Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Fld1 Fld2 Fld3 Fld4 Fld5 Fld6 Fld7 Fld8 Fld9 Fld10 Fld11 Fld12 Fld13 Fld14 Fld15 Fld16 Fld17 Fld18 Fld19 Fld20 Fld21 Fld22 Fld23 Fld24 Fld25 Fld26 Fld36 Fld37 Fld38 Fld39 Fld40 Fld41 Fld42 Fld43
1 South Bhagalpur Banka Shambhuganj-Asarganj
Road
MDR 0.0 2.00 2.00 0 to 2 2.00 0 to 2 2.00 w/s 01.08.07 30.06.08 5.50 Good 29.06.11 Good 2.00 Shambhuganj, Kurma
2 South Bhagalpur Banka Amarpur-Sambhuganj Rd. MDR 0.0 24.00 24.00 0 to
24
24.00 0 to 24 24.00 w/s 01.08.07 15.03.09 5.50 Good 14.03.12 Good 24.00 Englishmore Bharko Rampur
Mirazapur Jogni Sambhuganj
3 South Bhagalpur Banka Simultalla-Katoriya Road MDR 0.0 18.40 18.40 0 to
18.40
18.40 0 to 18.40 18.40 w/s 01.08.07 22.3.09 5.50 Good 21.03.12 Good 18.40 Bhairohanj Katoriya
4 South Bhagalpur Banka Pandaydih-Lahawan Road MDR 0.00 9.81 9.81 0 to 9.81 9.81 0 to 9.81 9.81 w/s 01.08.07 25.12.08 3.75 Good 24.12.11 Good 9.81 Pandihdih Lahawan
5 South Bhagalpur Banka Dhakamore-Banka Road MDR 0.00 8.00 8.00 0 to
8.00
8.00 0 to 8 8.00 w/s 18.09.06 31.5.08 7.00 Bad 30.05.11 BAD 8.00 In Aggrement
Process
Taliya Banka Dhaka
6 South Bhagalpur Banka Banka-Belhar Rd. MDR 0.00 8.00 8.00 0 to 8 8.00 0 to 8 8.00 w/s 18.09.06 22.12.08 5.50 Fair 21.12.11 Fair 8.00 Ramsariyamore Bhitiya
7 South Bhagalpur Banka Banka-Belhar Road. MDR 9.00 32.00 24.00 9 to
32
24.00 9 to 32 24.00 w/s 01.08.07 31.3.09 5.50 Good 30.3.12 Good 24.00 Beldia Bazar
8 South Bhagalpur Banka Rampur-Dalwa-Ramsariya
Road
MDR 0.00 18.40 18.40 0 to
18.40
18.40 0 to 18.40 18.40 w/s 25.12.08 24.11.09 5.50 Good 23.11.12 Good 18.40 Rampur Fulydumar Rata
Dalwamore Khasar Ramsariya
9 South Bhagalpur Banka P.C.C. Rd.
Puranithakurbari to
P.W.D. I.B.
MDR 0.00 0.75 0.75 0 to
0.75
0.75 0 to 0.75 0.75 P.C.C. 26.02.09 13.11.09 5.50 Good 12.11.12 Good 0.75 Azad Chowk Babutola
10 South Bhagalpur Banka Puranithakurbari to Azad
Chowk Road
MDR 0.00 0.65 0.65 0 to 0.65 0.65 0 to 0.65 0.65 P.C.C. 4.50 Good Good 0.65 Pandihdih Lahawan
11 South Bhagalpur Banka Banka-Katoriya P.W.D
Road to Santhal Pragana
Rd. via Malick tola Banka
Rd.
MDR 0.00 0.48 0.48 0 to
0.48
0.48 0 to 0.48 0.48 Improvement 26.11.10 05.10.11 160M 5.5
305M-3.75
Good 05.09.14 Good 0.48 160m. - 5.5m.
305m. - 3.75m.
Taliya Banka Dhaka
12 South Bhagalpur Banka Vijay Nagar Chowk to
Late Brijimohan Singh
Residence Road
MDR 0.00 0.455 0.46 0 to
0.455
0.455 0 to 0.455 0.455 P.C.C. 4.50 Good Good 0.455 Executed by
R.W.D.
Ramsariyamore
Bhitiya
13 South Bhagalpur Banka Sultanganj to Dumma
(Bihar Border) Kachhi
Kanwariya Road
MDR 0.00 84.20 84.20 0 to
84.24
84.20 0 to 84.20 84.20 Kachhi
Kanwarya Road
25.2.09 24.08.10 4.50 Good 23.8.13 Good 84.20 Carrige way-4.5M
(Earthen Road)
Asarganj Kumarsar Inaravaran
Dhouri Suiya
14 South Bhagalpur Banka Banka-Belhar Road (Old) MDR 0.00 8.10 8.10 0 to
8.10
8.10 0 to 8.10 8.10 w/s 23.2.11 22.8.12 5.50 Under
Const.
21.8.15 Under
Const.
8.10 Work in Progress Banka Dudhari Laxmipur
Pokhariya
15 South Bhagalpur Banka Mahagama More to
Dhoriya Via.-Nawada,
Bazar Road.
MDR 0.00 19.00 19.00 0 to 19 19.00 0 to 19 19.00 Improvement 31.7.10 30.4.12 3.75 Under
Const.
29.5.15 Under
Const.
19.00 Work in Progress Mahagama Nawada Dhoriya
(Newly Transffered from
R.E.O.)
16 South Bhagalpur Banka Englishmore to Punsiya
via-Jaithornath Rd.
Part-A
MDR 0.00 3.70 3.70 0 to 3.70 3.70 0 to 3.70 3.70 Improvement 23.2.11 22.5.12 3.76 Under
Const.
21.5.15 Under
Const.
3.70 Madachak (Newly Transffered
from R.E.O)
17 South Bhagalpur Banka Englishmore to Punsiya
via-Jaithornath Rd.
Part-B
MDR 4.375 12.70 8.33 4.375
to
12.7
8.325 4.375 to 12.7 8.325 Improvement 09.04.10 03.03.12 5.50 Under
Const.
03.02.15 Under
Const.
8.325 Mahgama Nawada
Dhoriya (Newly Transffered
from R.E.O)
18 South Bhagalpur Banka Bikrampur to Bounsi
Road
MDR 0.00 7.50 7.50 0 to
7.5
7.50 0 to 7.5 7.50 Improvement 5.50 Under
Const.
12.04.15 Under
Const.
7.50 Work in Progress Rampur Fulydumar
Rata Dalwamore
Khasar Ramsariya
19 South Bhagalpur Banka Barahat-Panjwara Road S.H.-84 0.00 12.00 12.00 0 to
12
12.00 0 to 12 12.00 w/s 01.08.07 28.2.09 5.50 Fair 27.2.12 Fair 12.00 Vikrampur More Panjwara
20 South Bhagalpur Banka Panjwara-Dhoriya Road S.H.-84 0.00 15.00 15.00 0 to
15
15.00 0 to 15 15.00 w/s 01.08.07 15.01.09 5.50 Good 14.1.12 Good 15.00 Dhoriya Beldia Saidpur Arrow
Panjwara.
21 South Bhagalpur Banka Dhoriya-Sanhoula S.H.-84 0.00 11.80 11.80 0 to
11.80
11.80 0 to 11.80 11.80 w/s 05.12.08 28.2.10 5.50 Good 27.3.13 Good 11.80 Dhoriya Kurma Saguniya
Butsar Ganji Chak.
22 South Bhagalpur Banka Akbarnagar to Sekhund-
Amarpur Road
S.H.-85 19.00 30(P) 11.40 19 to
30 (p)
11.40 19 to 30 (p) 11.40 w/s 26.2.09 25.2.10 5.50 Good 22.6.11 Good 11.40 Madachak (Newly Transffered
from R.E.O)
23 South Bhagalpur Banka Sultanganj-Tarapur-
Belhar-Katoriya-Chandan-
Dardmara Road.
S.H.-22 40.00 98.00 58.00 40 to
98
58.00 40 to 98 58.00 w/s 7.00 Under
Const.
Under
Const.
58.00 Excuted by
C.P.W.D.
24 South Bhagalpur Banka Bhagalpur-Amarpur-
Banka-Katoriya Road
S.H.-25 16.00 76.26 60.26 16 to
76.26
60.26 16 to 76.26 60.26 w/s 7.00 Good Good 60.26 Hand over by
C.P.W.D. on
19.12.11
25 South Bhagalpur Banka Bhagalpur-Hansdiha Road S.H.-19 17.00 63.75 46.75 17 to
63.75
46.75 17 to 63.75 46.75 w/s 7.00 Under
Const.
Under
Const.
46.75 Excuted by
C.P.W.D.
Chour, Hansdiha.
25 Banka Total 460.98 117.82 170.16 173.01 281.61 20.00 159.38
Road Condition
Good Fair BADRemarks
Total - 32 Km.
Total - 1.4 Km.
(0.65 Km.
Executed by
R.W.D.)
Total - 38.00 km.
Sanhoula-Dhoriya-
Pajwara-Barahat
Road (S.H.-84)
Total 12.025 Km.
Work in Progress
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
Page 1 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
26 South Bhagalpur Bhagalpur Akbarnagar Shahkund
Road KM 0 to 18, SH-85
SH-85 0.00 18.00 18.00 0-18 18.00 w/s 09.06.09 08.01.11 5.50 Good 07.1.14 Good 18.00 SH-85 Sahkund Pachrukhi
27 South Bhagalpur Bhagalpur Bhagalpur-Amarpur Via.-
Kajraili Road, SH-25
SH-25 0.00 16.00 16.00 0-0.32 16.00 w/s 04.07.07 27.09.08 5.50
7.00
Good 26.09.11 Good 16.00 Railway Crosswing
by Plan head
SH Work Executed
by CPWD
Habibpur Simaria, Gorachowki
Kajraulli
28 South Bhagalpur Bhagalpur Ghogha-Sanhaula Road 0
to 16 Km., SH-84
SH-84 0.00 16.00 16.00 0 to
16
16.00 w/s 05.02.09 in progress 5.50 Good Good 16.00 SH in Completion
stage
Ghogha Tarar, Jaikhut,
Maheshpur,Ramasi,Sanjaula
29 South Bhagalpur Bhagalpur Sultanganj-Tarapur-
Deoghar Road, SH-22
SH-22 0.00 6.00 6.00 0 to 6 6.00 w/s 7.00 Fair Fair 6.00 SH Work Executed
by CPWD
Sultanganj ROB, Kamrani.,
Naradpul
30 South Bhagalpur Bhagalpur Bhagalpur Hansdiha
Road, SH-19
SH-19 0.00 16.00 16.00 0 to 16 16.00 w/s 7.00 Good Good 16.00 SH Work Executed
by CPWD
Bhagarpur Bazar, Jagdishpur.
31 South Bhagalpur Bhagalpur Godda-Pirpainti Road
(Towards Barhat),
SH-23
SH-23 0.00 10.75 10.75 0 to
10.75
10.75 w/s 7.00 Good Good 10.75 km. 8.05 ro 9.75 in
Jharkhand, SH
work Executed by
CPWD
Pirpaity Rly. Station NH-80,
Barahat Bazar
32 South Bhagalpur Bhagalpur Bhagalpur Alternative by
pass Road KM 0 to 11.85
MDR 0.00 11.85 11.85 0 to
11.85
11.85 0
1.3 to 6.36
7.36 & 11.85
7(P) to 8 (p)
11.85 w/s 05.03.11
08.1.07
08.03.08
04.09.11
28.11.09
07.09.08
5.5
5.5
5.5
Good 27.11.12
06.09.11
Good 11.85 Work Completed.
Railway under pass
Airo Drum Bhagalpur NH-80,
Near Jain Mandir NH-80.
33 South Bhagalpur 2 to 8 7.00 0 to 1 1.00 0.00 7.00 w/s 08.08.08 02.06.09 7.00 Fair 01.06.12 Fair 7.00 In Chainage 0 Km.
to 1 Km. Road width
has widend from 7
to 13.00m.
Tilkamanjhi Champa Nagar,
Champa Nagar (Bisharisthan)
33 7.00 8.00 w/s 08.08.08 31.12.10 5.50 Good Good 1.00 Work Completed
34 South Bhagalpur Bhagalpur Tilkamanjhi - Barari Road
KM 0 to 3
MDR 0.00 3.00 3.00 0 to 3 3.00 0 to 3 3.00 w/s 06.08.08 05.02.09 5.50 Fair 04.02.12 Fair 3.00 Tilkamanjhi, Barari
35 South Bhagalpur Bhagalpur Mahila College Mirjanhat
Road Km. 0 to 3
MDR 0.00 3.00 3.00 0 to 3 3.00 0 to 3 3.00 w/s 06.08.08 05.05.09 7.00 Good 04.05.12 Good 3.00 In Chainage 300m
to 1200 Road
width has widend
from 7 to 13.00m.
Kacheiry Compound Mahila
Collage.
36 South Bhagalpur Bhagalpur Tower-Tatarpur Road KM
0 to 1.60
MDR 0.00 1.60 1.60 0 to
1.60
1.60 0 to 1.60 1.60 w/s 04.02.09 03.08.09 7.00 Good 02.08.12 Good 1.60 Kotwali Chowk, Khalifabag
Chowk
37 South Bhagalpur Bhagalpur Trimohaan - Ekchari
Dhanoura Road KM 0 to
20.20
MDR 0.00 20.20 20.20 0 to
20.22
20.20 0.00 20.20 w/s 06.03.07 02.01.10 5.50 Fair 01.01.13 Fair 20.20 Ekchari Railway Station,
Ekxhari Bazar Dhanwara Bazar
Sanokhar Bazar Chadika Sthan
Sadhupara Dighi,
38 South Bhagalpur Bhagalpur Shambhuganj-Asarganj
Road KM 3 to 8
MDR 3.00 8.00 6.00 3 to 8 6.00 3.00 8.00 w/s 23.03.07 25.03.09 5.50 Fair 24.03.12 Fair 6.00 Kurma, Asarganj
39 South Bhagalpur Bhagalpur Jagdishpur - Sanhaulla
Road KM 0 to 18.75
MDR 0.00 18.75 18.75 0 to
18.75
18.75 0 to 18.75 18.75 Strengthening 08.08.08 15.11.09 3.05 Fair 14.11.12 Fair 18.75 W/S required,
estimate submitted
for AA/TS
Jagdishpur Kotwali Dhankund
Babura Sanhaulla
40 South Bhagalpur Bhagalpur Shahkund - Asarganj
Road KM 0 to 14
MDR 0.00 14.00 14.00 0 to
14
14.00 0 to 6.5 6.50 w/s 12.02.11
09.04.07
11.11.11
25.03.09
5.50 Motarable 10.11.14
24.03.12
Motarable 14.00 2.5 km. B.M.
Completed, 1 Km.
Bad & Rest portion
Motarable, work in
Progress
Shahkund - Asarganj,
Nayagaon
41 South Bhagalpur Bhagalpur Bhagalpur-Agarpur
Kotwali Road 3.5 to
20.637
MDR 3.50 20.637 17.14 3.50
to
20.63
7
17.14 3.5 to 20.637 20.637 w/s 01.03.09 30.12.10 5.50 Good 29.12.13 Good 17.14 Goradih Machipur Kotwali
42 South Bhagalpur Bhagalpur Godda - Pirpatti Road
(Towards PS) 0 to 5 Km.
MDR 0.00 5.00 5.00 0 to 5 5.00 0.00 5.00 w/s 24.03.08 25.01.10 5.50 Fair 24.01.13 Fair 5.00 Pirpainti Rly. Sta., Pirpaainti
Thana
43 South Bhagalpur Bhagalpur Bhikhanpur - Barahpura
Road
MDR 0.00 1.60 1.60 0 to 1.60 1.60 0.00 1.60 w/s 07.12.07 31.03.08 3.75 Fair 30.03.11 Fair 1.60 Bhikhanpur barahpura
44 South Bhagalpur Bhagalpur Sultanganj Ghat Road MDR 0.00 2.00 2.00 0 to 2 2.00 0 to 0.2 & 0.6
to 2.0
w/s 01.03.09 15.02.10 5.50 Good 14.02.13 Good 2.00 In Km 1st 400m is
Railway Portion
ROB, Sultanganj Bazar
45 South Bhagalpur Bhagalpur Approach road of Ganga
Bridge
MDR 0.00 15.00 15.00 0 to 15 15.00 0.00 15.00 Strengthening 01.03.09 21.04.10 10.00 Fair 20.04.13 Fair 15.00 Bhagalpur high Level Jagatpur
tetri naugachiya (zeromile )
8.008.00MDR 0.00Tilkamanjhi -
Champanagar Road
KM 0 ti 8
Bhagalpur
Page 2 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
46 South Bhagalpur Bhagalpur Naugachia - Tintanga
Road
MDR 0.00 17.00 17.00 16 to 17 1.00 0 to
16
16.00 0.00 16.00 w/s 26.02.10 02.09.11 5.50 Fair 01.09.14 Fair 17.00 Work in Progress
Provisional work
order Issued vide.
