Page 1: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 2: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Event Essex

Colne Road Coggeshall - Tey Road Marks Tey

Slight (less than 10 mins)

Contact: ID: 3533211

Period: 11-Jan-2016 07:00 To: 15-Jan-2016 17:00 Length: 8730 m

Diversion route eastbound and westbound 0700 - 1700 hrs due to local authority closure

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Bradwell - Marks Tey

Slight (less than 10 mins)

Contact: ID: 3581976

Period: 18-Jan-2016 21:00 To: 22-Jan-2016 20:35 Length: 11710 m

Traffic signals in both directions from 2000 hrs to 0600 hrs due to Electrical Works

Page 3: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Marks tey roundabout and bradwell

Slight (less than 10 mins)

Contact: ID: 3599030

Period: 21-Jan-2016 06:00 To: 21-Jan-2016 10:00 Length: 280 m

Traffic signals eastbound and westbound 0800 - 1600 hrs due to Horticulture works

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

OPP Nursery Coggeshall Road to just pass lay by A120 Braintree Es...

No Delay

Contact: ID: 3572501

Period: 25-Jan-2016 00:00 To: 27-Jan-2016 23:59 Length: 0 m

Safe Access to Underground BT footway and carriageway boxes for fibre cabling and jointing works and duct cleaning in existing duct. Required for new customer connection.. This is a Project of 2 permits.

*****************************************************************************************************************************************************************

Page 4: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Outside the Reclamation Centre west of Marks Tey

Slight (less than 10 mins)

Contact: ID: 3595145

Period: 27-Jan-2016 20:45 To: 28-Jan-2016 04:45 Length: 240 m

Temporary Traffic signals for emergency repairs to 2No failing manholes by Anglian Water

*****************************************************************************************************************************************************************

A120 Planned Works Essex

A120 outside 184 Coggeshall Road west of Marks Tey outside Reclamat...

No Delay

Contact: ID: 3596497

Period: 27-Jan-2016 21:00 To: 27-Jan-2016 23:59 Length: 0 m

MANHOLE COVER AND FRAME REPLACEMENT..

*****************************************************************************************************************************************************************

A120 Planned Works Essex

A120 outside number 204 Coggeshall Road, eastbound before entering ...

No Delay

Contact: ID: 3596479

Period: 27-Jan-2016 21:00 To: 27-Jan-2016 23:59 Length: 0 m

REPLACE DEFECTIVE MANHOLE COVER AND FRAME.

Page 5: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 6: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Bradwell

No Delay

Contact: ID: 3608258

Period: 06-Feb-2016 20:45 To: 06-Feb-2016 23:20 Length: 780 m

Traffic signals both direction 2000 0430 due to electrical works

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Stebbing

Slight (less than 10 mins)

Contact: ID: 3613277

Period: 09-Feb-2016 22:45 To: 10-Feb-2016 03:25 Length: 1130 m

Lane 2 closure in both directions for safety barrier repairs

*****************************************************************************************************************************************************************

Page 7: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 8: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Event Essex

A131 - B1024

Slight (less than 10 mins)

Contact: ID: 3644726

Period: 03-Mar-2016 20:00 To: 04-Mar-2016 06:00 Length: 8460 m

Diversion route eastbound and westbound 2000 - 0600 hrs due to local authority closure of colchester road

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 9: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Event Essex

Feering road- Old road Marks tey

Slight (less than 10 mins)

Contact: ID: 3631985

Period: 04-Mar-2016 09:00 To: 11-Mar-2016 18:00 Length: 1900 m

diversion route eastbound and westbound 0900 - 1800 hrs due to local closue of elm lane

*****************************************************************************************************************************************************************

A120 Planned Works Essex

London Road slip - felsted slip

Slight (less than 10 mins)

Contact: ID: 3616039

Period: 04-Mar-2016 21:00 To: 06-Mar-2016 01:55 Length: 21580 m

Lane closure eastbound and westbound 2000 - 0500 hrs due to litter clearence

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

SECTION 81/CCH REF 1R3357, 200M EAST OF BP GARAGE , A120 FROM J A13...

No Delay

Contact: ID: 3657558

Period: 11-Mar-2016 16:10 To: 16-Mar-2016 23:59 Length: 0 m

Replace 1 jointbox frame and cover(s) (1220mm x 680mm) in Carriageway.

Page 10: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Incident Essex

Braintree A131 to Marks Tey

No Delay

Contact: ID: 3664766

Period: 18-Mar-2016 09:05 To: 18-Mar-2016 13:25 Length: 1280 m

A120 closure both ways due to RTC

Page 11: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Colne road Jct - A120 Westbound lane Coggeshall

Moderate (10 - 30 mins)

Contact: ID: 3440936

Period: 29-Mar-2016 20:30 To: 30-Mar-2016 02:50 Length: 250 m

Traffic signals westbound 2000 - 0600 hrs due to carriageway repair

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Hollies road jct bradwell

Slight (less than 10 mins)

Contact: ID: 3441005

Period: 30-Mar-2016 20:00 To: 30-Mar-2016 23:50 Length: 270 m

Traffic signals westbound 2000 - 0600 hrs due to carriageway repair

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Bridge Hall Road Jct

Slight (less than 10 mins)

Contact: ID: 3441018

Period: 30-Mar-2016 23:58 To: 31-Mar-2016 02:20 Length: 320 m

traffic signals eastbound 2000 - 0600 hrs due to carriageway repair

*****************************************************************************************************************************************************************

Page 12: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Marks Farm RABT to Marks Tey

No Delay

Contact: ID: 3684224

Period: 06-Apr-2016 22:40 To: 08-Apr-2016 04:00 Length: 2130 m

A120 Traffic Signals both ways 2030 - 0530 hrs due to carriage repairs.

