    Technical Audit Of

    Sui Southern Gas Company - 2007

  • 8/4/2019 SSGC Checklist Power Point Presentation

    2/56

    2

    Objective

    To carryout a systematic and objective verification, analysisand appraisal of the operational functionality.

    Performance evaluation of the system (safety, managements,documentation, data acquisition and control aspects of the

    system functions) Operations of equipments/ tools under SSGC use.

    Appraisal means technical appraisal only and exclude:

    Financial evaluation

    Estimation of worth..

    Physical execution

    Inspection, testing

    Measurement and calibrations

  • 8/4/2019 SSGC Checklist Power Point Presentation

    3/56

    3

    Tasks

    Operational functionality and performance evaluation ofthe system (Integrity, adequacy, effectiveness & efficiency)

    System Management

    Means technical systems and procedures only.

    Compliance with relevant legislation, policies, standards

    and HSE measures in the companys areas of operation.

    Legislation and policies are those required to

    meet laws of GOP.

  • 8/4/2019 SSGC Checklist Power Point Presentation

    4/56

    4

    Scope Of Work

    I) Projects System

    II) Transmission System

    III) Compression System

    IV) Corrosion SystemV) Telecommunication System

    VI) Metering System

    VII) Distribution System

    VIII) Civil Works

    IX) Procurement of materialX) Customer service

    response and operation

  • 8/4/2019 SSGC Checklist Power Point Presentation

    5/56

    Projects System

  • 8/4/2019 SSGC Checklist Power Point Presentation

    6/56

    6

    Projects System

    a) Pipelines System Construction & Installation activities

    Project means the pipeline construction and laying fortransmission and distribution systems.

    Reference Documents

    Section 2, 3, 5 & 6 OGRA GTTS

    ASME B 31.8

    API RP 5L 1

    API 1104

    API RP 1102

    Gas Rules 1960

  • 8/4/2019 SSGC Checklist Power Point Presentation

    7/56

    7

    Project System

    SSGC to provide:

    List of various projects in hand/ongoing

    Planning of each project showing work break down

    Project Schedule - Planned Vs Actual

    Manpower & Equipment Deployment - Planned vs. actual General Pipeline construction Manual

    QA / QC documentation (In house / 3rd Party)

    Design Dossier/Drawings of fewsignificant completed and on going projects

    Material inspection procedures & reports

    cont .

  • 8/4/2019 SSGC Checklist Power Point Presentation

    8/56

    8

    Projects System

    Right - of - Way (ROW) Drawings Stringing & Storing records

    Welding - QA / QC docs, Weld Test Result (NDT& DT),Welder qualification procedure & Records

    Coat & Wrap - Design Specs, MDS, QA / QC documents

    Ditching & Lowering / Backfill - Approved & As built drawings

    Crossings - Approved & As built Drawings

    Cathodic Protection - Design documents, Soil survey report,Approved & as built drawings

    Testing procedures & records including Holiday Detection,Leak Detection, Hydro Static Testing

  • 8/4/2019 SSGC Checklist Power Point Presentation

    9/56

    9

    Projects System

    b) Procurement of material & equipment for projects (procedure& conformance)

    Exclusions:

    Warehousing

    Issues relating to land acquisition / land rehabilitation

    Reference Documents - API 5L and other related codes

    SSGC to provide

    Procurement procedure

    Pre qualification of suppliers

    Criteria for acceptance and rejection of material

    Issuance of material

  • 8/4/2019 SSGC Checklist Power Point Presentation

    10/56

    Transmission System

  • 8/4/2019 SSGC Checklist Power Point Presentation

    11/56

    11

    Transmission System

    a) Pipeline operations (operation and maintenance planning and control

    Management) including right of way (ROW), Patrolling, ROWmaintenance, River crossing, valve assemblies maintenance, BlockValve and actuator operation, commissioning and de commissioning ofpipeline.

    Ref Doc - OGRA GTTS SEC 8, ASME B31.8 2, OGRA GTTS SEC 8.5

    SSGC to provide Transmission Net Work diagram showing all installations & facilities:

    Pipeline Terminal Stations Divisional Stations/HQ Stations SMS Repeater Stations Valve assemblies Major Road, Railway, Bridge or Barrage crossings Pipeline Diameters Approach from nearest highway, Railway Station or Airport

    cont ..