Letter No.-270,
Date 16.01.12
work in progress
Naugachia NH-31. Makandpur,
Pachgachia, Gopalpur, Saidpur
47 South Bhagalpur MDR 0.00 16(p) 16.10 0 to
16(p)
16.10 0.00 16.00 w/s 09.03.07 18.06.09 5.50 Fair 17.06.12 Fair 16.10 Revised Estimate
Submitted for A/A
& T/S
47 South MDR 16(p) 18(p) 2.75 16(p)
to 18
(p)
2.75 16(p) 18(p) w/s Bad BAD 2.75 Due to flood from
16(p) to 18(p)
Road length were
affected. Technical
Bid in C.E. Office.
48 South Bhagalpur 0 to 12 12.00 4th to 6th Strengthening 28.06.11 27.01.12 3.05 Bad 26.01.15 Fair Financial bid
submitted.
48 South 7th to 12th w/s 28.06.11 27.01.12 Bad GSB & WMM work
completed.
49 South Bhagalpur Bhagalpur Kataria-Tintanga Road MDR 0.00 9.31 9.31 0 to 9.31 9.31 0 to 1 1.00 Strengthening 04.02.09 03.08.09 3.05 Good 22.08.12 Good 9.31 InRetender
Process, Technical
Bid in C.E. Office.
Kataria, Rangra NH-31 Sukhita
bazar
50 South Bhagalpur MDR 0 to 6.75 6.75 0.00 0.90 Strengthening 3.05 Fair Fair 6.75
50 South MDR 0.90 3.00 Strengthening 28.01.07 24.07.09 3.05 Fair 23.07.12 Fair
50 South MDR 3.00 6.75 Strengthening 3.05 Bad Bad Work in Progress Kharik NH 3/and Chorhar
Ghat.
51 South Bhagalpur Bhagalpur Bihpur Birpur Road MDR 0.00 4.62 4.62 0 to 4.62 4.62 0 to 2.42 &
3.42 to 4.62
3.62 Strengthening 04.03.11 03.09.11 5.50 Good 02.09.14 Good 4.62 Bihpur, Bihpur NH31
52 South Bhagalpur Bhagalpur Barari Ghat Road MDR 0.00 0.50 0.50 0 to 0.50 0.50 0 to 0.5 0.5 w/s 12.02.09 25.03.09 4.50 Fair 24.03.12 Fair 0.50 Barari Ghat
53 South Bhagalpur Bhagalpur Kahalgaon Burning Ghat MDR 0.00 0.73 0.73 0 to 0.73 0.73 0 to 0.73 0.73 Strengthening 3.50 Bad Bad 0.73 Work in Progress Kahalgao bazar, Kahalgao
Burning Ghat
54 South Bhagalpur Bhagalpur Goradih-Sanhaulla Via
Mohanpur Bhojpur
Lhirijan
MDR 0.00 18.00 18.00 0 to 18 18.00 0 to 18 18.00 w/s 3.75 Bad Bad 18.00 This Road has
been taken over
from RWD vide
Letter No-4574(E)
Date-15.12.2004
Mohanpur Bhojpur
Chanimacha, Goradih,
Sanhaulla
54 South Bhagalpur
Total
297.65 73.26 167.04 41.35 16.00 127.27 148.90 21.48
55 South Bhagalpur Jamui Jamui Jhajha Chakai
Road
SH-18 0.00 63.10 63.10 0 to
63.10
63.10 Good 63.10 By CPWD Gidhour jhajha sonobatia
chakai
56 South Bhagalpur Jamui Sharwam Chakai Jasidih
Chopa Road
SH-18 74.425 93.225 18.80 74.425
to
93.225
18.80 Good 18.80 By CPWD Chakai
Madhopur
57 South Bhagalpur Jamui Sikandra Jamui
Kharagpur Road
SH-6 0.00 21.00 21.00 0 to 21 21.00 Good 21.00 By CPWD Sikandra Jamui
Laxmipur
58 South Bhagalpur Jamui Sikandra Jamui
Kharagpur Road
SH-18 0.00 6.00 6.00 0 to 6 6.00 Good 6.00 By CPWD Mahadev Simaria Khairma
59 South Bhagalpur Jamui Sikandra Jamui
Kharagpur Road
SH-72 0.00 23.30 23.30 0 to 2 2.00 2 to
5.00
3.00 5 to
23.3
18.30 Good 7
km.
Fair 16.3
km.
7.00 16.30 Uunder L.W.E Lakshmipur, Malaypur,
Khadigram, Matia
60 South Bhagalpur Jamui Bihar Barbigha Shiekpura
Sikandra Road
SH-6 64.00 67.00 3.50 64(p)
to 67
3.50 Good 3.50 By CPWD Sikandra
61 South Bhagalpur Jamui Lakhisarai Sikandra Road SH-8 25.00 27.000 2.50 0 to 2.5 2.50 Good 2.50 By CPWD Sikandra
62 South Bhagalpur Jamui Jamui By Pass Road SH-18 0.00 1.00 1.00 0 to 1 1.00 1.00 Good 1.00 By CPWD Jamui
Kharik NH 3/and Chorhar
Ghat.
Work completed.
Bihpur, Lattipur, jamunia
tulsipur
Naugachia Tetri Ganga Bridge
Approach Road, Mahadeopur
Ghat
Provisional work
order issued vide.
Letter No.-51,
Date-12.01.12.
work in progress
12.00
6.756.75
12.00
6.75
Bhagalpur Naugachia-Mahadeopur
Ghat Road
MDR 0.00 12.00
0.00Bhagalpur Kharik- Chorhar Road
Bhagalpur Bihpur- Gopalpur Road
Page 3 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
63 South Bhagalpur Jamui Pakaribarawan Sikandra
Road
SH-8 31(p) 52
Sikandra
21.45 31(p)
to 52
21.45 Good 21.45 By CPWD pakari Barama
sikandra
64 South Bhagalpur Jamui Lakisarai Jamui SH-18 14 km. 29 km 16.00 14 to
29
16.00 Good 16.00 By CPWD Jamui
65 South Bhagalpur Jamui Khaira Sona Road SH-82 0.00 20.500 20.50 0 to
20.5
20.50 19.00 Good 19
km. Fair
1.5 Km.
19.00 1.50 UNDER L.W.E Khaira mango
bandarsono
66 South Bhagalpur Jamui Jamui Kawakol Road SH-82 0.00 24.300 24.30 0 to 7.30 7.30 7.30
to
24.3
17.00 9.00 8.00 Good 9
Km. Fair 8
Km. Bad
7.3 Km.
9.00 8.00 7.30 UNDER L.W.E jamui garhi
67 South Bhagalpur Jamui Kesopur Borwa road MDR 0.00 17.725 17.725 - 0 to
17.725
17.725 - - Good 17.725 UNDER L.W.E keshopur,borwa
68 South Bhagalpur Jamui Jhajhabazar link road MDR 0.00 2.89 2.89 0 to
2.89
2.89 - - Good 2.89 UNDER L.W.E jhajha bazar
69 South Bhagalpur Jamui Shrawan Chakai road MDR 59P 75.0P 15.80 0 to
15.80
15.80 - - Good 15.80 UNDER L.W.E Chakai
70 South Bhagalpur Jamui Shrawan Bakshila road MDR 0.00 23.00 23.00 9.30 13.70 - - - Good 13.7
Km. Fiar
9.3 Km.
13.70 9.30 UNDER L.W.E Sharwan bakshila
71 South Bhagalpur Jamui Lachchuar Dhadhour road MDR 0.00 8.00 8.00 - 0 to
8.00
8.00 - 8.00 Good 8.00 UNDER L.W.E Lachhuar
72 South Bhagalpur Jamui Sikandra Lachhuar road MDR 0.00 5.00 5.00 - 0 to 5 5.00 - Good 5.00 UNDER L.W.E Lachhuar
73 South Bhagalpur Jamui Khargour Amarath
Shivsona Manjhway road
MDR 0.00 19.60 19.60 9.60 6.00 4.00 - - 9.60 Good 4
Km., Fair
9.6 Km.,
Bad 6 Km.
4.00 9.60 6.00 UNDER L.W.E Manjhaway
74 South Bhagalpur Jamui Amin Khaira road MDR 0.00 10.00 10.00 - 0 to 10 10.00 - - Good 10.00 UNDER L.W.E Mircha Khaira
75 South Bhagalpur Jamui Malaypur by pass road MDR 0.00 2.40 2.40 1.40 1.00 - - - Fair 2.40 UNDER L.W.E
76 South Bhagalpur Jamui Malaypur Barhat Lalmatia
Khadigram
MDR 0.00 14.60 14.60 0 to 1.7 1.70 1.7 to
14.60
12.90 - - Good 13.7
Km. Bad
0.9 Km.
13.70 0.90 UNDER L.W.E Barahat khadigram
77 South Bhagalpur Jamui Kenuhat Ratanpur MDR 0.00 16.00 16.00 15.5 0.50 0 to
15.50
15.50 - - Good 15.5
Km. Bad
0.5 Km.
15.50 0.50 UNDER L.W.E Ratanpur
78 South Bhagalpur Jamui Garhi Rupawel road MDR 0.00 9.60 9.60 0 to 9.60 9.60 - - - Good 6
Km., Fair
2.81 Km.,
Bad 0.79
6.00 2.81 0.79 UNDER L.W.E Garhi Rupawel
79 South Bhagalpur Jamui Jamui Bazar Road MDR 0.00 1.73 1.73 0 to 1.73 1.73 - - - - Fair 1.73 Under IRQP Jamui Bazar
80 South Bhagalpur Jamui Laxmipur Rest house
road
MDR 0.00 0.50 0.50 0 to
0.5
0.50 - - - Good 0.50 Laxmipur Block
81 South Bhagalpur Jamui Laxmipur Jinhara
Dhamna Jhajha Road
MDR 0.00 28.00 28.00 0 to 19 19.00 19 to
28
9.00 - - - 18.00 Fair 18.00
Km., Bad
10.00 Km.
18.00 10.00 Jinhara
Dhamna
Jhajha
82 South Bhagalpur Jamui Sharwan Bakshila Road MDR 24.00 31.935 8.935 1.705 7.23 - - 8.935 Good 8.935 Bakshila
82 South Jamui Total 405.23 63.84 57.43 283.97 310.10 69.64 25.49
83 South Bhagalpur Lakhisarai Shekhpura Lakhisarai
Jamui Deoghar road
SH 0.00 25.84 25.84 - - 0 to
25.84
25.84 - 0 to 25.84 25.84 W/S 7.00 Good Good 25.84 Constructed by
C.P.W.D
Sirari Ramgarh Head Qt. LKR
Khairi Tatarhat Manjhwe
Gunsagar 84 South Bhagalpur Lakhisarai Biharsharif Barbigha
Sikandra Jamui road
SH 0.00 9.00 9.00 - - 0 to 9.0 9.00 - 0 to 9.0 9.00 W/S 7.00 Good Good 9.00 Constructed by
C.P.W.D
Lanhaga Tahrari Matasi
85 South Bhagalpur Lakhisarai Gaya Nawada Sikandra
Lakhisarai road
SH 0.00 24.00 24.00 - - 0 to
24.0
24.00 0 to 24.00 24.00 W/S 7.00 Good Good 24.00 Constructed by
C.P.W.D
Ghonsa Halsi Kandi Ramgarh
Lakhisarai86 South Bhagalpur Lakhisarai Kiul Station approach
road
MDR 0.00 2.00 2.00 - 0 to 2 2.00 - - 0 to 2.00 2.00 W/S 03.01.07 01.11.08 5.50 Good 31.10.11 Fair/Bad 2.00 Kiul station Khagor Hakimganj
87 South Bhagalpur Lakhisarai Kajra Surajgarha road MDR 0.00 7.30 7.30 - 0 to
7.30
7.30 - 0 to 7.30 7.30 w/s 03.01.07 14.05.09 5.50 Good 13.05.12 Good 7.30 Kajra- Arma- Banshipur-
Mustphapur- Nista88 South Bhagalpur 0 to 12.8 12.80 - - - 0 to 7.05 7.05 Strengthening 09.06.09 3.50 Good Good 12.80 Surajgarha Salempur Tal
Bansipur Manikpur Konipar
Khaira Mahsoni
12.8012.800.00MDRLakhisarai Surajgarha Khaira
Mahsoni via Manikpur
road
Page 4 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
88 South 7.05 to
12.80
- - - 7.05 to 12.8 5.75 Strengthening 15.01.10 Work in
progress
3.75 Good Under
Const.
Surajgarha Salempur Tal
Bansipur Manikpur Konipar
Khaira Mahsoni
89 South Bhagalpur Lakhisarai Barahiya mini bypass
road
MDR 0.00 0.80 0.80 0 to 0.80 0.80 - - - 0 to 0.8 0.80 S/R 26.01.08 28.03.08 3.75 Fair 27.03.11 Average 0.80 - -
90 South Bhagalpur Lakhisarai Pontoon Bridge appoach
road
MDR 0.00 0.45 0.45 0 to 0.45 0.45 - - - 0 to 0.45 0.45 3.75 BAD 0.45 - Surajgarha
91 South Bhagalpur Lakhisarai Surajgarha Salempur
road
MDR 0.00 1.60 1.60 0 to 1.6 1.60 - - - 0 to 1.6 1.60 OR 06.09.10 20.09.10 3.05 Good Good 1.60 Surajgarha Salempur
92 South Bhagalpur Lakhisarai Approach road of IB,
Lakhisarai
MDR 0.00 0.39 0.39 0 to 0.39 0.39 - - - 0 to 0.39 0.39 PR 3.75 Good Good 0.39 Lakhisarai
93 South Bhagalpur Lakhisarai NH-80 to Ashokdham
road
MDR 0.00 1.50 1.50 0 to
1.50
1.50 - - 0 to 1.50 1.50 Strengthening 03.06.10 26.07.10 5.00 Good 25.07.13 Good 1.50 Ashok dham
94 South Bhagalpur Lakhisarai Lakhisarai bypass via
Ashokdham road
MDR 1.50 8.05 6.55 - 1.50
to
6.55
6.55 - - 1.50 to 6.55 6.55 Const. 31.01.07 5.50 Under
Const.
6.55 Agreement Closed Ashok dham Makuna
95 South Bhagalpur Lakhisarai Jamalpur Dharhara kajra
road
MDR 0.00 7.45 7.45 0 to 7.45 7.45 3.05 Worst Worst 7.45
96 South Bhagalpur Lakhisarai Kiul Railway Station to
Dhanawi road
MDR 0.00 12.12 12.12 0 to
12.12
12.12 3.05 Worst Worst 12.12
97 South Bhagalpur Lakhisarai Jitendra halt gumti to
Kundar road
MDR 12.12 17.50 5.33 12.12 to
17.45
5.33 3.05 Worst Worst 5.33
97 Lakhisarai
Total
117.13 40.94 17.35 58.84 84.43 0.80 31.90
98 South Bhagalpur Munger Munger Bariyarpur Link
Road
MDR 0.00 6.00 6.00 0.00 6.00 Good/Fair Good 4
Km.
Fair 2 Km.
