V1 02 Enquiry Package - Spare (3) : Requisition 10 1.00 100% 0%P34121J2V2 Prepare P.O. Package - Spare (3)P34121J2V2 03 Prepare P.O. Package - Spare (3) : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J2V2 04 Prepare P.O. Package - Spare (3) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J2V3 Vendor Data Review - Spare (3)P34121J2V3 05 Vendor Data Review - Spare (3) : Vendor Data Review 4 1.00 100% 0%

J63 Procurement - Pressure InstrumentsP34121J3A1 Enquiry Package - Pressure Transmitters (All Types)

P34121J3A1 01 Enquiry Package - Pressure Transmitters (All Types) : Data Sheet 6 1.00 100% 0%P34121J3A1 02 Enquiry Package - Pressure Transmitters (All Types) : Requisition 2 1.00 100% 0%P34121J3A2 Prepare P.O. Package - Pressure Transmitters (All Types)P34121J3A2 03 Prepare P.O. Package - Pressure Transmitters (All Types) : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J3A2 04 Prepare P.O. Package - Pressure Transmitters (All Types) : Update package documents for P.O. issue 2 1.00 100% 0%P34121J3A3 Vendor Data Review - Pressure Transmitters (All Types)P34121J3A3 05 Vendor Data Review - Pressure Transmitters (All Types) : Vendor Data Review 2 1.00 100% 0%

P34121J3B1 Enquiry Package - Pressure Gauges

P34121J3B1 01 Enquiry Package - Pressure Gauges : Data Sheet 6 1.00 100% 0%P34121J3B1 02 Enquiry Package - Pressure Gauges : Requisition 2 1.00 100% 0%P34121J3B2 Prepare P.O. Package - Pressure GaugesP34121J3B2 03 Prepare P.O. Package - Pressure Gauges : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J3B2 04 Prepare P.O. Package - Pressure Gauges : Update package documents for P.O. issue 2 1.00 100% 0%P34121J3B3 Vendor Data Review - Pressure GaugesP34121J3B3 05 Vendor Data Review - Pressure Gauges : Vendor Data Review 2 1.00 100% 0%

P34121J3C1 Enquiry Package - Pressure Switches

P34121J3C1 01 Enquiry Package - Pressure Switches : Data Sheet 6 1.00 100% 0%P34121J3C1 02 Enquiry Package - Pressure Switches : Requisition 2 1.00 100% 0%P34121J3C2 Prepare P.O. Package - Pressure SwitchesP34121J3C2 03 Prepare P.O. Package - Pressure Switches : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J3C2 04 Prepare P.O. Package - Pressure Switches : Update package documents for P.O. issue 2 1.00 100% 0%P34121J3C3 Vendor Data Review - Pressure SwitchesP34121J3C3 05 Vendor Data Review - Pressure Switches : Vendor Data Review 2 1.00 100% 0%

P34121J3D1 Enquiry Package - Spare (1)

P34121J3D1 01 Enquiry Package - Spare (1) : Data Sheet 6 1.00 100% 0%P34121J3D1 02 Enquiry Package - Spare (1) : Requisition 2 1.00 100% 0%P34121J3D2 Prepare P.O. Package - Spare (1)P34121J3D2 03 Prepare P.O. Package - Spare (1) : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J3D2 04 Prepare P.O. Package - Spare (1) : Update package documents for P.O. issue 2 1.00 100% 0%P34121J3D3 Vendor Data Review - Spare (1)P34121J3D3 05 Vendor Data Review - Spare (1) : Vendor Data Review 2 1.00 100% 0%

P34121J3E1 Enquiry Package - Spare (2)

P34121J3E1 01 Enquiry Package - Spare (2) : Data Sheet 6 1.00 100% 0%P34121J3E1 02 Enquiry Package - Spare (2) : Requisition 2 1.00 100% 0%P34121J3E2 Prepare P.O. Package - Spare (2)P34121J3E2 03 Prepare P.O. Package - Spare (2) : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J3E2 04 Prepare P.O. Package - Spare (2) : Update package documents for P.O. issue 2 1.00 100% 0%P34121J3E3 Vendor Data Review - Spare (2)P34121J3E3 05 Vendor Data Review - Spare (2) : Vendor Data Review 2 1.00 100% 0%

P34121J3E1 Enquiry Package - Spare (2)

P34121J3E1 01 Enquiry Package - Spare (2) : Data Sheet 6 1.00 100% 0%P34121J3E1 02 Enquiry Package - Spare (2) : Requisition 2 1.00 100% 0%P34121J3E2 Prepare P.O. Package - Spare (2)P34121J3E2 03 Prepare P.O. Package - Spare (2) : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J3E2 04 Prepare P.O. Package - Spare (2) : Update package documents for P.O. issue 2 1.00 100% 0%P34121J3E3 Vendor Data Review - Spare (2)P34121J3E3 05 Vendor Data Review - Spare (2) : Vendor Data Review 2 1.00 100% 0%

J64 Procurement - Level InstrumentsP34121J4A1 Enquiry Package - Level Gauges

P34121J4A1 01 Enquiry Package - Level Gauges : Data Sheet 4 1.00 100% 0%P34121J4A1 02 Enquiry Package - Level Gauges : Requisition 2 1.00 100% 0%P34121J4A2 Prepare P.O. Package - Level GaugesP34121J4A2 03 Prepare P.O. Package - Level Gauges : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J4A2 04 Prepare P.O. Package - Level Gauges : Update package documents for P.O. issue 10 1.00 100% 0%P34121J4A3 Vendor Data Review - Level GaugesP34121J4A3 05 Vendor Data Review - Level Gauges : Vendor Data Review 5 1.00 100% 0%

P34121J4B1 Enquiry Package - Ultrasonic Level Transmitters

P34121J4B1 01 Enquiry Package - Ultrasonic Level Transmitters : Data Sheet 4 1.00 100% 0%P34121J4B1 02 Enquiry Package - Ultrasonic Level Transmitters : Requisition 2 1.00 100% 0%P34121J4B2 Prepare P.O. Package - Ultrasonic Level TransmittersP34121J4B2 03 Prepare P.O. Package - Ultrasonic Level Transmitters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J4B2 04 Prepare P.O. Package - Ultrasonic Level Transmitters : Update package documents for P.O. issue 10 1.00 100% 0%P34121J4B3 Vendor Data Review - Ultrasonic Level TransmittersP34121J4B3 05 Vendor Data Review - Ultrasonic Level Transmitters : Vendor Data Review 5 1.00 100% 0%

P34121J4C1 Enquiry Package - Radar Level Transmitters

P34121J4C1 01 Enquiry Package - Radar Level Transmitters : Data Sheet 4 1.00 100% 0%P34121J4C1 02 Enquiry Package - Radar Level Transmitters : Requisition 2 1.00 100% 0%P34121J4C2 Prepare P.O. Package - Radar Level TransmittersP34121J4C2 03 Prepare P.O. Package - Radar Level Transmitters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J4C2 04 Prepare P.O. Package - Radar Level Transmitters : Update package documents for P.O. issue 10 1.00 100% 0%P34121J4C3 Vendor Data Review - Radar Level TransmittersP34121J4C3 05 Vendor Data Review - Radar Level Transmitters : Vendor Data Review 5 1.00 100% 0%

Page 61: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: INSTRUMENTS

Page 61 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEng. Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34121J4D1 Enquiry Package - Displacer Type Level Transmitters

P34121J4D1 01 Enquiry Package - Displacer Type Level Transmitters : Data Sheet 4 1.00 100% 0%P34121J4D1 02 Enquiry Package - Displacer Type Level Transmitters : Requisition 2 1.00 100% 0%P34121J4D2 Prepare P.O. Package - Displacer Type Level TransmittersP34121J4D2 03 Prepare P.O. Package - Displacer Type Level Transmitters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J4D2 04 Prepare P.O. Package - Displacer Type Level Transmitters : Update package documents for P.O. issue 10 1.00 100% 0%P34121J4D3 Vendor Data Review - Displacer Type Level TransmittersP34121J4D3 05 Vendor Data Review - Displacer Type Level Transmitters : Vendor Data Review 5 1.00 100% 0%

P34121J4E1 Enquiry Package - Float Type Transmitters

P34121J4E1 01 Enquiry Package - Float Type Transmitters : Data Sheet 4 1.00 100% 0%P34121J4E1 02 Enquiry Package - Float Type Transmitters : Requisition 2 1.00 100% 0%P34121J4E2 Prepare P.O. Package - Float Type TransmittersP34121J4E2 03 Prepare P.O. Package - Float Type Transmitters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J4E2 04 Prepare P.O. Package - Float Type Transmitters : Update package documents for P.O. issue 10 1.00 100% 0%P34121J4E3 Vendor Data Review - Float Type TransmittersP34121J4E3 05 Vendor Data Review - Float Type Transmitters : Vendor Data Review 5 1.00 100% 0%

P34121J4F1 Enquiry Package - Nucleonic Level Transmitters

P34121J4F1 01 Enquiry Package - Nucleonic Level Transmitters : Data Sheet 4 1.00 100% 0%P34121J4F1 02 Enquiry Package - Nucleonic Level Transmitters : Requisition 2 1.00 100% 0%P34121J4F2 Prepare P.O. Package - Nucleonic Level TransmittersP34121J4F2 03 Prepare P.O. Package - Nucleonic Level Transmitters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J4F2 04 Prepare P.O. Package - Nucleonic Level Transmitters : Update package documents for P.O. issue 10 1.00 100% 0%P34121J4F3 Vendor Data Review - Nucleonic Level TransmittersP34121J4F3 05 Vendor Data Review - Nucleonic Level Transmitters : Vendor Data Review 5 1.00 100% 0%

P34121J4G1 Enquiry Package - Capacitance / Admittance Level Transmitters

P34121J4G1 01 Enquiry Package - Capacitance / Admittance Level Transmitters : Data Sheet 4 1.00 100% 0%P34121J4G1 02 Enquiry Package - Capacitance / Admittance Level Transmitters : Requisition 2 1.00 100% 0%P34121J4G2 Prepare P.O. Package - Capacitance / Admittance Level TransmittersP34121J4G2 03 Prepare P.O. Package - Capacitance / Admittance Level Transmitters : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J4G2 04 Prepare P.O. Package - Capacitance / Admittance Level Transmitters : Update package documents for P.O. issue 10 1.00 100% 0%P34121J4G3 Vendor Data Review - Capacitance / Admittance Level TransmittersP34121J4G3 05 Vendor Data Review - Capacitance / Admittance Level Transmitters : Vendor Data Review 5 1.00 100% 0%

P34121J4H1 Enquiry Package - Tank Gauges & Systems

P34121J4H1 01 Enquiry Package - Tank Gauges & Systems : Data Sheet 4 1.00 100% 0%P34121J4H1 02 Enquiry Package - Tank Gauges & Systems : Requisition 2 1.00 100% 0%P34121J4H2 Prepare P.O. Package - Tank Gauges & SystemsP34121J4H2 03 Prepare P.O. Package - Tank Gauges & Systems : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J4H2 04 Prepare P.O. Package - Tank Gauges & Systems : Update package documents for P.O. issue 10 1.00 100% 0%P34121J4H3 Vendor Data Review - Tank Gauges & SystemsP34121J4H3 05 Vendor Data Review - Tank Gauges & Systems : Vendor Data Review 5 1.00 100% 0%

P34121J4J1 Enquiry Package - Level Switches (All Types)

P34121J4J1 01 Enquiry Package - Level Switches (All Types) : Data Sheet 4 1.00 100% 0%P34121J4J1 02 Enquiry Package - Level Switches (All Types) : Requisition 2 1.00 100% 0%P34121J4J2 Prepare P.O. Package - Level Switches (All Types)P34121J4J2 03 Prepare P.O. Package - Level Switches (All Types) : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J4J2 04 Prepare P.O. Package - Level Switches (All Types) : Update package documents for P.O. issue 10 1.00 100% 0%P34121J4J3 Vendor Data Review - Level Switches (All Types)P34121J4J3 05 Vendor Data Review - Level Switches (All Types) : Vendor Data Review 5 1.00 100% 0%

P34121J4K1 Enquiry Package - Level Instruments - Special (1)

P34121J4K1 01 Enquiry Package - Level Instruments - Special (1) : Data Sheet 4 1.00 100% 0%P34121J4K1 02 Enquiry Package - Level Instruments - Special (1) : Requisition 2 1.00 100% 0%P34121J4K2 Prepare P.O. Package - Level Instruments - Special (1)P34121J4K2 03 Prepare P.O. Package - Level Instruments - Special (1) : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J4K2 04 Prepare P.O. Package - Level Instruments - Special (1) : Update package documents for P.O. issue 10 1.00 100% 0%P34121J4K3 Vendor Data Review - Level Instruments - Special (1)P34121J4K3 05 Vendor Data Review - Level Instruments - Special (1) : Vendor Data Review 5 1.00 100% 0%

P34121J4L1 Enquiry Package - Level Instruments - Special (2)

P34121J4L1 01 Enquiry Package - Level Instruments - Special (2) : Data Sheet 4 1.00 100% 0%P34121J4L1 02 Enquiry Package - Level Instruments - Special (2) : Requisition 2 1.00 100% 0%P34121J4L2 Prepare P.O. Package - Level Instruments - Special (2)P34121J4L2 03 Prepare P.O. Package - Level Instruments - Special (2) : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J4L2 04 Prepare P.O. Package - Level Instruments - Special (2) : Update package documents for P.O. issue 10 1.00 100% 0%P34121J4L3 Vendor Data Review - Level Instruments - Special (2)P34121J4L3 05 Vendor Data Review - Level Instruments - Special (2) : Vendor Data Review 5 1.00 100% 0%

