AUGUST 2012
ST. SEBASTIAN SOUTH
DIVERSIONCONCEPTUAL DESIGN REPORT
1
Project No. SLLRDC/W/13
Doc!e"t "o. CD/SSD/0#
Ver$%o" &er$%o" 1
D'te o( %$$e 31 A)$t 2012
Pre*'re+ ,r$ S. S-%' De&% De$%)" E")%"eer
C-ece+ ,r. ,. ,. ,. ,o('r H+roo)%$t
,r. O. T-')'$'tt' Strctr' E")%"eer
,r$. A. H. T-$-'r% Project ,'"')er
8/17/2019 St Sebastian South Diversion
2/43
Contents
1 General Description...............................................................................2 Scope of Work........................................................................................3 Design Basis...........................................................................................
4 Performance Criteria.............................................................................5 Metho of Calc!lating..........................................................................." #!nctional Description...........................................................................$ %echnical Basis.....................................................................................& Cost 'stimate.......................................................................................
List of Figures
#ig. 1 ( Sections of Beira
#ig. 2 ( )ocation map
#ig. 3 ( Catchment area#ig. 4 ( Schematic iagram of *'C(*MS
#ig. 5 ( +ption 1
#ig. " ( +ption
#ig. $ ( +ption 3
#ig. & ( Propose impro,ement
#ig 1- ( Crest of the +gee spill a/
#ig 11 ( Pattern of */ra!lic 0!mp#ig 12 ( */ra!lic 0!mp interprete / specic
energ/ c!r,e
#ig 13 ( Simple horiontal apron for stillingasin
#ig. 14 ( Dimensions of the *B ,ehicle
#ig. 15 ( #ront 'le,ation of Weir
#ig. 1" ( Spilla/ longit!inal section
List of Tables
%ale 1 ( np!t ata to *'C(*MS
%ale 2 ( Details of minim!m concrete co,er
%ale 3 ( Safet/ factors for S)S 6)S
1
8/17/2019 St Sebastian South Diversion
3/43
1 General Description
%he Beira )ake is locate in the heart of the cit/ of
Colomo7 an has a highl/ !ranie catchment of
"8"ha that is mostl/ 9at7 ith gro!n le,els
ranging from less than 1m to "m ao,e mean seale,el. %he lake co,ers "5.4 hectares an has a
mean epth of 2.-m. t comprises fo!r main asins:
the 'ast )ake7 the Galle #ace )ake7 the West )ake
an the So!th West )ake. %he 'ast )ake is the
largest an eepest asin ;43.2 ha7 ma
8/17/2019 St Sebastian South Diversion
4/43
Fig 1 - Sections of Beira
3
8/17/2019 St Sebastian South Diversion
5/43
2 Scope of Work
%he poor >!alit/ of ater in the St. Seastian
So!th canal sho!l not e p!mpe in to the Beira
lake ,ia the p!mping station at so!th lock an also
the o!t9o from the poll!te @orris canal sho!lnot e ischarge to the Beira lake. %herefore it is
propose to i,ert the 9o of @orris canal an the
ischarge of So!th lock p!mping station !sing ne
i,ersion canals into the sea o!tfall onstream to
the Macc!l!m lock gate as shon in Fig.2
Fig 2 - Location map
At present7 storm ater from highl/ !ranie
catchment area of Beira lake normall/ rain o!t in
to the sea ,ia circ!lar eir in Gall face lake at
Galle face near ol parliament premises. %he crest
le,el of the eir is 1.&m MS). n aition to this
there are to lock gates for @a,igation p!rpose
5
8/17/2019 St Sebastian South Diversion
6/43
one is calle Macc!l!m lock gate at lake ho!se the
'ast Beira lake to the Colomo haro!r7 an the
other one is So!th lock gate at Maraana %echnical
college connect the east Beira lake to the
St.Seastian so!th canal.
%he Beira lake is compose of inter connecte
ater oies namel/ the east lake7 Galle face lake7
est lake an so!thest lake respecti,el/. %he
total area of Beira lake is $1ha
an the gro!n le,el s!rro!ning the lake ,ar/
from aro!n 2.- m MS) to " mMS).