4.00 2.00 DLP, In Km. 1st to
6th
Dt. 07.06.2011
D.A.V., school, Puraabsarai
railway staton
99 South Bhagalpur Munger Munger Jamalpur Road MDR 0.00 7.25 7.25 0 to
7.25
7.25 Good/Fair Good 4
Km. Fair
3.25 Km.
4.00 3.25 DLP, In Km. 1st,
2nd, 3rdP, 4th and
6th Date-
26.05.2011
Air Port, Khanka More
100 South Bhagalpur Munger Munger Dakranala Road MDR 0.00 4.15 4.15 0 to
4.15
4.15 Good Good 4.15 DLP, In Km. 2nd P,
3rdP and 4th, Date
04.06.2012,
DLP, In Km 1st,
2nd P, 3rd P and
5th P, Date
30.03.2013
Khanka More, Raja Rani Talab
101 South Bhagalpur Munger Jamui Laxmipur
Kharagpur Bariyarpur
Road
SH-72 23.3 58.64 35.40 23.3 to
58.64
35.40 Fair Fair 35.40 DLP, Ijn Km 116 to
131
Date 28.03.2012,
DLP, In Km 132 to
150P Date
01.02.2012
Navoday Vidyalat Kharagpur
102 South Bhagalpur Munger Gaighat Sangrampur
Road
MDR 0.00 15.50 15.50 0 to
15.5
15.50 Good Good 15.50 DLP, In Km 0 to 10
Date 30.03.2012,
DLP, In Km 11 to
16 P, Date
26.07.2013
Deoghara Mandir, Air Port
103 South Bhagalpur Munger Kharagpur Tarapur Road MDR 0.00 12.30 12.30 0 to
12.3
12.30 Good Good 12.30 DLP. In Km 0 to 13
P, Date
30.03.2013
Raja Rani Talab
104 South Bhagalpur Munger Sultanganj-Tarapur-
Belhar-Darmara Road
SH-22 7.00 40.00 34.00 7 to 40 34.00 34.00 Handed over to
CPWD, Div.,
Bhagalpur
Railway Station
104 Munger
Total
114.60 35.40 45.20 34.00 73.95 40.65 0.00 Sheikhpura Satpur &
Kosra
105 South Bhagalpur Shekhpura Bihar Barbigha Shiekpura
Sikandra Road
SH-18 25.30 55.00 29.70 25.30
to 55
29.70 Good Good 29.70 Place in the Road,
Bihar Sharif Chenaj
Barbigha
Biharshrif Chena Barbigha
Road
106 South Bhagalpur Shekhpura Lakhisarai Sheikhpura SH-6 23.50 33.00 9.50 23.5 to
33
9.50 Good Good 9.50 Place in the Road,
Bihar Sharif Chenaj
Barbigha
Shekhpura Lakhisarai
107 South Bhagalpur Shekhpura Mokama - Barbigha -
Warsaliganj
SH-83 7.50 21.20 13.70 0 to
13.70
13.70 Good Good 13.70 Place in the Road,
Bihar Sharif Chenaj
Barbigha
Biharshrif Shekhpura Town
108 South Bhagalpur Shekhpura Katra Bazar Road MDR 0.00 2.11 2.11 0 to
2.11
2.11 Fair Fair 2.11 Place in the Road,
Bihar Sharif Chenaj
Barbigha
Shekhpura Town
109 South Bhagalpur Shekhpura Satation Road -
Shekhpura
MDR 0.00 2.60 2.60 0 to
2.60
2.60 Fair Fair 2.60 Place in the Road,
Bihar Sharif Chenaj
Barbigha
Shekhpura Satpu & Nabards
12.8012.800.00MDRLakhisarai Surajgarha Khaira
Mahsoni via Manikpur
road
Page 5 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
110 South Bhagalpur Shekhpura Sheikhpura - Sahpur
Road
MDR 0.00 19.70 19.70 0 to
19.70
19.70 Bad Bad, Work
transferred to
BRPNN stay
by PHC For 0-
14.2km. 14.2
to 19.7
sanctioned
under W/p 11-
12
19.70 Place in the Road,
Bihar Sharif Chenaj
Barbigha
Shekhpura Arnami Mahuli
Nabard
111 South Bhagalpur Shekhpura Sheikhpura - Arha MDR 0.00 22.76 22.76 0 to
22.76
22.76 Good
17.8, Fair
2, Bad
2.96
Food,
2.96km.
Sanctioned
stay by
PHC
17.80 2.00 2.96 Place in the Road,
Bihar Sharif Chenaj
Barbigha
Shekhpura Satpu &Kosra
112 South Bhagalpur Shekhpura Sheikhpura - Sarai - Nimi
Kosra
MDR 0.00 5.70 5.70 0 to 5.70 5.70 Good 3.1,
Bad 2.6
Fair, 2.5
Km.
sanctioned
under w/p
of 11-12
3.10 2.60 Place in the Road,
Bihar Sharif Chenaj
Barbigha
Sahtpur Pmare
113 South Bhagalpur Shekhpura Shekhpura - Purania MDR 0.00 7.75 7.75 0 to 7.75 7.75 Good 7.75 Good 7.75 Place in the Road,
Bihar Sharif Chenaj
Barbigha
Sheikhpura Barbigha Satpur
114 South Bhagalpur Shekhpura Sheikhpura - Sahra via -
Mehus Road
MDR 0.00 19.26 19.26 0 to
19.26
19.26 Good,
10.26,
Bad 9
Fair, work
tranferred
to BRPNN
10.26 9.00 Place in the Road,
Bihar Sharif Chenaj
Barbigha
Bilalghat Kosra
115 South Bhagalpur Shekhpura Belauni - Ghat Kusumba
Road
MDR 0.00 4.65 4.65 0 to 4.65 4.65 Good,
4.65
Good 4.65 Place in the Road,
Bihar Sharif Chenaj
Barbigha
Purnia Ghat Kusubma
116 South Bhagalpur Shekhpura Purainia - Ghat Kusumba MDR 0.00 5.58 5.58 0 to 5.58 5.58 Good-
5.58
Good 5.58
117 South Bhagalpur Shekhpura Tanti Hathiama Road MDR 0.00 3.50 3.50 0 to 3.50 3.50 Good-3.5 Good 3.50
118 South Bhagalpur Shekhpura Sheikhpura Arai
Shekhpura Road
MDR 0.00 14.20 14.20 0 to
14.20
14.20 Good,
14.2
14.20 Place in the Road,
Bihar Sharif Chenaj
Barbigha
119 South Bhagalpur Shekhpura Mehus Link Road MDR 0.00 0.70 0.70 0 to
0.70
0.70 Good -
0.7
Good 0.70 Place in the Road,
Bihar Sharif Chenaj
Barbigha
119 South Shekhpura
Total
161.41 88.90 33.31 39.20 120.44 6.71 34.26
120 South Bhojpur Arrah Ara-Gothaula-Bhusaula
Road
MDR 0.00 13.90 13.90 0-6
(3.65)
7-
14(3.05)
13.90 O/R
0-13
Fair-11
Km., Bad-
2.9 Km.
Fair 11.00 2.90 Important Places
in the Road, Ara,
Bhushaula, Via.-
Jalpura
Ara,Bhushaula, Via Jalpura
Mathila
121 South Bhojpur Arrah Ara-Buxar
(Bazar Portion)
MDR 0.00 3.20 3.20 0 to
3.20
3.20 IRQP-(0-3.2) Fair-3.2
Km.
Fair 3.20 Important Places
in the Road,
Syndicate, Old
Police Line, Pakri
Syndicate old Police line Pakri
More
122 South Bhojpur Arrah Ara-Buxar Link Road MDR 0.00 0.50 0.50 0 to
0.50
0.50 O/R- 0.07 Fair-0.43
Km., Bad-
0.07
Fair 0.43 0.07 Important Places
in the Road, Katira
More, Mission
School.
Katira More, Mission School
123 South Bhojpur Arrah Nawada Chowk to
Eastern Railway Gumti
MDR 0.00 0.50 0.50 0 to
0.50
0.50 Fair Fair 0.50 Important Places
in the Road,
Nawada Chowk,
Rly. Godown
124 South Bhojpur Arrah Shahpur Bharauli Road MDR 0.00 6.00 6.00 0 to
6.00
6.00 Good Good 6.00 Important Places
in the Road,
Shahpur, Sama
Shahpur, Sarna
125 South Bhojpur Arrah Bharauli Karnamepur
Road
MDR 0.00 7.00 7.00 0 to
7.0
7.00 Good Good 7.00 Important Places
in the Road,
Ramdatahi
Ramdatahi
126 South Bhojpur Arrah Bihiya-Tier Road MDR 0.00 13.00 13.00 0 to
13
13.00 Good Good 13.00 Important Places
in the Road, Bihia,
Kamriyao, Tier
Bihia, Kamriyao, Tier
127 South Bhojpur Arrah Bihiya-Jagdishpur-Piro
Road Part of SH-102
SH 0.00 31.152 31.152 0 to
31.15
31.152 Km 0-10
(PR), 11-20
Good-
9.152
Km., Fair-
10 Km.,
Bad-12
Km.
Fair/Bad 9.152 10.00 12.00 Important Places
in the Road, Bihiya-
Jagdishpur-Piro
Bihiya-Jagdishpur-Piro
Page 6 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
128 South Bhojpur Arrah Veer Kunwar Singh Link
Road
MDR 0.00 3.15 3.15 0 to
3.15
3.15 Good Good 3.15 Important Places
in the Road,
Kunwar Singh Ka
Quila
Kunwar Singh Ka Quila
129 South Bhojpur Arrah Piro-Agiaon Road MDR 0.00 9.00 9.00 0 to 9.0 9.00 Good Good 9.00 Important Places
in the Road, Piro,
Agaion, Ahmetha
Road
Piro, Agaion, Ahmetha Road
130 South Bhojpur Arrah Piro-Sikarhatta-Bihta
Road Part of SH-12
MDR 0.00 22.725 22.725 0 to
22.72
5
22.725 Good Good 22.725 Important Places
in the Road, Piro-
Sikarhatta-Bihta
Piro- Sikarhatta- Bihta
131 South Bhojpur Arrah Garhani-Agiaon Road MDR 0.00 6.80 6.80 0 to
6.80
6.80 Good Good 6.80 Important Places
in the Road,
Garhani, Agiaon
Garhani, Agiaon
132 South Bhojpur Arrah Sakaddi Chandi-Sandesh-
Sahar-Khaira-Bihta Road
SH-81 0.00 47.00 47.00 22-47 25.00 0 to
22
22.00 Good-22
Km., Fair-
17 Km.,
Bad-8 Km.
Fair 22.00 17.00 8.00 Important Places
in the Road,
Sakadi, Chandi,
Sandesh, Noner
Sakadi, Chandi, Sandesh,
Noner, Sahar
133 South Bhojpur Arrah Koilwar-Babura Road MDR 0.00 12.53 12.53 0-12.53 12.53 Good-10
Km., Fair-
2.53 Km.
Good 10.00 2.53 Important Places
in the Road,
Koilwer, Jamalpur,
Babura
Koilwer,Jalalpur,Babura
134 South Bhojpur Arrah T.V. Senoterium Road MDR 0.00 0.40 0.40 0-0.4 0.40 Fair Fair 0.40 Important Places
in the Road,
Koilwer
135 South Bhojpur Arrah Pawna-Kori-Sandesh
Road
MDR 0.00 14.00 14.00 0-14 14.00 Good Good 14.00 Important Places
in the Road,
Pawan, Kori,
Chela, Sandesh
Pawan, Kori, Chela, Sandesh
136 South Bhojpur Arrah Ara-Ekauna-Khaira-Sahar
Road
MDR 0.00 32.07 32.07 0 to
32.07
32.07 Work in
Progress
Good-
10.07 Km.
Fair-9
Km., Bad-
13 Km.
Fair/Bad 10.07 9.00 13.00 Important Places
in the Road,
Ekauna, Khaira,
Sahar
Ara, Pawna, Agiaon,
Khaira,Sahar
137 South Bhojpur Arrah Ara-Sinha Road MDR 0.00 15.90 15.90 14.65-
15.9
1.25 0-14.65 14.65 Good-
11.65,
Bad-3.25
Good 12.65 3.25 Important Places
in the Road, Ara,
Saraiya, Sinha,
Yadavpur
Ara, Pawna, Agiaon,
Khaira,Sahar
138 South Bhojpur Arrah Keshopur-Gundi-Saraiya
Road
MDR 0.00 13.25 13.25 1-13.25 12.25 0-1 1.00 Good Good 13.25 Important Places
in the Road, Gundi,
Bakhorapur
Gundi, Bakhorapur
139 South Bhojpur Arrah Saraiya-Balua-Salempur
Road
MDR 0.00 10.40 10.40 0-10.4 10.40 Good Good 10.40 Important Places
in the Road, Balua,
Salempur,
Krishnagards
Balua. Salempur
140 South Bhojpur Arrah Ara-Barahara-Ekauna
Road
MDR 0.00 15.00 15.00 0-15 15.00 Good Good 15.00 Important Places
in the Road,
Keshopu, Berhara,
Ekauna
Keshopu, Bechan, Ekauna
141 South Bhojpur Arrah Ara-Salempur Road MDR 0.00 16.00 16.00 0-
14(3.75)
15-16
(3.05)
16.00 Good Good 16.00 Important Places
in the Road, Ara,
Dhobha, Salempur
Ara, Dhobha, Salempur
142 South Bhojpur Arrah Bihiya-Salempur Road MDR 0.00 10.40 10.40 0-10.4 10.40 Bad Bad 10.40 Important Places
in the Road,
Ramdihara,
Belwaniya,
Jhauwa, Dumariya,
Basudevpur,
Bandha
PMGSY
143 South Bhojpur Arrah Bihiya-Chaurasta to Barja
via Karja Road
MDR 0.00 13.25 13.25 0-7(3.75)
8-13.25
13.25 Good.,
10.25
Km., Bad-
3 Km.
Good 10.25 3.00 Important Places
in the Road, Kajra,
Barja, Charghat,
Belwania
Kajra, Barja, Charghat,
Belwania
144 South Bhojpur Arrah Krishnagarh Link Road MDR 0.00 0.50 0.50 0-0.50 0.50 Fair Fair 0.50 Important Places
in the Road,
Krishna Ghardh
Krishna Ghardh
145 South Bhojpur Arrah Arrah Sasaram Road SH-12 0.00 46.554 46.554 8.-14 6.00 40.554 Good Good 46.554 Important Places
in the Road, Ara,
Udwant Nagar,
Garhani, Piro,
Hasan Bazar
Ara, Udwant Nagar, Garhani,
Piro, Hasan Bazar
Page 7 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
146 South Bhojpur Arrah Koilwar-Chandi-Ara
(Dharhara ) Road
MDR 0.00 14.00 14.00 8.-14 7.00 0-7 7.00 IRQP-(8-14) Good-
7Km., Fair-
4 Km.,
Bad-3 Km.
Fair 7.00 4.00 3.00 Important Places
in the Road,
Koilwar, Chandi,
Zamirah
Koilwar, Chandi, Zamirah
147 South Bhojpur Arrah Eastern railway crossing
to Katira More
MDR 0.00 1.50 1.50 0-1.50 1.50 PR-(1.5) Fair-
1.5Km.
Fair 1.50 Important Places
in the Road,
Railway Station
Railway Station
148 South Bhojpur Arrah Nonar Karath-Tarari -
Bihta Road
MDR 0.00 22.00 22.00 0-22 22.00 IRQP-(0-12) Fair-22
Km.
Fair 22.00 Important Places
in the Road,
Karath, Tarari
149 South Bhojpur Arrah NH-30 (Sapna Cinema
More) to Katira More Via
Shivganj, Bari Mathiya,
Mathiya, Mahabir Tola,
Sahid Chowk, Judge
Kothi, Circuit House &
Pakri More
MDR 0.00 3.20 3.20 0 to
2.40
2.40 2.40 to
3.20
0.80 3.2 IRQP Bad-3.2
Km.
Bad 3.20 Important Places
in the Road, Circuit
House, Judge
Kothi, Sadar
Hospital, Ramna
Maidan, Pakri
Chowk, Ara.