*****************************************************************************************************************************************************************

Page 13: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Marks Farm RABT to Marks Tey

No Delay

Contact: ID: 3689873

Period: 11-Apr-2016 22:35 To: 13-Apr-2016 05:15 Length: 2130 m

A120 Traffic Signals both ways 2030 - 0530 hrs due to carriage repairs.

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

A120 from near outside Bridge Farm to near junction with A120 round...

No Delay

Contact: ID: 3674191

Period: 12-Apr-2016 20:00 To: 13-Apr-2016 06:00 Length: 0 m

Safe Access to Underground BT footway and carriageway boxes for fibre cabling and jointing works in existing duct. Required for new customer connection..

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Outside Gainsford House. c\w.

No Delay

Contact: ID: 3617783

Period: 14-Apr-2016 20:00 To: 14-Apr-2016 23:59 Length: 0 m

Connections Small Works:ALTERATION: OVERHEAD TO UNDERGROUND::Manned 2-way lights to allow safe working, carried out overnight (20:00 to 06:00). Manned 2-way lights to allow safe working, carried out overnight (20:00 to 06:00).

*****************************************************************************************************************************************************************

Page 14: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

O/S THE CHALDECOTT, A120 FROM J A131/B1256 TO J B1024 NORTH OF COGG...

Slight (less than 10 mins)

Contact: ID: 3457651

Period: 20-Apr-2016 00:00 To: 21-Apr-2016 02:50 Length: 0 m

Remedial reinstatement 2.0m in c/w.

*****************************************************************************************************************************************************************

Page 15: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

APPROX 20MTS WEST FROM JNC WTH THE STREET ON , A120 FROM J A131/B12...

Slight (less than 10 mins)

Contact: ID: 3477474

Period: 21-Apr-2016 00:00 To: 22-Apr-2016 06:00 Length: 0 m

Remedial reinstatement 2m in c/w.

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 16: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 17: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 18: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

M-tey to Marks Farm

No Delay

Contact: ID: 3718109

Period: 04-May-2016 21:55 To: 07-May-2016 01:05 Length: 2810 m

Traffic signals for lane closure in both directions 21:00 to 05:00hrs due to carriageway reconstruction

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Event Essex

A12 J25 Marks Tey to East Street Coggeshall

Slight (less than 10 mins)

Contact: ID: 3701126

Period: 09-May-2016 07:30 To: 28-May-2016 18:00 Length: 5040 m

Diversion route in both directions for works carried out on London Road - 07:30 - 18:00

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 19: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Pakestone to Stansted

No Delay

Contact: ID: 3731957

Period: 16-May-2016 22:20 To: 17-May-2016 04:40 Length: 114570 m

Mobile lane closure both directions 2000 to 0530 due to Horticulture (Cutting & Planting)

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 20: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Planned Works Essex

FROM JCT OF MOTTS LANE TO O/S GARAGE ON A120 FROM J B1024 TO J A12

No Delay

Contact: ID: 3700580

Period: 24-May-2016 20:00 To: 07-Jun-2016 06:00 Length: 0 m

COLCHESTER - 325597 - BLOCKAGES Excavate onto BT ducts for the clearance of duct blockages in FW/VERGE/CW to facilitate spine cabling works..

*****************************************************************************************************************************************************************

A120 Event Essex

Coggeshall Road - Ashbury Drive to Godmans Lane, Marks Tey

Slight (less than 10 mins)

Contact: ID: 3701082

Period: 31-May-2016 07:30 To: 11-Jun-2016 18:00 Length: 560 m

Diversion route in both directions for works carried out on Ashbury Drive and Godmans Lane

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Parkestone to Stansted

Slight (less than 10 mins)

Contact: ID: 3747695

Period: 01-Jun-2016 20:35 To: 03-Jun-2016 22:40 Length: 43990 m

Mobile lane closure in both directions from 2000 hrs to 0530 hrs due to Horticulture works

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 21: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

A120 Bradwell-Parkeston

No Delay

Contact: ID: 3758967

Period: 10-Jun-2016 20:30 To: 11-Jun-2016 02:00 Length: 114570 m

Lane closure in both directions 20:00 to 06:00 due to Horticulture (Cutting & Planting)

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 22: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Incident Essex

A120 Bradwell

No Delay

Contact: ID: 3767098

Period: 20-Jun-2016 03:55 To: 20-Jun-2016 04:40 Length: 530 m

Lane closure 0355 to 0440 due to incident

*****************************************************************************************************************************************************************

A120 Planned Works Essex

JNC WITH OLD LONDON ROAD ON A120 FROM J B1024 TO J A12 BRAINTREE ESSEX

No Delay

Contact: ID: 3753546

Period: 20-Jun-2016 20:00 To: 01-Jul-2016 06:00 Length: 0 m

MARKS TEY - 8 - 328503 - 328506 - 329440 - POWER: POWER INSTALLATION. Excavate to expose low voltage cable for Power Connection and lay approx 37m duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site..