P34121J4M1 Enquiry Package - Level Instruments - Spare (1)

P34121J4M1 01 Enquiry Package - Level Instruments - Spare (1) : Data Sheet 4 1.00 100% 0%P34121J4M1 02 Enquiry Package - Level Instruments - Spare (1) : Requisition 2 1.00 100% 0%P34121J4M2 Prepare P.O. Package - Level Instruments - Spare (1)P34121J4M2 03 Prepare P.O. Package - Level Instruments - Spare (1) : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J4M2 04 Prepare P.O. Package - Level Instruments - Spare (1) : Update package documents for P.O. issue 10 1.00 100% 0%P34121J4M3 Vendor Data Review - Level Instruments - Spare (1)P34121J4M3 05 Vendor Data Review - Level Instruments - Spare (1) : Vendor Data Review 5 1.00 100% 0%

P34121J4N1 Enquiry Package - Level Instruments - Spare (2)

P34121J4N1 01 Enquiry Package - Level Instruments - Spare (2) : Data Sheet 4 1.00 100% 0%P34121J4N1 02 Enquiry Package - Level Instruments - Spare (2) : Requisition 2 1.00 100% 0%P34121J4N2 Prepare P.O. Package - Level Instruments - Spare (2)P34121J4N2 03 Prepare P.O. Package - Level Instruments - Spare (2) : Prepare Technical Bid Analysis 6 1.00 100% 0%P34121J4N2 04 Prepare P.O. Package - Level Instruments - Spare (2) : Update package documents for P.O. issue 10 1.00 100% 0%P34121J4N3 Vendor Data Review - Level Instruments - Spare (2)P34121J4N3 05 Vendor Data Review - Level Instruments - Spare (2) : Vendor Data Review 5 1.00 100% 0%

J65 Procurement - Temperature InstrumentsP34121J5A1 Enquiry Package - Temperature Transmitters

P34121J5A1 01 Enquiry Package - Temperature Transmitters : Data Sheet 6 1.00 100% 0%P34121J5A1 02 Enquiry Package - Temperature Transmitters : Requisition 2 1.00 100% 0%P34121J5A2 Prepare P.O. Package - Temperature TransmittersP34121J5A2 03 Prepare P.O. Package - Temperature Transmitters : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J5A2 04 Prepare P.O. Package - Temperature Transmitters : Update package documents for P.O. issue 2 1.00 100% 0%P34121J5A3 Vendor Data Review - Temperature TransmittersP34121J5A3 05 Vendor Data Review - Temperature Transmitters : Vendor Data Review 3 1.00 100% 0%

P34121J5B1 Enquiry Package - Temperature Gauges

P34121J5B1 01 Enquiry Package - Temperature Gauges : Data Sheet 6 1.00 100% 0%P34121J5B1 02 Enquiry Package - Temperature Gauges : Requisition 2 1.00 100% 0%P34121J5B2 Prepare P.O. Package - Temperature GaugesP34121J5B2 03 Prepare P.O. Package - Temperature Gauges : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J5B2 04 Prepare P.O. Package - Temperature Gauges : Update package documents for P.O. issue 2 1.00 100% 0%P34121J5B3 Vendor Data Review - Temperature GaugesP34121J5B3 05 Vendor Data Review - Temperature Gauges : Vendor Data Review 3 1.00 100% 0%

P34121J5C1 Enquiry Package - Thermowells

P34121J5C1 01 Enquiry Package - Thermowells : Data Sheet 6 1.00 100% 0%P34121J5C1 02 Enquiry Package - Thermowells : Requisition 2 1.00 100% 0%P34121J5C2 Prepare P.O. Package - ThermowellsP34121J5C2 03 Prepare P.O. Package - Thermowells : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J5C2 04 Prepare P.O. Package - Thermowells : Update package documents for P.O. issue 2 1.00 100% 0%P34121J5C3 Vendor Data Review - ThermowellsP34121J5C3 05 Vendor Data Review - Thermowells : Vendor Data Review 3 1.00 100% 0%

P34121J5D1 Enquiry Package - Temperature Elements

P34121J5D1 01 Enquiry Package - Temperature Elements : Data Sheet 6 1.00 100% 0%P34121J5D1 02 Enquiry Package - Temperature Elements : Requisition 2 1.00 100% 0%P34121J5D2 Prepare P.O. Package - Temperature ElementsP34121J5D2 03 Prepare P.O. Package - Temperature Elements : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J5D2 04 Prepare P.O. Package - Temperature Elements : Update package documents for P.O. issue 2 1.00 100% 0%P34121J5D3 Vendor Data Review - Temperature ElementsP34121J5D3 05 Vendor Data Review - Temperature Elements : Vendor Data Review 3 1.00 100% 0%

P34121J5E1 Enquiry Package - Pyrometers

Page 62: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: INSTRUMENTS

Page 62 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEng. Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34121J5E1 01 Enquiry Package - Pyrometers : Data Sheet 6 1.00 100% 0%P34121J5E1 02 Enquiry Package - Pyrometers : Requisition 2 1.00 100% 0%P34121J5E2 Prepare P.O. Package - PyrometersP34121J5E2 03 Prepare P.O. Package - Pyrometers : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J5E2 04 Prepare P.O. Package - Pyrometers : Update package documents for P.O. issue 2 1.00 100% 0%P34121J5E3 Vendor Data Review - PyrometersP34121J5E3 05 Vendor Data Review - Pyrometers : Vendor Data Review 3 1.00 100% 0%

P34121J5F1 Enquiry Package - Temperature Equipment - Special (1)

P34121J5F1 01 Enquiry Package - Temperature Equipment - Special (1) : Data Sheet 6 1.00 100% 0%P34121J5F1 02 Enquiry Package - Temperature Equipment - Special (1) : Requisition 2 1.00 100% 0%P34121J5F2 Prepare P.O. Package - Temperature Equipment - Special (1)P34121J5F2 03 Prepare P.O. Package - Temperature Equipment - Special (1) : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J5F2 04 Prepare P.O. Package - Temperature Equipment - Special (1) : Update package documents for P.O. issue 2 1.00 100% 0%P34121J5F3 Vendor Data Review - Temperature Equipment - Special (1)P34121J5F3 05 Vendor Data Review - Temperature Equipment - Special (1) : Vendor Data Review 3 1.00 100% 0%

P34121J5G1 Enquiry Package - Temperature Equipment - Special (2)

P34121J5G1 01 Enquiry Package - Temperature Equipment - Special (2) : Data Sheet 6 1.00 100% 0%P34121J5G1 02 Enquiry Package - Temperature Equipment - Special (2) : Requisition 2 1.00 100% 0%P34121J5G2 Prepare P.O. Package - Temperature Equipment - Special (2)P34121J5G2 03 Prepare P.O. Package - Temperature Equipment - Special (2) : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J5G2 04 Prepare P.O. Package - Temperature Equipment - Special (2) : Update package documents for P.O. issue 2 1.00 100% 0%P34121J5G3 Vendor Data Review - Temperature Equipment - Special (2)P34121J5G3 05 Vendor Data Review - Temperature Equipment - Special (2) : Vendor Data Review 3 1.00 100% 0%

P34121J5H1 Enquiry Package - Temperature Instruments - Spare (1)

P34121J5H1 01 Enquiry Package - Temperature Instruments - Spare (1) : Data Sheet 6 1.00 100% 0%P34121J5H1 02 Enquiry Package - Temperature Instruments - Spare (1) : Requisition 2 1.00 100% 0%P34121J5H2 Prepare P.O. Package - Temperature Instruments - Spare (1)P34121J5H2 03 Prepare P.O. Package - Temperature Instruments - Spare (1) : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J5H2 04 Prepare P.O. Package - Temperature Instruments - Spare (1) : Update package documents for P.O. issue 2 1.00 100% 0%P34121J5H3 Vendor Data Review - Temperature Instruments - Spare (1)P34121J5H3 05 Vendor Data Review - Temperature Instruments - Spare (1) : Vendor Data Review 3 1.00 100% 0%

P34121J5J1 Enquiry Package - Temperature Instruments - Spare (2)

P34121J5J1 01 Enquiry Package - Temperature Instruments - Spare (2) : Data Sheet 6 1.00 100% 0%P34121J5J1 02 Enquiry Package - Temperature Instruments - Spare (2) : Requisition 2 1.00 100% 0%P34121J5J2 Prepare P.O. Package - Temperature Instruments - Spare (2)P34121J5J2 03 Prepare P.O. Package - Temperature Instruments - Spare (2) : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J5J2 04 Prepare P.O. Package - Temperature Instruments - Spare (2) : Update package documents for P.O. issue 2 1.00 100% 0%P34121J5J3 Vendor Data Review - Temperature Instruments - Spare (2)P34121J5J3 05 Vendor Data Review - Temperature Instruments - Spare (2) : Vendor Data Review 3 1.00 100% 0%

P34121J5K1 Enquiry Package - Temperature Instruments - Spare (3)

P34121J5K1 01 Enquiry Package - Temperature Instruments - Spare (3) : Data Sheet 6 1.00 100% 0%P34121J5K1 02 Enquiry Package - Temperature Instruments - Spare (3) : Requisition 2 1.00 100% 0%P34121J5K2 Prepare P.O. Package - Temperature Instruments - Spare (3)P34121J5K2 03 Prepare P.O. Package - Temperature Instruments - Spare (3) : Prepare Technical Bid Analysis 2 1.00 100% 0%P34121J5K2 04 Prepare P.O. Package - Temperature Instruments - Spare (3) : Update package documents for P.O. issue 2 1.00 100% 0%P34121J5K3 Vendor Data Review - Temperature Instruments - Spare (3)P34121J5K3 05 Vendor Data Review - Temperature Instruments - Spare (3) : Vendor Data Review 3 1.00 100% 0%

J66 Procurement - SystemsP34121J6A1 Enquiry Package - DCS

P34121J6A1 01 Enquiry Package - DCS : Configuration Specification 50 1.00 100% 0%

P34121J6A1 02 Enquiry Package - DCS : DCS Specification 40 1.00 100% 0%P34121J6A1 03 Enquiry Package - DCS : Requisition 10 1.00 100% 0%P34121J6A2 Prepare P.O. Package - DCSP34121J6A2 04 Prepare P.O. Package - DCS : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6A2 05 Prepare P.O. Package - DCS : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6A3 Vendor Data Review - DCSP34121J6A3 06 Vendor Data Review - DCS : Vendor Data Review 5 1.00 100% 0%

P34121J6B1 Enquiry Package - ESD System

P34121J6B1 01 Enquiry Package - ESD System : Specification 40 1.00 100% 0%P34121J6B1 02 Enquiry Package - ESD System : Requisition 10 1.00 100% 0%P34121J6B2 Prepare P.O. Package - ESD SystemP34121J6B2 03 Prepare P.O. Package - ESD System : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6B2 04 Prepare P.O. Package - ESD System : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6B3 Vendor Data Review - ESD SystemP34121J6B3 05 Vendor Data Review - ESD System : Vendor Data Review 5 1.00 100% 0%

P34121J6C1 Enquiry Package - Fire & Gas System

P34121J6C1 01 Enquiry Package - Fire & Gas System : Specification 40 1.00 100% 0%P34121J6C1 02 Enquiry Package - Fire & Gas System : Requisition 10 1.00 100% 0%P34121J6C2 Prepare P.O. Package - Fire & Gas SystemP34121J6C2 03 Prepare P.O. Package - Fire & Gas System : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6C2 04 Prepare P.O. Package - Fire & Gas System : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6C3 Vendor Data Review - Fire & Gas SystemP34121J6C3 05 Vendor Data Review - Fire & Gas System : Vendor Data Review 5 1.00 100% 0%

P34121J6D1 Enquiry Package - SCADA

P34121J6D1 01 Enquiry Package - SCADA : Specification 40 1.00 100% 0%P34121J6D1 02 Enquiry Package - SCADA : Requisition 10 1.00 100% 0%P34121J6D2 Prepare P.O. Package - SCADAP34121J6D2 03 Prepare P.O. Package - SCADA : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6D2 04 Prepare P.O. Package - SCADA : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6D3 Vendor Data Review - SCADAP34121J6D3 05 Vendor Data Review - SCADA : Vendor Data Review 5 1.00 100% 0%

P34121J6E1 Enquiry Package - PLCs

P34121J6E1 01 Enquiry Package - PLCs : Specification 40 1.00 100% 0%P34121J6E1 02 Enquiry Package - PLCs : Requisition 10 1.00 100% 0%P34121J6E2 Prepare P.O. Package - PLCsP34121J6E2 03 Prepare P.O. Package - PLCs : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6E2 04 Prepare P.O. Package - PLCs : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6E3 Vendor Data Review - PLCsP34121J6E3 05 Vendor Data Review - PLCs : Vendor Data Review 5 1.00 100% 0%