Mohania Bhabhua
149 South Arrah Total 404.88 169.48 170.40 64.20 0.80 264.00 82.06 58.82
150 South Bhojpur 1 & 2 18.70 1 to 2 2.00 W/S 16.08.10 15.11.10 5.50 Good 03.04.14 Good 2.00 Sisaura, Ramgarh Nuaon
150 3 to 11 9.00 W/S 23.01.12 22.05.12 5.50 Fair Going on Fair 9.00 PR work in
progress
150 12-18.7 7.70 Str. 23.01.12 22.05.12 3.05 Fair Going on Fair 7.70 PR work in
progress
Brahumpur, Raghunathpur,
Changanai, Koran Sarai
151 South Bhojpur 20.70 0 to 3 3.00 0 to 3 3.00 IRQP 19.05.08 18.08.08 4.88 Bad 14.06.11 Bad 3.00 IRQP is required Ramgarh
Durgawati
151 South 4 to
13
10.00 4 to 13 10.00 Str. 12.12.11 11.04.12 4.88 Fair Going on Fair 10.00 PR work in
progress
151 South 14 to
18
5.00 14 to 18 5.00 W/S 02.03.09 01.09.09 5.50 Good 26.02.13 Good 5.00 Bhojpur
151 South 19 to
23.7
5.70 19 to 23.7 5.70 W/S 12.12.11 11.04.12 5.50 Good Going on Good 5.70 PR work in
progress
Dumraon
152 South Bhojpur 0-11 11.00 0-11 11.00 Str. 13.12.11 12.03.13 4.20 Bad Going on Bad 11.00 W/S work in
progress
Kudra, Sonhan
152 South 12 to
20
9.00 12 to 20 9.00 W/S 29.02.08 28.02.09 5.50 Good 24.09.12 Good 9.00
153 South Bhojpur 23.40 2 to
10
9.00 2 to 10 9.00 P/R 27.02.09 26.05.09 5.50 Fair 30.11.11 Fair 14.00 IRQP is required Bhabua, Mundeshwari,
Chainpur, Chand, Dharuli
153 South 11 to
24
14.00 11 to 24 14.00 P/R 27.02.09 26.05.09 5.50 Fair 02.12.11 Fair 9.40 IRQP is required Sasaram, Kochas, Karaghar,
Kudra
153 South 1.25
to
32.4
9.40 1.25 to 32.4 9.40 P/R 16.08.10 15.11.10 5.50 Good 14.01.14 Good 9.40 Dehri,Bikramganj, Suryapura,
Dinara
154 South Bhojpur 3p to 22 19.40 0 to
3p
2.60 3p to 14p 11.00 Str. 25.02.05 24.10.05 3.05 Bad 18.02.09 Bad W/S required Belaon, Sabar, Karamchat
154 South 14p to 22 8.40 14p to 22 8.40 Str. 13.01.05 12.09.05 3.05 Bad 25.02.07 Bad W/S required Kudra Chenari Shivsagar
155 South Bhojpur 1.5 to 17 15.50 1 to
1.5
1.50 17.00 Chand, G.T. Road
155 South 9p to 16 7.50 Dumraon, Nawanagar,
Bikramganj
155 South 17.00 1.00 17.00 1.00 IRQP 06.11.07 05.01.08 3.05 Fair 03.12.12 Fair Nasriganj, Danwar, Bihta
156 South Bhojpur Bhabhua Bhabhua - Adhaura Road SH 80 0.00 53.00 53.00 1-27
&
41-53
28-40
53.00 1-27 &
41-53
28-40
40
13
Str.
P/R
06.01.07 05.10.08 4.88 Fair in 1
to 10 &
11 to 27
& 41 to
45 Good
& 46 to
53 bad 28
to 40 Bad
Going on Fair in 1 to
10 & 11 to
27 & 41 to
45 Good &
46 to 53
bad 28 to
40 Bad
22.00 10.00 21.00 28 to 40 needs
IRQP PR work in
km. 28 to 40 has
been done by
NPCC under
PMGSY Scheme in
2008-09
Bhabua, Mundeshwari,
Bhagwanpur, Adhaura
157 South Bhojpur Bhabhua Chainpur - Biur - GT Road MDR 0.00 23.00 23.00 0-23 23.00 0-23 23.00 W/S 06.01.07 05.10.08 5.50 Good 04.05.13 Good 23.00 Durgawati, Biur, Chainpur
158 South Bhojpur Bhabhua Aukhara - Hatta -
Mahdaich Road
MDR 0.00 14.80 14.80 0-14.8 14.80 0-14.8 14.80 W/S 06.01.07 05.10.08 5.50 Good 04.05.13 Good 14.80 Hatta, Mahdaich
159 South Bhojpur Bhabhua Kudra - Parsathua Road MDR 0.00 18.60 18.60 0-18.6 18.60 0-18.6 18.60 W/S 16.03.07 15.03.08 5.50 Fair 23.07.13 Fair 18.60 Kudra - Parsathua
160 South Bhojpur Bhabhua Durgawati - Hatta Road MDR 0.00 20.00 20.00 20p 0.60 0-20p 19.40 0-20p 19.40 W/S 10.05.10 09.05.12 7.00 19.40 0.60 Work is going on Durgawati, Hatta
0.00 17.00 17.00
20.00
0.00
22.00
32.40
Bhabhua Bhabhua - Sabar Road 0.00
Bhabhua - Chainpur -
Chand - Dharuali Road
MDRBhabhua
Bhabhua Sisaura - Mukhraon Road MDR
Chand - Pawara - Kharati
Road
MDR
0.00 18.70 18.70
23.70
32.40
20.00MDRBhabhua
23.70
22.00MDR
0.00Bhabhua MDRRamgarh - Durgawati
Road
0.00Kudra - Bhabhua Road
Bhabhua
22.00
17.00
Page 8 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
161 South Bhojpur Bhabhua Mohania Bhabhua SH-14 0.00 14.40 14.40 0-14.4 14.40 0-14.4 14.40 W/S 7.00 Good Good 14.40 work has been
completed by
central agency
CPWD
Sasaram Dariganon
162 South Bhojpur Bhabhua Mohania Ramgarh SH-14 0.00 15.00 15.00 0-15 15.00 0-15 15.00 W/S 7.00 Good Good 15.00
163 South Bhojpur Bhabhua Ramgarh Chausa SH 14 0.00 17.00 17.00 0-17 17.00 0-17 17.00 W/S 7.00 Good Good 17.00 Konar(Sasaram Chausa)
Tendua
164 South Bhojpur Bhabhua Betari - Bhagwanpur -
Jaitpur Road
(i) Bhagwanpur to Betari
Via Mundrshwari Road
MDR 0.00 10.40 10.40 0-10.4 10.40 2007-08
undedr
PMGSY by
NPCC
Bad Bad 10.00 Dumara Sasaram Chhuta)
Agrer
165 South Bhojpur Bhabhua Bhagwanpur to Newgarh-
Via.- Jaitpur Road,
MDR 0.00 12.00 12.00 0-12 12.00 2006-07
under
PMGSY by
NPCC
Bad Bad 12.00 Salempur (Dehri-Nasriganj
Bikramganj Munji
165 South Bhabhua
Total
332.00 129.90 197.30 65.80 0.00 146.00 107.00 79.00 Dehri to Dehri Station
166 South Bhojpur Buxar Station Ramrekhaghat
Road (2 Km.)
MDR 0.00 1.50 1.50 1.50 6.00 Fair 1.50 Work completed Railway Station Ramrekhaghat
167 South Bhojpur Buxar Old Bye pass Road
(1.6 Km.)
MDR 0.00 1.60 1.60 1.60 5.50 Bad 1.60 Work in Progress Kila Maidan
168 South Bhojpur Buxar Station New Bazar Road
2.8 Km.)
MDR 0.00 2.80 2.80 2.80 3.75 Fair 2.80 Work completed Buxar Block
169 South Bhojpur Buxar Central Jail Approch Road MDR 0.00 1.40 1.40 1.40 3.05 Fair 1.40 Work in Progress Central Jail
170 South Bhojpur Buxar New Bye pass Road (2.2
Km.)
MDR 0.00 2.20 2.20 2.20 7.00 Motorable 2.20 Work in Progress Bus Stand
171 South Bhojpur Buxar Buxar Itarhi Road (10.00
Km.)
MDR 0.00 10.00 10.00 10.00 5.50 Good 10.00 Work Completed Buxar Zilla H.O. Itarhi Block
172 South Bhojpur Buxar Itarhi Dhansoi Road MDR 0.00 14.00 14.00 14.00 3.65 Motorable 14.00 Keshobigha (DTR) Salukpur
173 South Bhojpur Buxar Dhansoi-Dinara Road MDR 0.00 14.00 14.00 14.00 3.65 Partially
Bad
14.00 Work in Progress Dinara NH-3D
174 South Bhojpur Buxar D K College Dumraon
Road (2.10 Km.)
MDR 0.00 2.10 2.10 2.10 3.65 Bad 2.10 Work in Progress Dumraon
175 South Bhojpur Buxar Station Road Dumraon
(0.370 Km.)
MDR 0.00 0.370 0.37 0.37 5.50 Bad 0.37 Work in Progress Dumraon
176 South Bhojpur Buxar Bhojpur-Simri Road
(Total Length 9.30 Km.)
MDR 0.00 9.30 9.30 9.30 3.05 Good 9.30 Simri Road
177 South Bhojpur Buxar Bhojpur-Dumri Road (7.0
Km.)
MDR 0.00 7.00 7.00 7.00 5.50 Bad 7.00 Work in Progress Bhojpur
178 South Bhojpur Buxar Dumraon-Bikramganj
Road (S.H.-79)
(26.00 km.)
SH 79 0.00 26.00 26.00 26.00 - - 5.50 Motorable 26.00 Estimate sent for
approval under
NABARD
Dumraon
179 South Bhojpur Buxar NH-84 to Nimage Semra-
Gayghat-Gangauli Road
(13.4km.)
MDR 0.00 13.40 13.40 13.40 Bad 13.40 This is a new Road
transferred to Road
Construction
Department by Rural
Work Department in
the year 2010 vide
letter no. 141(E)
Patna dt. 12-01-10
of E in Chief cum
Addle Com. Cum.
Spl. Secretary, RCD
Bihar, Patna.
Detailed project
Report is being
prepared for
submission for
Sanctiion under plan
head for the year
2011-12 Not
sanctioned
Chandi, Noorsarai
180 South Bhojpur Buxar Brahmpur - Koransai
Road (24.00 km)
MDR 0.00 23.50 23.50 23.50 5.50 Good 23.50 Work Completed Brahmpur
Road Construction
Department.,
Bihar, Patna
Notification No-
4574(s) we. Dt.
15.12.2004, Road
has been taken
over form NPCC
vide Letter No.
PNGSY/1100/171
Dt. 23.07.11
Page 9 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
181 South Bhojpur Buxar Raghunathpur Bazar to
Tulsisthan Road (1.25
km)
MDR 0.00 1.25 1.25 1.25 3.05 Good 1.25 Work Completed Raghunathpur Bazar
182 South Bhojpur Buxar Buxar-Chausa Road SH 0.00 10.00 10.00 10.00 7.00 Good 10.00 Taken over from
C.P.W.D
Buxar-Chausa
183 South Bhojpur Buxar Basahi Pool-Chausa
Road(S.H.17)
SH-17 0.00 25.50 25.50 25.50 7.00 Good 25.50 Do Basahi Pool
184 South Bhojpur Buxar Panjraw-Chausa Road
(S.H.14)
SH-14 0.00 17.00 17.00 17.00 7.00 Good 17.00 Do Panjraw
185 South Bhojpur Buxar Chausa-Karmnasa-
Approch Road (0.735 km)
MDR 0.00 0.735 0.735 0.735 7.00 Good 0.735 Chausa-Karmnasa
186 South Bhojpur Buxar Dewalghat Approch Road
(0.975 km)
MDR 0.00 0.95 0.945 0.945 7.00 Good 0.945 Work Completed
187 South Bhojpur Buxar Parari-Sonbarsa Road
(7.00 km)
MDR 0.00 4.88 4.88 4.88 4.88 Good 4.88 Work Completed
188 South Bhojpur Buxar Ara-Buxar Road (2.6 km) MDR 0.00 2.60 2.60 2.60 7.0 (0.877
Km.)
5.5 (1.723
Km.)
Good 2.60 Work Completed
189 South Bhojpur Buxar Chausa- Chunni-Pawani-
Kamarpur Road
(10.00km)
MDR 0.00 10.00 10.00 10.00 3.05
(4.365
km.)
3.75
(6.325
km.)
Good 10.00 Work Completed
189 South Buxar Total 202.08 73.13 72.57 56.38 0.00 115.71 61.90 24.47 Mausimganj
190 South Bhojpur Dehri on Sone Arrah Sasaram Road (SH-
12)
SH-12 0 48.40 48.40 0 to
48.40
48.40 Fair 0.00 48.40 Arah, Bikramganj, Piro,
Sasaram
191 South Bhojpur Dehri on Sone Dehri Nasriganj
Bikramganj Dinara Road
(SH-15)
SH-15 0 65.00 65.00 0 to
65.00
65.00 Fair 0.00 65.00 Dehri, Bikramganj, Suryapura,
Dinara
192 South Bhojpur Dehri on Sone Sasaram Chausa Road SH-17 0 41.00 41.00 0 to
41.00
41.00 Fair 0.00 41.00 Sasaram Kochas Karaghar
Kudra193 South Bhojpur Dehri on Sone Kudra Chenari Malhipur
Road
SH-67 0 43.00 43.00 0 to
43.00
43.00 Fair 0.00 43.0 Kudra Chenari Shivsagar
194 South Bhojpur Dehri on Sone Nokha-Nasariganj Road MDR 0 22.40 22.40 - - 0 to
22.40
22.40 - Good 0.00 22.40 - Nokha, Nasariganj
195 South Bhojpur Dehri on Sone Dehri-Tetrarh-Rajpur
Road
MDR 0 20.40 20.40 - 0 to
20.40
20.40 - - Good 0.00 20.40 - Dehri-Tetrarh-Rajpur
196 South Bhojpur Dehri on Sone Airkotha- -Amratalab
Bagan Road
MDR 0 17.50 17.50 - 0 to
17.50
17.50 - - Good 0.00 11.50 0.00 6.00 - Airkotha, Akorhigola,
Amratalab at Old G.T. Road197 South Bhojpur Dehri on Sone Dumaraon-Bikramganj
Road
MDR 0 17.40 17.40 - 0 to
17.40
17.40 - - Fair 0.0 17.40 - Dumaraon, Nawanagar,
Bikramganj198 South Bhojpur Dehri on Sone Itimaha Sakala Road SH-17 0 17.00 17.00 0 to
17
17.00 Fair 0.0 6.00 0.00 11.0 Itimaha Sakala Road
199 South Bhojpur Dehri on Sone Bedadih-Darshandih
Raipure Chore Road
MDR 0 12.80 12.80 0.00 12.80 Good 0.00 12.80 Bedadih old (NH-2)
Darshandih Raipure Chore
Road200 South Bhojpur Dehri on Sone Sasaram Darigaon Road MDR 0 12.80 12.80 0.00 12.80 Fair 0.00 1.00 0.00 9.00 0.0 2.80 Sasaram Darigaon Road
201 South Bhojpur Dehri on Sone Konar Mahuli Tendua
Kowadih Road
MDR 0 12.8 12.80 0 12.80 Fair 0.00 12.80 Konar(Sasaram Chausa)
Tendua202 South Bhojpur Dehri on Sone Nokha-Nonsari Road MDR 0 9.00 9.00 0.00 9.00 Good 0.00 9.00 Silaw Bazar Village
203 South Bhojpur Dehri on Sone Dumra-Aruhi-Agrer Road MDR 0 9.90 9.90 0.00 9.90 Good 0.00 6.90 3.00 Dumra (Sasaram Chhuta) Ager
204 South Bhojpur Dehri on Sone Tetrarh-Pyarepur-
Budhachap link road
MDR 0 9.20 9.20 9.20 - - Good 0.00 9.20 - Tetrarh (DTR)Budha & chap
205 South Bhojpur Dehri on Sone Dhelabag-Gohi-Tetrarh
road
MDR 0 8.16 8.16 0 8.16 - - Good 0.00 8.16 - Dhelabag (Dehri Nasariganj
Bikramganj)Tetrarh 206 South Bhojpur Dehri on Sone Salempur-Chiksil-Munji
Road
MDR 0 8.00 8.00 8.00 - - Good 0.00 8.00 - Salempur (Dehri Nasariganj
Bikramganj) Munji207 South Bhojpur Dehri on Sone NH-2 Suara Hawaiadda to
Bagain (Gangauli
Dewaria) Road
MDR 0 6.00 6.00 6.00 - - - - Bad 6.00 - NH-2 Suara Hawaiadda to
Bagain
208 South Bhojpur Dehri on Sone Nawadih-Muriyarchilbila
Road
MDR 0 6.70 6.70 6.70 - Bad 6.70 - Nawadih (Dehri Nasariganj
Bikramganj) Dehri Terrah209 South Bhojpur Dehri on Sone Dinara Baraon Road MDR 0 22.40 22.40 0 22.40 - - - - Fair 5.00 6.40 11.00 - Dinara (Block) Basaib (Arha
Sasaram)
210 South Bhojpur Dehri on Sone Belarhi-Haridaspur Road MDR 0 4.70 4.70 0 4.70 - - Fair 4.70 - Sonbarsa Belari Village
211 South Bhojpur Dehri on Sone Shankarpur Dudhani
Lakshman Bigha Road
MDR 0 4.50 4.50 0 4.50 Good 0.00 4.50 Shankarpur Dudhani Village
(NH-2C)212 South Bhojpur Dehri on Sone Shershah Tomb road MDR 0.0 3.00 3.00 0.00 3.00 - - Good 0.00 3.00 - Sasaram to Sasaram Shersha
tomb
Page 10 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
213 South Bhojpur Dehri on Sone Nasriganj Hariganj
Jamalpur Road
MDR 0 3.00 3.00 3.00 - - - Fair 0.00 3.00 - Nasriganj to Hariganj Village
214 South Bhojpur Dehri on Sone Telkap More to Amjhore
Factory
MDR 0 3.50 3.50 0 3.50 - - Fair 0.00 3.50 - Telkapmore (NH-2C) to
Amjhore Factory215 South Bhojpur Dehri on Sone Baradih Baijala Road MDR 0 4.00 4.00 4.00 - - Fair 0.00 4.00 - Baradih (Sasaram Chauta)
Baijala216 South Bhojpur Dehri on Sone Nokha Siyanwak Road MDR 0 3.00 3.00 0 3.00 - - Fair 0.00 3.00 - Nokha to Siyanwak Village
217 South Bhojpur Dehri on Sone G. T. Road to Pahleja Via.-
Jawahar Lal Nehru
College Road
MDR 0 2.00 2.00 - 0.00 2.00 - - Good 0.00 2.00 - Old G. T. Road to Pahleja
Village
218 South Bhojpur Dehri on Sone OLD G.T. Road Kumuhu
to Suara
MDR 0 19.30 19.30 - 0.00 19.30 - - Fair 0.00 13.00 0.00 3.30 0.0 3.00 - Kumuhu Sasaram Suara
219 South Bhojpur Dehri on Sone G.T. Road to Pathpura
Via Khairarh
MDR 0 6.50 6.50 6.50 - - - - Fair 0.00 6.50 - G.T. Road to Pathpura
Khairarh220 South Bhojpur Dehri on Sone Babhanaul Kowath Road MDR 0 3.50 3.50 3.50 - - Bad 0.00 3.50 - Babhanaul adda (Dumeraon
Bikramganj) and kowath221 South Bhojpur Dehri on Sone Nauhatta link Road MDR 0 4.00 4.00 4.00 - - Fair 0.00 4.00 - Dabua (NH-2C) to Nauhatta
block222 South Bhojpur Dehri on Sone Jalalpur-Samardiha Road MDR 0 2.50 2.50 - 0.00 2.50 - - Good 0.00 2.50 - Jalalpur Village to samardiha
Village
223 South Bhojpur Dehri on Sone Nasriganj Bazar Portion MDR 0 3.20 3.20 0.00 3.20 - - Fair 0.00 3.20 - Nasriganj
224 South Bhojpur Dehri on Sone Akbarpur -Yadunathpur
Road
MDR 0 45.00 45.00 0 45.00 - - - - Fair 13.00 0.00 27.00 0.0 5.00 - Akbarpur Nauhtta Yadunathpur
225 South Bhojpur Dehri on Sone Sasaram Tilauthu Road MDR 0 19.00 19.00 19.00 - - Fair 0.00 7.00 0.00 12.00 - Sasaram Tilauthu
226 South Bhojpur Dehri on Sone Rajpur Nokha Road MDR 0 21.00 21.00 - 0.00 21.00 - - Fair 0.00 21.00 - Rajpur Nokha
227 South Bhojpur Dehri on Sone Nimiyadih Chitauli Road MDR 0 15.60 15.60 0 15.60 - - - Fair 0.00 15.60 - Nimiyadih Chitauli (NH-2C)
