18
STA Investing in the Future New Research & Technical Guidance Fire Performance In Use Project AGM Update 16 th May 2019
Transcript
Page 1: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

STA Investing in the Future

New Research & Technical Guidance

Fire Performance In Use Project

AGM Update – 16th May 2019

Page 2: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Background

Live Project – 1st May 18

Future Proofing Project

Grow & Protect our Market

Grenfell watershed moment

Hackitt & Stollard Reviews – potential Shift to EN systems testing

DOE Ireland – Withdrew BS testing

Scotland - Section 2 (expected Oct 2019)

England - Approved Document B (expected 2020)

During 2020 Building Regulation Changes Implemented

Page 3: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Outputs & Partners

Recognised Industry Guidance

Fire Performance In Use

Pattern Book, EN Tested Common Systems

Evidence backed guidance

Good Practise Recommendations

Supported by verifiers (to be confirmed)

Scope – Timber Frame Construction

Major STA deliverable – not possible in isolation

Engineered Wood

Products Committee

Page 4: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Progress & Outlook

Gap analysis, plasterboard assessments & Ph1 Testing (7) – complete

Gathered test data & created library of results – STA, EWPC, TRA & ITFMA

Mid-Way Review – complete & mobilising writing of guidance

Ph2 Testing (6) & more research, await reg changes

Target to complete – 31st Dec 2019

Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

Preparation & Board sign off Sign Off

Month Number 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Project Start Meet

WP 1 - Mobilisation & Gap Analysis

WP 2 - Research - Test protocols & component analysis

WP 3 - EN fire testing & fire assessments MobilisePH1

Test 1 & 2PH1 Test 3 PH1 Test 4

PH1

Test 5, 6 & 7

Phase 2

ProposalMobilise

PH2

Tests 1-6Report

WP 4 - Guidance, peer review and sign off Interim

ReviewDraft 1 Draft 2 Final

WP 5 - Publish & dissemination AGM Publish

PIR Variability Testing

Q1 2019 Q2 2019 Q3 2019 Q4 2019

AD-B & Sect 6 Changes

Gap Analysis & Report

Load Ratio Paper & Plasterboard Variability Testing

STA In Use EN Fire Research Project Q4 2018Q2 2018 Q3 2018

Phase1 - Time Extension

Delay - More complex

Phase 2 - Time Extension

Page 5: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Costs, Funding & ContributorsTotal = £228,908 (3 out 56 TF Manufacturers Levies not paid)

Page 6: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Deliverables – Research Outputs

Gap Analysis – Research interest

UK Fire Design - BS5268:4.2 & BR128

BS5268 Component Additive Method - Fire Calcs

BS & EN Fire Testing Load Calculations

Timber Stud Charring - EN1995-2

P’brd Research - Vaxjo University

P’brd Drop Off Rate – NRCC research

TRADA Studies 1980’s

Page 7: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Deliverables - Research Outputs

Plasterboard Variability Research

H-TRIS - Unloaded test rig (not UKAS or BS/EN Std)

Material benchmarking – density & moisture

Water cooled sample holder & fixing solution

Type A & F Boards – Snapshot Comparisons

Differing suppliers & factory locations

3 x samples of each

Page 8: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Deliverables - Research Outputs

Fire Testing Load Ratio Paper

BS Load ratio calculation method (BS 5269:4.2 clause 2.3 - 1980)

EC5 & EN Load reduction factor method (EN 1995-1-2 - 2002)

Accidental fire load & limit state design

Hot & cold design states

Worse case – Flats v Bungalow

Walls (STA) & Floors (EWPC)

STA Fire Testing – EN loadings & EN:1365 test

Page 9: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Deliverables – Fire Testing (Phase:1)15mm Type A Boards

7 x Common walls used by sector

Plasterboard + VCL hard to stud

External walls – double socket BLH corner

30 & 60 minute options

Extra Thermocouples – research data

EN:1365-1 Furnace Tests & EN Loading Method

5 x BRE & 2 x Exova

Test No Rating Type

1 30 External Wall + 120 PIR @ 600 crs

2 60 External Wall + 120 PIR @ 600 crs

3 30 Int LB Wall (no OSB) @ 600 crs

4 60 Int LB Wall (no OSB) @ 600 crs

5 30 External Wall + 140 GW @ 600 crs

6 60 External Wall + 140 GW @ 600 crs

7 60 Party Wall E-WT-1 (no OSB) @ 600 crs &

18 kg/m² insulation

Page 10: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Deliverables – STA Fire Testing

Page 11: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

3RD Party Fire TestingITFMA Fire Testing – DOE Guidance

Shift to EN fire resistance testing

External make-up differs - thermal regs.