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

OUTSIDE PUMP STATION

No Delay

Contact: ID: 3768603

Period: 20-Jun-2016 22:00 To: 21-Jun-2016 23:59 Length: 0 m

EMERGENCY REPLACEMENT OF MANHOLE COVER IN CARRIAGEWAY. MANHOLE SUNK..

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

100m west of Old London Road, Marks Tey

No Delay

Contact:

Period: 20-Jun-2016 22:00 To: 21-Jun-2016 03:45 Length: 100 m

Temporary traffic signals in both directions to replace failing manhole cover - 22:00 to 05:00

Page 23: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Harwich to Stanstead

Slight (less than 10 mins)

Contact: ID: 3767472

Period: 20-Jun-2016 22:45 To: 25-Jun-2016 02:00 Length: 129100 m

Mobile lane closure for horticultural works

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Marks Tey to Church Lane

Slight (less than 10 mins)

Contact: ID: 3766067

Period: 21-Jun-2016 20:05 To: 25-Jun-2016 06:10 Length: 90 m

Eastbound and westbound technology works 2000 - 0600 hrs on behalf of Hire-A-Lite

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Event Essex

B1024 Colne Road to A12 J25 Marks Tey

Slight (less than 10 mins)

Contact: ID: 3701188

Period: 24-Jun-2016 19:45 To: 01-Jul-2016 03:20 Length: 6740 m

Diversion route in both directions for works carried out on London Road - 1930 - 0600 hrs

Page 24: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Harwich to Stanstead

Slight (less than 10 mins)

Contact: ID: 3774783

Period: 28-Jun-2016 22:40 To: 02-Jul-2016 01:00 Length: 129100 m

Mobile lane closure both directions for horticultural works

*****************************************************************************************************************************************************************

A120 Planned Works Essex

A120 BRADWELL

No Delay

Contact: ID: 3777659

Period: 02-Jul-2016 23:55 To: 03-Jul-2016 03:10 Length: 220 m

Lane Closure Westbound 20:00hr - 05:00hrs Due to Traffic signals

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Stanstead to Parkeston

No Delay

Contact: ID: 3782529

Period: 04-Jul-2016 20:15 To: 04-Jul-2016 21:20 Length: 114570 m

Mobile lane closure both directions 2000 to 0500 due to Horticulture (Cutting & Planting)

*****************************************************************************************************************************************************************

Page 25: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Planned Works Essex

A120 MARKS TEY JNC COGGESHALL

No Delay

Contact: ID: 3787335

Period: 07-Jul-2016 23:50 To: 08-Jul-2016 01:05 Length: 500 m

Lane Closure in Both directions 2000hrs - 0500hrs Due to Electrical works

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Outside Bridge Cottage on A120 From J A131/B1256 To J B1024 North O...

No Delay

Contact: ID: 3158692

Period: 20-Jul-2016 00:00 To: 21-Jul-2016 23:59 Length: 0 m

COGGESHALL - 296716 - INTERIM TO PERMANENT - in footway.

*****************************************************************************************************************************************************************

A120 Planned Works Essex

65 Blackwater Cottages

No Delay

Contact: ID: 3724118

Period: 20-Jul-2016 00:00 To: 21-Jul-2016 23:59 Length: 0 m

Proposed permanent reinstatement.

*****************************************************************************************************************************************************************

A120 Event Essex

A12 J25 Marks Tey to East Street Coggeshall

Slight (less than 10 mins)

Contact: ID: 3701156

Period: 01-Aug-2016 19:30 To: 03-Aug-2016 06:00 Length: 5040 m

Diversion route in both directions for works carried out on London Road - 19:30 - 06:00

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Stanstead to Parkeston

No Delay

Contact: ID: 3819906

Period: 05-Aug-2016 20:45 To: 05-Aug-2016 23:55 Length: 114570 m

Mobile lane closure both directions 2000 to 0500 due to Horticulture (Cutting & Planting)

Page 26: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Coggeshall

Slight (less than 10 mins)

Contact: ID: 3824729

Period: 10-Aug-2016 22:45 To: 12-Aug-2016 02:15 Length: 490 m

Traffic signals Eastbound from 2000 hrs to 0500 hrs due to Sign erection works

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Marks Tey

No Delay

Contact: ID: 3819889

Period: 10-Aug-2016 23:45 To: 12-Aug-2016 01:20 Length: 4170 m

Lane closure both directions 2000 to 0500 due to electrical works

*****************************************************************************************************************************************************************

A120 Planned Works Essex

A120 Coggeshall Rd from jnc with Great Tey Rd eastwards until opp n...

No Delay

Contact: ID: 3791021

Period: 15-Aug-2016 00:00 To: 16-Aug-2016 06:00 Length: 0 m

Desilt/Clean ManholeInstall 280m of cable in existing duct accessing footway / carriageway chambers along route.