At the St.Seastian So!th canal lock gate ehin
the Maraana %echnical 0!nction7 there is a p!mpho!se that is !se to p!mp ater from the canal
into the lake to spill to the sea / the spilla/
hen neee. %he p!mping capacit/ of each p!mp
is 1&-78- an 8- ls respecti,el/7 hich is
constr!cte to maintain the ater le,el ;1.& m
MS)= of the Beira lake. %he presents of former to
p!mps are reporte7 !t the/ ha,e een o!t of
commission !e to non ae>!ate amo!nt of 9o to
operation s/stem.
%he semicirc!lar concrete spilla/ is going to
constr!ct at lonel/ pelican(Beira lake. %he spill
crest le,el is 1.&5 m MS) hich maintains the
present minim!m ater le,el of the lake an keep
aa/ from o!tlet of St.Seastian canal ,ia Beira
lake in to the sea.
%he r/ 9o of @orris canal is alloe to 9o into
the Beira )ake ,ia lter meia ;ee Be= to
impro,e the ater >!alit/ an to a,oi the ater
!nalance in the Beira )ake !ring r/ eather
perio. Part of the et eather 9o is i,erte ,ia
!nergro!n i,ersion canal along the D
Wi0earhane Maatha into the @orthern #elcon
of 'ast Beira )ake an then the 9o from this
7
8/17/2019 St Sebastian South Diversion
7/43
i,ersion together ith the 9o from the
catchment of the #elicon an the 9o of the p!mp
station at So!th )ock are i,erte ,ia semi circ!lar
eir folloe / !nergro!n canal along the
Bastian Maatha an +lcott Maatha into the Sea
+!tfall onstream to the Macc!l!m Gate tomitigate the 9oos in the areas of Pettha7
s!rro!ning of Beira )ake an @orris canal.
9
8/17/2019 St Sebastian South Diversion
8/43
3 Design Basis
Methodolog
%he prime o0ecti,es of propose i,ersion of
storm ater from @orris Canal an so!th lock p!mp
station are7
1 Mitigate the 9ooing of areas of Pettha area7
s!rro!ning areas of @orris Canal an
Maligaatta Area.
2 Pre,ent the ischarge of poor >!alit/ ater in
St.Seastian So!th Canal.
3 mpro,e the E!alit/ of poll!te ater of @orris
Canal in Dr/ eather 9o in to the Beira )ake
%o achie,e the ao,e 17 2 an 3
;a= %he part of et eather 9o of @orris Canal
is i,erte into the @orthern #elicon of 'ast
Beira )ake / constr!cting !nergro!n
reinforce concrete o< canal along the D
Wi0earhana Maatha.
;=%he ischarge of So!th )ock p!mp Station
an storm ater 9o from the catchment of @orthern #elicon together ith 9o from
@orris anal i,ersion in ;a= ao,e are
i,erte to the Sea +!tfall onstream to
the Maccal!m Gate / constr!cting
!nergro!n reinforce concrete canal along
the Bastian Maatha an +lcott Maatha.
;c= %o a,oi the !nalance of ater !get of
Beira )ake in r/ eather perio 7 ischarge
the r/ eather 9o of @orris Canal into the
Beira )ake thro!gh horiontal 9o ee Be
to impro,e the >!alit/ of poll!te ater of
@orris Canal.
;=
!e" Standards
!f"
;g= Stanar for h/rological an h/ra!lic
anal/sis *'C(*MS Softare is !se to etermine
11
8/17/2019 St Sebastian South Diversion
9/43
the peak ischarge #lo Master Softare is !se
to etermine the canal section
;h=
;i= W'S Stanar Spilla/ Shapes is !se to
estalish the eir prole.
;0=;k= Stanars for str!ct!ral an geotechnical
esigns British Stanar for steel7 concrete an
composite riges ;18$&7 188-( BS 54--.
;l=
;m= British Stanar for str!ct!ral !se of
concrete ;18&5= ( BS &11-.
;n= BS &--2 : 1884 F Coe of practice for
'arth etaining Str!ct!res.
;o= BS &--4 : ( Coe of practice for
esign of #o!nations.
;p=
;>= einforce Concrete Designers *anook7
Charles '. e/nols an Hames C Steeman7 1-th
eition.
