State Farm Center Renovation and Addition Project
Project Leadership Owner
University of Illinois F&S DIA
Construction Manager
Design Team AECOM – Architectural Thorton Tomasetti – Structural Henderson Engineers – Mechanical, Electrical ESD – Plumbing
Project Specifics 160 Million Renovations and Addition
New Mechanical Spaces and Systems Reconfiguration of the arena New Luxury Seating New Ramps and Walks
6 phases 1,3,5 – Basketball Phases 2,4,6 – “Construction” Phases
Peak manpower for Phase 2 – 160 Peak manpower for Phase 4 – 250
Google Earth
State Farm Center12/02/2013 – 02/28/2014
Phase 1 – Site Work
Key
Construction
No Service
Ongoing
In Use
Other
State Farm Center12/02/2013 – 02/28/2014
PRV RoomDemo HV-10T/C Offices
Phase 1 – Mechanical Level
Key
Construction
No Service
Ongoing
In Use
Other
State Farm CenterState Farm CenterPhase 1 Construction LogisticsDecember 2013 To February 2014
St. Mary’s Road
Four
th S
tree
tFo
urth
Str
eet
St. Mary’s Road
Kirby Avenue Kirby Avenue
Orange LotNo Construction
Parking
Brown LotNo Construction
Parking
Blue LotNo Construction
Parking
N
Relocate Fence As
Work Progresses
Relocate Fence As
Work Progresses
Construction
Deliveries
B
B
B
B
B B
C C
CC
C C
C
C
C
C
C
C
C
C
C
C
C
C
B
B
B
B
B B
P
P
-6’ High chain link fence (with posts in ground)
-6’ High chain link fence, moveable fence supported by bases and sandbags and/or pins
-Primary construction truck ingress and egress
-”B” level entrance into building via stairs (must be maintained for ingress and egress)
-”C” level entrance into building via existing ramps
-Maintain pedestrian access/egress into SFC at “B” level
-Maintain pedestrian access/egress via ramps to “C” level entrance
-Public drop off-30’ Wide Sliding Gate-25’ Wide Swing Gate-25’ Wide Sliding Gate-Masonry Silo-800 AMP 120/208V Service for Trailers
G1
G7
G5
G4
G2
G6
G3
C
B
B
C
P
Relocate Fence As
Work Progresses
Relocate Fence As
Work Progresses
G5G5G5
Trailers - 15 Spaces
300’ x 60’
MM
TETE
Dumpster
Dumpster
Dumpster
Dumpster
Dumpster
Tool Trailers – 34 Spaces340’ x 60’
Storage/StagingArea
Notes: Typical Work of Phase 11) U.G. Utility Contractor shall provide, install, maintain, and reposition moveable chain link fence around all excavations, equipment, and disturbed areas during installations.
2) Any existing roads, sidewalks or pavements shall be restored via 3000 PSI concrete, 4 inches thick after underground installation to allow pedestrian or vehicle traffic.
3) U.G. Utility Contractor to provide and maintain steel road plates over areas where pavement can not be replaced to allow access to SFC.
4) U.G. Utility Contractor to schedule and coordinate work to always provide ingress and egress to the SFC “B” Level entrances and ramps to the “C” Level entrances.