P34121J6F1 Enquiry Package - Burner Management System

P34121J6F1 01 Enquiry Package - Burner Management System : Specification 40 1.00 100% 0%P34121J6F1 02 Enquiry Package - Burner Management System : Requisition 10 1.00 100% 0%P34121J6F2 Prepare P.O. Package - Burner Management SystemP34121J6F2 03 Prepare P.O. Package - Burner Management System : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6F2 04 Prepare P.O. Package - Burner Management System : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6F3 Vendor Data Review - Burner Management SystemP34121J6F3 05 Vendor Data Review - Burner Management System : Vendor Data Review 5 1.00 100% 0%

P34121J6G1 Enquiry Package - Control Panels

P34121J6G1 01 Enquiry Package - Control Panels : Specification 40 1.00 100% 0%P34121J6G1 02 Enquiry Package - Control Panels : Requisition 10 1.00 100% 0%P34121J6G2 Prepare P.O. Package - Control PanelsP34121J6G2 03 Prepare P.O. Package - Control Panels : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6G2 04 Prepare P.O. Package - Control Panels : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6G3 Vendor Data Review - Control PanelsP34121J6G3 05 Vendor Data Review - Control Panels : Vendor Data Review 5 1.00 100% 0%

P34121J6H1 Enquiry Package - Hydraulic (or Wellhead) Panel

P34121J6H1 01 Enquiry Package - Hydraulic (or Wellhead) Panel : Specification 40 1.00 100% 0%P34121J6H1 02 Enquiry Package - Hydraulic (or Wellhead) Panel : Requisition 10 1.00 100% 0%P34121J6H2 Prepare P.O. Package - Hydraulic (or Wellhead) PanelP34121J6H2 03 Prepare P.O. Package - Hydraulic (or Wellhead) Panel : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6H2 04 Prepare P.O. Package - Hydraulic (or Wellhead) Panel : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6H3 Vendor Data Review - Hydraulic (or Wellhead) PanelP34121J6H3 05 Vendor Data Review - Hydraulic (or Wellhead) Panel : Vendor Data Review 5 1.00 100% 0%

P34121J6J1 Enquiry Package - Pneumatic Panel

Page 63: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: INSTRUMENTS

Page 63 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEng. Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34121J6J1 01 Enquiry Package - Pneumatic Panel : Specification 40 1.00 100% 0%P34121J6J1 02 Enquiry Package - Pneumatic Panel : Requisition 10 1.00 100% 0%P34121J6J2 Prepare P.O. Package - Pneumatic PanelP34121J6J2 03 Prepare P.O. Package - Pneumatic Panel : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6J2 04 Prepare P.O. Package - Pneumatic Panel : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6J3 Vendor Data Review - Pneumatic PanelP34121J6J3 05 Vendor Data Review - Pneumatic Panel : Vendor Data Review 5 1.00 100% 0%

P34121J6K1 Enquiry Package - Equipment Monitoring Panel

P34121J6K1 01 Enquiry Package - Equipment Monitoring Panel : Specification 40 1.00 100% 0%P34121J6K1 02 Enquiry Package - Equipment Monitoring Panel : Requisition 10 1.00 100% 0%P34121J6K2 Prepare P.O. Package - Equipment Monitoring PanelP34121J6K2 03 Prepare P.O. Package - Equipment Monitoring Panel : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6K2 04 Prepare P.O. Package - Equipment Monitoring Panel : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6K3 Vendor Data Review - Equipment Monitoring PanelP34121J6K3 05 Vendor Data Review - Equipment Monitoring Panel : Vendor Data Review 5 1.00 100% 0%

P34121J6L1 Enquiry Package - Telemetry

P34121J6L1 01 Enquiry Package - Telemetry : Specification 40 1.00 100% 0%P34121J6L1 02 Enquiry Package - Telemetry : Requisition 10 1.00 100% 0%P34121J6L2 Prepare P.O. Package - TelemetryP34121J6L2 03 Prepare P.O. Package - Telemetry : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6L2 04 Prepare P.O. Package - Telemetry : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6L3 Vendor Data Review - TelemetryP34121J6L3 05 Vendor Data Review - Telemetry : Vendor Data Review 5 1.00 100% 0%

P34121J6M1 Enquiry Package - CCTV System

P34121J6M1 01 Enquiry Package - CCTV System : Specification 40 1.00 100% 0%P34121J6M1 02 Enquiry Package - CCTV System : Requisition 10 1.00 100% 0%P34121J6M2 Prepare P.O. Package - CCTV SystemP34121J6M2 03 Prepare P.O. Package - CCTV System : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6M2 04 Prepare P.O. Package - CCTV System : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6M3 Vendor Data Review - CCTV SystemP34121J6M3 05 Vendor Data Review - CCTV System : Vendor Data Review 5 1.00 100% 0%

P34121J6N1 Enquiry Package - PABX System

P34121J6N1 01 Enquiry Package - PABX System : Specification 40 1.00 100% 0%P34121J6N1 02 Enquiry Package - PABX System : Requisition 10 1.00 100% 0%P34121J6N2 Prepare P.O. Package - PABX SystemP34121J6N2 03 Prepare P.O. Package - PABX System : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6N2 04 Prepare P.O. Package - PABX System : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6N3 Vendor Data Review - PABX SystemP34121J6N3 05 Vendor Data Review - PABX System : Vendor Data Review 5 1.00 100% 0%

P34121J6P1 Enquiry Package - Radios

P34121J6P1 01 Enquiry Package - Radios : Specification 40 1.00 100% 0%P34121J6P1 02 Enquiry Package - Radios : Requisition 10 1.00 100% 0%P34121J6P2 Prepare P.O. Package - RadiosP34121J6P2 03 Prepare P.O. Package - Radios : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6P2 04 Prepare P.O. Package - Radios : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6P3 Vendor Data Review - RadiosP34121J6P3 05 Vendor Data Review - Radios : Vendor Data Review 5 1.00 100% 0%

P34121J6R1 Enquiry Package - Satellite Communications System

P34121J6R1 01 Enquiry Package - Satellite Communications System : Specification 40 1.00 100% 0%P34121J6R1 02 Enquiry Package - Satellite Communications System : Requisition 10 1.00 100% 0%P34121J6R2 Prepare P.O. Package - Satellite Communications SystemP34121J6R2 03 Prepare P.O. Package - Satellite Communications System : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6R2 04 Prepare P.O. Package - Satellite Communications System : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6R3 Vendor Data Review - Satellite Communications SystemP34121J6R3 05 Vendor Data Review - Satellite Communications System : Vendor Data Review 5 1.00 100% 0%

P34121J6S1 Enquiry Package - Entertainment System

P34121J6S1 01 Enquiry Package - Entertainment System : Specification 40 1.00 100% 0%P34121J6S1 02 Enquiry Package - Entertainment System : Requisition 10 1.00 100% 0%P34121J6S2 Prepare P.O. Package - Entertainment SystemP34121J6S2 03 Prepare P.O. Package - Entertainment System : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6S2 04 Prepare P.O. Package - Entertainment System : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6S3 Vendor Data Review - Entertainment SystemP34121J6S3 05 Vendor Data Review - Entertainment System : Vendor Data Review 5 1.00 100% 0%

P34121J6T1 Enquiry Package - PA / GA System

P34121J6T1 01 Enquiry Package - PA / GA System : Specification 40 1.00 100% 0%P34121J6T1 02 Enquiry Package - PA / GA System : Requisition 10 1.00 100% 0%P34121J6T2 Prepare P.O. Package - PA / GA SystemP34121J6T2 03 Prepare P.O. Package - PA / GA System : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6T2 04 Prepare P.O. Package - PA / GA System : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6T3 Vendor Data Review - PA / GA SystemP34121J6T3 05 Vendor Data Review - PA / GA System : Vendor Data Review 5 1.00 100% 0%

P34121J6U1 Enquiry Package - Marshalling Cabinets

P34121J6U1 01 Enquiry Package - Marshalling Cabinets : Specification 40 1.00 100% 0%P34121J6U1 02 Enquiry Package - Marshalling Cabinets : Requisition 10 1.00 100% 0%P34121J6U2 Prepare P.O. Package - Marshalling CabinetsP34121J6U2 03 Prepare P.O. Package - Marshalling Cabinets : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6U2 04 Prepare P.O. Package - Marshalling Cabinets : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6U3 Vendor Data Review - Marshalling CabinetsP34121J6U3 05 Vendor Data Review - Marshalling Cabinets : Vendor Data Review 5 1.00 100% 0%

P34121J6V1 Enquiry Package - Systems - Spare (1)

P34121J6V1 01 Enquiry Package - Systems - Spare (1) : Specification 40 1.00 100% 0%P34121J6V1 02 Enquiry Package - Systems - Spare (1) : Requisition 10 1.00 100% 0%P34121J6V2 Prepare P.O. Package - Systems - Spare (1)P34121J6V2 03 Prepare P.O. Package - Systems - Spare (1) : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6V2 04 Prepare P.O. Package - Systems - Spare (1) : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6V3 Vendor Data Review - Systems - Spare (1)P34121J6V3 05 Vendor Data Review - Systems - Spare (1) : Vendor Data Review 5 1.00 100% 0%

P34121J6W1 Enquiry Package - Systems - Spare (2)

P34121J6W1 01 Enquiry Package - Systems - Spare (2) : Specification 40 1.00 100% 0%P34121J6W1 02 Enquiry Package - Systems - Spare (2) : Requisition 10 1.00 100% 0%P34121J6W2 Prepare P.O. Package - Systems - Spare (2)P34121J6W2 03 Prepare P.O. Package - Systems - Spare (2) : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6W2 04 Prepare P.O. Package - Systems - Spare (2) : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6W3 Vendor Data Review - Systems - Spare (2)P34121J6W3 05 Vendor Data Review - Systems - Spare (2) : Vendor Data Review 5 1.00 100% 0%

P34121J6X1 Enquiry Package - Systems - Spare (3)

P34121J6X1 01 Enquiry Package - Systems - Spare (3) : Specification 40 1.00 100% 0%P34121J6X1 02 Enquiry Package - Systems - Spare (3) : Requisition 10 1.00 100% 0%P34121J6X2 Prepare P.O. Package - Systems - Spare (3)P34121J6X2 03 Prepare P.O. Package - Systems - Spare (3) : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J6X2 04 Prepare P.O. Package - Systems - Spare (3) : Update package documents for P.O. issue 10 1.00 100% 0%P34121J6X3 Vendor Data Review - Systems - Spare (3)P34121J6X3 05 Vendor Data Review - Systems - Spare (3) : Vendor Data Review 5 1.00 100% 0%

J67 Procurement - Fire & Gas EquipmentP34121J7A1 Enquiry Package - Fire & Gas Equipment

P34121J7A1 01 Enquiry Package - Fire & Gas Equipment : Specification 40 1.00 100% 0%P34121J7A1 02 Enquiry Package - Fire & Gas Equipment : Requisition 10 1.00 100% 0%P34121J7A2 Prepare P.O. Package - Fire & Gas EquipmentP34121J7A2 03 Prepare P.O. Package - Fire & Gas Equipment : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J7A2 04 Prepare P.O. Package - Fire & Gas Equipment : Update package documents for P.O. issue 10 1.00 100% 0%P34121J7A3 Vendor Data Review - Fire & Gas EquipmentP34121J7A3 05 Vendor Data Review - Fire & Gas Equipment : Vendor Data Review 5 1.00 100% 0%

P34121J7B1 Enquiry Package - Gas Detectors (Generic)

P34121J7B1 01 Enquiry Package - Gas Detectors (Generic) : Specification 40 1.00 100% 0%

Page 64: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: INSTRUMENTS

Page 64 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEng. Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34121J7B1 02 Enquiry Package - Gas Detectors (Generic) : Requisition 10 1.00 100% 0%P34121J7B2 Prepare P.O. Package - Gas Detectors (Generic)P34121J7B2 03 Prepare P.O. Package - Gas Detectors (Generic) : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J7B2 04 Prepare P.O. Package - Gas Detectors (Generic) : Update package documents for P.O. issue 10 1.00 100% 0%P34121J7B3 Vendor Data Review - Gas Detectors (Generic)P34121J7B3 05 Vendor Data Review - Gas Detectors (Generic) : Vendor Data Review 5 1.00 100% 0%

P34121J7C1 Enquiry Package - Gas Detectors (Toxic / Other)

P34121J7C1 01 Enquiry Package - Gas Detectors (Toxic / Other) : Specification 40 1.00 100% 0%P34121J7C1 02 Enquiry Package - Gas Detectors (Toxic / Other) : Requisition 10 1.00 100% 0%P34121J7C2 Prepare P.O. Package - Gas Detectors (Toxic / Other)P34121J7C2 03 Prepare P.O. Package - Gas Detectors (Toxic / Other) : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J7C2 04 Prepare P.O. Package - Gas Detectors (Toxic / Other) : Update package documents for P.O. issue 10 1.00 100% 0%P34121J7C3 Vendor Data Review - GasDetectors (Toxic / Other)P34121J7C3 05 Vendor Data Review - GasDetectors (Toxic / Other) : Vendor Data Review 5 1.00 100% 0%

P34121J7D1 Enquiry Package - Flame Detectors

P34121J7D1 01 Enquiry Package - Flame Detectors : Specification 40 1.00 100% 0%P34121J7D1 02 Enquiry Package - Flame Detectors : Requisition 10 1.00 100% 0%P34121J7D2 Prepare P.O. Package - Flame DetectorsP34121J7D2 03 Prepare P.O. Package - Flame Detectors : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J7D2 04 Prepare P.O. Package - Flame Detectors : Update package documents for P.O. issue 10 1.00 100% 0%P34121J7D3 Vendor Data Review - Flame DetectorsP34121J7D3 05 Vendor Data Review - Flame Detectors : Vendor Data Review 5 1.00 100% 0%

