7/28/2019 Standard_Interconnection_Application 100-1000 kW.pdf http://slidepdf.com/reader/full/standardinterconnectionapplication-100-1000-kwpdf 1/4 Standard Interconnection Application Generating Facilities with Rated Capacities Greater Than 100 kW and up to 1,000 kW A Cus tomer-Generator applicant ("Applicant") hereby makes application to EI Paso Electric Company ("EPE") to install and operate a generating facility with rated capacity greater than 100 kW and up to 1,000 kW interconnected with the EPE utility system. Written Applications should be submined by mail, e-mail, or fax, to E I Paso Electric Company, as follows : EI Paso Electric Company (Loc. 131) lOON. Stanton, EI Paso, Texas 7990 1 Fax N umber : (915)521-4418 E-Mail Address:[email protected] EI Paso Electric Contact Name: Rober1o Favela EI Pa so Electric Contact Tille : Project Manager - Corporate Development An app lication is a Complele Application when it provides a ll applicable infonnation required be l ow. (Additional infonnation to evaluate a request lo r interconnection may be required and will be so requested from the Interconnection Applicant by EI Paso Electric Company aRer the applicf i tion is deemed complete). Application Fee Must Accompany this Appliclltion o System >100 kW up 10 lind including 1,000 kW; $100 plus $1.00 ro r nch kW .bove 100 kW SECfION 1. APPLICANT INFORMATION Legal Name of Interconnecting Applicant (OJ, if an Individual, Individuals Name) Name: __ _________________ Mailing Address : ____ Cit y: ______ __ ______ __ State: Zip Code: ______ Facility Location (i f different from above): Telephone (Day) : ___ __ ________ __ _ _ (Evening) ____________ __ _ Fax Number: _____________ _ E-Mail Address: ____________________ __ ____________ __ _ EPE AccOWlt Number : - - - ~ ~ c ~ - - . , , _ _ ~ ~ ~ - - ~ ~ ~ - - - - - - ~ _ ~ _ - - ~ ~ , = = ___ - (Existin& Account Number . if generltor to be inte roonrtecled on the Cus tomer liide of EPE's r even u e metef) Type oflnterconneci Service Applied for (choose o ne): o Network Resource 0 Energy Only 0 Load Response (no export) 0 Net Metering SECTION 1. GENERATOR QUALIFICATIONS Data apply only to the Generating Facility , not the intercoMection Facilities. Energy Source: 0 Solar 0 Wind 0 Hydro Hydro Type (e .g., Run-of-River): ________ __ ____ __ __________ o Diesel 0 Natural Gas 0 Fuel Oil 0 Other (state type): _______________________ __ Prime Mover: 0 Fuel Ce ll 0 Recipr oc a ting EngiRt : 0 Ga s Turbine 0 Steam Turbine 0 Microturbine 0 PV o Other (descr i be) __ __ __ _________ ______ _____ _ _ Type of Generator: 0 Synchronous 0 Induction 0 Inverter Page I or4
Transcript
Page 1: Standard_Interconnection_Application 100-1000 kW.pdf

7/28/2019 Standard_Interconnection_Application 100-1000 kW.pdf

http://slidepdf.com/reader/full/standardinterconnectionapplication-100-1000-kwpdf 1/4

Standard Interconnection ApplicationGenerating Facilities with Rated Capacities Greater Than 100 kW and up to 1,000 kW

A Customer-Generator applicant ("Applicant") hereby makes application to EI Paso Electric Company ("EPE") to install

and operate a generating facility with rated capacity greater than 100 kW and up to 1,000 kW interconnected with the

EPE utility system.

Written Applications should be submined by mail, e-mail, or fax, to EI Paso Electric Company, as follows:

EI Paso Electric Company (Loc. 131)lOON. Stanton, EI Paso, Texas 7990 1

Fax Number: (915)521-4418E-Mail Address:[email protected]

EI Paso Electric Contact Name: Rober1o Favela

EI Paso Electric Contact Tille: Project Manager - Corporate Development

An app lication is a Complele Application when it provides a ll applicable infonnation required below. (Additional

infonnation to evaluate a request lor interconnection may be required and will be so requested from the InterconnectionApplicant by EI Paso Electric Company aRer the applicfition is deemed complete).

Application Fee Must Accompany this Appliclltion

o System >100 kW up 10 lind including 1,000 kW; $100 plus $1.00 ror nch kW .bove 100 kW

SECfION 1. APPLICANT INFORMATION

Legal Name of Interconnecting Applicant (OJ, if an Individual, Individuals Name)

Name: ___________________

Mailing Address: ____

City: ________________ State: Zip Code: ______

Facility Location (i f different from above):

Telephone (Day): _ _ __ ____________ _ (Evening)______________ _

Fax Number: ______________ E-Mail Address: ____________________ _________________

EPE AccOWlt Number: - - - ~ ~ c ~ - - . , , _ _ ~ ~ ~ - - ~ ~ ~ - - - - - - ~ _ ~ _ - - ~ ~ , = = ___ -(Existin& Account Number . ifgenerltor to be interoonrtecled on the Customer liide of EPE's revenue metef)

Type oflnterconneci Service Applied for (choose one):

o Network Resource 0 Energy Only 0 Load Response (no export) 0 Net Metering

SECTION 1. GENERATOR QUALIFICATIONS

Data apply only tothe

Generating Facility, not the intercoMection Facilities.