Page 27: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

FROM Adj to Entrance to Pavillion TO Marks Tey RBT

No Delay

Contact: ID: 3754758

Period: 17-Aug-2016 00:00 To: 18-Aug-2016 23:59 Length: 0 m

Access to Underground structure - cabling for new customer connection.

*****************************************************************************************************************************************************************

A120 Planned Works Essex

From Marks Tey RBT for 90m eastward

No Delay

Contact: ID: 3754746

Period: 17-Aug-2016 21:00 To: 18-Aug-2016 06:00 Length: 0 m

Access to Underground structure - cabling for new customer connection.

*****************************************************************************************************************************************************************

Page 28: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Blackwater Bridge, Bradwell

Moderate (10 - 30 mins)

Contact: ID: 3825553

Period: 30-Aug-2016 20:40 To: 31-Aug-2016 02:15 Length: 640 m

Temporary traffic signals in both directions to carry out inspection survey of Bridge - 20:00 to 06:00

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

A120 E/B & W/B Coggeshall

Slight (less than 10 mins)

Contact: ID: 3846038

Period: 05-Sep-2016 22:30 To: 06-Sep-2016 04:10 Length: 2410 m

Traffic signals in both directions 20:00 to 05:00 due to Electrical works

Page 29: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Event Essex

Marks Tey Roundabout

Slight (less than 10 mins)

Contact: ID: 3753934

Period: 09-Sep-2016 20:00 To: 10-Sep-2016 06:00 Length: 110 m

Diversion route 2000 - 0600 hrs due to local authority closure

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Goodmans Lane Marks Tey

Slight (less than 10 mins)

Contact: ID: 3848957

Period: 12-Sep-2016 20:10 To: 23-Sep-2016 05:20 Length: 740 m

Eastbound and westbound traffic signals affecting both directions for utilities works - 20:00 to 05:00

*****************************************************************************************************************************************************************

Page 30: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Bradwell

Slight (less than 10 mins)

Contact: ID: 3862790

Period: 17-Sep-2016 21:15 To: 18-Sep-2016 03:55 Length: 110 m

Lane closure traffic signals eastbound 20:00 till 05:00 due to electrical works

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 31: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 32: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Stansted to Harwich

Slight (less than 10 mins)

Contact: ID: 3877067

Period: 30-Sep-2016 21:30 To: 01-Oct-2016 02:40 Length: 420 m

Lane 1 closure Eastbound & westbound 2000 - 0530hrs due to horticulture works

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

MARKS FARM / M11

No Delay

Contact: ID: 3880556

Period: 04-Oct-2016 22:45 To: 04-Oct-2016 23:15 Length: 5020 m

Mobile lane closure both directions 2000 - 0530 hrs due to Inspection/Survey

Page 33: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Planned Works Essex

15 Coggeshall Road to near junction Old London Road Braintree Essex...

No Delay

Contact: ID: 3842640

Period: 05-Oct-2016 00:00 To: 06-Oct-2016 23:59 Length: 0 m

Install 250m of cable in existing duct accessing footway / carriageway chambers along route.

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 34: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

M11 - Harwich

No Delay

Contact: ID: 3887991

Period: 12-Oct-2016 00:10 To: 14-Oct-2016 02:25 Length: 22180 m

Mobile lane closure both direction 2000 - 0530 hrs due to Horticulture (Cutting & Planting)

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

1585A120/614 - 1585A120/617 Coggeshall

No Delay

Contact: ID: 3898770

Period: 23-Oct-2016 22:45 To: 24-Oct-2016 03:30 Length: 1820 m

Temporary signals both ways Coggeshall 2000 - 0500 due to electrical works

*****************************************************************************************************************************************************************

A120 Event Essex

Great Tey Road to B1024

Slight (less than 10 mins)

Contact: ID: 3831920

Period: 24-Oct-2016 07:45 To: 28-Oct-2016 12:25 Length: 3450 m

Eastbound continuous 24 hr diversion route 0900 - 1700 hrs for the erection of signage

*****************************************************************************************************************************************************************

A120 Event Essex

A131 Marks Farm Rbt, Bratintree to Kings Lane

No Delay

Contact: ID: 3871478

Period: 24-Oct-2016 09:30 To: 25-Oct-2016 15:30 Length: 350 m

Eastbound diversion route 09:30 to 15:30 for utilities works on King's Lane Stisted near Braintree

Page 35: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 36: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

OS THE LEYS & OPP STISTED TURNING, A120, JTN OF KINGS LANE, BRAINTR...

No Delay

Contact: ID: 3925019

Period: 14-Nov-2016 08:27 To: 14-Nov-2016 23:59 Length: 0 m

Urgent 3 way PTS required to replace telegraph pole damaged by vehicle..

*****************************************************************************************************************************************************************

Page 37: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 38: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Planned Works Essex

63 Coggeshall Road, Bradwell

No Delay

Contact: ID: 3612132

Period: 01-Dec-2016 00:00 To: 01-Dec-2016 02:15 Length: 0 m

PERM REINSTATEMENT.