P34121J7E1 Enquiry Package - Manual Alarm Call Points

P34121J7E1 01 Enquiry Package - Manual Alarm Call Points : Specification 40 1.00 100% 0%P34121J7E1 02 Enquiry Package - Manual Alarm Call Points : Requisition 10 1.00 100% 0%P34121J7E2 Prepare P.O. Package - Manual Alarm Call PointsP34121J7E2 03 Prepare P.O. Package - Manual Alarm Call Points : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J7E2 04 Prepare P.O. Package - Manual Alarm Call Points : Update package documents for P.O. issue 10 1.00 100% 0%P34121J7E3 Vendor Data Review - Manual Alarm Call PointsP34121J7E3 05 Vendor Data Review - Manual Alarm Call Points : Vendor Data Review 5 1.00 100% 0%

P34121J7F1 Enquiry Package - Visual & Audible Alarms

P34121J7F1 01 Enquiry Package - Visual & Audible Alarms : Specification 40 1.00 100% 0%P34121J7F1 02 Enquiry Package - Visual & Audible Alarms : Requisition 10 1.00 100% 0%P34121J7F2 Prepare P.O. Package - Visual & Audible AlarmsP34121J7F2 03 Prepare P.O. Package - Visual & Audible Alarms : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J7F2 04 Prepare P.O. Package - Visual & Audible Alarms : Update package documents for P.O. issue 10 1.00 100% 0%P34121J7F3 Vendor Data Review - Visual & Audible AlarmsP34121J7F3 05 Vendor Data Review - Visual & Audible Alarms : Vendor Data Review 5 1.00 100% 0%

P34121J7G1 Enquiry Package - Smoke Detectors

P34121J7G1 01 Enquiry Package - Smoke Detectors : Specification 40 1.00 100% 0%P34121J7G1 02 Enquiry Package - Smoke Detectors : Requisition 10 1.00 100% 0%P34121J7G2 Prepare P.O. Package - Smoke DetectorsP34121J7G2 03 Prepare P.O. Package - Smoke Detectors : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J7G2 04 Prepare P.O. Package - Smoke Detectors : Update package documents for P.O. issue 10 1.00 100% 0%P34121J7G3 Vendor Data Review - Smoke DetectorsP34121J7G3 05 Vendor Data Review - Smoke Detectors : Vendor Data Review 5 1.00 100% 0%

P34121J7H1 Enquiry Package - Heat Detectors

P34121J7H1 01 Enquiry Package - Heat Detectors : Specification 40 1.00 100% 0%P34121J7H1 02 Enquiry Package - Heat Detectors : Requisition 10 1.00 100% 0%P34121J7H2 Prepare P.O. Package - Heat DetectorsP34121J7H2 03 Prepare P.O. Package - Heat Detectors : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J7H2 04 Prepare P.O. Package - Heat Detectors : Update package documents for P.O. issue 10 1.00 100% 0%P34121J7H3 Vendor Data Review - Heat DetectorsP34121J7H3 05 Vendor Data Review - Heat Detectors : Vendor Data Review 5 1.00 100% 0%

P34121J7J1 Enquiry Package - Fusible Loop Panels

P34121J7J1 01 Enquiry Package - Fusible Loop Panels : Specification 40 1.00 100% 0%P34121J7J1 02 Enquiry Package - Fusible Loop Panels : Requisition 10 1.00 100% 0%P34121J7J2 Prepare P.O. Package - Fusible Loop PanelsP34121J7J2 03 Prepare P.O. Package - Fusible Loop Panels : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J7J2 04 Prepare P.O. Package - Fusible Loop Panels : Update package documents for P.O. issue 10 1.00 100% 0%P34121J7J3 Vendor Data Review - Fusible Loop PanelsP34121J7J3 05 Vendor Data Review - Fusible Loop Panels : Vendor Data Review 5 1.00 100% 0%

P34121J7K1 Enquiry Package - Fire & Gas Equipment - Spare (1)

P34121J7K1 01 Enquiry Package - Fire & Gas Equipment - Spare (1) : Specification 40 1.00 100% 0%P34121J7K1 02 Enquiry Package - Fire & Gas Equipment - Spare (1) : Requisition 10 1.00 100% 0%P34121J7K2 Prepare P.O. Package - Fire & Gas Equipment - Spare (1)P34121J7K2 03 Prepare P.O. Package - Fire & Gas Equipment - Spare (1) : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J7K2 04 Prepare P.O. Package - Fire & Gas Equipment - Spare (1) : Update package documents for P.O. issue 10 1.00 100% 0%P34121J7K3 Vendor Data Review - Fire & Gas Equipment - Spare (1)P34121J7K3 05 Vendor Data Review - Fire & Gas Equipment - Spare (1) : Vendor Data Review 5 1.00 100% 0%

P34121J7L1 Enquiry Package - Fire & Gas Equipment - Spare (2)

P34121J7L1 01 Enquiry Package - Fire & Gas Equipment - Spare (2) : Specification 40 1.00 100% 0%P34121J7L1 02 Enquiry Package - Fire & Gas Equipment - Spare (2) : Requisition 10 1.00 100% 0%P34121J7L2 Prepare P.O. Package - Fire & Gas Equipment - Spare (2)P34121J7L2 03 Prepare P.O. Package - Fire & Gas Equipment - Spare (2) : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J7L2 04 Prepare P.O. Package - Fire & Gas Equipment - Spare (2) : Update package documents for P.O. issue 10 1.00 100% 0%P34121J7L3 Vendor Data Review - Fire & Gas Equipment - Spare (2)P34121J7L3 05 Vendor Data Review - Fire & Gas Equipment - Spare (2) : Vendor Data Review 5 1.00 100% 0%

P34121J7M1 Enquiry Package - Fire & Gas Equipment - Spare (3)

P34121J7M1 01 Enquiry Package - Fire & Gas Equipment - Spare (3) : Specification 40 1.00 100% 0%P34121J7M1 02 Enquiry Package - Fire & Gas Equipment - Spare (3) : Requisition 10 1.00 100% 0%P34121J7M2 Prepare P.O. Package - Fire & Gas Equipment - Spare (3)P34121J7M2 03 Prepare P.O. Package - Fire & Gas Equipment - Spare (3) : Prepare Technical Bid Analysis 40 1.00 100% 0%P34121J7M2 04 Prepare P.O. Package - Fire & Gas Equipment - Spare (3) : Update package documents for P.O. issue 10 1.00 100% 0%P34121J7M3 Vendor Data Review - Fire & Gas Equipment - Spare (3)P34121J7M3 05 Vendor Data Review - Fire & Gas Equipment - Spare (3) : Vendor Data Review 5 1.00 100% 0%

J68 Procurement - AnalyticalP34121J8A1 Enquiry Package - Analyzer Systems

P34121J8A1 01 Enquiry Package - Analyzer Systems : Data Sheet 12 1.00 100% 0%P34121J8A1 02 Enquiry Package - Analyzer Systems : Requisition 10 1.00 100% 0%P34121J8A2 Prepare P.O. Package - Analyzer SystemsP34121J8A2 03 Prepare P.O. Package - Analyzer Systems : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8A2 04 Prepare P.O. Package - Analyzer Systems : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8A3 Vendor Data Review - Analyzer SystemsP34121J8A3 05 Vendor Data Review - Analyzer Systems : Vendor Data Review 8 1.00 100% 0%

P34121J8B1 Enquiry Package - Chromatographs

P34121J8B1 01 Enquiry Package - Chromatographs : Data Sheet 12 1.00 100% 0%P34121J8B1 02 Enquiry Package - Chromatographs : Requisition 10 1.00 100% 0%P34121J8B2 Prepare P.O. Package - ChromatographsP34121J8B2 03 Prepare P.O. Package - Chromatographs : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8B2 04 Prepare P.O. Package - Chromatographs : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8B3 Vendor Data Review - ChromatographsP34121J8B3 05 Vendor Data Review - Chromatographs : Vendor Data Review 8 1.00 100% 0%

P34121J8C1 Enquiry Package - pH Meters

P34121J8C1 01 Enquiry Package - pH Meters : Data Sheet 12 1.00 100% 0%P34121J8C1 02 Enquiry Package - pH Meters : Requisition 10 1.00 100% 0%P34121J8C2 Prepare P.O. Package - pH MetersP34121J8C2 03 Prepare P.O. Package - pH Meters : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8C2 04 Prepare P.O. Package - pH Meters : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8C3 Vendor Data Review - pH MetersP34121J8C3 05 Vendor Data Review - pH Meters : Vendor Data Review 8 1.00 100% 0%

P34121J8D1 Enquiry Package - Density Analyzer

P34121J8D1 01 Enquiry Package - Density Analyzer : Data Sheet 12 1.00 100% 0%P34121J8D1 02 Enquiry Package - Density Analyzer : Requisition 10 1.00 100% 0%

Page 65: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: INSTRUMENTS

Page 65 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEng. Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34121J8D2 Prepare P.O. Package - Density AnalyzerP34121J8D2 03 Prepare P.O. Package - Density Analyzer : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8D2 04 Prepare P.O. Package - Density Analyzer : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8D3 Vendor Data Review - Density AnalyzerP34121J8D3 05 Vendor Data Review - Density Analyzer : Vendor Data Review 8 1.00 100% 0%

P34121J8E1 Enquiry Package - Conductivity Analyzer

P34121J8E1 01 Enquiry Package - Conductivity Analyzer : Data Sheet 12 1.00 100% 0%P34121J8E1 02 Enquiry Package - Conductivity Analyzer : Requisition 10 1.00 100% 0%P34121J8E2 Prepare P.O. Package - Conductivity AnalyzerP34121J8E2 03 Prepare P.O. Package - Conductivity Analyzer : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8E2 04 Prepare P.O. Package - Conductivity Analyzer : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8E3 Vendor Data Review - Conductivity AnalyzerP34121J8E3 05 Vendor Data Review - Conductivity Analyzer : Vendor Data Review 8 1.00 100% 0%

P34121J8F1 Enquiry Package - Oxygen Analyzer

P34121J8F1 01 Enquiry Package - Oxygen Analyzer : Data Sheet 12 1.00 100% 0%P34121J8F1 02 Enquiry Package - Oxygen Analyzer : Requisition 10 1.00 100% 0%P34121J8F2 Prepare P.O. Package - Oxygen AnalyzerP34121J8F2 03 Prepare P.O. Package - Oxygen Analyzer : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8F2 04 Prepare P.O. Package - Oxygen Analyzer : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8F3 Vendor Data Review - Oxygen AnalyzerP34121J8F3 05 Vendor Data Review - Oxygen Analyzer : Vendor Data Review 8 1.00 100% 0%

P34121J8G1 Enquiry Package - Hydrogen Dew Point Analyzer

P34121J8G1 01 Enquiry Package - Hydrogen Dew Point Analyzer : Data Sheet 12 1.00 100% 0%P34121J8G1 02 Enquiry Package - Hydrogen Dew Point Analyzer : Requisition 10 1.00 100% 0%P34121J8G2 Prepare P.O. Package - Hydrogen Dew Point AnalyzerP34121J8G2 03 Prepare P.O. Package - Hydrogen Dew Point Analyzer : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8G2 04 Prepare P.O. Package - Hydrogen Dew Point Analyzer : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8G3 Vendor Data Review - Hydrogen Dew Point AnalyzerP34121J8G3 05 Vendor Data Review - Hydrogen Dew Point Analyzer : Vendor Data Review 8 1.00 100% 0%

P34121J8H1 Enquiry Package - Moisture Analyzer

P34121J8H1 01 Enquiry Package - Moisture Analyzer : Data Sheet 12 1.00 100% 0%P34121J8H1 02 Enquiry Package - Moisture Analyzer : Requisition 10 1.00 100% 0%P34121J8H2 Prepare P.O. Package - Moisture AnalyzerP34121J8H2 03 Prepare P.O. Package - Moisture Analyzer : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8H2 04 Prepare P.O. Package - Moisture Analyzer : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8H3 Vendor Data Review - Moisture AnalyzerP34121J8H3 05 Vendor Data Review - Moisture Analyzer : Vendor Data Review 8 1.00 100% 0%

P34121J8J1 Enquiry Package - CO2 Analyzer

P34121J8J1 01 Enquiry Package - CO2 Analyzer : Data Sheet 12 1.00 100% 0%P34121J8J1 02 Enquiry Package - CO2 Analyzer : Requisition 10 1.00 100% 0%P34121J8J2 Prepare P.O. Package - CO2 AnalyzerP34121J8J2 03 Prepare P.O. Package - CO2 Analyzer : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8J2 04 Prepare P.O. Package - CO2 Analyzer : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8J3 Vendor Data Review - CO2 AnalyzerP34121J8J3 05 Vendor Data Review - CO2 Analyzer : Vendor Data Review 8 1.00 100% 0%