Energy Source: 0 Solar 0 Wind 0 Hydro Hydro Type (e .g., Run-of-River): __________________________

o Diesel 0 Natural Gas 0 Fuel Oil 0 Other (state type): _________________________

Prime Mover: 0 Fuel Ce ll 0 Reciprocating EngiRt: 0 Gas Turbine 0 Steam Turbine 0 Microturbine 0 PV

o Other (descr ibe) _____ ________________ ______ _

Type of Generator: 0 Synchronous 0 Induction 0 Inverter

Page I or4

Page 2: Standard_Interconnection_Application 100-1000 kW.pdf

7/28/2019 Standard_Interconnection_Application 100-1000 kW.pdf

http://slidepdf.com/reader/full/standardinterconnectionapplication-100-1000-kwpdf 2/4

Generator Nameplate Rating: _ kW (Typical); GeneralOr Nameplate kVA:

Interconnection Customer or Customer-Site Load: _ _ _ kW (if none, so state)

Typical Reactive Load (irknown):

Maximum Physical Export Capability Requested:

List components of the Generating Faci lity Equipment Package that are currently certified:Egu ipment Type Certifying Enlity

I.===-=====.

3.4. ________ ____ _ _

5. _ _ .__

Is the prime mover compatible with the certified protective relay package? __ _ Yes __

Generator (or solar collector)Manufacturer, Model Name & Number:

Version Number:

Nameplate u t p u t I P ~ o w w ~ e " ~ R ~ . ~ H ; ; n g g T . i n 1 i i k W V i ' = = = (Summer) (Winter)Nameplate Output Power Rating in kVa: _____ Summer) (Winter)

lndividual Generator Power Factor

kW

No

Rated Power Factor: Leading: I.agging: 7 ' - - - ~ ~ ~Total number of Generators to be interconnected pursuant to this Interconnection Application: _________

Elevation: Single Phase: _ _ ____ Thrce Phase: ___ _ _

Inverter Manufacturer. Model Name & Number (i fused): c ~ ; o ; t ; : m - : : = : : : : = = = ; = : : : : = = = = = = : : : ; = = =List of adjustable set points for the protective equipme nt or software:

Note: A completed Power Systcms Load Flow data sheet must be supplied with the Interconnection Application.

Generating Facility Characteristic Data (for jnverter-ba$ed machines)Max design fault contribution current: Instantaneous or RMS?

Harmonics Characteristics:Start-up Requirements:

Generating Facility Characteristic Data (for rotatin, m ~ . £ h i n . WRPM Frequency: Neutral Grounding Resistor (ifapplicabte): ______ _____

Synchronous GeneratorsDirect Axis Synchronous Reactance, Xd:Direct Axis Transient Reactance, X'd:Direct Axis Subtransient Reactance, X"d:

Negative Sequence Reactance, X2:Zero Sequence Reactance, XO:

P.U.

P.U .____ _ P.U.

____ .U.

P.U.--- ---

KVA Base: Field Volts:

Induction Generators•

Field Ampers:

Motoring Power (kW): 12t or K (Heating Time Constant):

Rotor Resistance, Rr: Stator Resistance, Rs:Stator Reactance, Xs: Rotor Reactance. Xr:Magnetizing Reactance, Xm: Short Circuit Reactance, Xd":Exciting Current: Temperature Rise:

Frame Size: Design Letter:Reactive Power Required in Vars (No Load): _ _ _ _ Reactive Power Required in Vars (Full Load): ___ _

Total Rotating Inertia. H: Per Unit on kVA Base

Page 2 of 4

Page 3: Standard_Interconnection_Application 100-1000 kW.pdf

7/28/2019 Standard_Interconnection_Application 100-1000 kW.pdf

http://slidepdf.com/reader/full/standardinterconnectionapplication-100-1000-kwpdf 3/4

• Note: Please contact EI Paso Electric Company prior to submitting the Int erconnection Application to determine if

the specified infonnation above is required

Excitation and Governor System Dato for SynchrrulrulUieneraton Onlv

Provide appropriate IEEE model block diagram of excitation system. governor system and power systemstabilizer (PSS) in accordance with the regional reliability council criteria. A PSS may not be determined to be

required by applicable studies. A copy of the manufacturer 's block diagram may not be substituted.