Tested solutions, junction detailing & specifications

Page 12: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

3rd Party Fire Testing

3rd Party Fire Testing (TF & Masonry)

Floors - Proprietary System Testing (30 & 60 minutes)

• I-Joists

• Metal Web

Roofs - Generic System Testing (30 Minutes)

• Truss Rafter Association

• Metal Plates

Comprehensive Database Information

EN 1365 Fire Resistance Testing

Data provided under NDA

Proprietary systems, could be referenced in STA guidance

Awaiting Regulation changes before issue

Common solutions for TF & Masonry

Engineered Wood

Products Committee

Page 13: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Final Things To Do

Ph:2 Fire Testing,12.5mm Type A

Repeat Tests 1-6

Provides options to clients

Improves understanding of EN testing impact

October 19 testing – Exova Warrington

Plasterboard Research,12.5mm Type AH-TRIS material sampling (UOE)

Repeat 15mm Type A

Insulation – Variability AssessmentPIR & Glasswool

Suppliers & Specifications

Previous Research

Test No Rating Type

1 30 External Wall + 120 PIR @ 600 crs

2 60 External Wall + 120 PIR @ 600 crs

3 30 Int LB Wall (no OSB) @ 600 crs

4 60 Int LB Wall (no OSB) @ 600 crs

5 30 External Wall + 140 GW @ 600 crs

6 60 External Wall + 140 GW @ 600 crs

Page 14: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Specific Testing & Generic Guidance

Testing = Specific

ComponentsGuidance = Generic

Components

Common Variables &

Classifications, for min of 3

suppliers/products/detailing

• Plasterboard Make

• Glass Wool Make

• PIR Make & Thickness

• Stud size

Page 15: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Route to Recognised Generic Guidance

Page 16: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Guidance Outlook

Interim Guidance

Specific in nature

Liaise with BRE to validate generic variables

Ideally some variables will be validated

STA Technical Advice Note

7 x Wall tests/materials and suppliers tested

Available to TF manufacturing member sponsors

Targeted 1st Sept 19

Final Guidance

Generic in nature

Variables validated by BRE

Recognised by verifiers – MHCLG, SBSD, NHBC, FPA

Comprehensive compendium information

Available to all STA members

Targeted 31st Dec 19

Page 17: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Final Guidance - Compendium Introduction

Foreword

Background

Endorsement

Governance, Liability & Use

EN Tested Systems

7 x STA Wall tests – 15mm Type A

6 x STA Wall tests – 12.5mm Type A (subject to results)

Proprietary Systems – Floors & Roofs (tbc)

Best Practise Recommendations

Construction Junctions – Detailing & Sequence

Firestopping, Cavity Barriers & Spandrels

Penetrations & Services, Critical Fire Seals

Cladding

Materials & Workmanship

Appendices – Summary Research Work (Lay Person)

Gap Analysis

Fire Testing, Heat Curves & Calculation Methodology

EN Load Reduction Factors

Materials - Plasterboard & Insulation Analysis

Page 18: STA Investing in the Future - Structural Timber · Report WP 4 - Guidance, peer review and sign off Interim Review Draft 1 Draft 2 Final WP 5 - Publish & dissemination AGM Publish

Summary

▪ Project is progressing well

▪ Test outcomes positive & much learning

▪ STA Investing in future - Value for Money

▪ Proactive future proofing project, readying for change

▪ Raises standards to EN compliance

▪ Enables growth & builds confidence in sector

▪ Recognised “Go To” Guidance for market/members/verifiers to use

▪ Credible, evidence backed, independent & peer reviewed

▪ Opportunity for recalibration & harmonisation

▪ IP owned & governed by STA

▪ Interim Guidance – Targeted 1st Sept 19 (specific)

▪ Final Guidance – Targeted 31st Dec 19 (generic)


Recommended