P34121J8K1 Enquiry Package - H2S Analyzer

P34121J8K1 01 Enquiry Package - H2S Analyzer : Data Sheet 12 1.00 100% 0%P34121J8K1 02 Enquiry Package - H2S Analyzer : Requisition 10 1.00 100% 0%P34121J8K2 Prepare P.O. Package - H2S AnalyzerP34121J8K2 03 Prepare P.O. Package - H2S Analyzer : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8K2 04 Prepare P.O. Package - H2S Analyzer : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8K3 Vendor Data Review - H2S AnalyzerP34121J8K3 05 Vendor Data Review - H2S Analyzer : Vendor Data Review 8 1.00 100% 0%

P34121J8L1 Enquiry Package - Vibration Monitors

P34121J8L1 01 Enquiry Package - Vibration Monitors : Data Sheet 12 1.00 100% 0%P34121J8L1 02 Enquiry Package - Vibration Monitors : Requisition 10 1.00 100% 0%P34121J8L2 Prepare P.O. Package - Vibration MonitorsP34121J8L2 03 Prepare P.O. Package - Vibration Monitors : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8L2 04 Prepare P.O. Package - Vibration Monitors : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8L3 Vendor Data Review - Vibration MonitorsP34121J8L3 05 Vendor Data Review - Vibration Monitors : Vendor Data Review 8 1.00 100% 0%

P34121J8M1 Enquiry Package - Analyzer Sample Systems

P34121J8M1 01 Enquiry Package - Analyzer Sample Systems : Data Sheet 12 1.00 100% 0%P34121J8M1 02 Enquiry Package - Analyzer Sample Systems : Requisition 10 1.00 100% 0%P34121J8M2 Prepare P.O. Package - Analyzer Sample SystemsP34121J8M2 03 Prepare P.O. Package - Analyzer Sample Systems : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8M2 04 Prepare P.O. Package - Analyzer Sample Systems : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8M3 Vendor Data Review - Analyzer Sample SystemsP34121J8M3 05 Vendor Data Review - Analyzer Sample Systems : Vendor Data Review 8 1.00 100% 0%

P34121J8N1 Enquiry Package - Analyzer - Special (1)

P34121J8N1 01 Enquiry Package - Analyzer - Special (1) : Data Sheet 12 1.00 100% 0%P34121J8N1 02 Enquiry Package - Analyzer - Special (1) : Requisition 10 1.00 100% 0%P34121J8N2 Prepare P.O. Package - Analyzer - Special (1)P34121J8N2 03 Prepare P.O. Package - Analyzer - Special (1) : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8N2 04 Prepare P.O. Package - Analyzer - Special (1) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8N3 Vendor Data Review - Analyzer - Special (1)P34121J8N3 05 Vendor Data Review - Analyzer - Special (1) : Vendor Data Review 8 1.00 100% 0%

P34121J8P1 Enquiry Package - Analyzer - Special (2)

P34121J8P1 01 Enquiry Package - Analyzer - Special (2) : Data Sheet 12 1.00 100% 0%P34121J8P1 02 Enquiry Package - Analyzer - Special (2) : Requisition 10 1.00 100% 0%P34121J8P2 Prepare P.O. Package - Analyzer - Special (2)P34121J8P2 03 Prepare P.O. Package - Analyzer - Special (2) : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8P2 04 Prepare P.O. Package - Analyzer - Special (2) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8P3 Vendor Data Review - Analyzer - Special (2)P34121J8P3 05 Vendor Data Review - Analyzer - Special (2) : Vendor Data Review 8 1.00 100% 0%

P34121J8R1 Enquiry Package - Analyzer - Special (3)

P34121J8R1 01 Enquiry Package - Analyzer - Special (3) : Data Sheet 12 1.00 100% 0%P34121J8R1 02 Enquiry Package - Analyzer - Special (3) : Requisition 10 1.00 100% 0%P34121J8R2 Prepare P.O. Package - Analyzer - Special (3)P34121J8R2 03 Prepare P.O. Package - Analyzer - Special (3) : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8R2 04 Prepare P.O. Package - Analyzer - Special (3) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8R3 Vendor Data Review - Analyzer - Special (3)P34121J8R3 05 Vendor Data Review - Analyzer - Special (3) : Vendor Data Review 8 1.00 100% 0%

P34121J8S1 Enquiry Package - Analyzer - Spare (1)

P34121J8S1 01 Enquiry Package - Analyzer - Spare (1) : Data Sheet 12 1.00 100% 0%P34121J8S1 02 Enquiry Package - Analyzer - Spare (1) : Requisition 10 1.00 100% 0%P34121J8S2 Prepare P.O. Package - Analyzer - Spare (1)P34121J8S2 03 Prepare P.O. Package - Analyzer - Spare (1) : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8S2 04 Prepare P.O. Package - Analyzer - Spare (1) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8S3 Vendor Data Review - Analyzer - Spare (1)P34121J8S3 05 Vendor Data Review - Analyzer - Spare (1) : Vendor Data Review 8 100% 0%

P34121J8T1 Enquiry Package - Analyzer - Spare (2)

P34121J8T1 01 Enquiry Package - Analyzer - Spare (2) : Data Sheet 12 1.00 100% 0%P34121J8T1 02 Enquiry Package - Analyzer - Spare (2) : Requisition 10 1.00 100% 0%P34121J8T2 Prepare P.O. Package - Analyzer - Spare (2)P34121J8T2 03 Prepare P.O. Package - Analyzer - Spare (2) : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8T2 04 Prepare P.O. Package - Analyzer - Spare (2) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8T3 Vendor Data Review - Analyzer - Spare (2)P34121J8T3 05 Vendor Data Review - Analyzer - Spare (2) : Vendor Data Review 8 1.00 100% 0%

P34121J8U1 Enquiry Package - Analyzer - Spare (3)

P34121J8U1 01 Enquiry Package - Analyzer - Spare (3) : Data Sheet 12 1.00 100% 0%P34121J8U1 02 Enquiry Package - Analyzer - Spare (3) : Requisition 10 1.00 100% 0%P34121J8U2 Prepare P.O. Package - Analyzer - Spare (3)P34121J8U2 03 Prepare P.O. Package - Analyzer - Spare (3) : Prepare Technical Bid Analysis 12 1.00 100% 0%P34121J8U2 04 Prepare P.O. Package - Analyzer - Spare (3) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J8U3 Vendor Data Review - Analyzer - Spare (3)

Page 66: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: INSTRUMENTS

Page 66 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEng. Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34121J8U3 05 Vendor Data Review - Analyzer - Spare (3) : Vendor Data Review 8 1.00 100% 0%

J69 Procurement - MiscellaneousP34121J9A1 Enquiry Package - Local Controllers / Recorders / Indicators

P34121J9A1 01 Enquiry Package - Local Controllers / Recorders / Indicators : Data Sheet 6 1.00 100% 0%P34121J9A1 02 Enquiry Package - Local Controllers / Recorders / Indicators : Requisition 2 1.00 100% 0%P34121J9A2 Prepare P.O. Package - Local Controllers / Recorders / IndicatorsP34121J9A2 03 Prepare P.O. Package - Local Controllers / Recorders / Indicators : Prepare Technical Bid Analysis 4 1.00 100% 0%P34121J9A2 04 Prepare P.O. Package - Local Controllers / Recorders / Indicators : Update package documents for P.O. issue 5 1.00 100% 0%P34121J9A3 Vendor Data Review - Local Controllers / Recorders / IndicatorsP34121J9A3 05 Vendor Data Review - Local Controllers / Recorders / Indicators : Vendor Data Review 2 1.00 100% 0%

P34121J9B1 Enquiry Package - Isolators & Barriers

P34121J9B1 01 Enquiry Package - Isolators & Barriers : Data Sheet 6 1.00 100% 0%P34121J9B1 02 Enquiry Package - Isolators & Barriers : Requisition 2 1.00 100% 0%P34121J9B2 Prepare P.O. Package - Isolators & BarriersP34121J9B2 03 Prepare P.O. Package - Isolators & Barriers : Prepare Technical Bid Analysis 4 1.00 100% 0%P34121J9B2 04 Prepare P.O. Package - Isolators & Barriers : Update package documents for P.O. issue 5 1.00 100% 0%P34121J9B3 Vendor Data Review - Isolators & BarriersP34121J9B3 05 Vendor Data Review - Isolators & Barriers : Vendor Data Review 2 1.00 100% 0%

P34121J9C1 Enquiry Package - Junction Boxes

P34121J9C1 01 Enquiry Package - Junction Boxes : Data Sheet 6 1.00 100% 0%P34121J9C1 02 Enquiry Package - Junction Boxes : Requisition 2 1.00 100% 0%P34121J9C2 Prepare P.O. Package - Junction BoxesP34121J9C2 03 Prepare P.O. Package - Junction Boxes : Prepare Technical Bid Analysis 4 1.00 100% 0%P34121J9C2 04 Prepare P.O. Package - Junction Boxes : Update package documents for P.O. issue 5 1.00 100% 0%P34121J9C3 Vendor Data Review - Junction BoxesP34121J9C3 05 Vendor Data Review - Junction Boxes : Vendor Data Review 2 1.00 100% 0%

P34121J9D1 Enquiry Package - Signal Conditioners

P34121J9D1 01 Enquiry Package - Signal Conditioners : Data Sheet 6 1.00 100% 0%P34121J9D1 02 Enquiry Package - Signal Conditioners : Requisition 2 1.00 100% 0%P34121J9D2 Prepare P.O. Package - Signal ConditionersP34121J9D2 03 Prepare P.O. Package - Signal Conditioners : Prepare Technical Bid Analysis 4 1.00 100% 0%P34121J9D2 04 Prepare P.O. Package - Signal Conditioners : Update package documents for P.O. issue 5 1.00 100% 0%P34121J9D3 Vendor Data Review - Signal ConditionersP34121J9D3 05 Vendor Data Review - Signal Conditioners : Vendor Data Review 2 1.00 100% 0%

P34121J9E1 Enquiry Package - Corrosion Monitors

P34121J9E1 01 Enquiry Package - Corrosion Monitors : Data Sheet 6 1.00 100% 0%P34121J9E1 02 Enquiry Package - Corrosion Monitors : Requisition 2 1.00 100% 0%P34121J9E2 Prepare P.O. Package - Corrosion MonitorsP34121J9E2 03 Prepare P.O. Package - Corrosion Monitors : Prepare Technical Bid Analysis 4 1.00 100% 0%P34121J9E2 04 Prepare P.O. Package - Corrosion Monitors : Update package documents for P.O. issue 5 1.00 100% 0%P34121J9E3 Vendor Data Review - Corrosion MonitorsP34121J9E3 05 Vendor Data Review - Corrosion Monitors : Vendor Data Review 2 1.00 100% 0%

P34121J9F1 Enquiry Package - Instrument Test Equipment

P34121J9F1 01 Enquiry Package - Instrument Test Equipment : Data Sheet 6 1.00 100% 0%P34121J9F1 02 Enquiry Package - Instrument Test Equipment : Requisition 2 1.00 100% 0%P34121J9F2 Prepare P.O. Package - Instrument Test EquipmentP34121J9F2 03 Prepare P.O. Package - Instrument Test Equipment : Prepare Technical Bid Analysis 4 1.00 100% 0%P34121J9F2 04 Prepare P.O. Package - Instrument Test Equipment : Update package documents for P.O. issue 5 1.00 100% 0%P34121J9F3 Vendor Data Review - Instrument Test EquipmentP34121J9F3 05 Vendor Data Review - Instrument Test Equipment : Vendor Data Review 2 1.00 100% 0%

P34121J9G1 Enquiry Package - Weighing Systems

P34121J9G1 01 Enquiry Package - Weighing Systems : Data Sheet 6 1.00 100% 0%P34121J9G1 02 Enquiry Package - Weighing Systems : Requisition 2 1.00 100% 0%P34121J9G2 Prepare P.O. Package - Weighing SystemsP34121J9G2 03 Prepare P.O. Package - Weighing Systems : Prepare Technical Bid Analysis 4 1.00 100% 0%P34121J9G2 04 Prepare P.O. Package - Weighing Systems : Update package documents for P.O. issue 5 1.00 100% 0%P34121J9G3 Vendor Data Review - Weighing SystemsP34121J9G3 05 Vendor Data Review - Weighing Systems : Vendor Data Review 2 1.00 100% 0%

P34121J9H1 Enquiry Package - Speed Transmitters

P34121J9H1 01 Enquiry Package - Speed Transmitters : Data Sheet 6 1.00 100% 0%P34121J9H1 02 Enquiry Package - Speed Transmitters : Requisition 2 1.00 100% 0%P34121J9H2 Prepare P.O. Package - Speed TransmittersP34121J9H2 03 Prepare P.O. Package - Speed Transmitters : Prepare Technical Bid Analysis 4 1.00 100% 0%P34121J9H2 04 Prepare P.O. Package - Speed Transmitters : Update package documents for P.O. issue 5 1.00 100% 0%P34121J9H3 Vendor Data Review - Speed TransmittersP34121J9H3 05 Vendor Data Review - Speed Transmitters : Vendor Data Review 2 1.00 100% 0%

P34121J9J1 Enquiry Package - Miscellaneous - Spare (1)

P34121J9J1 01 Enquiry Package - Miscellaneous - Spare (1) : Data Sheet 6 1.00 100% 0%P34121J9J1 02 Enquiry Package - Miscellaneous - Spare (1) : Requisition 2 1.00 100% 0%P34121J9J2 Prepare P.O. Package - Miscellaneous - Spare (1)P34121J9J2 03 Prepare P.O. Package - Miscellaneous - Spare (1) : Prepare Technical Bid Analysis 4 1.00 100% 0%P34121J9J2 04 Prepare P.O. Package - Miscellaneous - Spare (1) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J9J3 Vendor Data Review - Miscellaneous - Spare (1)P34121J9J3 05 Vendor Data Review - Miscellaneous - Spare (1) : Vendor Data Review 2 1.00 100% 0%