SECTION J. INTERCONNECION FACILITIES INFORMATION

Will a transformer be used between the generator and thl: Point ofCommon Coupling? Yes No

Iransfonncr Data (((Applicable for Interconnection C"Homer-Owned Transfonnerl

Is the transfonner: single phase three phase? Size: kVA

Transformer Impedencc: _____ percent on kVA Base

Ifllrree Phase:Transfonner Primary: _ ____ Volts____ _ _ Delta Wye Wye Grounded

Transfonner SeGondary: ____ Volts____ Delta Wyc Wye Grounded

Transformer Tertiary: _ ___ Volts_____ Delta Wye Wye Grounded

Transformer Fuse Data UfApplicable for I n t e r c o ~ n Customer-Owned Fuse)

(Anach copy of fuse manufacturer's Minimum Melt IUld Total Clearing Time-Current Curves)Manufacturer: . Type: Size: Speed: ___ _

Inle«:oooecling Circuit Breaker (If Applicable)

Manufacturer: Type:'(l;YOie.j;:-::=====-Load Rating (Amps): Interrupt Rating (Amps): Trip Speed (Cycles):

Jnlercoooecljon Protectjve Relays aCApplicabld

If Microprocessor-CQntrolled:List of Functions and Adjustable Setpoints for the prote(:tive equipment or software:

J.

2.

Selpoint FWlctjon Minimmu

3. _ _ _ __ __ _ _ _ _ _ _ __

4. =========.6. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

If Discrete Components:

(Enclose Copy of any Proposed Time-Overcurrent Coordination Curves)

Maximum

Manufacturer: Type: _ _ _ _ Style/Catalog No.: Proposed Setting: ___Manufacturer: Type: _ _ _ _ Style/Catalog No.: ____ Proposed Setting:__Manufacturer: Type:___ Style/Catalog No. : Proposed Setting: ___Manufacturer: _ _ Type:___ Style/Catalog No.: Proposed Setting: _ __Manufacturer: Type: _ __ Style/Catalog No.: Proposed Setting:___

CUmnt Iransfonner Data Of p . Q ~(Enclose Copy of Manufacturer's Excitation and Ratio Correction Curves)

Manufacturer: _ Type: ._ _ _ _ Accuracy Class: Proposed Ratio Connect ion : _ _Manufacturer: Type: _ _ __ Accuracy Class: ___ Proposed Ratio Connection:__Manufacturer: Type:__ ccuracy Class: Proposed Ratio Connection:__

PQleniial Transformer Data (I fApplicable}

(Enclose Copy of Manufacturer's Excitation and Ratio Correction Curves)

Manufacturer: Type: Accuracy C las s: Proposed Ratio COMcction:__Manufacturer: ___ Type: ____ Accuracy Class: ____ Proposed Ratio Connection:__Manufacturer: Type: _ __ _ Accuracy Class: Proposed Ratio Connect ion :__

Page 3 of4

Page 4: Standard_Interconnection_Application 100-1000 kW.pdf

7/28/2019 Standard_Interconnection_Application 100-1000 kW.pdf

http://slidepdf.com/reader/full/standardinterconnectionapplication-100-1000-kwpdf 4/4

SECTION 4. GENERAL INFORMATION

Enclose copy of s ite electrical one-line dillgram showing the configuration of a ll Generating Facil ity equipment, current

and potential circuits, and protedion and C(lntroi schemes.

This one-line diagram must be signed and stamped by a licensed Professional Engineer if the Generating Facility is larger

than 50 kW. Is One·Line Diagram enclosed? ._ _ _ _ _ _ Yes No

Enclose copy of any site documentation that indicates the precise physicallocalion of the proposed Generating Facility

(e.g., USGS topographic map or other diagram or documentation).

Proposed location of protective interface equipment on property (include address if different from the InterconnectionCustomer's address). _____________ _ ____ ___ ______ ________ __

Enclose copy of ally site documentation that describe!; and details the operation of the protection and control schemes. Is

available documentation enclosed? Yes No

Enclose copies of schematic drawings fOf a ll proteetjc,n and control circuits, relay current circuits, relay potential circuits.

and alarm/monitoring circuits ( i f applicable). Are schematic drawings enclosed? Yes No

SECTION 5. APPLICANT SIGNATURE

I hereby certify that, to the best ofmy knowledge, the infonnation provided in the Interconnection Application is true and

correct. I also agree to install II Warning Label provided by EI Paso Electric Company on or near my service meter

location. Generating systems must be compliant with IEEE, NEe, ANSI, and UL standards, where applicable. Bysigning below, the Applicant also certifies that the installed generating equipment meets the appropriate preceding

requirement(s) and can supply documentation that confirms compliance.

Signature of Applicant:

Title:

Date:

SECTION 6. INFORMATION REQUIRED PRIOR TO PHYSICAL INTERCONNECTION

(Not fequired as a part of he applicution, unless available at time of application)

Installing Electrician:____________ ___ _______________ _ _ ___ _ _

Finn:__ _ __ _ _

License Number:___ _

Mailing Address:___ _ _____

City: State: Zip Code:____ _ _

Telephone:

___Installation Date: ___ ______

Interconnection Date:___ _ ___

Signed (Inspector- if required): ________________________ _ _____ _

Date:

(In lieu of signature of Inspec tor, a copy oflne final inspection certificate may be attached.)

Page 4 of4