+ All Categories
Home > Education > Ssu singapore presentation

Ssu singapore presentation

Date post: 21-Jan-2015
Category:
Upload: rick-albert
View: 532 times
Download: 0 times
Share this document with a friend
Description:
 
Popular Tags:
11
MSFSC SSU Singapore
Transcript
Page 1: Ssu singapore presentation

MSFSC SSU Singapore

Page 2: Ssu singapore presentation

MSFSC SSU SINGAPORE

Mission: MSFSC TYCOM Executive Agent in SE Asia.- Man, Train, Equip, Maintain- Logistics, Medical, Religious Ministries, Safety, Financial Management- IT/Computer Systems, Manpower Analysis, Administration Support.

Page 3: Ssu singapore presentation

N-000-4

N-00C0-4

N-00SGS-12

N-1GS-12

N-4GS-12

N-6GS-12

N-7GS-13

N-8GS-12

N-9E-8

AdminOfficer

E-6

N-71GS-12

N-72GS-12

N-81GS-12

N-91E-6

N-41GS-7

ILS

SRA

TANO

SSU Singapore Current Manning

Page 4: Ssu singapore presentation
Page 5: Ssu singapore presentation

Ready Assets, ship solutions

COMSC

DIRMSFSCTYPE COMMANDER PM 1MAN, TRAIN, EQUIP, MAINTAIN

SSU SINGAPORE

CLASSMANAGERS

CLWP/CTF-73OPCON

Schedule requirements

Program funding, policy

Program execution data

SEALOGFE N1, N6 and N8Support

MAINTENANCE REQUIREMENTS MAINTENANCE WINDOWS

CLWP - SEALOGFE RELATIONSHIP

PM1 SHIPS

MaintenanceMedicalLogisticsReligious MinPersonnelSafetyIT/Computer Systems

Maintenance Centric Relationship

Direct Support

ABS/USCGABS/USCG

Page 6: Ssu singapore presentation

Maintenance Cycle

SSU Singapore Maintenance Operations ISO ABS/USCG 60-month Certification Cycle:

Provide Oversight/Act as Assistant Port Engineers for:Regular Overhaul (ROH) every 30 months. 45-60 day shipyard period with dry-docking. Mid-Term Availability (MTA) every 30 months. 30-45 day shipyard period without dry-docking.

Main Maintenance Missions:Voyage Repairs (VR) every quarter. 14-day period designated by OPCON. Occurs every quarter without an MTA or ROH.EMERGENT/CASREP Support. Formulate repair/engineering solution and to commit funds to cover cost of emergent work.

* Over $25 Million in PM1 Ship Repair oversight/execution annually

Page 7: Ssu singapore presentation

ROH/MTA

WSD DEC/MAR 2008/9PEC MAR/MAY 2009TIP MAY/JUN 2009RAP AUG/SEP 2009WSD DEC/FEB 2009/10PEC MAY/JUN 2010

VOYAGE REPAIRS

SAF MAR 2009RAP APR 2009AME AUG/SEP 2009WSD SEP 2009PEC OCT/NOV 2009WSD NOV 2009 TIP DEC 2009TIP APR 2010REB JUN 2010AME JUL 2010

VOYAGE REPAIRS

RAP DEC/JAN 2008/9CCD DEC/JAN 2008/9CCD MAR 2009ABS APR 2009SJO MAY 2009SAF MAY 2009FLT JUN/JUL 2009FLT OCT 2009REB NOV 2009ABS JUL 2010

ROH/MTASAF MAR/MAY 2010

VOYAGE REPAIRS

SAF AUG/SEP 2009REB FEB 2010MER JUN 2010

Page 8: Ssu singapore presentation

0

2

4

6

8

10

12

14

16

18

2005 2006 2007 2008 2009

VR

MTA/ROH

Maintenance in SE Asia – Ship Support Unit Singapore

Number ofVoyage Repairs

Page 9: Ssu singapore presentation

MSRA HolderABR Holder (Limited/Unlimited)

Singapore: 3 MSRA 5 ABRAustralia: 2 MSRA 4 ABRMalaysia: 2 ABRThailand: 1 MSRA 1 ABRIndonesia: 3 ABRPhilippines: 1 MSRA 2 ABRIndia: 1 ABRHong Kong: 2 ABRVietnam: 1 MSRA/1 ABR

Page 10: Ssu singapore presentation

SSU Singapore COMREL

Camilian HIV/AIDS Center – Thailand (RAP)Pattaya Orphanage – Thailand (SAF)International Childrens Advocate Center – PI (RAP)Sihanoukville Samdech Ouv Secondary School - CB (SAF)Barrio Barretto Good Heart Organization – PI (SJO)Olongapo Social Development Center – PI (ABS, CCD REB, SJO)

Page 11: Ssu singapore presentation

Costs - Concerns

AVERAGE VOYAGE REPAIR COSTS IN SE ASIA:

Republic of the Philippines – Subic Drydock Company - $119,708.46Thailand – UNITHAI Shipyard - $268,393,85Vietnam – Saigon Shipmarin/Cam Ranh Shipyard - $281,000.00

Average Cost - $223,034.10Includes Force Protection, Husbandry, Port Services, Maintenance

CONCERNS:

Husbandry Costs – Regional USN Contracts – MSFSC Can Do Better-AKE Footprint in SE Asia-Voyage Repairs in Singapore (Port Loading)-COMFISC MOA/U – LSR MOA, Ship Repair Contracting MOA


Recommended