P34121J9K1 Enquiry Package - Miscellaneous - Spare (2)

P34121J9K1 01 Enquiry Package - Miscellaneous - Spare (2) : Data Sheet 6 1.00 100% 0%P34121J9K1 02 Enquiry Package - Miscellaneous - Spare (2) : Requisition 2 1.00 100% 0%P34121J9K2 Prepare P.O. Package - Miscellaneous - Spare (2)P34121J9K2 03 Prepare P.O. Package - Miscellaneous - Spare (2) : Prepare Technical Bid Analysis 4 1.00 100% 0%P34121J9K2 04 Prepare P.O. Package - Miscellaneous - Spare (2) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J9K3 Vendor Data Review - Miscellaneous - Spare (2)P34121J9K3 05 Vendor Data Review - Miscellaneous - Spare (2) : Vendor Data Review 2 1.00 100% 0%

P34121J9L1 Enquiry Package - Miscellaneous - Spare (3)

P34121J9L1 01 Enquiry Package - Miscellaneous - Spare (3) : Data Sheet 6 1.00 100% 0%P34121J9L1 02 Enquiry Package - Miscellaneous - Spare (3) : Requisition 2 1.00 100% 0%P34121J9L2 Prepare P.O. Package - Miscellaneous - Spare (3)P34121J9L2 03 Prepare P.O. Package - Miscellaneous - Spare (3) : Prepare Technical Bid Analysis 4 1.00 100% 0%P34121J9L2 04 Prepare P.O. Package - Miscellaneous - Spare (3) : Update package documents for P.O. issue 5 1.00 100% 0%P34121J9L3 Vendor Data Review - Miscellaneous - Spare (3)P34121J9L3 05 Vendor Data Review - Miscellaneous - Spare (3) : Vendor Data Review 2 1.00 100% 0%

J75 Subcontracts - Engineering / SpecialistsP34121J710 Enquiry Package - Eng. / Specialist Services

P34121J710 01 Enquiry Package - Eng. / Specialist Services : Data Sheet 30 1.00 100% 0%P34121J710 02 Enquiry Package - Eng. / Specialist Services : Requisition 20 1.00 100% 0%P34121J720 Prepare P.O. Package - Eng. / Specialist ServicesP34121J720 03 Prepare P.O. Package - Eng. / Specialist Services : Prepare Technical Bid Analysis 20 1.00 100% 0%P34121J720 04 Prepare P.O. Package - Eng. / Specialist Services : Update package documents for P.O. issue 20 1.00 100% 0%P34121J730 Vendor Data Review - Eng. / Specialist ServicesP34121J730 05 Vendor Data Review - Eng. / Specialist Services : Vendor Data Review 30 1.00 100% 0%

J76 Subcontracts - FabricationP34121J740 Enquiry Package - Fabrication

P34121J740 01 Enquiry Package - Fabrication : Data Sheet 30 1.00 100% 0%P34121J740 02 Enquiry Package - Fabrication : Requisition 20 1.00 100% 0%P34121J750 Prepare P.O. Package - FabricationP34121J750 03 Prepare P.O. Package - Fabrication : Prepare Technical Bid Analysis 20 1.00 100% 0%P34121J750 04 Prepare P.O. Package - Fabrication : Update package documents for P.O. issue 20 1.00 100% 0%P34121J760 Vendor Data Review - FabricationP34121J760 05 Vendor Data Review - Fabrication : Vendor Data Review 30 1.00 100% 0%

Page 67: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: INSTRUMENTS

Page 67 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEng. Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

J77 Subcontracts - ConstructionP34121J770 Enquiry Package - Construction

P34121J770 01 Enquiry Package - Construction : Data Sheet 30 1.00 100% 0%P34121J770 02 Enquiry Package - Construction : Requisition 20 1.00 100% 0%P34121J780 Prepare P.O. Package - ConstructionP34121J780 03 Prepare P.O. Package - Construction : Prepare Technical Bid Analysis 20 1.00 100% 0%P34121J780 04 Prepare P.O. Package - Construction : Update package documents for P.O. issue 20 1.00 100% 0%P34121J790 Vendor Data Review - ConstructionP34121J790 05 Vendor Data Review - Construction : Vendor Data Review 30 1.00 100% 0%

P34121J800 Hazardous Area Certification (non SAA certified equipment for use in Australia only)P34121J800 01 Hazardous Area Certification (non SAA certified equipment for use in Australia only) : Add Haz Equip certi details to Instrumen 0.2 1.00 100% 0%P34121J800 02 Hazardous Area Certification (non SAA certified equipment for use in Australia only) : Add all certi haz equip items to Cable Bl 40 1.00 25% 75%P34121J800 03 Hazardous Area Certification (non SAA certified equipment for use in Australia only) : Obtain certificates for existing equipmen 2 1.00 100% 0%P34121J800 04 Hazardous Area Certification (non SAA certified equipment for use in Australia only) : Visual inspection of existing equipment o 1 1.00 100% 0%P34121J800 05 Hazardous Area Certification (non SAA certified equipment for use in Australia only) : Suitability reports - non AS equipment 2 1.00 100% 0%P34121J800 06 Hazardous Area Certification (non SAA certified equipment for use in Australia only) : Suitability reports - existing equipment 3 1.00 100% 0%P34121J800 07 Hazardous Area Certification (non SAA certified equipment for use in Australia only) : Liaison with Haz area equip consultant 30 1.00 100% 0%P34121J800 08 Hazardous Area Certification (non SAA certified equipment for use in Australia only) : Haz area consultant review of suitability 0.5 1.00 100% 0%P34121J800 09 Hazardous Area Certification (non SAA certified equipment for use in Australia only) : Input different types into haz area datab 2 1.00 100% 0%P34121J800 10 Hazardous Area Certification (non SAA certified equipment for use in Australia only) : Input repeated items into haz area data 0.2 1.00 100% 0%P34121J800 11 Hazardous Area Certification (non SAA certified equipment for use in Australia only) : Review of status 5 1.00 100% 0%P34121J800 12 Hazardous Area Certification (non SAA certified equipment for use in Australia only) : Issue Hazardous Area Certification Repo 20 1.00 100% 0%P34121J800 13 Hazardous Area Certification (non SAA certified equipment for use in Australia only) : Senior Engineer Review/approval 0.5 1.00 100% 0%P34121J800 14 1.00 100% 0%P34121J800 15 1.00 100% 0%

16 1.00 100% 0%P34121J850 Construction SupportP34121J850 01 Construction Support : Construction Support 50 1.00 50% 50%P34121J850 02 Construction Support : Prepare Construction Discrete Workpack (DWP) 30 1.00 50% 50%P34121J850 03 1.00 50% 50%P34121J850 04 1.00 50% 50%P34121J850 05 1.00 50% 50%P34121J860 Inspection, Testing & Commissioning SupportP34121J860 01 Inspection, Testing & Commissioning Support : Control Valves and In-Line Equipment 4 1.00 100% 0%P34121J860 02 Inspection, Testing & Commissioning Support : Packaged Systems 10 1.00 100% 0%P34121J860 03 Inspection, Testing & Commissioning Support : DCS / ESD Systems 12 1.00 100% 0%P34121J860 04 Inspection, Testing & Commissioning Support : Panels and Racks 10 1.00 100% 0%P34121J860 05 Inspection, Testing & Commissioning Support : Telecommunications systems 1.00 100% 0%P34121J870 Design Reports / Job BooksP34121J870 01 Design Reports / Job Books : Job Books 60 1.00 50% 50%P34121J870 02 Design Reports / Job Books : Design Reports 20 1.00 50% 50%P34121J870 03 1.00 50% 50%P34121J870 04 1.00 50% 50%P34121J870 05 1.00 50% 50%P34121J900 Formal Operator TrainingP34121J900 01 1.00 100% 0%P34121J900 02 1.00 100% 0%P34121J900 03 1.00 100% 0%P34121J900 04 1.00 100% 0%P34121J900 05 1.00 100% 0%P34121J910 Maintenance Procedures and TrainingP34121J910 01 1.00 100% 0%P34121J910 02 1.00 100% 0%P34121J910 03 1.00 100% 0%P34121J910 04 1.00 100% 0%P34121J910 05 1.00 100% 0%P34121J950 As-BuildingP34121J950 01 As-Building : As-Building (refer attached sheet for estimate generation) 1.00 0% 100%P34121J950 02 1.00 0% 100%P34121J950 03 1.00 0% 100%P34121J950 04 1.00 0% 100%

P34121J950 05 1.00 0% 100%

Page 68: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

W job number Longford As Built Staffhour EstimateTitle (Includes drg & IDDS) 5/14/2003

Discipline Instrumentation (Does NOT include P&ID's or FEC's)

Project drawings/Reports Descriptions No Off

Loop report IDDS 0

SFD / Logic Diagrams Acad 0

Connection/Termination Report IDDS 0

Connection/Termination Diag Acad 0

Cable Schedules Report IDDS 0

Cable Schedules Acad 0

Instrument Location Drgs Now not Asbuilt 0

Critical Layouts 0

Colour Prints required 0

Schematics Acad 0

I/O Map Report IDDS 0

Panel Layouts Acad 0

Trip Setting Schedules Reports IDDS 0

INtools Database (Number of Tags) Total No = 10 70% asbuild 7

Project Drawing Schedules Acad 0

As built activities

Description No. Drgs Hrs/Drg Total Hrs

Drawing sheet return check 0 0.02 0

Project Drg archive 0 0.17 0

Archive Electronic drg files 0 0.08 0

Raster burn Back =60% total 0 0.08 0

Unused masterdrgs returned 0.08 0

Unused drg numbers returned 0.08 0

List all used Inst Tags 0.08 0

Unused PLC/DCS and I/O returned 0.08 0

Unused wire and grid Nos returned 0.08 0

Unused data/Spec sheet Nos returned 0.08 0

Cd Verification against Drawing register 0 0.25 0

A3 wet signature hard copy 0 0.08 0

As built Mark up review 0 0.08 0

Request Drawings 0 0.08 0

INtools Claim (per Tag) 0 0.15 0

SFD / Logic Diagrams 0 2 0

Connection/Termination Diag 0 3 0

Cable Schedules 0 2.5 0

Instrument Location Drgs 0 2 0

Critical Layouts 0 2.5 0

Colour Prints 0 1.5 0

Schematics 0 3 0

Panel Layouts 0 3 0

INtools Trip Setting Reports 0 0.5 0

INtools Loop Update 0 1 0

Intools merge request 0 0.1 0

INtools .psr check/verification 0 0.1 0

Edots progress reporting 0 0.17 0

Asbuild Drawing/Report Schedules 0 2 0

Est for Extras as noted 1, & 2 below 0 0

Sub Total 0

Supervision 10% 0.00

Total 0.0 Hours

1 Cancelling drawings 0 Hours

2 ? 0 Hours

Note Indicates manual entry

Page 69: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 69 of 73 04/17/2023

CIVIL/STRUCTURAL ENGINEERING / DESIGN - STAFFHOUR ESTIMATE PH4

Project No : 359/Y5066Title : Sulphur Dioxide Reduction Project

Workpack Ref. : Lo-Cat Licensed technologyDescription : Phase 3 cost estimate - Off plot - Lo-Cat process

EngineeringEngineering Design

Hrs HrsCat Hours 0 0

Rate 110.0 95.0

% Of Total #DIV/0! #DIV/0!

Total Hrs 0Total Cost $0

Rev Description Prepared By Reviewed By DateA Issued For Estimate

Notes on Using this Estimate Sheet

1 Activities (WBS Nos.) are included as prompts for guidance. It is not necessary to complete all categories.2 Additional activities may be added as required.3 Norms (Unit Hours) may be adjusted to suit project requirements.4 Generally M00 is to be used on proposals and small FEED projects.5 Electronic copy of this template is stored in the following directory - G:\Engineering_Intranet\Structural\Estimate_Sheets\6 Store one copy of this Estimate in the proposal directory on the k:\ drive and one

in G:\Engineering_Intranet\Structural\Estimate_Sheets\7 Please advise the Engineering Manager of any additions, changes or adjustments required to norms or activities.