228 South Bhojpur Dehri on Sone Gohi Mauna Road Via.
Hemeradih-Garaon Road
MDR 0 8.40 8.40 0 8.40 - - - - Bad 1.40 0.00 7.00 - Gohi (Dehri Bikramganj Nokha
Nasriganj229 South Bhojpur Dehri on Sone Dhanghai Surajpura
Kalyani Road
MDR 0 6.00 6.00 0 6.00 - - - - Good 0.00 6.00 - Dhanghai Surajpura
230 South Bhojpur Dehri on Sone Piro Agiaon Kowath Road MDR 0 6.00 6.00 0 6.00 - - Bad 0.00 6.00 - Piro Kowath
231 South Bhojpur Dehri on Sone Keshobigha Baruna
Salukpur Munair Road
MDR 0 4.50 4.50 0 4.50 - - - Good 0.00 4.50 - Keshobigha (DTR) Salukpur
232 South Bhojpur Dehri on Sone G.T. Road Gangauli
Gobardanpur Road
MDR 0 7.50 7.50 0 7.50 - - - Fair 4.50 2.00 1.00 - Gangauli Gobardanpur
233 South Bhojpur Dehri on Sone Dehri-Anicut Road MDR 0 4.50 4.50 - 0.00 4.50 - - Good 0.00 4.50 - Dehri to Dehri
234 South Bhojpur Dehri on Sone Dehri-Railway Station
Rakshabir Road
MDR 0 1.50 1.50 - 0.00 1.50 - - Good 0.00 1.50 - Dehri to Dehri Station
235 South Bhojpur Dehri on Sone Old G.T. Road Bazar
Portion
MDR 0 1.50 1.50 - 0.00 1.50 - - Good 0.00 1.50 - Dehri Bazar Portion
236 South Bhojpur Dehri on Sone Nokha Noonsari By Pass MDR 0 1.50 1.50 0 1.50 - - - - Bad 0.00 1.50 -
237 South Bhojpur Dehri on Sone Sasaram Nekta Hill MDR 0 4.00 4.00 - 0.00 4.00 - - - Good 0.00 4.00 -
238 South Bhojpur Dehri on Sone Nasriganj Bihta Danwar
Road (SH-81)
SH-81 0 0.00 19.00 - 0.00 19.00 - - - Fair 0.00 19.0 -
238 South Dehir-on-
Sone Total
641.56 223.46 167.00 251.10 0.00 193.26 394.80 53.50
239 South Central Biharsharif Fatuha Hilsa Ekangarsarai
Road
SH-4 12.00 34.00 22.00 0.00 22.00 7.00 Fair Fair 0.00 22.0 Const. by CPWD
under RSVY
Daniyawan, Ekngarsarai
240 South Central Biharsharif Ekangarsarai Islampur
Road
SH 4 0.00 10.00 10.00 0.00 10.00 7.00 Fair Fair 0.00 10.0 Const. by CPWD
under RSVY
Ekangarsarai, Islampur
241 South Central Biharsharif Islampur Hulasganj Road SH 4 0.00 8.00 8.00 - 0.00 8.00 7.00 Fair Fair 0.00 8.00 Const. by CPWD
under RSVY
Islampur, Hulasganj
242 South Central Biharsharif Chandi Noorsarai Road SH 78 0.00 6.00 6.00 0 6.00 Bad Bad 0.00 6.00 Under Const. by
B.S.R.D.C.L.
Chandi, Noorsarai
243 South Central Biharsharif Noorsarai - Sarmera Road SH 78 0.00 42.40 42.40 0 42.40 50.00 0.00 42.40 Under Const. by
B.S.R.D.C.L.
Noorsarai , Sarmera
244 South Central Biharsharif Islampur Kewali Rajgir
Giriyak Parwatipur Road
SH 71 0.00 61.00 61.00 0.00 61.00 7.00 Good Good 0.00 61.00 Road Transer to
S.H. Nawada
Islampur Kewali, Rajgir Market
Bank Dharmshala Hospital,
Rajgir Giriyak Parwatipur etc.
245 South Central Biharsharif Asthawan Saksohra MDR 0.00 18.45 18.45 0.00
to
18.45
18.45 0 to 18.45 18.45 W/S 12.12.06 28.06.09 5.50 Bad 28.06.12 Bad 0.00 18.45 Benar More NH-82, Manpur
Bind Nauranga, Saksohra NH-
30A
Page 11 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
246 South Central Biharsharif Bihar Bakhtiyarpur MDR 0.00 8.00 8.00 0.00 to
08
8.00 0 to 8.00 8.00 W/S 11.06.08 08.09.09 10.50 Fair 07.09.12 Fair 0.00 8.00 Kagil Chowk NH-31,Biharsarif
Town, Pachasa247 South Central Biharsharif Pawapuri Jal Mandir MDR 0.00 4.00 4.00 2.6 to
3.00
0.40 0.00
to 2.6
&
3.00
to
4.00
3.60 0 to 4.00 4.00 W/S 17.01.08 28.03.10 3.05 &
5.50
Good 28.03.13 Good 0.00 4.00 Pawapuri More NH-31,
Pawapuri Jal Mandir
248 South Central Biharsharif Bihar - Ekangarsarai Road MDR 0.00 1.20 1.20 0.00 to
1.20
1.20 7.00 Fair
&
Bad
0.00 1.20 Bharawper, Ramchndarpur NH-
31 Biharsarif Town
249 South Central Biharsharif Amber More - Badi
Dargah
MDR 0.00 3.00 3.00 1.2 to
3.00
1.80 0.00 to
1.20
1.20 0 to 2.60 2.60 P/R 16.01.12 28.03.12 1.80km.
3.05m
1.20km
7.0m
Good 28.03.14 Fair 0.00 3.00 Amber More NH-82 Badi
Dargah, Biharsarif Town
250 South Central Biharsharif Bharowpar Khandakpar MDR 0.00 2.00 2.00 0.00
to
2.00
2.00 0.58 PCC 20.01.09 31.07.09 5.50 Good 31.07.12 Good 0.00 2.00 Bharowpar, Khandakpar,
Biharsarif Town
251 South Central Biharsharif Bihar Nijay-NH-82 MDR 0.00 15.76 15.76 0 to
0.786
0.79 0.786
to
15.76
14.97 1-11
12-15.76
11.00
4.76
P/R
W/S
16.01.12
-
12.12.06
15.03.12
30.06.07
31.03.09
5.5
5.50
Good 15.03.14
31.03.12
Fair 15.76 Amber More NH-82, Nijay,
Rahul Nijay
252 South Central Biharsharif Chero Bazar, NH-31 MDR 0.00 1.50 1.50 0.00 to
1.50
1.50 0 to 1.50 1.50 P/R 16.01.09 31.07.09 7.00 Fair 30.07.12 Fair 0.00 1.50 P/R NH-31 To NH-31, Chero Bazar
253 South Central Biharsharif Chandi Sohsarai MDR 0.00 19.48 19.48 ___ 0.00 9.00 0.00 10.48 ___ 9.10
10.38
IRQP
W/S
11.06.08
11.06.08
30.06.10
12.03.10
5.50
7.00
Fair 30.06.13
11.03.13
Fair 0.00 19.48 Jaitipur, NH-30A, Sohsarai
Biharsarif, Chandi Noorsarai254 South Central Biharsharif Chandi Sohsarai (A) SH-78 0.00 9.10 9.10 ___ 0 to
9.00
9.00 9.00 to
9.10
0.10 0 to 9.10 9.10 IRQP 11.06.08 30.06.10 5.50 Fair 30.06.13 Fair 9.10
255 South Central Biharsharif Chandi Sohsarai (B) MDR 9.10 19.48 10.38 ___ 9.10 to
19.48
10.38 9.10 to 19.48 10.38 W/S 11.06.08 12.03.10 7.00 Fair 12.03.13 Fair 10.38
256 South Central Biharsharif Kumar CinemaTelephone
Exchange Bhaisasur
Chouraha Kagji Moholla
NH-82
MDR 0.00 1.60 1.60 0 to
1.60
1.60 0 to 1.60 1.60 W/S 11.06.08 12.03.10 7.00 Fair 12.03.13 Fair 0.00 1.60 Kumar Cinema, Kagji Moholla
NH-82, Biharsarif Town
257 South Central Biharsharif Laheri Thana to Mangla
Sthan NH-31
MDR 0.00 1.06 1.06 0 to
1.06
1.06 0 to 1.06 W/S 20.03.10 31.08.10 5.50 Good 31.08.13 Good 0.00 1.06 Laheri Thana RCD Road,
Mangla Sthan NH-31,
Biharsarif Town258 South Central Biharsharif Nalanda College More to
Baradari NH-82
MDR 0.00 0.43 0.43 ___ 0 to
0.43
0.43 0 to 0.43 0.43 W/S 05.02.10 20.03.10 5.50 Good 20.03.13 Good 0.00 0.43 Nalanda College, Baradari NH-
82, Biharsarif Town259 South Central Biharsharif Amber More Badi Pahari
via Hospital more
MDR 0.00 2.80 2.80 ___ 0 to
2.80
2.80 0.3 to 1.147 &
2.03 to 2.80
1.61 IRQP 22.10.08 31.08.09 5.50 Good 31.08.12 Fair
&
Good
0.00 2.80 Amber More NH-82, Badi
Pahari, NH-31, Biharsarif
Town
260 South Central Biharsharif Hilsa Noorsarai Road MDR 0.00 18.98 18.98 ___ 0 to
18.98
18.98 0-10
11-18.98
10.00
8.98
W/S
W/S
12.12.06 30.01.09
20.10.08
5.50
5.50
Bad
Bad
30.01.12
20.10.11
Bad
Bad
0.00 18.98 Hilsa, Noorsarai,
261 South Central Biharsharif Nagarnausa Khushrupur MDR 0.00 1.69 1.69 ___ 0 to
1.69
1.69 ___ ___ 0 to 1.69 1.69 W/S 12.12.06 27.02.08 5.50 Fair 27.02.12 Fair 0.00 1.69 Nagarnausa
262 South Central Biharsharif Mausimganj Aungari MDR 0.00 4.00 4.00 ___ 0 to
4.00
4.00 ___ ___ 0.60 to 4.00 2.40 W/S 28.02.09 31.03.10 5.50 Fair 31.03.13 Fair 0.00 4.00 Kund water/Mausimganj,
Aungari, Mausimganj 263 South Central Biharsharif Salepur Soradih MDR 0.00 18.00 18.00 2(P) &
3 (P)
0.40 0 to
18.00
17.60 ___ ___ 0-3 & 11-18 11.00 W/S 14.11.06 31.03.10 5.50 Fair 31.03.13 Fair 0.00 18.00 Salepur, Narsanda
264 South Central Biharsharif Gridhkut, N.H.82 MDR 0.00 1.30 1.30 ___ 0 to
1.30
1.30 ___ ___ 0 to 1.30 1.30 W/S 11.06.08 31.03.09 5.50 Fair 31.03.12 Fair 0.00 1.30 N.H.82, Vishwa Shanti Stup
(Road)
265 South Central Biharsharif Swarn Bhandar MDR 0.00 0.70 0.70 0 to 0.70 0.70 ___ ___ ___ 0 to 0.70 0.70 W/S 11.06.08 31.03.09 3.05 Fair 31.03.12 Fair 0.00 0.70 N.H.82, Swarn Bhandar, Rajgir
266 South Central Biharsharif Virayatan MDR 0.00 2.00 2.00 ___ ___ 0 to
2.00
2.00 ___ 0 to 2.00 2.00 W/S 11.06.08 31.03.10 7.00 Good 31.03.13 Good 0.00 2.00 N.H.82, Hokko Hotel Japani
Temple, Thathgat Viryatan267 South Central Biharsharif Rajgir College MDR 0.00 1.57 1.57 0.87 to
1.065
0.195 ___ 0 to
0.87 &
1.065
to 1.57
1.37 ___ 0 to 1.57 1.57 W/S 11.06.08 31.03.10 0.195km
3.05
1.375km
7.00
Good 31.03.13 Good 0.00 1.57 Makdumkund, Kalali More
(Rajgir), Bangali Para, Mohalla
Rajgir
268 South Central Biharsharif Ajatshatru MDR 0.00 0.25 0.25 ___ ___ 0 to
0.25
0.25 ___ 0 to 0.25 0.25 W/S 11.06.08 31.03.09 7.00 Fair 31.03.12 Fair 0.00 0.25 Viryatan Road, Ajatsatru Road,
Ajatsatru Maidan269 South Central Biharsharif Rajgir Bazar MDR 0.00 1.25 1.25 ___ ___ 0 to
1.25
1.25 ___ 0 to 1.25 1.25 W/S 11.06.08 31.03.09 7.00 Good 31.03.12 Good 0.00 1.25 NH-82, Hospital More Rajgir,
Rajgir P.S. Hospital, Important
Hotels and Markets270 South Central Biharsharif Rajgir Panditpur MDR 0.00 2.25 2.25 0.33 ___ 1.92 ___ 0 to 2.25 2.25 W/S 11.06.08 31.03.10 0.330km
305
1.920km
7.00
Good 31.03.13 Good 0.00 2.25 Kalalimore to NH-32 Near
Railway crossing, Panditpur
village Rajgir Block
271 South Central Biharsharif Ghoshi Hulasganj
Sukhiyawan Khudaganj
Road
MDR 17.48 19.73 2.25 ___ 17.48
to
19.73
2.25 ___ 17.48 to
19.73
2.25 W/S 29.01.08 31.03.09 5.50 Fair 31.03.12 Fair 2.25 Jahanabad District Border,
Khudaganj more, Khudaganj,
Hulasganj etc 272 South Central Biharsharif Rajgir Block Road MDR 0.00 0.31 0.31 ___ ___ 0 to
0.305
0.31 ___ 0 to 0.305 0.31 W/S 15.04.08 31.03.09 7.00 Fair 31.03.12 Fair 0.00 0.31 NH-82, Rajgir Block
273 South Central Biharsharif Makhdum Road Rajgir MDR 0.00 0.27 0.27 ___ ___ 0.00 0.27 ___ 0 to 0.27 0.27 W/S 15.04.08 31.03.09 7.00 Fair 31.03.12 Fair 0.00 0.27 NH-82, Makhdum kund Road,
Makhdum kund Rajgir
274 South Central Biharsharif Islampur Kewali Rajgir
Giriyak Parwatipur Road
48 (p) to 50 (p)
MDR 47.55 49.35 1.80 ___ 47.8
to
48.2
0.40 1.40 ___ 47.55 to
49.35
1.80 W/S 04.01.08 29.06.08 0.40km
4.88
1.40km
7.00
Fair 29.06.11 Fair 1.80 NH-82 Bus stand more, Ayodh
Factory Gate, Rajgir Market
Bank Dharamsala Hospital etc.