;r=
13
8/17/2019 St Sebastian South Diversion
10/43
# $erfor%ance &riteria;s=
;t= %he o!nar/ conition of i,ersion rain is
the ater le,el of the Beira lake Maccal!m gate
onstream. %he esign is carrie o!t for 1- /ears
ret!rn perio an esign HCA istri!tion. Withthese concepts an information the canal is
moelle !sing *'C(*MS.
;!=
15
8/17/2019 St Sebastian South Diversion
11/43
' Method of &alculating;,=
!(" &alculation of peak discharge
!)"
;/= 'stimate of peak storm ater from *'C(*MS
moel an !se the #lo master to n the s!italesection of the !nergro!n o< rain.
;=
;aa=
;a=
(ac) Fig 3 - Catchment area
;a=
17
8/17/2019 St Sebastian South Diversion
12/43
;ae=
;af=
(ag) Fig 4 - Schematic diagram of HEC-HMS
;ah= *'C *MS esign presents peak ischarges /
rele,ant catchments as a o!tp!t of h/ro graphs7
to str!ct!ral esign. %he s! catchment areas
etails are7
;ai=
(a) !a"#e $1 - %np&t data to HEC-HMS
;ak=
!al" Location
!a%" *
!an"M
!ao"+
!ap"S
!a,"Di
;ar= Ar
ea
;as=-
;at=-.
;a!=-.
;a,=&
;a=5.
;a
8/17/2019 St Sebastian South Diversion
13/43
asi
n 1;0= S!
asi
n 2
;k=
-
;l=
-.
;m=
-.;n=
8
;o=
1.
;p= S!
asi
n 3
;>=
-
;r=
-.
;s=
-.;t=
8
;!=
-.
;,= P!
mpin
g
stati
on
;= ;
8/17/2019 St Sebastian South Diversion
14/43
- Functional Description;cg=
;ch= %he intene f!nction of this proposal is that
the con,e/ance of 9oo ater from @orris Canal 7
9oo ater ischarge from So!th )ock P!mping
Station an 9oo ater from catchment of tonger shape @orthern #elicons of 'ast Beira )ake
into the Sea / passing the Beira )ake to mitigate
the 9ooing sit!ation in the areas of Pettha7
G!nasinghe P!ra7 Maligaatta an @orris Canal as
the con,e/ance capacit/ of circ!lar eir o!tfall in
Galle #ace )ake at +l Parliament Premises is not
ae>!ate to cope ith peak 9oo of the Beira )ake
rainage asin. %hree options co!l e consiere
as follos.;ci=
!c." /ption 1
;ck= Constr!ction of !nergro!n i,ersion canal
from location A of @orris canal !p to the location B
here the St.Seastian So!th canal con9!ence.
After that the 9o i,erte into the Sea o!t fall
canal onstream to the Macc!l!m gate ,ia
!nergro!n canal along the W ' Bastian Maatha
an +lcotte Maatha;'(#= pro,ie that the nger
shape @orthern #elicons of 'ast Beira )ake ha,e
to e lle. Also poll!te r/ eather 9o of the
@orris Canal has to e alloe to 9o into the
Beira )ake to pre,ent the ater !nalance.
%herefore r/ eather 9o ith poll!te ater of
@orris Canal has to e sent thro!gh some lter
meia;horiontal ee Be= to impro,e the ater
>!alit/.;cl=
!c%" /ption 2
;cn= Constr!ction of a eir at the location D to
maintain the minim!m ater le,el of Beira )ake at
1.& mMS) an constr!ction of o!tlet canal !p to
the sea o!t fall canal onstream to the Maccal!m
)ock Gate along the W ' Bastian Maatha an the
+lcott Maatha. ;'(#= n this option also poll!te
23
8/17/2019 St Sebastian South Diversion
15/43
ater in r/ eather 9o of @orris Canal has to e
sent thro!gh some lter meia ;horiontal ree
e= to impro,e the ater >!alit/. Constr!ct the
Crossing str!ct!re at C to pre,ent the ater from
Beira )ake.