Notes on Using 'Insert New Row' button1 Position cursor in any cell - a new row will always be inserted below2 This function will also copy previous row fomulas and text to new row - please modify text accordingly

Notes on Using 'Delete Row' button1 Position cursor in a cell of the row you want to delete

Notes on Using 'View' & 'Hide' buttons1 Position cursor in a cell (or cells) that you want the '0' to be visible or not

Assumptions and Clarifications for this Estimate:

1 Project duration is XX weeks23456789101112131415

Activity ID Del.Cost Time & Resources Summary Engineering Design Total

(CTR) or Task

P34123S000 Default - total is less than 200 hours

P34123S100 General Coordination & Job Preparation

P34123S110 Professional Dimensional Surveys

Page 70: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Page 70 of 73 04/17/2023

XX4123S200 Studies

XX4123S300 Calculations - Preliminary Structural Analysis

XX4123S310 Calculations - Final Structural Analysis

XX4123S320 Calculations - Preliminary Structural Design

XX4123S330 Calculations - Final Structural Design

XX4123S340 Calculations - Civil

XX4123S350 Specifications

XX4123S400 Schedules and Lists

XX4123S450 Preliminary MTOs

XX4123S460 Intermediate MTOs

XX4123S470 Final MTOs

XX4123S500 Structural Steelwork Drawings

XX4123S510 Structural Concrete Drawings

XX4123S520 Civil, Earthworks, Road and Drainage Drawings

XX4123S530 3D CAD Modelling - Set-up & Input

XX4123S540 3D CAD Modelling - Checking / Backdrafting

XX4123S550 3D CAD Modelling - Finalise / Issue Outputs

XX4123S560 Architectural Drawings

XX4123S570 Demolition Drawings

XX4123S580 Installation Details

S60 Procurement - Structural Bulks

XX4123S60A Enquiry Package - Structural Bulks

XX4123S60B Prepare P.O. Package - Structural Bulks

XX4123S60C Enquiry Package - Structural Bulks- Contingencies

XX4123S60D Prepare P.O. Package - Strucutral Bulks Bulks - Contingencies

S75 Subcontracts - Engineering / Specialists

XX4123S75A Prepare Enquiry Package - Geotechnical Survey

XX4123S75B Bid Evaluation & P.O. Package Preparation - Geotechnical Survey

XX4123S75C Vendor Data Review / Vendor Liaison - Geotechnical Survey

XX4123S75D Prepare Enquiry Package - Topographical Survey

XX4123S75E Bid Evaluation & P.O. Package Preparation - Topographical Survey

XX4123S75F Vendor Data Review / Vendor Liaison - Topographical Survey

XX4123S75G Prepare Enquiry Package - Architectural Works

XX4123S75H Bid Evaluation & P.O. Package Preparation - Architectural Works

XX4123S75I Vendor Data Review / Vendor Liaison - Architectural Works

S76 Subcontracts - Fabrication

XX4123S76A Prepare Enquiry Package - Steel Fabrication

XX4123S76B Bid Evaluation & P.O. Package Preparation - Steel Fabrication

XX4123S76C Vendor Data Review / Vendor Liaison - Steel Fabrication

S77 Subcontracts - Construction

XX4123S77A Prepare Enquiry Package - Concrete / Civil Works

XX4123S77B Bid Evaluation & P.O. Package Preparation - Concrete / Civil Works

XX4123S77C Vendor Data Review / Vendor Liaison - Concrete / Civil Works

XX4123S850 Construction Support

XX4123S860

XX4123S870 Design Reports / Job Books

XX4123S950 As-Building

Overall Totals

Inspection, Testing, Operator Training & Commissioning Support

Page 71: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: STRUCTURAL

Page 71 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

P34123S000 Default - total is less than 200 hoursP34123S000 4S00-01A 1.00 50% 50%P34123S000 4S00-02A 1.00 50% 50%P34123S000 4S00-03A 1.00 50% 50%P34123S000 4S00-04A 1.00 50% 50%

Sub Totals

Activity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

P34123S100 General Coordination & Job PreparationP34123S100 4S10-01A General Coordination & Job Preparation : Meetings -Weekly 4 1.00 50% 50%P34123S100 4S10-02A General Coordination & Job Preparation : Project Reports - Weekly 1 1.00 100% 0%P34123S100 4S10-03A General Coordination & Job Preparation : Supervision - Engineering 1.00 100% 0%P34123S100 4S10-04A General Coordination & Job Preparation : Supervision - Design 1.00 100%P34123S100 4S10-05A General Coordination & Job Preparation : Site Visits - Engineering 10 1.00 100% 0%P34123S100 4S10-06A General Coordination & Job Preparation : Site Visits - Design 10 1.00 100%P34123S100 4S10-07A General Coordination & Job Preparation : Travel - Engineering 1.00 100% 0%P34123S100 4S10-08A General Coordination & Job Preparation : Travel - Design 1.00 100%P34123S100 4S10-09A General Coordination & Job Preparation : HAZOP Attendance 10 1.00 100% 0%P34123S100 4S10-10A General Coordination & Job Preparation : Inter-discipline Squad Checks / week 2 1.00 50% 50%P34123S100 4S10-11A General Coordination & Job Preparation : Inter-discipline Review Meetings / week 2 1.00 50% 50%P34123S100 4S10-12A General Coordination & Job Preparation : Vendor Data Incorporation 10 1.00 50% 50%P34123S100 4S10-13A General Coordination & Job Preparation : Project Closeout 10 1.00 50% 50%P34123S100 4S10-14A General Coordination & Job Preparation : Data Acquisition / Project Data Review 10 1.00 50% 50%P34123S100 4S10-15A General Coordination & Job Preparation : Certification / Statutory Authority Support 20 1.00 100% 0%P34123S100 4S10-16A General Coordination & Job Preparation : Constructability Review 10 1.00 50% 50%P34123S100 4S10-17A General Coordination & Job Preparation : Job Setup 10 1.00 50% 50%P34123S110 Professional Dimensional SurveysP34123S110 4S10-21A Professional Dimensional Surveys : Survey Scope Drawings 30 1.00 50% 50%P34123S110 4S10-22A Professional Dimensional Surveys : Manual Site Surveys 1.00 50% 50%P34123S110 4S10-23A Professional Dimensional Surveys : Electronic Site Surveys 1.00 50% 50%P34123S200 StudiesP34123S200 4S20-01A Studies : Weight Control Report 20 1.00 100% 0%P34123S200 4S20-02A Studies : Installation Study 20 1.00 100% 0%P34123S200 4S20-03A Studies : Design Basis Document 20 1.00 100% 0%P34123S200 4S20-04A Studies : Cost Estimates 40 1.00 100% 0%P34123S200 4S20-05A Studies : Study Reports 40 1.00 100% 0%P34123S300 Calculations - Preliminary Structural AnalysisP34123S300 4S30-01A Calculations - Preliminary Structural Analysis : Model Development 80 1.00 100% 0%P34123S300 4S30-02A Calculations - Preliminary Structural Analysis : In Place Analysis / run 40 1.00 100% 0%P34123S300 4S30-03A Calculations - Preliminary Structural Analysis : Existing Structure Assessment 30 1.00 100% 0%P34123S300 4S30-04A Calculations - Preliminary Structural Analysis : Lift Analysis / run 30 1.00 100% 0%P34123S300 4S30-05A Calculations - Preliminary Structural Analysis : Transport Analysis / run 25 1.00 100% 0%P34123S310 Calculations - Final Structural AnalysisP34123S310 4S30-11A Calculations - Final Structural Analysis : Finalise Confirmation Model 80 1.00 100% 0%P34123S310 4S30-12A Calculations - Final Structural Analysis : In Place Analysis / run 40 1.00 100% 0%P34123S310 4S30-13A Calculations - Final Structural Analysis : Existing Structure Assessment 30 1.00 100% 0%P34123S310 4S30-14A Calculations - Final Structural Analysis : Lift Analysis / run 30 1.00 100% 0%P34123S310 4S30-15A Calculations - Final Structural Analysis : Transport Analysis / run 30 1.00 100% 0%P34123S310 4S30-16A Calculations - Final Structural Analysis : Seismic 200 1.00 100% 0%P34123S310 4S30-17A Calculations - Final Structural Analysis : Fatigue 200 1.00 100% 0%P34123S320 Calculations - Preliminary Structural DesignP34123S320 4S30-21A Calculations - Preliminary Structural Design : Primary Steelwork Calculations / dwg 30 1.00 100% 0%P34123S320 4S30-22A Calculations - Preliminary Structural Design : Secondary Steelwork Calculations / dwg 15 1.00 100% 0%P34123S320 4S30-23A Calculations - Preliminary Structural Design : Miscellaneous Structural Details Calculations/ dwg 25 1.00 100% 0%P34123S320 4S30-24A Calculations - Preliminary Structural Design : Concrete Calculations / dwg 25 1.00 100% 0%P34123S330 Calculations - Final Structural DesignP34123S330 4S30-31A Calculations - Final Structural Design : Primary Steelwork Calculations / dwg 30 1.00 100% 0%P34123S330 4S30-32A Calculations - Final Structural Design : Secondary Steelwork Calculations / dwg 15 1.00 100% 0%P34123S330 4S30-33A Calculations - Final Structural Design : Miscellaneous Structural Calculations/ dwg 25 1.00 100% 0%P34123S330 4S30-34A Calculations - Final Structural Design : Concrete Calculations /dwg 25 1.00 100% 0%P34123S330 4S30-35A Calculations - Final Structural Design : Steel Pipe Support Calculations / dwg 25 1.00 100% 0%P34123S330 4S30-36A Calculations - Final Structural Design : Concrete Pipe Support Calculations / dwg 25 1.00 100% 0%P34123S340 Calculations - CivilP34123S340 4S30-41A Calculations - Civil : Foundation Calculations - Equipment / dwg 40 1.00 100% 0%P34123S340 4S30-42A Calculations - Civil : Foundation Calculations - Structures / dwg 40 1.00 100% 0%P34123S340 4S30-43A Calculations - Civil : Existing Foundation Assessment 25 1.00 100% 0%P34123S340 4S30-44A Calculations - Civil : Drainage Calculations / dwg 25 1.00 100% 0%P34123S340 4S30-45A Calculations - Civil : Miscellaneous Calculations / dwg 25 1.00 100% 0%P34123S350 SpecificationsP34123S350 4S35-01A Specifications : Construction Specification 20 1.00 100% 0%P34123S350 4S35-02A Specifications : Steel Fabrication 20 1.00 100% 0%P34123S350 4S35-03A Specifications : Building Works 50 1.00 100% 0%P34123S350 4S35-04A Specifications : Topographical Survey 30 1.00 100% 0%P34123S350 4S35-05A Specifications : Architectural Specification 30 1.00 100% 0%P34123S350 4S35-06A Specifications : Geotechnical Specification 30 1.00 100% 0%P34123S350 4S35-07A Specifications : Concrete Works 20 1.00 100% 0%P34123S350 4S35-08A Specifications : Earth Works 30 1.00 100% 0%P34123S350 4S35-09A Specifications : Roads & Paving 30 1.00 100% 0%P34123S350 4S35-10A Specifications : Drainage 30 1.00 100% 0%P34123S400 Schedules and ListsP34123S400 4S40-01A Schedules and Lists : Drawing Register 10 1.00 0% 100%P34123S450 Preliminary MTOsP34123S450 4S45-01A Preliminary MTOs : Preliminary MTOs (per drawing) 5 1.00 0% 100%P34123S460 Intermediate MTOsP34123S460 4S45-02A Intermediate MTOs : Intermediate MTOs (per drawing) 5 1.00 0% 100%P34123S470 Final MTOsP34123S470 4S45-03A Final MTOs : Final MTOs (per drawing) 5 1.00 0% 100%P34123S500 Structural Steelwork Drawings P34123S500 4S50-01A Structural Steelwork Drawings : Steelwork General Arrangement Drawings 30 1.00 100%P34123S500 4S50-02A Structural Steelwork Drawings : Primary Steelwork Framing Plans 30 1.00 100%P34123S500 4S50-03A Structural Steelwork Drawings : Secondary Steelwork Framing Plans 30 1.00 100%P34123S500 4S50-04A Structural Steelwork Drawings : Steelwork Framing Elevations 30 1.00 100%P34123S500 4S50-05A Structural Steelwork Drawings : Steelwork Framing Details 30 1.00 100%P34123S500 4S50-06A Structural Steelwork Drawings : Tertiary Steelwork Drawings 30 1.00 100%P34123S500 4S50-07A Structural Steelwork Drawings : Walkway and Stair Plans and Elevations 30 1.00 100%P34123S500 4S50-08A Structural Steelwork Drawings : Walkway and Stair Details 30 1.00 100%P34123S500 4S50-09A Structural Steelwork Drawings : Steelwork Special Items and Appurtenances 30 1.00 100%P34123S500 4S50-10A Structural Steelwork Drawings : Steelwork Pipe Supports (SPS) 30 1.00 100%P34123S500 4S50-11A Structural Steelwork Drawings : Pile Steelwork and Details 30 1.00 100%P34123S510 Structural Concrete DrawingsP34123S510 4S51-01A Structural Concrete Drawings : Foundation Layouts 30 1.00 100%P34123S510 4S51-02A Structural Concrete Drawings : Footing Details 30 1.00 100%P34123S510 4S51-03A Structural Concrete Drawings : Beam and Column Layouts 30 1.00 100%P34123S510 4S51-04A Structural Concrete Drawings : Beam and Column Details 30 1.00 100%P34123S510 4S51-05A Structural Concrete Drawings : Slab and Paving Layouts 30 1.00 100%P34123S510 4S51-06A Structural Concrete Drawings : Slab and Paving Details 30 1.00 100%P34123S510 4S51-07A Structural Concrete Drawings : Precast Panel Layouts 30 1.00 100%P34123S510 4S51-08A Structural Concrete Drawings : Precast Panel Elevations 30 1.00 100%P34123S510 4S51-09A Structural Concrete Drawings : Precast Panel Details 30 1.00 100%P34123S510 4S51-10A Structural Concrete Drawings : Retaining Wall and Bund Layouts 30 1.00 100%P34123S510 4S51-11A Structural Concrete Drawings : Retaining Wall and Bund Details 30 1.00 100%P34123S510 4S51-12A Structural Concrete Drawings : Concrete Pipe Supports (CPS) 30 1.00 100%P34123S520 Civil, Earthworks, Road and Drainage DrawingsP34123S520 4S52-01A Civil, Earthworks, Road and Drainage Drawings : Earthworks Layouts and Details 25 1.00 0% 100%P34123S520 4S52-02A Civil, Earthworks, Road and Drainage Drawings : Drainage Layouts 25 1.00 0% 100%