  • 8/4/2019 SSGC Checklist Power Point Presentation

    12/56

    12

    Transmission System

    Right of WayROW Dimensions at various sections of pipeline Net work

    Patrolling Procedure & Inspection Record

    Maintenance Record of ROW

    Work orders to Contractors - HQs/Terminal Stations.

    Encroachments reports and measurestaken

    Pipeline Maintenance

    Periodical inspection & maintenance reports including thicknesschecks, Sleeving, Coat & Wrap repairs.

    Pigging arrangements locations and records.Hot tap/stoppling design, procedure and reports.

    Maintenance of Civil Structure and Protective Works records

    Valve Assemblies - Maintenance procedures and inspection records

  • 8/4/2019 SSGC Checklist Power Point Presentation

    13/56

    13

    Transmission System

    b) Compressor operation (operation planning and control only)

    SSGC to provide:

    Compressor Operation Plan Vs Actual of last three yearscovering

    Un-interrupted running hours

    Standby time

    Down time for scheduled maintenance

    Log book or Shift Status Chart

    Daily Operation Activity reports transmitted to Zonal /Central Offices.

    Maintenance work records

  • 8/4/2019 SSGC Checklist Power Point Presentation

    14/56

    14

    Transmission System

    c) Pre- Invoice verification of Gas source. Debit invoice includingcircular chart reading, strip chart reading, Gas volumecalculations and transmission UFG.

    Post Invoicing verification of Gas supply

    Ref Doc - AGA REPORT 3, MNOP&R MODEL GSA

    SSGC to provide

    Gas Sales Agreements

    Billing Trail

    Circular charts

    Strip charts

    Gas chromatograph data

  • 8/4/2019 SSGC Checklist Power Point Presentation

    15/56

    15

    Transmission System

    d) Filtering, Metering and pressure regulation arrangementsRef Docs - ASME B31.8 SECTION 803.3 / 853

    SSGC to provide

    P & IDs

    Filter design specifications and drawings Pressure regulators and meter data sheets

    e) Operation data recording arrangements

    KT / other stations

    SSGC to provide

    P & IDs and Instrument data sheets

  • 8/4/2019 SSGC Checklist Power Point Presentation

    16/56

    16

    Transmission System

    f) SCADA System Data Acquisition from sources and SMSs

    SSGC to provide

    Vendors Manual

    SOPs

    Records / Data

    g) Meter Proving and maintenance

    Ref Doc - AGA Report No.3 & 8, AGA Report 9

    SSGC to provide Vendor manuals

    in-house SOPs

    Maintenance and calibration record

  • 8/4/2019 SSGC Checklist Power Point Presentation

    17/56

    17

    Transmission System

    h) Joint calibration of custody transfer metering equipment atgas source

    Ref Doc - AGA Report, GSA with producers

    SSGC to provide

    GSA

    Record of joint calibration

    i) Joint calibration of SMS with Distribution Department

    Ref Doc - AGA Report No.3. SOPs

    SSGC to provide

    SOPs

    Maintenance and calibration records

  • 8/4/2019 SSGC Checklist Power Point Presentation

    18/56

    18

    Transmission System

    j) Gas Quality Monitoring Ref Doc - GSA

    SSGC to provide

    GSA

    Gas chromatograph readings provided by seller

    k) Operation and maintenance of Power Generating sets atRepeater stations

    Ref Doc - SOPs / Vendor Maintenance Manuals

    SSGC to provide

    Schedules

    Log books

    Maintenance report

  • 8/4/2019 SSGC Checklist Power Point Presentation

    19/56

    19

    Transmission System

    l) Operation and Maintenance of construction equipment Ref Doc - Operations & Maintenance manuals

    SSGC to provide

    Operation and maintenance manuals

    Maintenance record of individual machine Maintenance schedule

    n) Transport Fleet Management

    SSGC to provide

    Fleet maintenance register

    Maintenance manuals.