!co"!cp"/ption 3
;c>= Constr!ction of i,ersion canal from location
A of @orris Canal !pto the location B to an
constr!ction of eir at location D to maintain the
ater le,el at 1.& m MS) an constr!ction of
o!tlet canal !pto the sea o!tfall canal onstream
to the Maccal!m )ock Gate along the W ( ' Bastian
Maatha an the +lcott Maatha ;'(#= isconnect
the interconnection of ater o/ at location C.
;cr=
;cs= +ption 2 is consiere as more feasile option
since it has the least ork scope an hence it
inc!rre the least cost. %herefore7 this report
contains the technical asis for +ption 2 onl/.
;ct=
;c!=
25
8/17/2019 St Sebastian South Diversion
16/43
;c,=
(c')Fig - ption 1;c
8/17/2019 St Sebastian South Diversion
17/43
;c/=
;c=
;a=#ig. " ( +ption 2
;=
29
8/17/2019 St Sebastian South Diversion
18/43
(dc)
;=
;e=#ig.$ ( +ption 3
31
8/17/2019 St Sebastian South Diversion
19/43
;f= %he proposal can e s!mmarie as follos ;g=
;h=
&anal Stretch
0t
• Drain str!ct!re
;i= Section 4.- < 2.$5 I &5- m
&5-m. efer #ig.1.2.1
;0= Section 23.$5 < 2.5 I "-- m
;k=
• Weir;1.&5 m MS) = I -1 @o.
• Close crossing str!ct!re I -1 @o.
;l=
;m=
;n=
;o=;p=
33
Proposed Closed
crossing structure
8/17/2019 St Sebastian South Diversion
20/43
;>=
;r=
;s=
;t=
35
g* + - ,roposed improement
8/17/2019 St Sebastian South Diversion
21/43
Technical Basis;!=
!d"$roposed Weir
!d("
;!ire rop D
• Determine tail ater conitions at esign
ischarge
• Choose a str!ct!re sie
;eh=
;ei=
!e." For /gee (eir
!ek"
;el= E Design I C ) e *e 32
;em= E Design I Design Discharge
;en= C I Coe?icient of Discharge
;eo= ) e I '?ecti,e length of Spill
a/ crest
;ep= *e I %otal hea o,er the crest
incl!ing the ,elocit/ hea
37
8/17/2019 St Sebastian South Diversion
22/43
Crest axisF1 = 0.5 Hd
F2 = 0.2 Hd
a = 0.175 Hd
b = 0.282 Hd
Dis curve in accordance it! e"
#ertical
C $%rigin or apex. o& crest'a
b
r1
r2
;e>=
;er=
;es=
(et) Fig . - E#ements of /appe-shaped crest pro0#e;e!=;e,=;e= Weir coe?icient I 2.21
;e
8/17/2019 St Sebastian South Diversion
23/43
;f0=
;fk=
;9=
;fm=
;fn=
;fo=(fp) Fig 1$ - Crest of the +gee spill a/etermine energ dissipaters and stilling
basins
;f>=
;fr=
!fs" $rotection against scour do(nstrea%
of da%s
!ft"
;f!= %he ,elocit/ of 9o onstream from eir isala/s high an it erosions the e an ank of
ri,er elo the eir. %here are man/ t/pes of
e,ices. %o issipate energ/ of 9o onstream in
orer to make the 9o enter the earth canal at a
safe ,elocit/
;f,=
;f= %he most fre>!entl/ !se energ/ issipater is
a h/ra!lic 0!mp.
;f
8/17/2019 St Sebastian South Diversion
24/43
;g= H!mp e>!ation
Y2
Y1 =
1
2√ (1+8 F 12−1)
;ge=
;gf=
;gg=;gh=
;gi=
;g0=
;gk=
;gl=
;gm=
;gn=
;go=
(gp) Fig 11 - ,attern of Hdraic ∓g>=
;gr=
;gs= Where K 1 an K 2 are epth efore an
after the 0!mp7 respecti,el/
;gt=
;g!= L 1 I 9o ,elocit/ efore the 0!mp
;g,= g I gra,it/ acceleration7 an
F 1=
V 1
√ gy 1
!g(" Length of .u%p
!g)"
;g/= man/ st!ies for length of 0!mp ha,e een
con!cte. %he e>!ation gi,es the length of 0!mp
%he length of 0!mp ma/ e ene as the istance
from the point here the 0et ith a s!percritical
,elocit/ rises to the point here the streaming 9o
meets the se>!ent epth of s!critical 9o.
