    Upon striking the wall of Isel Church, the water coursed around both the north and

    south sides of the church until the level rose around the building to a depth of between

    four and five feet. Once again the water pressure built up, this time against the inside

    of the churchyard boundary walls, and two further lengths of wall to the north gave

    way

  • 8/14/2019 St. Michael and All Angels Church, Isel.

    3/93

  • 8/14/2019 St. Michael and All Angels Church, Isel.

    4/94

    After 3 - 4 days, the waters had receded. Under advice, wet documents and registers

    were removed to a freezer store as soon as possible. Proper access to inspect the

    church was first made on Wednesday, 25th. November 2010, and coincided with the

    Archdeacons quinquennial inspection visit. Representatives from Ecclesiastical

    Insurance and Crawfords Loss Adjusters, were also present.

    In its wake, the water had left older headstones around the church, leaning orflattened. In the new churchyard some 20 headstones were uprooted and left in

    disarray. Church paths were gouged out to a depth of 3 feet, drainage pipes and

    electric cables were unearthed, grassed areas were stripped back, topsoil had been

    washed away and considerable waterborne debris had been deposited all over the

    churchyard. Approximately 150 metres of boundary stone walling had been

    demolished and washed away, and a further 60 metres of wall had been left with a

    worrying lean. Both main gates had disappeared, as had the entrance light and other

    items of churchyard furniture.

  • 8/14/2019 St. Michael and All Angels Church, Isel.

    5/91

    Outside the churchyard, the 6 feet high wall between Isel Bridge House and the church drive had been demolished

    by the floodwater, causing the church driveway and car park to be gouged out, including one hole, which was 7+

    feet deep. Railings dividing the driveway from Margarets Field had also been ripped out and damaged or

    misshapen.

    Inside Isel Church, the outer doors, aided by small floodgates, remained closed and had prevented water from

    surging into the building. Nevertheless, the rising water table forced water up through the earth floor of the

    church and water rose to a depth of about 15 inches. Because the vestry is a few steps lower than the main body

    of the church, water in here was about 3! feet deep. Water was also seen to have coursed from an under floor

    source in the southeastern corner of the chancel, near the Altar.

    All furnishing and other items including floor coverings, inside the church, which were beneath the water level,

    were either destroyed or sustained a water (bleaching) mark where it had been submerged for some time.

  • 8/14/2019 St. Michael and All Angels Church, Isel.

    6/92

    Likewise, in the vestry, anything beneath the water was lost. The exceptions were precious documents and linens/

    hangings, which have been taken for specialist restoration or laundering. Some older items of furniture are also

    restorable. The large oak storage dresser was not recoverable and was lost. The vestry kitchen units and contents

    stored within were also destroyed.

    Everywhere that had been under water, had been left with a film of silt and mud.

  • 8/14/2019 St. Michael and All Angels Church, Isel.

    7/93

    The List of Recovery Work Required.

    Outside Isel Church.

    Church Drive to be re-instated.Church Drive Railings to be repaired and re-erected.

    Church Paths to be re-instated.

    Drainage Pipes to be re-instated.

    Underground Electricity Cables to be re-installed.

    Broken Tree branches to be made safe.

    Churchyard Debris to be cleared away or stockpiled for re-use.

    150 metres. of Boundary Stone Walling require to be rebuilt.

    60 metres. of Boundary Stone Walling to be demolished and rebuilt.

    Various Short Lengths of Wall to be patched and pointed.

    New Gates to be supplied.New Light at Entrance required.

    Landscaping of Churchyard to re-instate lost topsoil and grass.

    Old and new Headstones to make good.

    Inside Isel Church.

    Removal to Store all mobile Furnishings.

    Removal and Sorting of all Contents to establish recoverable items.

    Deep Cleansing of the Premises, including fixed furnishings.Removal of Flooring (in parts), to aid drying.

    Air-Drying of Building.

    Restoration of Precious Documents.

    Specialist Laundering of vestment items.

    Repairs to Church Organ.

    Replacement of Safe.

    Renovation of salvageable Furniture.

    Re-decoration of Church, Porch, Vestry and Toilet.

    Refurbishment of French Polished Furniture.