Page 12 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
275 South Central Biharsharif Silaw Bazar Road MDR 0.00 1.35 1.35 0.00 1.35 3.05 Fair Fair 1.35 NH-82 More (South), NH-82
More (North), Silaw Bazar
Village276 South Central Biharsharif Deepnagar Bazar Road MDR 0.00 1.00 1.00 0 to 1.00 1.00 ___ ___ ___ 3.05 Fair Fair 0.00 1.00 NH-82 More (South), NH-82
More (North), Deep Nagar
Bazar Police Station277 South Central Biharsharif Nalanda Link road MDR 0.00 4.00 4.00 2.50 to
3.00
0.50 3 to 4 1.00 0 to
2.50
2.50 0 to 4.00 4.00 S/R 31.03.08 0.500km
3.05
1.00km
5.50
2.50km
Fair 31.03.11 Fair 0.00 4.00 NH-82 Nalanda More,
Kundalpar (Nadhyawart),
Nalanda University Surajpur
Kundalpur Bargawan
278 South Central Biharsharif Pali Institute Road
Nalanda
MDR 0.00 0.60 0.60 0 to 0.60 0.60 ___ ___ ___ 0 to 0.60 0.60 IRQP 31.03.08 3.05 Fair 31.03.11 Fair 0.00 0.60 Kapatia More in Nalanda Link
Road, Nav-Vihar Nalanda to
Pali Institute, Nav-Vihar
Nalanda University279 South Central Biharsharif Mayapur Mohabatpur
Road
MDR 0.00 5.00 5.00 0.00 5.00 ___ ___ ___ 3.05 Bad 27.03.11 Bad 0.00 5.00 Mayapur- Mohabatpur,
Mayapur Katrisarai Lalbigha
Mohbatpur280 South Central Biharsharif Suraj Kund Road MDR 0.00 0.25 0.25 0 to 0.25 0.25 ___ ___ ___ 3.05 Fair Fair 0.25 NH-82 (Near Kund Area),
Makdumkund Road, Surajkund
281 South Central Biharsharif Chero NH-30A
(Bahadurpuar)
MDR 0.00 8.64 8.64 5.45 to
5.965
0.52 0.00 8.12 ___ ___ 0 to 8.64 8.64 W/S 14.04.08 31.08.09 0.515km
3.05
8.125km
5.50
Fair 31.08.12 Fair 8.64 NH-31 Dawanka Bigha, NH-30
A (Bahadurpur), Kalayan Bigha
Sevdah etc.
282 South Central Biharsharif Kundalpur Pawapuri Road
via Dharhara Nanad
MDR 0.00 12.065 12.065 0 to
12.065
12.065 0 to 12.065 12.07 W/S 04.06.10 03.12.11 5.50 Good Good 12.065 NH-82 Nalanda More, MH-31
Pawapuri
283 South Central Biharsharif Link Road NH-82 Pipaltar
to Kundalpur Pawapuri
Road via Sabiat Niyamat
Nagar
MDR 0.00 3.40 3.40 0 to 3.40 3.40 0 to 3.40 3.40 W/S 04.09.10 03.06.11 5.50 Good 03.06.14 Good 3.40 NH-82 Pipaltar, Niyamatpur
Nagar
284 South Central Biharsharif Nijay Gonwan Road MDR 0.00 6.87 6.87 0.00 6.87 0 to 6.87 6.87 W/S 19.01.11 5.50
(Proposed)
Bad 6.87 W/S work in
progress
Nijay, Gonwan
285 South Central Biharsharif Silaw Giriyak Road MDR 0.00 12.00 12.00 0 to
12.00
12.00 Bad Bad 12.00 Recently transfer
from RWD.
Silaw, Giriyak
286 South Central Biharsharif Goshrawan-Pawapuri
Belari Road
MDR 0.00 12.30 12.30 0 to
12.30
12.30 7.00 Bad Bad 12.30 Recently transfer
from RWD.
Goshrawan, Pawapuri
287 South Central Biharsharif Goshrawan-
Chhachhubigha Belari
MDR 0.00 7.50 7.50 0.00 7.50 Bad Bad 7.50 DPR work in
progress
Goshrawan, Belari
287 South Biharsharif Total 379.75 116.37 118.25 134.73 10.40 93.83 161.43 124.50
288 South Central New Capital Frazer Rd/Mazharul Haq
Path
MDR 0.00 1.56 1.56 — — 1.56 0.0-1.56 1.56 W/S 12.08.09 03.06.10 2x10.5 Good 02.06.13 Good 1.56 Work done by
BRPNN
Nehru Gol., J.P. Gol., Radio
Station, Jay Parkash Bhawan,
Dakbanglow289 South Central New Capital Dakbanglow Rd MDR 0.00 0.375 0.38 — — — 0.38 0.0-0.375 0.375 P/R 27.05.10 10.06.10 2x9.0 Good 09.06.13 Good 0.38 Kotwali Thana, Dakbanglow
Chouraha, Maurya Complex,
Vidyalaya Nirichar Bhawan290 South Central New Capital New Dakbanglow Rd MDR 0.00 0.43 0.43 — — — 0.43 0.0-0.43 0.43 W/S 14.02.09 13.08.09 2x7.0 Good 12.08.12 Fair 0.43 Dakbanglow Chouraha,
Bhattscharya Chouraha, N.P.
Centre291 South Central New Capital Golakpur Link Rd MDR 0.00 1.16 1.16 — 1.16 — 0.0-1.160 1.160 P/R 06.10.06 05.01.07 5.20 Fair Expired Fair 1.16 Ashok Rajpath Jn., Gandhi
Ghat & Law College, N.I.T.
Patna 292 South Central New Capital Sinha Library Rd MDR 0.00 0.63 0.63 — — — 0.0-
0.630
0.63 0.0-0.630 0.630 W/S 15.12.06 27.05.08 2x5.5 Good 26.05.11 Fair 0.63 Dakbanglow Road Jn., T.N.
Banarjee Road Jn., Sinha
Library293 South Central New Capital Chhajjubagh Link Rd MDR 0.00 1.04 1.04 — — 1.04 0.0-1040 1.04 P/R 17.01.09 16.02.09 1x6.0
1x3.5
Good 15.02.12 Good 1.04 Radio Station, C.J. Gate &
Other, C.J. House294 South Central New Capital Chhajjubagh Rd. MDR 0.00 0.40 0.40 — 0.40 — 0.0-0.40 0.40 E/R 02.09.08 17.09.08 4.50 Fair Expired Fair 0.40 T.N. Banarjee Rd. Jn., Radio
Station, Hindi Bhawan, S.E.
Office Patna Central Circle,
RCD295 South Central New Capital T.N. Banarjee Rd. MDR 0.00 0.76 0.76 — 0.76 0.0-0.760 0.76 P/R 24.10.07 23.11.07 7.0(av) Fair Expired Fair 0.76 Budh Marg Jn., Around Gandhi
Maidan Road Jn., Lala Lajpat
Rai Bhawan296 South Central New Capital Jamal Rd. MDR 0.00 0.47 0.47 — 0.47 0.0-0.47 0.47 W/S 16.12.06 12.05.08 5.75 Good 11.05.11 Fair 0.47 New Dakbanglow Road Jn.,
Station Road Jn., Clark Hotel297 South Central New Capital S.P. Verma Rd MDR 0.00 0.34 0.34 — — — 0.34 0.0-0.340 0.34 W/S 15.12.06 11.05.08 2x5.5 Good 10.05.11 Fair 0.34 Swabhinandan Golumber, New
Dakbanglow Road Jn. Sumati
Place
298 South Central New Capital Bhattacharya Rd MDR 0.00 0.23 0.23 — — — 0.23 0-0.230 0.230 IRQP 24.10.07 17.03.09 2x6.5 Good 16.03.12 Fair 0.23 Bhattacharya Chauraha,
Rajendra Road Jn., Bansal
Appartment299 South Central Harding Road Nehru
golamber to GPO
0.00 0.39 0.39 — — — 0.39 0-0.390 0.39 W/S 15.12.06 03.12.07 2x11 Fair 02.12.10 Fair 0.39 Nehru Gol., G.P.O. Gol., Veer
Kunwar Singh Park, Telephone
Bhawan, Shahid Smarak, Haj
Bhawan300 South G.P.O Gol. To Railway
Crossing
0.00 0.94 0.94 0.94 0-0.94 0.94 W/S 15.12.06 01.06.08 2x10.5 Good 31.05.11 0.94
301 South (Railway Crossing to
Patel Gol.)
0.00 2.61 2.61 2.61 0.0-2.50 2.61 W/S 26.02.09 23.05.09 2x9.00 Good 22.05.12 2.61
302 South Central New Capital Station Road MDR 0.00 0.44 0.44 — — — 0.44 0-0.440 0.44 P/R 19.10.09 18.12.09 2x5.5 Good 17.12.12 Good 0.44 Nehru Gol., Chiraiyatar ROB,
Veena Cinema
New Capital MDR
Page 13 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
303 South Central New Capital Brajkishore Path
(Exhibition Road)
MDR 0.00 1.10 1.10 — — — 1.10 0-0.712 1.10 W/S 15.12.06 12.05.08 2x10.5 Good 11.05.11 Fair 1.10 — Gandhi Maidan Rd. Jn.,
Chiraiyatar ROB, Luv Kus
Tower, Chanakya Cinema,
Apsara Cinema304 South Central New Capital Ashok Rajpath MDR 0.00 3.20 3.20 — — 3.20 0-3.20 3.20 P/R 27.11.06 31.03.07 2x7.5
1x15.0
1x11.0
1x6.50
Fair Expired Fair 3.20 Gandhi Sangharalya, Mahendru
SBI, Magadh Mahilla College,
Red Cross, Krishna Memo.
Hall, B.N. College, PMCH,
Patna Science College
305 South Central New Capital Road Around Gandhi
Maidan
MDR 0.00 1.57 1.57 — — — 1.57 0-1.57 1.57 P/R 18.10.09 17.12.09 2x7.0
15.0
17.0
Good 16.12.12 Good 1.57 D.M. Residence, Elefiston
Cinema Hall, Biskoman
Bhawan, RBI, Mona & Elefiston
Cinema 306 South Central New Capital Bari Road MDR 0.00 2.60 2.60 — — — 2.60 0-0.2.60 2.60 W/S 04.02.09 17.09.10 11.0(av) Good 16.09.13 Good 2.60 Apna Bazar, Ashok Rajpath
Jn., Rupak Cinema, Hatwa
Market, Patna Collegiate
School307 South Central New Capital Civil Court Link Rd MDR 0.00 1.60 1.60 — — — 1.60 0-1.600 1.60 W/S 20.12.08 20.05.10 2x5.5
11.0(av)
7.0(av)
Good 19.05.13 Good 1.60 Kargil Chowk, Civil Court &
Other, Vikash Bhawan,
Collectriate Office, Bankipur
Club, RRB Office, Civil Court308 South Central New Capital Kankarbagh Main Rd MDR 0.00 5.65 5.65 — — — 5.65 0.69 to 2.115
01.42km.
2.905-5.345
= 2.44km.
2.44 W/S 16.06.08 19.07.09 2x10.5 Good 18.07.12 Fair 5.65 Work done by
BRPNN
Chirayatarn ROB, Kumhrar
Shitla Mandir, Chiryatarn,
Rajendra Nagar Terminal,
Commerce College, Shitla
Mandir309 South Central New Capital Rajendra Nagar ROB Rd MDR 0.00 0.70 0.70 — — — 0.70 0-0.700 0.70 P/R 2010-11 2010-11 2x7.0 Good 13-14 Good 0.70 Vaishali Gol., Kankarbagh
Road No. 2 Jn., Rajendra
Nagar, Kankarbagh310 South Central New Capital Rajendra Nagar East
service lane
MDR 0.00 0.677 0.68 — 0.68 0-0.677 0.677 P/R 2006-07 2006-07 6.1-3.65 Fair Expired Fair 0.68 Vaishali Gol., Kankarbagh
Road No. 2 Jn., Heart Hospital
311 South Central New Capital Rajendra Nagar West
service lane
MDR 0.00 0.677 0.68 — 0.68 0-0.677 0.677 P/R 2007-08 2007-08 5.0-3.65 Fair Expired 0.68 Vaishali Gol., Kankarbagh
Road No. 2 Jn., Vaishali
Cinema312 South Central New Capital Karbigahiya Rd MDR 0.00 0.904 0.90 — — 0.90 0.90 Karbigahiya Gumti, Chiryatand
ROB, Karbigahiya Rly. Jn.
313 South Central — — — 1.85 1.34-1.852 1.852 W/S 17.03.06 31.12.06 2x14.0 Fair 30.12.09 Fair 1.852 Karbigahiya Road T. Jn., NH-
30 T.Jn., Mithapur Bus Stand,
NH-30, Mithapur Agg.
Reaserch Inst.313 South 0.0-1.340 1.852 W/S 02.05.07
02.03.09
31.03.09
31.03.09
2x14.0
2x7.0
Good 30.03.12 Fair
314 South Central New Capital Rajendra Path MDR 0.00 1.83 1.83 — — — 1.83 0-1.82 1.83 W/S 27.11.08 04.06.09 2x10.50 Good 30.06.12 Good 1.83 Work done by
BRPNN
Chirayantar ROB, Bari Path
Jn., CDA office, Uma Cinema,
Hindi Sahitya Smmelan.315 South Central New Capital Arya Kumar Rd MDR 0.00 1.20 1.20 — — — 1.20 0-1.20 1.20 W/S 20.12.08 28.03.10 2x8.5
11.0(av)
Good 27.03.13 Good 1.20 Vaishali Gol., Bari Path Jn.,
Machli Market.316 South Central New Capital R.K. Avenue Rd/Nala Rd MDR 0.00 3.20 3.20 — — — 3.20 0-0.825
0.825-2.055
3.20 Strengthening
W/S
24.02.09
20.12.08
18.07.09
14.03.10
11 (av) Good 17.07.12
1303.13
Good 3.20 Rajendra Path, Bahadurpur
Gumti, Sashi Place, Dinkar Gol.
& Premchand Gol. Macdonal
Gol.317 South Central New Capital Kankarbagh Rd No 1 MDR 0.00 1.20 1.20 — — — 1.20 0-1.20 1.20 W/S 15.10.08 11.12.09 10.0(av) Good 10.12.12 Good 1.20 K. Bagh Colony More, Tempo
Stand, Shalimar Sweets,
Tempo Stand.
318 South Central New Capital Kankarbagh Rd No 2 MDR 0.00 1.93 1.93 — — — 1.93 0-1.930 1.93 W/S 20.12.08 02.12.09 12.0(av) Good 01.12.12 Good 1.93 Shalimar Sweets, Munna Chak
K. Bagh Main Rd. Jn., K. Bagh
Community Hall Central
School.319 South Central New Capital Kankarbagh Rd No 3 MDR 0.00 1.69 1.69 — — — 1.69 0-1.696 1.69 W/S 25.11.08 30.07.10 2x10.5 Good 29.07.13 Good 1.69 Doctor's Colony, NH.-30 T.Jn.,
Doctor's Colony, Malahi Pakri.