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Incident Essex

Between A12 and Braintree

Severe (more than 30 mins)

Contact: ID: 3948896

Period: 03-Dec-2016 06:45 To: 03-Dec-2016 12:10 Length: 6680 m

Road closure due to Incident, both directions closed

*****************************************************************************************************************************************************************

A120 Event Essex

Marks Farm Rbt to A12 J25

Slight (less than 10 mins)

Contact: ID: 3850319

Period: 03-Dec-2016 20:00 To: 05-Dec-2016 06:00 Length: 16120 m

Eastbound and westbound diversion routes 2000 - 0600 hrs on behalf of Essex Highways

*****************************************************************************************************************************************************************

Page 39: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Event Essex

B1024 Colchester Road to A12 J25 Marks Tey

Slight (less than 10 mins)

Contact: ID: 3850234

Period: 12-Dec-2016 20:00 To: 21-Dec-2016 06:00 Length: 5140 m

Eastbound and westbound diversion routes 2000 - 0600 hrs on behalf of Essex Highways

*****************************************************************************************************************************************************************

Page 40: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Planned Works Essex

APPROX 250 M SOUTH EAST FROM THE JUNC OF KINGS LANE ON A120 FROM J ...

Slight (less than 10 mins)

Contact: ID: 3966571

Period: 22-Dec-2016 20:00 To: 23-Dec-2016 06:00 Length: 0 m

BRAINTREE - 363446 - TRAFFIC MANAGEMENT to facilitate BT Openreach Fibre Cabling Works approx m with no Excavation..

*****************************************************************************************************************************************************************

A120 Event Essex

Great Tey Road to Colne Road

Slight (less than 10 mins)

Contact: j ID: 3919010

Period: 04-Jan-2017 09:30 To: 04-Jan-2017 15:30 Length: 4580 m

Eastbound and westbound diversion routes 0930 - 1530 hrs on behalf of A Plant Lux

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 41: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 42: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Marks Tey Rbt to B1024

Moderate (10 - 30 mins)

Contact: ID: 3668886

Period: 11-Jan-2017 20:40 To: 12-Jan-2017 04:50 Length: 5140 m

Eastbound and westbound carriageway closure 2000 - 0600 hrs due to carriageway repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 43: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Event Essex

Great Tey Road to Colne Road

Slight (less than 10 mins)

Contact: j ID: 3946440

Period: 21-Jan-2017 09:30 To: 22-Jan-2017 15:30 Length: 4580 m

Eastbound and westbound diversion routes 0930 - 1530 hrs on behalf of A Plant

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Marks Tey Rbt to B1024

Moderate (10 - 30 mins)

Contact: ID: 3965162

Period: 24-Jan-2017 19:58 To: 04-Feb-2017 02:15 Length: 5130 m

Eastbound and westbound carriageway closure 2000 - 0600 hrs due to carriageway repair works on behalf of Interserve TM

Page 44: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Incident Essex

Coggeshall

No Delay

Contact: ID: 4001347

Period: 27-Jan-2017 12:16 To: 27-Jan-2017 15:10 Length: 14630 m

carriageway closure both directions 1200 to 1700 due to incident

Page 45: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 46: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 47: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Planned Works Essex

FEEDER PILLAR FP3, AT THE MARKS TEY ROUNDABOUT . f\w.

No Delay

Contact: ID: 4021168

Period: 27-Feb-2017 00:00 To: 13-Mar-2017 23:59 Length: 0 m

Connections Highway Services:WORKS FOR ROAD PURPOSES: (NOTICE FOR INFORMATION ONLY):5X DISCONNECTIONS 4X NEW SERVICES. 5X DISCONNECTIONS 4X NEW SERVICES.

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 48: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 49: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Parkeston/Stansted

No Delay

Contact: ID: 4047604

Period: 06-Mar-2017 23:05 To: 07-Mar-2017 04:00 Length: 2950 m

Mobile lane closure both directions 2000hrs - 0530hrs due to Horticulture works

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

APX 230M SE FROM TENNIS COURT ON A120 FROM J A131/B1256 TO J B1024 ...

No Delay

Contact: ID: 4038644

Period: 09-Mar-2017 00:00 To: 13-Mar-2017 23:59 Length: 0 m

COGGESHALL - 380235 - Defective Frame and Cover IN VERGE.

*****************************************************************************************************************************************************************

Page 50: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

ir

*****************************************************************************************************************************************************************

A120 Event Essex

Marks Farm to Marks Tey

Slight (less than 10 mins)

Contact: ID: 3974060

Period: 10-Mar-2017 20:00 To: 27-Mar-2017 05:40 Length: 22660 m

Eastbound and westbound diversion routes 2000 - 0400 hrs due to carriageway repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

A120 Planned Works Essex

The Street to Dog House

Slight (less than 10 mins)

Contact: ID: 3968275

Period: 10-Mar-2017 20:00 To: 13-Mar-2017 05:35 Length: 1370 m

Eastbound and westbound 24 hr continuous carriageway closure 2000 - 0600 hrs due to structure - new/ reconstruction works on behalf of Interserve TM.

*****************************************************************************************************************************************************************

A120 Planned Works Essex

FOOTWAY OUTSIDE 21 COGGESHALL ROAD, COVERING WORKS FOR ANNEXE TO R/...