B
BWest Construction Staging Area Construction Road
G8
G9
BC
B
C
Plywood Canopy
Protection
*Trades Men Parking For Phase 1 Only
G11
G11
Service Level Dock Below
B
C
Construction Field Office and Staging
RED PARKING LOT
Temporary Fence Panels
Site Utilities Conflicts
Site Utilities Conflicts
Equipment Selection
Equipment Selection
State Farm CenterState Farm Center
St. Mary’s Road
Four
th S
tree
t
Kirby Avenue Kirby Avenue
Orange LotNo Construction
Parking
Brown LotConstruction Parking
(Phase 2 Only)
Blue LotNo Construction
Parking-6’ High chain link fence (with posts in ground)
-6’ High chain link fence, moveable fence supported by bases and sandbags and/or pins
-Primary construction truck ingress and egress-Public drop off
-Earth Retention
-30’ Wide Sliding Gate
-25’ Wide Swing Gate
-25’ Wide Sliding Gate
-Masonry Silo
-800 AMP 120/208V Service for Trailers
-30’ Wide Swing Gate
P
Crane Pad
Plywood Canopy
Protection
Crane Pad50’ x 100’
STAGING AREA FOR WEST
STAGING AREA FOR NORTH
STAGING AREA FOR SOUTH
STAGING AREA FOR EAST
Four
th S
tree
t
St. Mary’s Road
Construction
Deliveries
G1
G7
G2
G3
Trailers - 15 Spaces
300’ x 60’
MTE Dumpster
Dumpster
Dumpster
Dumpster
Dumpster
Tool Trailers – 34 Spaces340’ x 60’
Storage/StagingArea
G5
G5
G5
MTE
G5
30’ Wide Road< Ramp <
There will be no ramp to service
level
Contractor must provide their own cranes for hoisting
Construction hoisting access to service level after concrete floor at Level B is poured
West Construction Staging AreaNew Road
Phase 2 Construction LogisticsMarch 2014 To November 2014
Crane Pads to be constructed of CA-A plus 6” of CA-6 with
top elevation @ 749’
G13
G5
G6
G12
G10
G11
G10 G9
G4
G8
G9
*No Construction Parking
East Staging Area50’ x 200’
Crane Pad50’ x 100’
Crane Pad
New U.G. electrical ductbank, water main, and steam
installations in this area.
G11
G11
G8
G9
Access to loading dock at event level
Service Level Dock Below
N
03/01/2014 – 10/31/2014
BTN Work RoomLoading Dock WalkShopsSecurity
Phase 2 – Service Level
Key
Construction
No Service
Ongoing
In Use
Other
East MechanicalWest MechanicalMicro Piles from Above
Earth Retention - Arena
03/01/2014 – 10/31/2014
Operations OfficesSubstation A & BTunnel Abatement
Phase 2 – Mechanical Level
Key
Construction
No Service
Ongoing
In Use
Abatement
Chilled Water Main to AHU 18Demo Chiller
Generator Base
PRV RoomEast Mechanical TunnelWest Mechanical TunnelMicro Piles from Above
Earth Retention – Additions
Earth Retention/ Excavation - Additions
Earth Retention – Soil Nail Wall
Earth Retention – Soil Nail Wall
Earth Retention – Soil Nail Wall
Earth Retention – Soil Nail Wall
Earth Retention – Soil Nail Wall
Remove InsulrockEast Addition
03/01/2014 – 10/31/2014
Phase 2 – B Level Concourse
Key
Construction
No Service
Ongoing
In Use
Other
Abate Office AreasDemo Office AreasDemo Toilet LidsDomestic Water Loop
West AdditionFit Out (No Service)
South Ramps and PlazaDemo Stair Over Substation A & B
Excavation – Link Tunnels
Excavation – Link Tunnels
Crane Usage
Single Sided Forms
03/01/2014 – 10/31/2014
Bowl Retention PilesNew Tunnel PilesRaker Duct Lining
Phase 2 – Event Bowl
Key
Construction
No Service
Ongoing
In Use
Preparation
Booth ExteriorVom. InfillsC-Level SeatingProvide Raker Access
Prepare Catwalk for Phase 6
Raker Openings
Seating Infills
Seating Installation
03/01/2014 – 10/31/2014
Temporary StairsDemolition of Stairs at Substation
5 Portables2 ADA RampsEast Addition
Phase 2 – C Level Concourse
Key
Construction
No Service
Ongoing
In Use
Temporary
South Ramps & PlazaWest Addition
Dust Protection Tent
Phase 3 Egress Plan
Phase 3 – Basketball Season• Work continues on the East and West Addition
Service Level Fitout• Closeout of the Bid Package 1 Contractors• EXTENSIVE scheduling and pre-planning session
for Phase 4
Phase 4 Arena Bowl Demolition
Day 1
Phase 4 Arena Bowl Demolition
Day 6
NE Tunnel Excavation
Tie Backs for the NE Tunnel
Load Transfer Beam Placement
“”Other” Work
Project Challenges
Aggressive design schedule and even more aggressive construction schedule
Public client with state procurement limitations Renovation of a 50 year old building Finding qualified local manpower to be able to
support a project of this magnitude Despite all the challenges so far the project
remains on schedule and within budget.
Questions ?