320 South Central New Capital Kankarbagh Rd No 4 MDR 0.00 4.70 4.70 — 4.70 0-4.70 0.70 W/S 21.01.08 30.06.10 10.5-7.0 Good 29.06.13 Fair 4.70 Dwarika College, Hanuman
Nagar,Dwarika College, PNN
Circle Office, Hanuman Nagar,
Pani Tanki321 South Central New Capital Gyatri Mandir Rd MDR 0.00 0.70 0.70 0.70 — 0-0.70 0.70 P/R 2006-07 2006-07 5.5-3.75 Fair Expired Fair 0.70 Kankarbagh Rd. No.-2 Jn.,
Kankarbagh Rd. No.-4 Jn.,
Gyatri Mandir
322 South Central New Capital Bhoot Nath Rd MDR 0.00 1.786 1.79 — — 1.79 0-1.057
1.057-1.786
1.79 W/S 24.02.09
02.03.10
23.08.09
2 months
7.0
7.0
Good 3 years Good 1.79 Kankarbagh Main Rd. Jn., NH-
30 Jn., Bhoot Nath Ashram
323 South Central New Capital Bhoot Nath Link Rd MDR 0.00 0.82 0.82 0.82 0-0.263 0.82 IRQP 20.02.09 One
months
Two Month — 0.82 Booth Nath Jn. (Sadanand
Singh House), Booth Nath Jn.
(Nala Par), Ustav Hall Link Rd.
324 South Central New Capital Saidpur Road MDR 0.00 0.51 0.51 — 0.51 0.510 0.510 W/S 24.10.07 15 days 9.00 Good 6 month Good 0.51 Premchand Gol., Bari Path Jn.,
Saidpur Nala325 South Central New Capital Kankarbagh L Sector Rd MDR 0.00 1.29 1.29 — 1.29 1.290 1.290 IRQP 17.01.09 One
months
1.29 One Year 1.29 Near Dwarika College,
Kankarbagh Rd. No.-4 Jn., Rd.
No. A,B,C,D,E,F,G- Sector326 South Central New Capital Postal Park Road MDR 0.00 2.40 2.40 2.40 2.40 2.40 13.04.11 6 month 2.40 3 Year — 2.40 Chirayartarn ROB., NH-30 Jn.
0.00 1.852 1.85New Capital MDRMithapur Bus Stand Rd
Page 14 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
327 South Central New Capital Chiraiyatand North East
Service Road (Rajendra
Path Jn.)
MDR 0.00 0.15 0.15 0.15 0.00 0.15 W/S 24.02.09 One
months
3 Year 0.15
328 South Central New Capital New Police Line to
Biscoman Jn.
MDR 0.00 0.803 0.80 0.80 0.00 0.803 W/S 06.12.10 05.04.11 11.5-6.75 Good 05.04.14 Good 0.80 Work complete
2011-12329 South Central New Capital Dwarika College More to
Bypass NH-30 via Ashok
Nagar Road No. 8
MDR 0.00 1.113 1.11 1.11 0.00 1.113 W/S 27.12.10 26.06.11 5.500 Good Good 1.11 Work complete
2011-12
330 South Central New Capital Vaishali Golumber at Arya
Kumar Road to Macdonal
Golumber (Both side
North & South)
MDR 0.00 1.204 1.20 1.20 0.00 1.204 Fair 1.20
331 South Central New Capital Hanuman Nagar State
Bank to NH-30 via Kali
Mandir
MDR 0.00 1.568 1.57 1.57 0.00 1.568 25.04.11 24.08.11
Six month
3.65 3 years Good 1.57 Work complete
2011-12
332 South Central New Capital S K Puri to Boring Road
Link Path
MDR 0.00 2.70 2.70 2.70 0.00 2.70 IRQP 06.09.10 05.12.10 6.25 2.70
333 South Central New Capital Salimpur Ahara Link Path MDR 0.00 0.662 0.66 0.66 0.00 0.662 W/S 10.12.10 09.06.11 3.70 09.06.14 Good 0.66 Work complete
2011-12334 South Central New Capital Bazar Samiti to Macdonal
Chowk Golumber
MDR 0.00 0.794 0.79 0.79 0.00 0.794 16.01.12 3 months 0.79
335 South Central New Capital Bhoot Nath Link Road to
NH-30 via Bhagwat Nagar
MDR 0.00 1.256 1.26 1.26 0.00 1.256 1.26
336 South Central New Capital Mangles Road MDR 0.00 1.00 1.00 — — 1.00 0-1000 1.00 W/S 21.02.09 28.04.10 15.00 Good 27.04.13 Good 1.00 Baily Road, Sahid Smarak,
Bidhan Sabha337 South Central New Capital Harding Road MDR 0.00 2.50 2.50 — — 2.50 0-2500 2.50 W/S 26.02.09 23.05.09 2x9.00m Good 22.05.12 Good 2.50 R- Block Railway Crossing,
Patel Golamber R.O.B.338 South Central New Capital South Harding Road MDR 0.00 2.40 2.40 0-240 2.40 — — 0-240 2.400 3.75m. Fair Out of DLP Fair 2.40 Gumti No.-1, Chitkohra R.O.B.,
Back of Minioter's Residence
339 South Central New Capital North Harding Road MDR 0.00 0.600 0.60 0-600 0.60 — — 0-600 0.600 3.75m. Fair Out of DLP Fair 0.60 Mecdonald Road, Patel
Golamber R.O.B.
340 0-750 0.75 W/S 28.02.09 21.11.09 15.00m Good 20.11.12 Good 0.75
340 751-2100 1.35 O/R 20.03.10 25.03.10 5.50m Fair 24.09.10 Fair 1.35
341 South Central 0-400 0.40 0-400 0.40 W/S 15.00m 0.40 Baily Road, Taylor Road.
341 South 401-
1250
0.85 401-1250 0.85 W/S 13.00m. 0.85
342 South Central New Capital Taylor Road MDR 0.00 1.100 1.10 — — — 0-1100 1.10 0-1100 1.100 W/S 09.06.09 04.01.10 15.00m Good 03.01.13 Good 1.10 Baily Road, Patel Golamber,
Raj Bhawan & C.M. House.343 South Central New Capital K.G.A. Path MDR 0.00 0.892 0.89 — — — 0-892 0.89 0.892 9.00m Good Out of DLP Good 0.89 Raj Bhawan, Old Secretriate,
C.M. House & C.M. Secretriate.
344 South Central New Capital Macdonal Road MDR 0.00 0.80 0.80 — — 0.0-600
601-800
0.80 0.0-600
601-800
0.800 W/S 30.11.09 06.11.10 15.00m. Good 05.11.13 Good 0.80 Harding Road, Raj Bhawan,
C.M. House.345 South Central New Capital Off Mall Road MDR 0.00 0.60 0.60 — — 0-600 0.60 0-600 0.600 W/S 03.06.09 05.04.10 7.00m Good 04.04.13 Good 0.60 Harding Road, Old Secretriate,
M.L.A.'S Residence.
346 South Central New Capital Mall Road MDR 0.00 1.00 1.00 — 0.00 1.00 — 0-1000 1.00 5.50m
(Avg.)
Good Out of DLP Good 1.00 Harding Road, Mangle's Road,
Old Secretriate.347 South Central New Capital Wheeler Road MDR 0.00 1.30 1.30 — — — 0-1300 1.30 0-1300 1.300 P/R 19.10.09 19.11.09 2x7.00m Good 18.11.12 Good 1.30 Aireport Patel Golamber, Workshop
Mech.
348 South Central New Capital Riding Road MDR 0.00 0.70 0.70 — — 0-700 0.70 0-700 0.700 P/R 11.11.09 20.12.09 2 x 7.00m Fair 19.12.12 Good 0.70 Airport Baily Road, Mech. Workshop
349 South Central New Capital Jagdeo Path MDR 0.00 3.245 3.25 — — 0-3245 3.25 0-3245 3.245 W/S 27.02.09 15.05.10 7.00m Good 14.05.13 Good 3.25 Diary College
Potato Agriculure
farm
Baily Road, Phulwari/B.Stand
350 South Central New Capital Ashiana-Patliputra Rd MDR 0.00 2.90 2.90 0-
2900
2.90 — 0-2900 2.900 W/S 27.02.09 26.03.10 5.50m Good 25.03.13 Good 2.90 IIT Patna Ashiyana-Digha Road, Boring
Road.
351 South Central New Capital Shekhpura More to
Bidyuth Board Road
MDR 0.00 3.57 3.57 0-
3570
3.57 — 0-3570 3.570 W/S 15.01.09 25.04.10 5.50m. Good 24.04.13 Good 3.57 Baily Road, Bidyut Board.
352 South Central New Capital Bailey Rd to Ashiana-
Patliputra Road
MDR 0.00 2.20 2.20 0-
2200
2.20 — 0-1730 1.730
(2.200)
W/S 09.02.09 24.01.10 5.50m Good 23.01.13 Good 2.20 470mtr. Length
inside I.G.M.S.
(After Fencing by
IGIMS Admn.)
Baily Road, Ashiyana-
Patliputra.
353 South Central New Capital Ashiana-Digha Road MDR 0.00 4.70 4.70 0-4700 4.70 0-4700 4.700 W/S 30.06.08 10.03.09 7.00m. Good 09.03.12 Good 4.70 Work done by
BRPNNL
Baily Road, B.D.Road.
Good06.07.09
0-7501.35
—0.00 1.25 1.25MDR
Strand Road
New Capital Circular Raod — Good— 07.11.1308.11.10
Central New Capital 0.00 2.10 2.10MDRSouth — — 0.75751-
2100
Mangles Road, Taylor Road,
Minister's Residence
Page 15 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
354 South Central New Capital Phulwari Sharif to BMP-16 MDR 0.00 1.20 1.20 — — — 0-1200 1.20 0-1200 1.200 w/S 31.01.07 08.02.09 2X7.00m. Good 07.02.12 Good 1.20 Sahid Bhagat Singh
Chowk
Bhagat Singh Chowk, B.M.-16
355 South Central New Capital Mithapur-Anisabad
Khagaul Road
MDR 0.00 4.255 4.26 — — 1.525km
1.70km
Rest
length
4.26 1.525km
1.70km Rest
length
4.255 W/S 15.12.06
27.02.09
14.08.08
25.03.10
2x7.50
2x7.50m
Good 13.08.11 Good 4.26 Karbigahia Railway Crossing,
Anisabd NH.-30 Jn.
356 South Central New Capital Bankipur-Nadaul Road MDR 0.00 1.71 1.71 — 0-
1710
1.71 0-1710 1.710 O/R 27.09.08 5.5(av) Fair Good 1.71 Schme under
action plan
Karbigahia Cumti, NH. R.O.B.
357 South Central New Capital Phulwari Sharif -Janipur
Road
MDR 0.00 6.175 6.18 — 0-
6175
6.18 — 0-6175 6.175 W/S 08.03.08 12.08.09 5.50m. Good 11.08.12 Good 6.18 N.H.-98 Jn., Akbarpur Village.
358 South Central New Capital N.H.-98 to Sahid Chawk
(Phulwari Bazar Road)
MDR 0.00 1.00 1.00 — 0-
1000
1.00 — 0-1000 1.000 IRQP 20.08.10 15.09.11 5.50 (av.) Good 14.09.14 Good 1.00 I.R.Q.P. N.H.-98, Sahid Chawk,
Phulwari Bazar.
359 South Central New Capital Bailey Road MDR 6.45 6.45 — — — 6.45 6.45 — 6.45 2-4 Strengthening
5-6 (W/S)
Nirman Bhawan, Jagdeo Path,
Botnical Garden, B.P.S.C.,
360 South Central New Capital Bailey Rd. to B.S.E.B. I.B.
Rd (Shastri Nagar Rd)
MDR 0.00 0.79 0.79 — 0-790 0.79 — 0-790 0.790 6.50m.
7.00m.
(av.)
Good Good 0.79 Schme under
action plan
Baily Road, B.S.E.B., I.B.
361 South Central New Capital Baily Rd. (Railway
Crossing to Jagdeo Path)
MDR 1.97 7.967 1.97 — — 1.950 to
3.917
1.97 1950 to 3917 1.967 Strengthening 05.10.09 12.05.10 2x10.50m Good 11.05.13 Good 1.97
362 South Central New Capital W/S of the Road from
R.C.D. Mechanical work
shop, Patna to Jagdeo
Path via Vetenary
College, Patna, BMP -1,
I.C.A.R. Research
Complex & Phulwarisharif
Camp Jail, Patna for the
10-11
MDR 0.00 2.575 2.58 — 0-2575 2.58 0-2575 2.575 W/S 22.02.11 24.07.11 7.00m. 2.58
363 South Central — — 0-544 0.54 5.50m 1.45
363 South 545-563 0.02 3.05m
363 South 564-1450 0.89 3.65m
364 South Central New Capital Rajeev Nagar Road from
Ashiayana Nala Road to
Road No. 23 & 24 Jn. For
the year 2010-11
MDR 0.00 0.850 0.85 — 0-850 0.85 — 0-850 0.850 W/S 8.12.10 7.5.11 5.50m
(Avg.)
Good 6.514 Good 0.85
365 South Central New Capital Improvement of Rajeeva
Nagar Road No.=24 to
Khagaul-Digha Canal Via
House of Shekhar
Photographer (Ghordaur
Survey Road) at Patna for
the year 2010-11
MDR 0.00 1.715 1.72 — 0-
1715
1.72 — 0-1715 1.715 Improvement 17.03.11 9 Month 5.50m
(Avg.)
Fair Fair 1.72
366 South Central New Capital Baily Road Jn. Sheikhpura
More to Peon Quarter
Chowk (Const. of P.C.C.
Road) New Capital Road
Division, R.C.D., Patna
for the year 2010-11
MDR 0.00 0.438 0.44 — 0-438 0.44 — 0-438 0.438 Improvement 4.5.11 3.8.11 5.50m
(Avg.)
Fair Fair 0.44
1.4500-1450 15.03.11ImprovementImprovement of Road
from Khwaza Imali-
Chauharmal Nagar-
Purnendu Nagar-
Karorichak Road for the
Year 2010-11 (Length-
1.450km.)
1 Year0.00New Capital 1.45MDR 1.45
Page 16 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
367 South Central New Capital Const. of PCC Road, Hard
Shouldering & Drain in
Purnendu Nagar-
Mitramandal Colony-
Karorichak Patha (P.M.K.
Road) for the year 2011-
12
MDR 0.00 0.425 0.43 0-425 0.43 — 0-425 0.425 Improvement 4.5.11 3.8.11 3.65m Fair Fair 0.43
368 South Central New Capital Amarnath Path MDR 0.00 0.537 0.54 — 0-0.537 0.54 0-0.537 0.537 W/S 15.12.06 01.06.08 9.00 Fair Out of DLP Fair 0.54 Veerchand Patel Marg, Budh
Marg, Panch Mandir, Krishna
Cinema Resi.
369 South Central New Capital Budh Marg MDR 0.00 2.40 2.40 — — — 0-2.40 2.40 0-2.40 2.40 W/S 29.05.08 25.12.08 2x11.0m. Fair Out of DLP Fair 2.40 B.P.Road Jn., G.P.O. Gol..
370 South Central New Capital I.G. Road MDR 0.00 0.651 0.65 — — — 0-0.651 0.65 0-0.651 0.651 W/S 21.01.08 22.05.09 11.000 Fair 21.05.12 Fair 0.65 Baily Road, Singh Bhawan,
Museum Lady Stifan Hall.
371 South Central New Capital I.G.-PG Link Road MDR 0.00 0.306 0.31 — — — 0-0.306 0.31 0-0306 0.306 W/S 27.01.09 10.02.09 10.00 Fair 9.2.12 Fair 0.31 I.G.Road, Budh Marg, Surya
Clinic NHAI office.372 South Central New Capital Kidwaipuri Srikrishna
Nagar Road
MDR 0.00 2.274 2.27 — — 0-2.2740 2.27 0-2.274 2.274 W/S 27.02.09 26.12.09 9.00m. Fair 25.12.12 Fair 2.27 I.T.O., Golamber, B.D. Road
Jn., SESA Bidg.373 South Central New Capital Bailey Road MDR 0.00 1.950 1.95 — — 0-1.95 1.95 0-1.95 1.950 Strengthing 05.10.09 12.05.10 2x10.00 Good 11.05.13 Good 1.95 Kotwali P.S., Rly. Crossing, Art
College, Vidyapati Bhawan.