Slight (less than 10 mins)

Contact: ID: 4051903

Period: 11-Mar-2017 08:00 To: 12-Mar-2017 18:00 Length: 0 m

LAY NEW 52M STANDARD DOMESTIC 63MM SERVICE OF WHICH 22M IS PUBLIC FROMMAIN FAR SIDE FOOTWAY.

*****************************************************************************************************************************************************************

Page 51: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

Stanstead to Parkeston

No Delay

Contact ID: 4061215

Period: 16-Mar-2017 20:15 To: 18-Mar-2017 00:10 Length: 114570 m

Mobile lane closure 2000 to 0530 both directions due to essential roadworks

Page 52: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Planned Works Essex

The Street to Dog House

Slight (less than 10 mins)

Contact: ID: 3968308

Period: 17-Mar-2017 20:00 To: 20-Mar-2017 03:55 Length: 1370 m

Eastbound and westbound 24 hr continuous carriageway closure Friday 2000 to Monday 0600 hrs due to structure - new/ reconstruction works on behalf of Interserve TM.

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

B1024 to West Street

Slight (less than 10 mins)

Contact: ID: 4065280

Period: 18-Mar-2017 12:45 To: 19-Mar-2017 18:10 Length: 2860 m

Eastbound and westbound traffic signals 0800 - 1900 hrs due to carriageway repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 53: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 54: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 55: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

B1024 to West Street

Slight (less than 10 mins)

Contact: ID: 4074489

Period: 25-Mar-2017 07:45 To: 26-Mar-2017 15:00 Length: 2860 m

Eastbound and westbound traffic signals 0800 - 1900 hrs due to carriageway repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 56: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 57: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Marks Tey I/C to Jct 25

Moderate (10 - 30 mins)

Contact: ID: 3965013

Period: 01-Apr-2017 20:00 To: 02-Apr-2017 04:15 Length: 400 m

Westbound lane closure 2000 - 0600 hrs due to carriageway repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

A120 Planned Works Essex

B1024 to West Street

Slight (less than 10 mins)

Contact: ID: 4084311

Period: 02-Apr-2017 20:15 To: 02-Apr-2017 23:15 Length: 2860 m

Eastbound and westbound traffic signals 0800 - 1900 hrs due to carriageway repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

Page 58: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Marks Tey Rbt to B1024

Moderate (10 - 30 mins)

Contact: ID: 4034789

Period: 08-Apr-2017 20:00 To: 02-Jun-2017 04:20 Length: 5140 m

Eastbound and westbound carriageway closure 2000 - 0600 hrs due to carriageway repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Outside The Spicey Swan Inn A120 from ja 131 B1256 TO B1024 Nort of...

No Delay

Contact: ID: 4087760

Period: 08-Apr-2017 21:00 To: 09-Apr-2017 06:00 Length: 0 m

Access required to Underground BT structure to restore service - No structural changes. Work being carried out on existing BT Plant.

*****************************************************************************************************************************************************************

Page 59: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

o/s The Spicey Swan

No Delay

Contact: ID: 4099371

Period: 14-Apr-2017 15:30 To: 14-Apr-2017 23:59 Length: 0 m

Emergency jetting required to clear blockage on main foul line. NO EXCAVATION.

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Prince of Wales Rbt to Marks Tey Rbt

Slight (less than 10 mins)

Contact: ID: 4057677

Period: 03-May-2017 20:00 To: 06-May-2017 03:15 Length: 820 m

Eastbound and westbound lane closures 2000 - 0600 hrs due to carriageway reconstruction/ repair works on behalf of Interserve

Page 60: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Marks Tey I/C to Jct 25

Moderate (10 - 30 mins)

Contact: ID: 4102571

Period: 06-May-2017 20:10 To: 07-May-2017 03:00 Length: 400 m

Westbound lane closure 2000 - 0600 hrs due to carriageway repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

.

*****************************************************************************************************************************************************************

A120 Planned Works Essex

OPPOSITE of the junction GODMANS LANE on A120 FROM J B1024 TO J A12

No Delay

Contact: ID: 4108491

Period: 10-May-2017 00:00 To: 12-May-2017 23:59 Length: 0 m

MARKS TEY - 392682 - Renew / Raise / Lower Frame and Cover on in.

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Prince of Wales Rbt to Marks Tey Rbt

Slight (less than 10 mins)

Contact: ID: 4124026

Period: 10-May-2017 20:30 To: 24-May-2017 04:15 Length: 44300 m

Eastbound and westbound lane closures 2000 - 0600 hrs due to carriageway - reconstruction/ repair works on behalf of Interserve TM

Page 61: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

A120 from opposite 132 Coggeshall Rd to outside Twin Oaks, Stisted,...

No Delay

Contact: ID: 4124103

Period: 16-May-2017 00:00 To: 16-May-2017 23:59 Length: 0 m

SAFE Access to poles to provide customer service.

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Prince of Wales Rbt to Marks Tey Rbt

Slight (less than 10 mins)

Contact: ID: 4124120

Period: 16-May-2017 20:00 To: 17-May-2017 04:05 Length: 44530 m

Westbound carriageway closure 2000 - 0600 hrs due to carriageway - reconstruction/ repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 62: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

FEEDER PILLAR 58, JUNCTION WITH GODMANS LANE. f\w.