  • 8/4/2019 SSGC Checklist Power Point Presentation

    20/56

    20

    Transmission System

    M & o) Safety & Fire Protection & ERP:

    Ref Docs - NFPA Codes, API code

    SSGC to provide

    HSE Manual Safety checklists

    Safety records

    Fire drill records

    Emergency Response Procedures

    Incident reporting procedures and records

    investigation procedures and records

    List of Safety & Fire Fighting equipment at each installation

  • 8/4/2019 SSGC Checklist Power Point Presentation

    21/56

    21

    Transmission System

    p) Rehabilitation of Transmission lines (Coat & Wrap, Sleeving) Ref Doc - OGRA GTTS, ASME B31.8

    SSGC to provide:

    Thickness and PSP / HOLIDAY / DCVG Reports

    Sleeving, Coat & Wrap procedures and record

    q) PCV remote operation through SCADA

    Ref Doc - Operation and maintenance manual.

    SSGC to provide:

    Schematics

    Operation reports

    Operations and maintenance manuals

  • 8/4/2019 SSGC Checklist Power Point Presentation

    22/56

    22

    Transmission System

    r) Pigging of pipelines wherever required

    Ref Doc - ASME B31.8, SOPs

    SSGC to provide:

    Pipeline schematic showing pig launching and receivingarrangements

    Pigging procedures and reports

    s) Hot tapping / Stoppling

    Ref Doc - Operation & maintenance manuals

    SSGC to provide:

    Hot Tap / Stoppling procedure and records

  • 8/4/2019 SSGC Checklist Power Point Presentation

    23/56

    23

    Transmission System

    t) Daily / hourly maintenance of flow pressure data of GasControl

    Refer item e of SOW

    u) Maintenance of Civil Structure and protective works.

    Refer item a of SOW

  • 8/4/2019 SSGC Checklist Power Point Presentation

    24/56

    Compression System

  • 8/4/2019 SSGC Checklist Power Point Presentation

    25/56

    25

    Compression System

    a) Compressor Operations evaluation

    Ref Doc - API 616, API 617

    SSGC to provide

    Operation Manual / Design & As built Manual

    FAT report, performance curves

    Gas Turbine & compressor operating parameters recorded atnormal / average operating conditions and at peak load

    b) Compressor efficiency evaluation

    Ref Doc - API 616, API 617

    SSGC to provide

    Detail of studies carried out for improvement

    Recommendation & Implementation

    Methodology adopted & results of improvements

  • 8/4/2019 SSGC Checklist Power Point Presentation

    26/56

    26

    Compression System

    c) Maintenance of equipment installed at compressor station

    Ref Doc - OGRA GTTS, ASME B31.8

    SSGC to provide

    Maintenance manual.

    In-house SOPs.

    Planned maintenance schedules vs. actual.

    Maintenance record of individual unit

    Maintenance report prepared after each overhaul / Scheduledinspection

  • 8/4/2019 SSGC Checklist Power Point Presentation

    27/56

    27

    Compression System

    d) Controls of Gas Turbines SSGC to provide

    Detail of studies carried out for improvement

    Recommendation & Implementation

    Methodology adopted and results of improvements.

    e) Optimization of pipeline flow, pressure for better utilization ofavailable horse power

    SSGC to provide

    Detail of studies carried out for improvement

    Recommendation & Implementation

    Methodology adopted and results of improvements.

  • 8/4/2019 SSGC Checklist Power Point Presentation

    28/56

    28

    Compression System

    f) Improvement of compression efficiency through restagingredundancy and standby equipment requirement to meet thegoals and objectives / targets

    SSGC to provide

    Detail of studies carried out for improvement

    Recommendation & Implementation

    Methodology adopted and results of improvements.

    h) Gas Filtration facilities functioning

    Ref Doc - ASME B31.8, OGRA GTTS

    SSGC to provide

    P & IDs

    Filter design specifications and drawings

    Filter element change-out frequency records

  • 8/4/2019 SSGC Checklist Power Point Presentation

    29/56

    29

    Compression System

    i) Discharge cooling system functioning Ref Doc - API 661

    SSGC to provide

    Design data sheet

    Vendor data

    Discharge temperature

    Number of fans

    Operating Parameters recorded during normal / averagecondition and peak load / peak ambient condition.