;g=
;ha= length of h/ra!lic 0!mp on a horiontal 9oor
;h=
;hc= ) 0 I 5 ;K 2 ( K 1= ............../
Bakhetett7 Matke
;h=
43
8/17/2019 St Sebastian South Diversion
25/43
;he= %he energ/ loss in a h/ra!lic 0!mp on
horiontal 9oor ma/ e comp!te / the folloing
e>!ation.
;hf=
;hg= H L=(Y2-Y1)
4Y2Y1;hh=
;hi= When *) I *ea lost thro!gh the
h/ra!lic 0!mp;h0= K 2 I Depth after the 0!mp7
an
;hk= K 1 I epth efore the 0!mp
;hl=
(hm) Note – subcritical depth y 2 only
depends on y 1 and the Froude number.
;hn=
;ho=
;hp=
;h>=
;hr=
;hs=!ht"
;h!=
;h,=
;h=
(hx)
(h)
(h)
(ia)
45
8/17/2019 St Sebastian South Diversion
26/43
(i")
(ic)Fig 12 - Hdraic &mp interpreted " speci0c
energ c&re(id)
(ie) oss of energy !if" %heoretical epth after 0!mp F alternate
depth!ig" Act!al epth after 0!mp F se,uent depth
;ih= #rom Calc!lation
;ii= > I E esign) e
E I 2- m3s )e I 3- m;i0= K 1 I -.2 m;ik= K 2 I -." m;il= #ro!e n!mer I 2.5
;im= H!mp length I 2 m
;in=;io=
• Choose a s!itale stilling asin
;ip=
;i>= #1 I 2.5
;ir=
;is= %here for in this case a simple concrete apron
of length 5;K 1(K 2= is generall/ s!?icient to
pro,ie protection in the region of h/ra!lic
0!mp7
;it=
;i!= D!e to issipation of energ/ of ater 9oing
o,er eirs propose stilling asin to pre,ent
possile erosion an sco!ring !e to high
,elocities. shon Fig....................
;i,=
!i(" )ength of stilling asin I 5; 2 4 1" 5 267
%
!i)"
!i"
47
8/17/2019 St Sebastian South Diversion
27/43
!i8"
(a)
(") Fig 13 - Simp#e horionta# apron for sti##ing "asin
!.c"!.d" Bo) drain
;0e=
;0f= )oa Conitions
;0g=
;0h= i. 'arth press!re
;0i=
;00= Soil press!re calc!late as triang!larl/
istri!te loa7 an ater press!re
calc!late as triang!larl/ istri!te.;0k= %he folloing earth press!re coe?icient
shall e !se in the esign calc!lation:
;0l=
;0m= ;a= Coe?icient of earth press!re at rest
;o=
;0n= ;Hak/s '>!ation=
;0o= o I 1(Sin N
;0p=
;0>= ;= Coe?icient of acti,e earth press!re ; A =
;0r= ;Col!ms e>!ation=
49
8/17/2019 St Sebastian South Diversion
28/43
$(s'
( + )Cos( +ω)¿
cos¿sin(∅+δ )sin(∅−ω)
¿cos 2 Cos( + ) \{1+√ ¿
K A=Cos2(∅ - )
¿;0t=
;0!=
;0,= ;c= Coe?icient of acti,e passi,e press!re ; p=
;0= ;Col!ms e>!ation=
$(x'
( + )Cos( +ω)¿
cos¿sin(∅+δ )sin (∅−ω)
¿cos 2 Cos( + ) \{1-√ ¿
K P=Cos2(∅ - )
¿
$()'
;0=
;ka= ;= Coe?icient of acti,e earth press!re!ring 'arth>!ake ; A'=7is not taken is to
acco!nt
;k=
;kc= Where7
;k=
;ke= N : nternal angle friction of soil
;kf= N : '?ecti,e angle of internal
friction soil
;kg= O : Angle eteen all
s!rface an ,ertical irection
;kh= : Slope of ackll
;ki= : Angle of all friction
;k0=
;kk=
51
8/17/2019 St Sebastian South Diversion
29/43
;kl=
;km=
;kn=
;ko=
;kp= */ra!lic press!re
;k>=;kr= nternal h/ra!lic press!re also calc!late as
triang!lar loaing internall/
;ks=
;kt= ii Dea loa
;k!=
;k,= %he eight of the materials an part of the
str!ct!re that are str!ct!ral elements7 !t
e
8/17/2019 St Sebastian South Diversion
30/43
;li= Compacte ll ;Soil= 18
;l0= Gra,elBo!lers 18
;lk= )ight eight aggregate concrete 15
( 1$
;ll= Cement mortar 21.5
;lm= Waterproof asphalt 22
;ln=
;lo= ;iii= )i,e loa
;lp=
;l>= )i,e loas are ene as loas !e
to ,ehicle or peestrian tra?ic. li,e loas are
f!rther classie in to primar/ li,e
loas an seconar/ li,e loas as follos:(
;lr=
;ls= ;a= Primar/ li,e loas
;lt= Lertical li,e loas7 consiere as static
loas7 !e to irectl/ to the mass of tra?ic.
