Powerpoint presentation of building work needed by St Marys Anglican Primary School, Belize City.
Popular Tags:
14
ST. MARY`S ANGLICAN PRIMARY SCHOOL, BELIZE CITY
Transcript
Page 1: St   Marys Belize City

ST. MARY`S ANGLICAN PRIMARY SCHOOL, BELIZE

CITY

Page 2: St   Marys Belize City
Page 3: St   Marys Belize City

St. Mary`s – the story

• Ages 3 to 15• Infant 1 to Standard 6• 14 teachers• 210 children• Over 50% PSE pass rate• School founded in 1922• Children are mainly from poor homes• Location – 1 minute from Tourist Village, Belize

City

Page 4: St   Marys Belize City

St Mary`s is a lively community

Page 5: St   Marys Belize City

We do a lot of great work

Page 6: St   Marys Belize City

But our school is in bad shape

Page 7: St   Marys Belize City

Parts of the structure are crumbling

• Water has penetrated the cement

• In places the rebar is visible

• Some patching has been done but this has not solved the problems

• The internal stairs are potentially dangerous

Page 8: St   Marys Belize City

Gutters and downpipes are inadequate

• Downpipes run directly into the courtyard, there are no under-floor drains to carry the water away

• Gutters are collapsing and no longer function, allowing water to penetrate the building

Page 9: St   Marys Belize City

The toilet block is wholly inadequate

Page 10: St   Marys Belize City

Drinking water in the courtyard

• This courtyard tap is the only source of drinking water for the children

• The surrounding area floods as there is no drain

• The whole area is subject to mould and damp and is clearly unsatisfactory

Page 11: St   Marys Belize City

Paintwork is shabby and peeling

Page 12: St   Marys Belize City

OUR CHILDREN DESERVE BETTER

Page 13: St   Marys Belize City

What we would like to do• Repair all concrete to

ensure it is safe• Repair gutters, add

new downpipes, put in under-floor drains

• Tile courtyard with non slip tiles

• Sandblast all outside paintwork and repaint

• Install drinking water fountains

• Renovate toilet block• Repair leaks in roof• Renovate classrooms

including repair of ceilings

• Repair window louvers and bars

• Surface staircases with non-slip finish

• Replace worn out furniture