    Winter data

    j) Operations and maintenance of Generators installed atcompressor stations

    SSGC to provide

    Vendor manuals, operations Log, running hours, standby,downtime maintenance history of individual Gensets

  • 8/4/2019 SSGC Checklist Power Point Presentation

    30/56

    30

    Compression System

    k) Designing, Planning and implementation work for revamping/ De bottlenecking of Compressor stations

    SSGC to provide

    Reports on modification for De-bottlenecking efficiencyimprovement.

    Plans for ongoing & those to be taken in hand in near future.

    l) Fuel measuring facilities installed at compressor station

    SSGC to provide

    P & IDs

    Drawings

    SOPs

    Vendor manuals

    Operations Log

    Maintenance logs / reports

  • 8/4/2019 SSGC Checklist Power Point Presentation

    31/56

    31

    Compression System

    m) Evaluation of overhauling function and appraisal ofoverhauling activities

    SSGC to provide

    OEMs guidelines / Manuals, Drawings.

    Workshop facilitates availability of essential machines.

    Availability of requisite hand tools / special tools.

    No of overhauls carried out with / without OEM support.

    Maintenance reports including Post overhaul performancetesting.

    n) HSE condition at all the above mentioned activities

    SSGC to provide

    Refer items m,o of Transmission System

  • 8/4/2019 SSGC Checklist Power Point Presentation

    32/56

    Corrosion System

  • 8/4/2019 SSGC Checklist Power Point Presentation

    33/56

    33

    Corrosion System

    a) Physical and operating conditions of CP System installations vis-

    -vis DC source (T/R, TEG units), ground bed (Horizontal, deepwell ), Negative distribution box, drain point etc.

    SSGC to provide

    Complete route map indicating CP system.

    Installed Equipment detail, Data sheets.

    Operations and maintenance Procedures and records

    b) Calibration of the CP Measuring and Monitoring Devices.

    SSGC to provide

    Maintenance & Calibration records of all CP Measuring and

    Monitoring devices.

    Measurement and calibration traceability

    Equipment manufacturer manual

    In-house calibration setup & procedures

    Pre-qualification of calibration service providers

  • 8/4/2019 SSGC Checklist Power Point Presentation

    34/56

    34

    Corrosion System

    c) Testing of CP Isolation devices, insulating flanges SSGC to provide

    Test record of insulating flanges

    d) Pipeline Integrity Assessment through indirect surveys vis-

    -vis Close Interval Potential (CIP) survey, Direct CurrentVoltage Gradient (DCVG) survey, Soil Resistively survey,Soil Analysis of the selected pipeline sections

    SSGC to provide

    Record of integrity assessment surveys Recommendations and implementation reports

  • 8/4/2019 SSGC Checklist Power Point Presentation

    35/56

    35

    Corrosion System

    e) Pipeline Integrity Assessment through direct examination ofpipeline vis--vis, Bell Hole (visual coating inspection, pipesurface condition of the selected pipeline sections.

    SSGC to provide

    Record of integrity assessment surveys

    Recommendations and implementation reports

    f) Recommendation for CP System up-gradation and coatingrehabilitation of the vulnerable pipeline section.

    SSGC to provide

    Record of integrity assessment surveys

    Recommendations and implementation reports

  • 8/4/2019 SSGC Checklist Power Point Presentation

    36/56

    Tele-communication System

  • 8/4/2019 SSGC Checklist Power Point Presentation

    37/56

    37

    Tele-communication Stations

    a) Maintenance of the existing Telecommunication Network,

    comprising of Digital Microwave Back Bone Radio Link, LowCapacity Digital Spur Links, Single Channel Radio Telephonelinks and Base to Vehicle UHF Wireless Radio System forminimum outage time.

    Ref Doc - ITUT standards or PTA regulatory authority code.