;l!= *A loaing an *B loaing as per
BS54-- fall !ner this categor/.
;l,= *A ( )oaing
;l= 6niforml/ istri!te loa per one
notional lane
;l
8/17/2019 St Sebastian South Diversion
31/43
;me= *B ( )oaing
;mf= ;i= 6nit loa
;mg= %he g!re elo shos the plan an
a!al to the 1-@ per a!are contact area ma/ e ass!me7
!sing the same e?ecti,e press!re.
;mn= #oot a/ li,e
57
8/17/2019 St Sebastian South Diversion
32/43
;mo= )Q 3-m I 5.- k@m2
;mp= )R 3-m I P < 5.- k@m2
;m>= here7 ) is the loae length ;in
m=
;mr= P I 6D)3-
;ms= ;= Seconar/ li,e loa
;mt= )i,e loa !e to change in spee or
irection of the ,ehicle tra?ic an loa
!e to ,ehicle raking shall fall !ner this
categor/.
(mu) (!ource "! #$%% & 'art 2)
(m)
;m= Breaking loa;m
8/17/2019 St Sebastian South Diversion
33/43
;ni= Wall eight Sla eight )ateral 'arth
press!re */ro static on alls nternal
*/ra!lic Press!re on internal alls *B
)oaing
;n0=
;nk= Combination %2
;nl= Wall eight Sla eight )ateral 'arth
press!re */ro static on alls nternal
*/ra!lic Press!re on internal alls *A
)oaing
;nm=
(nn) Combination %
;no= Wall eight Sla eight )ateral 'arth
press!re */ro static on alls *B)oaing *A )oaing
(np) Combination %$
;n>= Wall eight Sla eight )ateral 'arth
press!re */ro static on alls nternal
*/ra!lic Press!re on alls
;nr=
(ns) Combination %#
;nt= Wall eight Sla eight )ateral 'arthpress!re */ro static on alls
;n!=
(n) Combination %*
;n= Wall eight Sla eight )ateral 'arth
press!re */ro static on alls nternal
*/ra!lic Press!re on alls *B )oaing
*A )oaing.
;n
8/17/2019 St Sebastian South Diversion
34/43
non( prestresse steel reinforcement7 the mo!l!s
of elasticit/7 's 7 ma/ e taken as 27---7--- or
271--7--- kg S>.cm.
;o=
;oe= ;ii= %he folloing minim!m concrete co,er
shall e pro,ie for reinforce concrete.;of=
(og) !a"#e 2 - etai#s of minim&m concrete coer
;oh=
!oi" &ondition
!o." 9
ni
t
!
%
%"
!ol"
S
!o%"
B
;on= 1. @ot e= 2. mportant str!ct!res an
str!ct!res e
8/17/2019 St Sebastian South Diversion
35/43
;pf= ;,= Design of reinforcement.