    Replacement of non-salvageable furniture.Replacement of Contents lost, i.e. hymnbooks, hassocks, vases, crockery, etc. etc.

    Replacement of Kitchen Units and Fittings etc.

    Electricity Circuitry checks and replacement as required.

    Replacement of Heating System.

    Replacement (part) of flooring including parquet flooring.

  • 8/14/2019 St. Michael and All Angels Church, Isel.

    8/94

    Summary of the Present Position.

    Inside.

    1. SALVAGE contractors, CONTINUITY UK, were very quickly appointed by the insurers, to limit the

    deterioration of contents and building, by recovery and cleaning of all salvageable material. All movablecontents have been taken away to suitable storage premises in Embleton, near Cockermouth. The

    exceptions are those items taken elsewhere for specialist cleaning or renovation. I.e. vestments and

    documents.

    Items, which were destroyed and have been removed to a landfill site, have been documented by

    CONTINUITY UK. The list does not contain any items that are irreplaceable most items will be replaced

    in due course by purchase.

    After all contents had been removed, CONTINUITY UK has deep cleaned all parts of the church building.

    Blowers and de-humidifiers have been installed and are running continually to help with a natural, heatlessdrying process. Sections of wooden and parquet flooring have been removed to aid with the drying.

    Surprisingly, the Vestry and kitchen have dried exceptionally well. The main body of the church however,

    is taking longer - the recent spell of cold weather has not helped.

    2. The ELECTRICITY supply to the building was temporarily disconnected by United Utilities, until our

    own electrician could disconnect the consumer unit and install a temporary circuit; the supply was then re-

    connected. The electric wiring is scheduled for inspection a report is expected shortly.

    3. The HEATING SYSTEM (currently, oil filled electric heating pipes) has been condemned and will needto be replaced. Alternative heating methods should be considered at this stage. The Loss Adjusters have

    agreed that they will meet their financial obligations for replacing the existing system, but that the funds

    may be used towards an alternative system.

    4. ORGAN specialists, JARDINE, have inspected the church organ and have given an estimate for the

    repair. A new motor and wind trunk is needed and drying out/repairs to stops and pipes will be carried out

    in due course. Further work may be required when pipes etc. have been removed and the full extent of

    any damage is apparent. JARDINEs are hopeful that they have seen most if not all of the damage.

    5. CARPET suppliers have quote for the exact replacement of floor coverings lost.

    6. DECORATING, JOINERY, PLUMBING, FRENCH POLISHING, SAFE and OAK DRESSER

    estimates are awaited.

  • 8/14/2019 St. Michael and All Angels Church, Isel.

    9/9

    Outside.

    1. DRIVEWAY AND CHURCH PATHS have been reinstated to approximately 2 inches below their finish

    level to enable safe access for contractors working on site. Some church path infill beyond the church

    porch and vestry door has yet to be completed.

    2.DRAINAGE PIPES AND ELECTRIC CABLES

    beneath the in-filled paths have been replaced.

    3. Salvageable RAILINGS adjacent to Margarets Field, has been put back into position and need some

    further re-alignment.

    4. Damaged TREE BRANCHES have been made safe and wood debris has been removed from site.

    5. Re-usable WALLING STONE has been collected and placed adjacent to the boundaries to remove

    obstacles from the churchyard and in preparation for re-building work.

    6. DisplacedHEADSTONES

    have been replaced into their proper locations, but left lying down for safetyreasons until they are re-erected. All remaining leaning headstones have been checked for stability.

    7. WALL BUILDING quotations have been received and approved by the Loss Adjuster. For safety reasons

    and to reduce the opportunity of theft, work should start as soon as the contractor is able, (probably

    February). Work is expected to take about 3-4 months.

    8. The CHANCEL CORNER WALL area will be excavated when a mini digger is on site to excavate the

    wall foundations, to inspect for ingress erosion and voids. The removal of one or two flagstones and a

    small excavation carried out inside the church, adjacent to this area will also be necessary.

    9. Replacement GATES will be considered in due course.

    Mr. Ray Day of Architects, DAY CUMMINS, has been appointed to oversee the restoration of Isel Church.

    John Thompson 17 January 2010