    SSGC to provide

    SOP

    Lay out diagrams

    Vendors Manuals

    Maintenance procedures

    Down time analysis reports

    Record for the calibration of test equipment

    License for getting required frequencies

    Spares record

  • 8/4/2019 SSGC Checklist Power Point Presentation

    38/56

    38

    Tele-communication Stations

    b) Maintenance of existing SCADA system for reliable Dataacquisition from Gas Sources, Sales Meter Stations,Compressor Stations, Repeater Stations and RemoteControl Operation of Pressure Control valves and MainlineBlock valves.

    SSGC to provide SOP

    Lay out diagrams

    Vendors Manuals

    Maintenance procedures

    Down time analysis reports Record for the calibration of test equipment

    Procedure of calibrating the pressure, temp and flow fromSMS, compressors stations and controlling the remote blockvalve operation.

  • 8/4/2019 SSGC Checklist Power Point Presentation

    39/56

    39

    Telecommunication Stations

    c)Operation and maintenance of Digital Telephone Exchangesinstalled from SUI to Peshawar on our Microwave RadioNetwork.

    SSGC to provide

    SOP

    Lay out diagrams Customer Manuals

    Spares record

    d) Provision and maintenance of internet facilities in SNGPLthrough Companys dedicated radio network.

  • 8/4/2019 SSGC Checklist Power Point Presentation

    40/56

    40

    Tele-communication Stations

    e) Routine calibration of SCADA instruments for Data Integrity

    SSGC to provide Procedure adopted for the calibration of SCADA instruments

    Record of routine calibration performed on different instrumentsfor the data integrity.

    f) Planning, equipment indenting and Bid Evaluation ofTelecommunication system.

    SSGC to provide

    Prequalification procedure for supplier

    Bid evaluation procedure

    g) Planning and execution of new projects for up grading of theexisting telecommunication system.

    SSGC to provide

    Future plans and upcoming projects to upgrade the existingtelecommunication system.

  • 8/4/2019 SSGC Checklist Power Point Presentation

    41/56

    Distribution System

  • 8/4/2019 SSGC Checklist Power Point Presentation

    42/56

    42

    Distribution System

    a) Laying of distribution mains and service lines

    Ref Doc - OGRA GDTS Sec-2 thru 4ASME B 31.8 Sec 849, 850 & 852

    SSGC to provide

    SOPs

    Pipeline route, Layout drawings showing rail / road crossings QA/QC Procedure

    b) Testing and commissioning of mains

    Ref Doc - OGRA GDTS Sec-5

    SSGC to provide

    Testing Procedure

    Test reports

  • 8/4/2019 SSGC Checklist Power Point Presentation

    43/56

    43

    Distribution System

    c) Meter installation at different domestic, industrial and

    commercial customers Ref Doc - ASME B31.8 SECTION 848, OGRA GDTS sec 8.15

    SSGC to provide

    Installation Procedure

    Maintenance procedure and records Calibration procedure and records

    d) Service line shifting

    Ref Doc - ASME B 31.8 Sec 849, OGRA GDTS Sec 8.20

    SSGC to provide

    Work Procedure

    Completion reports / log reports

  • 8/4/2019 SSGC Checklist Power Point Presentation

    44/56

    44

    Distribution System

    e) Control valves maintenance Ref Doc - ASME B 31.8 Sec 841.126

    SSGC to provide

    Maintenance Procedure

    Maintenance register

    f) Maintenance of regulatory stations

    Ref Doc - OGRA GDTS Sec 8.15 thru 8.19, ASME B 31.8Sec 848

    SSGC to provide

    Maintenance procedure

    Maintenance register

  • 8/4/2019 SSGC Checklist Power Point Presentation

    45/56

    45

    Distribution System

    g) Gas Leakage rectification Ref Doc - OGRA GDTS Sec 7.2 & 7.3 & 8.6, ASME B 31.8

    Sec 851.3, 851.6 & 852.3 Appendix M

    SSGC to provide

    Leakage Survey reports

    Leakage rectification Procedure

    Leakage rectification reports

    h) Gas Quality Monitoring

    Ref Doc - AGA Report No.3

    SSGC to provide

    Specs from GSA, Gas chromatograph readings

  • 8/4/2019 SSGC Checklist Power Point Presentation

    46/56

    46

    Distribution System

    i) Meter proving at central metering shop and at mobile test van Ref Doc - AGA Report No.3