;pg=
;ph= %he folloing esign proce!re as
folloe accoring to BS &11- : part 1 :
18&5
;pi=(pj) f /0/ say doubly reinforced
(p)
;pl= %hen e,al!ate I U-.5V;-.25(-.8= an it
sho!l not e greater than -.85
;pm= < I ;(=-.45
;pn= AsI ;(
=f c!2-.&$f/;(=
;po= As I fc!2-.&$f/ As
;pp=
;p>= an f d3x exceeds %.$4 the
compression stress ill e less than -.&$f/
sho!l e otaine from BS&11- part
-1
;pr=
;ps= B!t if e !se singl/ reinforcemente pro,ie compression reinforcement also
to o,ercome practical prolems.
;pt=
;p!= ;,i= Crack ith of einforce
concrete sections
;p,=
;p= #or the calc!lation of crack iths of
sections the folloing proce!re mentione in
the J einforce Concrete Designers *anBook 7 Charles '. e/nols an Hames C.
Steeman7 1-th eition as folloe.
;p
8/17/2019 St Sebastian South Diversion
36/43
• Determine moment Ms at section
concerne from elastic anal/sis ith
ser,ice loa
• Determine instantaneo!s ,al!e elastic
mo!lar of concrete 'c
• ',al!ate < an !sing the folloing
ea=
;>= c= IU3;e= fs I Ms;As < =
;>f=
• Calc!late strain ]1
;>g= ]1 I fs2 < 1-5U;a(i= ]m I ]1 ( ; t ;a(
8/17/2019 St Sebastian South Diversion
37/43
;>s= I )e,er arm
;>t= 7 t I reath of the section
;>!= Ms I Ma,= Wr I With of the crack.
;>= acr I Minim!m istance to the
steel s!rface
;>/= Crack ith is limite elo -.2mm
;>=
;ra= ;,i= Partial safet/ factor f1 an f3
!se in the limit state anal/sis are as follos:;r=
;rc= ^f 3 is 1.1
;r= ^f 1 is shon elo
;re=
;rf=
;rg=
;rh=
;ri=
;r0=
;rk=
;rl=
(rm) !a"#e 3 - Safet factors for SLS 5 6LS
69
8/17/2019 St Sebastian South Diversion
38/43
71
$a' Structure
$b' S
L
S
$c' 9
L
S
$d' Superstruct
ure;e= ;f=
$g' Dea )oa
;concrete=
$!' 1.
-
-
$i' 1.
2
-
$(' *A t/pe
$*' 1
.
2
-
$l' 1
.
5
-
$+' )i,e )oas $n' 1
.
1
-
$o' 1
.
3
-
$p' *B t/pe
$s' Breaking
load;t= ;!=
$v' *A t/pe
$' 1
.
-
-
$x' 1
.
2
5
$)' *B t/pe
$,' 1
.
-
-
$aa'1
.
1
-
$ab'#oot path
)oa
$ac'1
.
-
-
$ad'1
.
5
-$ae'Substructur
e
;af= ;ag=
$a!'Self eight
$ai' 1
.-
-
$a(' 1
.2
-
$a*''arth
press!re
$al' 1
.
-
-
$a+'
1.5-
$an')i,e )oas
S!rcharge
$ao'1
.
-
-
$ap'1
.
5
-
$a"'#ill eight
$ar' 1
.
-
-
$as'1
.
5
-
8/17/2019 St Sebastian South Diversion
39/43
;ro=
;rp=
;r>=
;rr=
;rs=
;rt=;r!=
;r,=
;r=
;r
8/17/2019 St Sebastian South Diversion
40/43
;s>=
!sr" Soil
;ss= %he emankment material an
ack lling soil e
8/17/2019 St Sebastian South Diversion
41/43
;tk=
;tl=
(tm) Fig* 1 - Front E#eation of 7eir
;tn=
;to=
;tp=
;t>=
;tr=
;ts=
(tt) Fig* 18 - Spi##'a #ongit&dina# section
77
8/17/2019 St Sebastian South Diversion
42/43
;t!=
;t,=
;t=
;t
8/17/2019 St Sebastian South Diversion
43/43
: &ost ;sti%ate!t8"
;!a= ;!= ;!c= ;!=!ue"< !uf" D;S&+=$27-3"7---
.--
;,r=
!s" G+*=D T/T*L ;,t=
!u"-2C33-C777677
!"(')