No Delay

Contact: ID: 4162438

Period: 22-May-2017 00:00 To: 26-May-2017 23:59 Length: 0 m

Connections Highway Services:WORKS FOR ROAD PURPOSES: (NOTICE FOR INFORMATION ONLY):NEW SERVICE. NEW SERVICE.

*****************************************************************************************************************************************************************

A120 Planned Works Essex

FEEDER PILLAR FP1, BY JUNCTION WITH COLNE ROAD. f\w.

No Delay

Contact: ID: 4162435

Period: 22-May-2017 00:00 To: 30-May-2017 23:59 Length: 0 m

Connections Highway Services:WORKS FOR ROAD PURPOSES: (NOTICE FOR INFORMATION ONLY):TRANSFER SERVICE. TRANSFER SERVICE.

*****************************************************************************************************************************************************************

Page 63: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Event Essex

B1024 to West Street

Slight (less than 10 mins)

Contact: ID: 4153681

Period: 05-Jun-2017 20:00 To: 17-Jun-2017 05:55 Length: 2860 m

Eastbound and westbound 24 hr continuous speed restriction 2000 - 0600 hrs due to carriageway repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Event Essex

A131 Garden Village Way to Jct 25 Marks Tey

Slight (less than 10 mins)

Contact: ID: 4125869

Period: 05-Jun-2017 20:00 To: 10-Jun-2017 05:00 Length: 27760 m

Eastbound and westbound diversion routes 2000 - 0500 hrs due to resurfacing works on behalf of Essex Highways

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 64: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 65: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 66: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 67: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Event Essex

B1024 to West Street

Slight (less than 10 mins)

Contact: ID: 4168356

Period: 17-Jun-2017 12:30 To: 20-Jun-2017 01:20 Length: 2860 m

Eastbound and westbound 24 hr continuous speed restriction 2000 - 0600 hrs due to carriageway repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

A120 Planned Works Essex

s/o THE LEYS A120 NEAR STISTED TURN ING OPPOSITE KINGS LANE CM77 8AD

No Delay

Contact: ID: 4167053

Period: 18-Jun-2017 00:00 To: 18-Jun-2017 23:59 Length: 0 m

BRAINTREE 382935 - POLING WORKS - Excavate for new BT Openreach Pole (s) or to Replace Existing BT Openreach Pole (s) in replace telegraph pole damaged by vehicle to facilitate overhead spine cabling works..

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Event Essex

Church Road Bradwell to West Street Coggeshall

No Delay

Contact: ID: 4157357

Period: 19-Jun-2017 07:00 To: 23-Jun-2017 18:00 Length: 3020 m

Eastbound and westbound diversion routes 0700 - 1800 hrs on behalf of Morrison Utilities in Coggeshall

*****************************************************************************************************************************************************************

A120 Event Essex

Bridge Hall Road, Braintree to Colne Road, Coggeshall

Slight (less than 10 mins)

Contact: ID: 4067139

Period: 19-Jun-2017 08:00 To: 21-Jun-2017 23:59 Length: 6370 m

Eastbound and westbound diversion routes 24 hr continuous 0800 - 2359 hrs on behalf of TMO Highways

Page 68: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Event Essex

Marks Farm to Marks Tey

Slight (less than 10 mins)

Contact: ID: 3991336

Period: 26-Jun-2017 20:00 To: 30-Sep-2017 06:00 Length: 22660 m

Eastbound and westbound diversion routes 2000 - 0600 hrs due to carriageway repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

Page 69: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Prince of Wales Rbt to Marks Tey Rbt

Slight (less than 10 mins)

Contact: ID: 4177413

Period: 07-Jul-2017 20:00 To: 07-Jul-2017 23:20 Length: 810 m

Eastbound and westbound lane closures 2000 - 0600 hrs due to carriageway - reconstruction/ repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

Page 70: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

THREE WAY LIGHTS FROM OUTSIDE 15 - 31 COGGESHALL ROAD - LAYING 8MAL...

No Delay

Contact: ID: 4145369

Period: 15-Jul-2017 20:00 To: 16-Jul-2017 06:00 Length: 0 m

2 NEW 32MM MPDE SERVICES FROM 63MM PE IN NEARSIDE FOOTWAY -LAYING8MALONG FOOTWAY OUTSIDE 21 COVERING 19 & 1.7M FOOTWAY OUTSIDE 27.

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Event Essex

Coggeshall to Marks Tey and Kelvedon

No Delay

Contact: ID: 4199491

Period: 17-Jul-2017 08:00 To: 21-Jul-2017 17:30 Length: 11090 m

Eastbound and Westbound diversion route on A120 and northbound and southbound on A12 for works being undertaken on Bridge Street Coggeshall.