    SSGC to provide

    Meter proving Procedure and reports

    Practical demonstration

    j) Maintenance of industrial, commercial and domestic meters

    Ref Doc - ASME B 31.8 Sec 848, OGRA GDTS 8.15

    SSGC to provide

    OEM Manuals

    SOP's

    Maintenance record and reports

  • 8/4/2019 SSGC Checklist Power Point Presentation

    47/56

    47

    Distribution System

    k) Maintenance of Town border stations, District regulatorystations and consumer meter station

    Ref Doc - OGRA GTTS Sec 8.15, ASME B 31.8 Sec 848 &803

    SSGC to provide

    SOP's

    Maintenance manuals of individual equipment

    Maintenance records

    l) Painting of over head crossings and service valves. SSGC to provide

    SOP's

    Maintenance records

  • 8/4/2019 SSGC Checklist Power Point Presentation

    48/56

    48

    Distribution System

    m) Material inspection test laboratory (If available)

    SSGC to provide

    SOP's for individual tests and equipment used.

    Sample test report for individual item.

    Test record keeping system

    n) Maintenance of construction equipment like welding plants,compressors etc

    SSGC to provide

    Maintenance manuals

    Maintenance Schedules and reports

    o) Transport Fleet Management

    Refer item n of Transmission System

  • 8/4/2019 SSGC Checklist Power Point Presentation

    49/56

    49

    Distribution System

    p) Pipeline patrolling

    Ref Doc - ASME B 31.8 Sec- 851.2

    SSGC to provide

    Pipeline patrolling log book.

    Pipeline Patrolling Guidance note

    Report on special / abnormal situations noted during patrolling

    q) Safety and fire protection at Area level

    Refer item o of Transmission System

    r) Preparation of master plan at regional level

    Extent of Scope of work to be deliberated.

  • 8/4/2019 SSGC Checklist Power Point Presentation

    50/56

    Procurement of Material& Equipment for Projects

  • 8/4/2019 SSGC Checklist Power Point Presentation

    51/56

    51

    Procurement of Material of Projects

    Procurement

    SSGC to provide

    Purchasing manual

    Procedure and criteria for prequalification of suppliers

    Tendering procedures

    Criteria for technical bid evaluation

    Standard Specifications

    SSGC to provide RFQs, P/Os

    Technical Evaluation

    Test / inspection Reports

  • 8/4/2019 SSGC Checklist Power Point Presentation

    52/56

    52

    Procurement of Material of Projects

    Customized Specification - Manufacturer certificates for Q.A

    Technical Evaluation - Technical Evaluation Procedures

    In-house Quality Assurance - In-house QA Procedures

    Inspection - In-house Inspection Procedures

  • 8/4/2019 SSGC Checklist Power Point Presentation

    53/56

    Customer Service Response

    & Operation

  • 8/4/2019 SSGC Checklist Power Point Presentation

    54/56

    54

    Customer Service Response & Operation

    Performance Standards

    Gas Emergencies

    Telephone Calls

    Complaints

    Investigation of Pressure Complaints

    Making and Keeping Appointments

    Notification of Planned Work

    Connection to Distribution System

    Energy / Safety advice

    Replies to correspondence

    Visits

    Estimating Procedures for billing

    Meter alteration & replacement at consumers request

    Responding to meter problems

  • 8/4/2019 SSGC Checklist Power Point Presentation

    55/56

    55

    Customer Service Response & Operation

    Performance Standards

    Meter Accounts (Meter reading / billing )

    Meter Reading Frequency

    Special Meter Readings

    Appointment for reading

    Providing additional meter

    Notifying consumer for non-payment

    Termination of service for default

    Reconnection after payment of dues

    Refunds to the Consumers

    Backfill, Restoration

  • 8/4/2019 SSGC Checklist Power Point Presentation

    56/56

    Customer Service Response & Operation

    SSGC to provide

    Customer response manual/ Guidelines / Procedure

    Customer response facilities / Location

    Customers complaint record and close out formats.

    Customers complaints visit reports

    Connection restoration records after payment dues.


Recommended