Split Eng/Design

Split Eng/Design

Page 72: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

Staffhour Estimate: STRUCTURAL

Page 72 of 73 04/17/2023

Actvity ID Del. Cost Time & Resources No. Norm LoadingEngineering Design Total(CTR) or Task Break Down Off (hrs) Factor

Split Eng/Design

P34123S520 4S52-03A Civil, Earthworks, Road and Drainage Drawings : Drainage Pit Schedule and Details 25 1.00 0% 100%P34123S520 4S52-04A Civil, Earthworks, Road and Drainage Drawings : Roads and Paving Layouts and Details 25 1.00 0% 100%P34123S520 4S52-05A Civil, Earthworks, Road and Drainage Drawings : Underground Services Layouts and Details 25 1.00 0% 100%P34123S520 4S52-06A Civil, Earthworks, Road and Drainage Drawings : Water Treatment Layouts and Details 25 1.00 0% 100%P34123S530 3D CAD Modelling - Set-up & InputP34123S530 4S53-01A 3D CAD Modelling - Set-up & Input : Set up project resouce file 20 1.00 100%P34123S530 4S53-02A 3D CAD Modelling - Set-up & Input : Set up project configuration file 4 1.00 100%P34123S530 4S53-03A 3D CAD Modelling - Set-up & Input : Set up model seed file 4 1.00 100%P34123S530 4S53-04A 3D CAD Modelling - Set-up & Input : Create Section Libraries & material grades 10 1.00 100%P34123S530 4S53-05A 3D CAD Modelling - Set-up & Input : Create drawing border 16 1.00 100%P34123S530 4S53-06A 3D CAD Modelling - Set-up & Input : Create project drawing cell library 8 1.00 100%P34123S530 4S53-07A 3D CAD Modelling - Set-up & Input : Create plot driver files 1 1.00 100%P34123S530 4S53-08A 3D CAD Modelling - Set-up & Input : Configure add on standard routines 8 1.00 100%P34123S530 4S53-09A 3D CAD Modelling - Set-up & Input : Project users guide 20 1.00 100%P34123S530 4S53-10A 3D CAD Modelling - Set-up & Input : Configure workstations 1 1.00 100%P34123S530 4S53-11A 3D CAD Modelling - Set-up & Input : Create models 0.1 1.00 100%P34123S530 4S53-12A 3D CAD Modelling - Set-up & Input : Initial model development / output dwg 40 1.00 100%P34123S540 3D CAD Modelling - Checking / BackdraftingP34123S540 4S53-21A 3D CAD Modelling - Checking / Backdrafting : Model Checking / Backdrafting 10 1.00 100%P34123S550 3D CAD Modelling - Finalise / Issue OutputsP34123S550 4S52-31A 3D CAD Modelling - Finalise / Issue Outputs : Finalise Model / Issue Drawings 10 1.00 100%P34123S560 Architectural DrawingsP34123S560 4S54-01A Architectural Drawings : Building Floor Plans and Elevations 30 1.00 0% 100%P34123S560 4S54-02A Architectural Drawings : Building Details 30 1.00 0% 100%P34123S560 4S54-03A Architectural Drawings : Door and Window Schedules and Details 30 1.00 0% 100%P34123S560 4S54-04A Architectural Drawings : Fixtures and Fittings Schedules and Details 30 1.00 0% 100%P34123S570 Demolition DrawingsP34123S570 4S57-01A Demolition Drawings : Steelwork Demolition Drawings 20 1.00 100%P34123S570 4S57-02A Demolition Drawings : Concrete Demolition Drawings 20 1.00 100%P34123S580 Installation DetailsP34123S580 4S59-01A Installation Details : Lifted Equipment Location Plans 20 1.00 100%P34123S580 4S59-02A Installation Details : Installation Sequence Drawings 20 1.00 100%P34123S580 4S59-03A Installation Details : Installation Aid Drawings - Spreaders, Frames & Padeyes 30 1.00 100%P34123S580 4S59-04A Installation Details : Rigging Drawings 30 1.00 100%P34123S580 4S59-05A Installation Details : Equipment - Lifting Area Layouts 30 1.00 100%

S60 Procurement - Structural BulksP34123S60A Enquiry Package - Structural BulksP34123S60A 4S60-01A Enquiry Package - Structural Bulks : Requisition 10 1.00 100% 0%P34123S60B Prepare P.O. Package - Structural BulksP34123S60B 4S60-02A Prepare P.O. Package - Structural Bulks : Prepare Technical Bid Analysis 20 1.00 100% 0%P34123S60B 4S60-03A Prepare P.O. Package - Structural Bulks : Update package documents for P.O. issue 10 1.00 100% 0%P34123S60C Enquiry Package - Structural Bulks- ContingenciesP34123S60C 4S60-04A Enquiry Package - Structural Bulks- Contingencies : Requisition 10 1.00 100% 0%P34123S60D Prepare P.O. Package - Structural Bulks Bulks - ContingenciesP34123S60D 4S60-05A Prepare P.O. Package - Structural Bulks Bulks - Contingencies : Prepare Technical Bid Analysis 20 1.00 100% 0%P34123S60D 4S60-06A Prepare P.O. Package - Structural Bulks Bulks - Contingencies : Update package documents for P.O. issue 10 1.00 100% 0%

S75 Subcontracts - Engineering / SpecialistsP34123S75A Prepare Enquiry Package - Geotechnical Survey

P34123S75A 4S75-01A Prepare Enquiry Package - Geotechnical Survey : Scope of Work Specification 10 1.00 100% 0%

P34123S75A 4S75-02A Prepare Enquiry Package - Geotechnical Survey : Requisition 5 1.00 100% 0%

P34123S75B Bid Evaluation & P.O. Package Preparation - Geotechnical Survey

P34123S75B 4S75-03A Bid Evaluation & P.O. Package Preparation - Geotechnical Survey : Bid Evaluation 5 1.00 100% 0%

P34123S75B 4S75-04A Bid Evaluation & P.O. Package Preparation - Geotechnical Survey : Prepare P.O. Package 5 1.00 100% 0%

P34123S75C Vendor Data Review / Vendor Liaison - Geotechnical Survey

P34123S75C 4S75-05A Vendor Data Review / Vendor Liaison - Geotechnical Survey : Vendor Data Review 5 1.00 100% 0%

P34123S75C 4S75-06A Vendor Data Review / Vendor Liaison - Geotechnical Survey : Vendor Liaison 5 1.00 100% 0%

P34123S75D Prepare Enquiry Package - Topographical Survey

P34123S75D 4S75-07A Prepare Enquiry Package - Topographical Survey : Scope of Work Specification 10 1.00 100% 0%

P34123S75D 4S75-08A Prepare Enquiry Package - Topographical Survey : Requisition 5 1.00 100% 0%

P34123S75E Bid Evaluation & P.O. Package Preparation - Topographical Survey

P34123S75E 4S75-09A Bid Evaluation & P.O. Package Preparation - Topographical Survey : Bid Evaluation 5 1.00 100% 0%

P34123S75E 4S75-10A Bid Evaluation & P.O. Package Preparation - Topographical Survey : Prepare P.O. Package 5 1.00 100% 0%

P34123S75F Vendor Data Review / Vendor Liaison - Topographical Survey

P34123S75F 4S75-11A Vendor Data Review / Vendor Liaison - Topographical Survey : Vendor Data Review 5 1.00 100% 0%

P34123S75F 4S75-12A Vendor Data Review / Vendor Liaison - Topographical Survey : Vendor Liaison 5 1.00 100% 0%

P34123S75G Prepare Enquiry Package - Architectural Works

P34123S75G 4S75-13A Prepare Enquiry Package - Architectural Works : Scope of Work Specification 10 1.00 100% 0%

P34123S75G 4S75-14A Prepare Enquiry Package - Architectural Works : Requisition 5 1.00 100% 0%

P34123S75H Bid Evaluation & P.O. Package Preparation - Architectural Works

P34123S75H 4S75-15A Bid Evaluation & P.O. Package Preparation - Architectural Works : Bid Evaluation 5 1.00 100% 0%

P34123S75H 4S75-16A Bid Evaluation & P.O. Package Preparation - Architectural Works : Prepare P.O. Package 5 1.00 100% 0%

P34123S75I Vendor Data Review / Vendor Liaison - Architectural Works

P34123S75I 4S75-17A Vendor Data Review / Vendor Liaison - Architectural Works : Vendor Data Review 5 1.00 100% 0%P34123S75I 4S75-18A Vendor Data Review / Vendor Liaison - Architectural Works : Vendor Liaison 5 1.00 100% 0%

S76 Subcontracts - FabricationP34123S76A Prepare Enquiry Package - Steel Fabrication

P34123S76A 4S76-01A Prepare Enquiry Package - Steel Fabrication : Scope of Work Specification 10 1.00 100% 0%

P34123S76A 4S76-02A Prepare Enquiry Package - Steel Fabrication : Requisition 5 1.00 100% 0%

P34123S76B Bid Evaluation & P.O. Package Preparation - Steel Fabrication

P34123S76B 4S76-03A Bid Evaluation & P.O. Package Preparation - Steel Fabrication : Bid Evaluation 5 1.00 100% 0%

P34123S76B 4S76-04A Bid Evaluation & P.O. Package Preparation - Steel Fabrication : Prepare P.O. Package 5 1.00 100% 0%

P34123S76C Vendor Data Review / Vendor Liaison - Steel Fabrication

P34123S76C 4S76-05A Vendor Data Review / Vendor Liaison - Steel Fabrication : Vendor Data Review 5 1.00 100% 0%P34123S76C 4S76-06A Vendor Data Review / Vendor Liaison - Steel Fabrication : Vendor Liaison 5 1.00 100% 0%

S77 Subcontracts - ConstructionP34123S77A Prepare Enquiry Package - Concrete / Civil Works

P34123S77A 4S77-01A Prepare Enquiry Package - Concrete / Civil Works : Scope of Work Specification 10 1.00 100% 0%

P34123S77A 4S77-02A Prepare Enquiry Package - Concrete / Civil Works : Requisition 5 1.00 100% 0%

P34123S77B Bid Evaluation & P.O. Package Preparation - Concrete / Civil Works

P34123S77B 4S77-03A Bid Evaluation & P.O. Package Preparation - Concrete / Civil Works : Bid Evaluation 5 1.00 100% 0%

P34123S77B 4S77-04A Bid Evaluation & P.O. Package Preparation - Concrete / Civil Works : Prepare P.O. Package 5 1.00 100% 0%

P34123S77C Vendor Data Review / Vendor Liaison - Concrete / Civil Works

P34123S77C 4S77-05A Vendor Data Review / Vendor Liaison - Concrete / Civil Works : Vendor Data Review 5 1.00 100% 0%P34123S77C 4S77-06A Vendor Data Review / Vendor Liaison - Concrete / Civil Works : Vendor Liaison 5 1.00 100% 0%

P34123S850 Construction SupportP34123S850 4S85-01A Construction Support : Construction Support 20 1.00 100% 0%P34123S850 4S85-02A Construction Support : Lift Plans 40 1.00 100% 0%P34123S860 Inspection, Testing, Operator Training & Commissioning SupportP34123S860 4S86-01A Inspection, Testing, Operator Training & Commissioning Support : ITPs 10 1.00 100% 0%P34123S870 Design Reports / Job BooksP34123S870 4S87-01A Design Reports / Job Books : Design Reports / Job Books 40 1.00 100% 0%P34123S950 As-BuildingP34123S950 4S95-01A As-Building : As-Building (as per attached sheet) 1.00 0% 100%

Page 73: SRU Offplot - Process - Phase 3_Class 3 TIC Estimate (FEED)

As Built Staffhour EstimateOn Shore

This estimate is basedon minimal changes to as built documents

Discipline Civil/Structural

Project drawings descriptions No Off

Pipe Racks

Radio Towers

HVAC

Layout Drawings

Foundations

No Pieces of Equipment

Project Drawing Schedules

Equipment Schedules

U/G Process Drains

As built activities

Description No. Drgs Hrs/Drg Total Hrs

Drawing sheet check 0 0.25 0

Electronic Critical drg check 0 0.33 0

Project Drg archive 0 0.17 0

Archive Electronic drg files 0 0.08 0

Raster burn Back=60% Total 0 0.08 0

Unused masterdrgs returned 0 0.08 0

Unused drg numbers returned 0 0.08 0

Cd Verification against Drawing register 0 0.25 0

A3 wet signature hard copy 0 0.08 0

Request Drawings 0 0.5 0

As built Mark up review 0 0.03 0

Pipe Racks 0 2 0

Radio Towers 0 2 0

HVAC 0 2 0

Layout Drawings 0 2 0

Foundations 0 2 0

Project Drawing Schedules 0 2 0

Equipment Schedules 0 2 0

U/G Process Drains 0 2 0

Sub total 0

Supervision 0

Total Hrs 0.0 Hours