Page 71: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Event Essex

Coggeshall to Marks Tey

Slight (less than 10 mins)

Contact: ID: 4104168

Period: 26-Jul-2017 10:00 To: 26-Jul-2017 15:00 Length: 5460 m

Eastbound and westbound diversion routes 1000 - 1500 hrs on behalf of Centurion Site Services

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Marks Tey Rbt to B1024

Moderate (10 - 30 mins)

Contact: ID: 4207046

Period: 26-Jul-2017 20:20 To: 09-Sep-2017 06:00 Length: 5130 m

Eastbound and westbound carriageway closures 2000 - 0600 hrs due to carriageway repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 72: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

OUTSIDE 214 COGGESHALL ROAD / A120 FROM J B1024 TO J A12

No Delay

Contact: ID: 4145370

Period: 29-Jul-2017 20:00 To: 30-Jul-2017 06:00 Length: 0 m

LAYING NEW 32MM MPDE FROM 32MM PE IN NEARSIDE FOOTWAY.

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Prince of Wales Rbt to Marks Tey Rbt

Slight (less than 10 mins)

Contact: ID: 4198391

Period: 01-Aug-2017 20:00 To: 02-Aug-2017 04:00 Length: 44530 m

Westbound carriageway closure 2000 - 0600 hrs due to carriageway - reconstruction/ repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

Page 73: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Incident Essex

Marks Tey

No Delay

Contact: ID: 4238281

Period: 17-Aug-2017 19:30 To: 17-Aug-2017 20:55 Length: 560 m

Carriageway closure both directions 1930 to 2055 due to incident

*****************************************************************************************************************************************************************

A120 Incident Essex

Coggeshall

Slight (less than 10 mins)

Contact: ID: 4238290

Period: 18-Aug-2017 00:30 To: 18-Aug-2017 05:54 Length: 710 m

Carriageway closure both directions 0030 to 0600hrs due to incident

*****************************************************************************************************************************************************************

A120 Emergency Works Essex

OUTSIDE SUNRAY A120 FROM J A131/B1256 TO J B1024 NORTH OF COGGESHAL...

No Delay

Contact: ID: 4240270

Period: 20-Aug-2017 13:56 To: 22-Aug-2017 23:59 Length: 0 m

COGGESHALL 370179 - SECTION 81/140 - HAZARDOUS - Renew / Raise / Lower Frame and Cover on in c/w.

*****************************************************************************************************************************************************************

A120 Event Essex

B1024 Colne Road Coggeshall to Great Tey Road Marks Tey

No Delay

Contact: ID: 4135796

Period: 21-Aug-2017 08:00 To: 21-Aug-2017 18:00 Length: 4570 m

Eastbound and westbound diversion routes 0800 - 0600 hrs on behalf of BT Openreach in Great Tey

*****************************************************************************************************************************************************************

A120 Event Essex

The Street to West Street

Slight (less than 10 mins)

Contact: ID: 4225569

Period: 22-Aug-2017 08:00 To: 24-Aug-2017 17:00 Length: 3020 m

Eastbound and westbound diversion routes 0800 - 1700 hrs due to pre surface dressing patching works on behalf of Ringway Jacobs

Page 74: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Planned Works Essex

near 85 Coggeshall Road

No Delay

Contact: ID: 3506750

Period: 22-Aug-2017 17:45 To: 22-Aug-2017 23:59 Length: 0 m

REMEDIAL REINSTATEMENT Carriageway reported as sinking.

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Prince of Wales Rbt to Marks Tey Rbt

Slight (less than 10 mins)

Contact: ID: 4243533

Period: 29-Aug-2017 20:00 To: 02-Sep-2017 06:00 Length: 810 m

Eastbound and westbound carriageway closures 2000 - 0600 hrs due to carriageway - reconstruction/ repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

Page 75: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

*****************************************************************************************************************************************************************

A120 Event Essex

A120 E/B & W/B Jct B1024 & Jct A12

No Delay

Contact: ID: 4243745

Period: 08-Sep-2017 09:30 To: 08-Sep-2017 16:30 Length: 5110 m

Diversion route from junction with A12 to junction with London Road B1024

*****************************************************************************************************************************************************************

A120 Planned Works Essex

Marks Tey Rbt to B1024

Moderate (10 - 30 mins)

Contact: ID: 4179517

Period: 11-Sep-2017 20:00 To: 16-Sep-2017 06:00 Length: 5130 m

Eastbound and westbound carriageway closures 2000 - 0600 hrs due to carriageway repair works on behalf of Interserve TM

*****************************************************************************************************************************************************************

A120 Event Essex

B1024 Colne Road to A12 Jct 25

Slight (less than 10 mins)

Contact: ID: 4104085

Period: 11-Sep-2017 20:00 To: 16-Sep-2017 06:00 Length: 7020 m

Eastbound and westbound diversion routes 1930 - 0600 hrs on behalf of Essex Highways

Page 76: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex
Page 77: Standard Report - Published Closures · Standard Report - Published Closures Generated By on 10-Jan-2018 ***** A120 Planned Works Essex

Standard Report - Published Closures

Generated By on 10-Jan-2018

*****************************************************************************************************************************************************************

A120 Event Essex

B1024 Colne Road to A12 Jct 25

Slight (less than 10 mins)

Contact: ID: 4142413

Period: 10-Nov-2017 20:00 To: 18-Nov-2017 06:00 Length: 7020 m

Eastbound and westbound diversion routes 2000 - 0600 hrs on behalf of Essex Highways


Recommended