Stakeholder Focus Group (SFG)
12 June 2018 1
▪ Provideinputatprojectmilestones▪ SharePELinfowithyourorganizations▪ AttendSFGmeetingsthroughoutPELprocess
SFG Roles & Responsibilities
2
I-25 Central PEL Video
3
What is a Planning and Environmental Linkages (PEL) Study?
Atahigh-level,planningscale:
▪ Identifiescorridorneeds▪ Performsdetailedtrafficanalysis
▪ Definesandevaluatespotentialimprovementprojects▪ Reviewsexistingenvironmentalresourcesandpossibleimpactsfrom
proposedalternatives
▪ Developsavisionandimplementationplanforprioritieslargeandsmall
4
Study Overview
5
CDOTisconductingaPlanningandEnvironmentalLinkages(PEL)StudyofI-25betweenSantaFeDriveand20thStreet▪ 5-milesegmentofI-25
▪ Muchofthecorridorareremainingpartsofthe1950sValleyHighwayera
▪ MosttrafficinallofColorado
Project Schedule
6
Engaging the Community
25 May 2018 7
Who has been involved in the process so far?▪ Auraria Campus▪ CCD- OfficeofEconomic
Development▪ CCD- PublicWorks▪ CCD- CommunityPlanningand
Development▪ CDOT- ColoradoTransportation
ManagementCenter▪ Children’sMuseum▪ ColfaxBusinessImprovement
District(BID)▪ DenverAquarium▪ DenverBroncos▪ DenverCityCouncil:Brooks,Clark,
Espinoza,Ortega,Lopez
▪ DenverMayor’sOffice▪ DenverMetroChamberof
Commerce▪ DenverPoliceDepartment▪ ElitchGardens▪ FreightAdvisoryCouncil(FAC)▪ GreenwayFoundation▪ JeffersonParkUnitedNeighbors▪ JoshuaStation▪ MetropolitanFootballStadium
District▪ MileHighMinistries▪ PepsiCenter▪ RTD
25 May 2018 8
Data Collected
25 May 2018 9
Traffic Study Area
25 May 2018 10
▪ Thetrafficanalysisstudyareaismuchlargerthantheprojectstudyarea
Can I-25 be safer?
InfrastructureDeficiencies
HistoricalCrashData
11
Need: Improve Safety
Highnumberofcrashes1,000crashesperyearwithinprojectlimits
Colfax Ave
6th Ave
Alameda Ave
Need: Improve Safety
25 May 2018
Roadwaydeficiencies
12
Tightcurvesandchangingslopesalongthemainline
Narrowlanes Narrowshoulders Rampsaretooclosetogetherandhavetightcurves
25 May 2018 13
Morning Peak: 3 hoursEvening Peak: 5.5 hours
Typical peak travel times can be 3.5 times greater than free flow times and vary by up to 88%
Need: Reduce Traffic Congestion
Morethan250,000vehiclesperdayonsomeportionsofI-25
14
Can I-25 be safer?
InfrastructureDeficiencies
HistoricalCrashData
25 May 2018 15
Need: Improve Travel Time Reliability
Breakdowntypeincidentsimpacttravelreliability
25 May 2018 16
Connectivity
Forallmodesto,from,andacrossI-25
25 May 2018 17
Environmental Resources and Constraints
SouthPlatteRiverandTrail
RailroadNumerousparksandrecreationalopportunitiesalongthecorridor
Historicresources
Environmentaljusticecommunities
18
Areas of change
▪ Additionalstudiesexaminingsurroundinglandusesandthelocaltransportationnetwork
▪ MajorLandUsechanges▪ SunValley
▪ Elitches/RiverMile
▪ more
25 May 2018 19
What interactions are at play on the corridor?Safety• 3low-clearancebridges• Numerousgeometricdeficiencies
• 1,000crashesperyear
Environmental Considerations• 7majorareasofchange• ProximitytoS.PlatteRiverandrecreationalresources
Congestion• 250,000vehiclesperday• 8.5hoursofdailycongestion
Agency, Stakeholder, and Public Interests• Corridorvision• Neighborhoodconnectivity• Localaccessandlanduse
Purpose and Need
25 May 2018 20
Project Purpose
25 May 2018
ThepurposeoftherecommendedtransportationimprovementsintheI-25CentralCorridorbetweenapproximatelySantaFeDriveand20thStreetistoreducecongestionandimprovesafetyandtravel-timereliabilityforthemovementofpeopleandgoods.TheimprovementswillalsoconsideraccesstoandfromI-25aswellasconnectivityacrossI-25forbicycles,pedestrians,transitandlocaltraffic.
21
SFG Issues, Concerns, andIdeas for the
I-25 Central PEL
25 May 2018 22
InteractiveinputgatheringofSFGmembersusingcorridormaps
Next Steps
25 May 2018 23