374 South Central New Capital Veerchand Patel Path MDR 0.00 1.22 1.22 — — — 0-1.22 1.22 0-1.22 1.22 W/S 17.05.08 26.02.09 2x10.50 Good 25.02.12 Good 1.22 I.Tax Gol., R-Block Chowk, R-
Block Chouraha Veer Kumar
Singh Park.
375 South Central New Capital Daroga Prasad Rai Path MDR 0.00 1.10 1.10 — — — 0-1.10 1.10 0-1.10 1.00 11.50 Fair Fair 1.10 Hartali More, Veerchand Patel
Marg, I.T. Office Ashok, Hotel
Patna Club, Sultan Palace.
376 South Central New Capital Harding Road MDR 0.00 0.940 0.94 — — — 0-0.940 0.94 0-0.940 0.940 2x11.00m. Fair Fair 0.94 G.P.O. Golamber, Rly.
Crossing, Patna High Court.
377 South Central New Capital South Baily Road MDR 0.00 1.10 1.10 — 1-1.10 1.10 — 1.10 1x5.50 Fair Fair 1.10 Baily Road, Daroga Rai Path,
A.N.College, Alpana Market.
378 South Central New Capital Boring Canal Road MDR 0.00 2.00 2.00 — — 0 to 2.0 2.00 1.00 1x8.00 Fair Fair 2.00 Rajapur Pul, Hartali More,
Chitkohra Park.379 South Central New Capital Boring Road West Side MDR 0.00 4.67 4.67 — — 0 to
4.670
4.67 2x7.00 Fair Fair 4.67
380 South Central New Capital Shahdeo Mahto Marg MDR 0.00 0.745 0.75 — — — 0 to
0.745
0.75 2x7.00 Fair Fair 0.75 Boring Canal Road, Boring
Road, Veena Cinema.381 South Central New Capital Shahdeo Mahto Link Path MDR 0.00 0.260 0.26 — 0.260 0.26 — 1x6.00 Fair Fair 0.26
382 South Central New Capital Boring Canal Road East
Side
MDR 0.00 1.990 1.99 — — 0 to
1.990
1.99 1x8.00 Fair Fair 1.99
382 South New Capital
Total
151.81 4.99 29.43 27.22 90.17 10.14 84.03 67.78 0.000 P/R in 9(P) and
10th - 07-08
383 South Central Patna City Sadikpur Pavera Masaurhi
Road
SH 0.00 38.20 38.20 38.20 0 to
38.20
IRQP Fair Fair 38.20 Work is in progress
Being Const. by
CPWD
Patna (Pahari), Masaurhi.
384 South Central Patna City Fatwa Daniyawan Hilsa
Road
SH-4 0.00 5.40 5.40 5.40 3.50 1.90 Estimate submitted
under W/S for Km
14.00 to 26.10
385 South Central Patna City Kansari Dumri Rajghat
SH-78
SH-78 0.00 27.85 27.85 27.85 27.85
386 0.00 10.00 10.00 0 to
10.00
10.00 0 to 10.00 10.00 Improvement
Work
12.012.06 20.03.09 5.50 Good 21.03.12 Motorable 10.00 Barh Thana.
386 11.00 13.00 2.00 11.00
to
13.00
2.00 11.00 to
13.00
20.00 Trafic
Restoration
5.50 Good Motorable 2.00 Karmaine Mathurapur
386 13.00 17.00 4.00 13.00 to
17.00
4.00 13.00 to
17.00
4.00 Trafic
Restoration
12.12.06 20.03.09 3.75 Good 21.03.12 Motorable 4.00 Guraru Mathurapur
386 17.00 25.00 8.00 17.00 to
25.00
8.00 17.00 to
25.00
8.00 3.75 Bad Bad 8.00 Guraru Ahiyapur
387 South Central Patna City Barh Mokama Barahia
Road
MDR 0 10.20 10.20 0 to
10.20
10.20 0 to 10.20 10.20 Strengthening 12.12.06 20.03.09 7.00 Good 21.03.12 Good 10.20 NH-30 at Sewnar, Bata More.
388 South Central Patna City Baktiyarpur Bazar Road MDR 0 2.00 2.00 2.00 2.00 31.03.12 2.00 NH-30 at BKP Thana, NH-30
389 South Central 3.90 3.90 0 to 3.90 3.90 0 to 3.90 3.90 IRQP 13.02.09 30.01.09 3.90 Fair 30.03.09 Motorable 3.90 NH-30 at Bidhipur, Dhowa
River.
South Central
Patna City Bidhipur Soradih Road MDR 0
Patna City Barh Sahari Sarmera
Road
MDR
Page 17 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
389 South 0.00 2.00 0.00 to
2.00
2.00 0.00 to 2.00 2.00 Improvement 12.12.06 20.03.09 3.00 Good 21.03.12 Good 2.00
390 South Central Patna City Baikatpur Bazar Road
(Link Road)
MDR 0 0.00 0.50 0.50 W/S Good 0.50
391 South Central MDR 3.20 10.70 7.50 3.20 to
10.70
7.50 3.20 to 10.70 7.50 IRQP 22.02.08 21.10.08 6.00 Good 22.10.11 Fair 7.50 Mahendru S.B.I., Didarganj NH-
30, Gurudwara and Patandevi
Mandir.
391 South MDR 10.70 3.80 3.10 10.70
to
13.80
3.10 10.70 to
13.80
3.10 Strength.
Improv.
15.12.06 14.08.08 5.70 Fair 15.08.11 Fair 3.10 0.70 Km under
P/R - 07-08
392 South Central Patna City Agamkuan Marufganj
Road
MDR 0 3.89 3.89 0 to
3.89
3.89 0 to 3.89 3.89 W/S 20.05.08 10.06.08 6.60 Fair 01.07.11 Fair 3.89 Agam Kuan Rly. Crossing,
Ashok Rajpath Near Poorab
Darwaza.
393 South Central Patna City Shershah Road MDR 0 2.50 2.50 0 to 2.50 2.50 0 to 2.50 2.50 W/S 25.12.06 14.12.07 3.65 Fair 15.12.10 Fair 2.50 Tripolia More Ashok Rajpath,
Paschim Darwaza Ashok Raj
Path Road.
394 South Central Patna City Guru Govind Singh Road MDR 0 1.20 1.20 0 to
1.20
1.20 0 to 1.20 1.20 P/R 11.07.10 10.05.08 7.00 Fair- 0.7
Bad- 0.5
10.05.10 Fair- 0.7
Bad- 0.5
0.70 0.50 Chowksikarpur AM Road,
Chowk Patna City A.R.Road,
Mangal Talab.395 South Central Patna City Fatuha old Bypass MDR 2.00 2.00 2.00 2.00 2.00 NH-30, NH-30A, Mosipur
(Govindpur).396 South Central Patna City Service cum Haullage
Road
MDR 0 2.20 2.20 0 to
2.20
2.20 0 to 2.20 2.20 P/R 31.12.08 30.03.09 7.00 Good 31.03.12 Fair 2.20 Kumhrar Gumti, Gaighat.
397 South Central Patna City Kumhrar Sandalpur
Sanichara Road
MDR 0 1.17 1.17 0 to
1.17
1.17 0 to 1.17 1.17 Strenth. 21.11.07 30.08.08 5.50 Good 22.08.11 Fair 1.17 Kumhrar Gumti, Dargha.
398 South Central Patna City Ganga Bridge North
Approach (North Ramp)
Road
MDR 0 0.00 0.35 0 to
0.35
0.35 0.35 0 to 0.35 0.35 Biscoman (Golamber) NH-19.
399 South Central Patna City South Ramp MDR 0 0.00 0.60 0.60 0.60 0.60 Danki More, NH-19.
400 South Central Patna City Link Road
(Ganga bridge)
MDR 0 0.00 0.63 0 to
0.63
0.63 0.63 0.63 Biscoman (Golamber),
Agamkuan (Gumti)401 South Central Patna City Agamkuan Pahari Road MDR 0 0.00 1.30 0 to
1.30
1.30 0.00 to 1.30 1.30 P/R 14.12.07 30.03.08 5.50 Good 31.03.11 Good 1.30 Agam Kuan, Pahari.
402 South Central Patna City Khushrupur Nagarnausha
Road
MDR 1.2 11.24 10.04 1.20
to
11.24
10.04 1.20 to 11.24 10.04 Improvement
Work
12.12.06 20.03.09 5.50 Pots have
been
daveloped
21.03.12 Motorable 10.04 Khusrupur, Alawalpur.
403 South Central 11.3 17.80 6.50 11.30
to
17.80
6.50 11.30 to
17.80
6.50 W/S 20.12.06 20.06.08 5.50 Good 20.06.11 Good 6.50 Masauri, Deowari.
403 South 17.8 21.80 4.00 17.80 to
21.80
4.00 P/R 03.01.11 4.00
404 South Central Patna City Masaurhi Naubatpur Road MDR 0 0.00 10.50 0.00 10.50 IRQP
(0-5), P/R (5-
10.5)
12.03.09
17.10.06
30.06.09
16.02.07
5.5 Good
Motorable
Good 10.50 Masaurhi, Pitmas.
405 South Central Patna City Masaurhi Nataul Okri
Road
MDR 0.00 10.50 0 to
10.50
10.50 10.50 Masaurhi, Aster Datwai.
406 South Central Patna City Masaurhi Punpun MDR 0.00 1.70 1.70 1.70 1.70 Punpun NH-83, NH-83.
407 South Central 0 to
0.717
0 to 0.717 0.717 W/S 25.04.08 24.01.09 5.50 Good 25.01.12 Good Morcha Road, NH-30.
407 South 0.717
to
1.374
0.717 to
1.374
0.657 W/S 08.03.10 07.05.10 5.50 Good 25.01.12 Motarable Khizersarai
408 South Central Patna City Khajekala link Road MDR 0 0.00 0.50 0 to 0.50 0.50 0 to 0.50 0.50 W/S 02.07.07 01.02.08 4.00
(av)
Good 02.02.11 Good 0.50 Khajekhala Ashok Raj Path
Road, Khajekala.409 South Central Patna City Nawab Bahadur Road MDR 0 0.00 0.50 0-0.50 0.50 0-0.50 0.50 W/S 04.07.07 03.02.08 7.00 Good 02.02.11 Fair 0.50 Mahandiganj at A.M. Road,
Paschim Darwaza at A.R. Path.
410 South Central Patna City Shershah Agamkuan Link
Road via Meena Bazar
MDR 0.00 1.50 1.50 1.50 1.50 Agamkuan (Rly. St.), Meena
Bazar Sher Shah Road.
411 South Central Patna City Patna City Court
Khajekala Link Road
MDR 0 0.00 2.37 0 to 2.37 2.37 0 to 2.37 2.370 W/S 4.00 2.37 Patna City Court, Khajakala
Link Road.412 South Central Patna City Ganga Bridge South
Approach Road (South
Ramp)
MDR 0.00 0.00 0.34 0.00 to
0.335
0.34 0.00 to 0.335 0.335 P/R 31.12.08 28.02.09 7.00 Good 28.02.10 Good 0.34
413 South Central Patna City Fatua Link Road MDR 0.00 0.000 2.00 0.00
to
2.20
2.00 0.00 to 2.20 2.000 O/R 3.50 Motarable Motarable 2.00
414 South Central Patna City Masaurhi Bazar Road MDR 0 0.00 0.95 0.95 0.95 0.95 Masaurhi Chowk, Rly. Station
Masaurhi.415 South Central Patna City Bharat Wagan link Road MDR 0 0.00 1.90 0 to 1.90 1.90 0 to 1.90 1.90 P/R 21.09.07 20.03.08 3.00 Motarable 21.03.11 Good 1.90 P/R work done BMB Km. 91, Junction of NH-
31 & 82, Bharat Wagon
Factory.416 South Central 1.62 1.62 0 to
1.624
1.62 0 to 1.624 1.624 W/S 11.07.08 Revised
A/A in
Progress
7.00 Good Revised
A/A in
Progress
Good 1.62 NH-30 Pahari, Jain Mandir,
Kamaldah Jain Mandir.
416 South 0.00 0.81 0 to
0.81
0.81 0 to 0.81 0.81 W/S 11.07.08 7.00 Good Good 0.81
417 South Central Patna City Kanti Factory Road MDR 0.00 1.10 1.10 Fair 1.10 K.Bagh Old By Pass, Jogipur
Nala.
0.72
MDR
Patna City Morcha NH-30 link Road
(via Mathinatal Chainpur
Karmalichak
MDR 0 0.00
Patna City
Patna City Ullar Masaurhi Road
Bidhipur Soradih Road MDR
Patna City
0
0.72
Patna City Agamkuan-Kamaldah NH-
30 Link Road
MDR
0.72
Ashok Rajpath
Page 18 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
418 South Central Patna City NH-30 Gurugovind Singh
Road Link Road
MDR 0.00 0.80 0.80 0.80 Link Road.
419 South Central Patna City Nima to Rajghat MDR 0.00 3.00 3.00 3.00 Nima, Rajghat.
420 South Central Patna City Fatuha Bazar Road MDR 0 0.00 1.70 0.00
to
1.70
1.70 0.00 to
1.70
1.70 OR 5.50 Motorable Motorable 1.70 Fatuha Chowk, NH.
421 South Central Patna City Approach Road IB
Mokama Office Godown
MDR 0.00 1.60 1.60 1.60 1.60 BMB Km. 91, Godown
Mokama, Rajghat.422 South Central Patna City Approach Road BMB Km
90 to NH 31
MDR 0.00 0.50 0.50 0.50 0.50 MBM Km. 90, NH-31
423 South Central Patna City BMB Road 100(P) to NH-
31
MDR 0.00 0.60 0.60 0.60 0.60 BMB 100 (P), NH-31
424 South Central Patna City Shershah-Bhikhna Pahari
Road via Gur Ki Mandi
MDR 0 0.00 3.00 0 to 1.90 1.90 1.90
to
3.00
1.10 - 3.00 Guru Ki Mandi Shershah Road,
Bhikhana Pahari, Mussalhpur
Hat, Dargah.425 South Central Patna City NH-30 Link Road (From
Ashok Rajpath to new NH-
30)
MDR 0 0.00 0.42 0 to
0.42
0.42 0 to 0.42 0.42 W/S 14.12.07 13.06.08 7.00 Good 14.06.11 Good 0.42
426 South Central Patna City Agamkuan-Shersha Link
Road (Via NMCH Jall Mina
Bazar) Road
MDR 0 0.80 0.80 0 to
0.80
0.80 0 to 0.80 0.80 W/S 14.05.08 23.11.08 7.00 Good 24.11.11 Good 0.80
427 South Central Patna City Sader Gali Road (From
Khagakala Ranipur-Noon
ka Chowhara)Roadi
MDR 0 0.00 1.84 0-1.84 1.84 0-1.84 1.84 W/S 16.07.08 20.03.09 4.00
(av)
Good 21.03.12 Good 1.84
428 South Central Patna City Ganga Bridge North
Approach (North Ramp)
Road
MDR 0.00 0.00 0.35 0.00 to
0.35
0.35 0.00 to 0.35 0.35 P/R 31.12.08 28.02.09 7.00 Good 05.01.11 Good 0.35
429 South Central Patna City Ganga Bridge Link Road MDR 0.00 0.00 0.63 0.00
to
0.63
0.63 0.00 to 0.63 0.63 P/R 24.05.06 23.08.06 5.50 Fair 24.08.10 Fair 0.63
430 South Central Patna City Guru Govind Singh Link
Road
MDR 0 0.00 0.86 0 to
0.86
0.86 0 to 0.86 0.86 Improvement
Work
20.02.08 19.05.09 7.00 Good 19.05.12 Motorable 0.86
431 South Central Patna City Pitambra Mandir Colony
Road
MDR 0 0.00 1.34 1.34 1.34
432 South Central Patna City Gouri Shankar Colony
Road
MDR 0 0.00 0.54 0.54 0.54
433 South Central Patna City Mokama NH-31 Link Road MDR 0 0.00 0.60 0.60 0.60 No work is done
during last three
years.434 South Central 0 5.00 5.00 0 to
5.00
5.00 IRQP 12.03.09 30.06.09 5.50 Good Good 5.00
434 South 0.50 0.50 5.00
to
5.50
0.50 0.50
435 South Central Patna City Neva Village to SH-78
Link Road
MDR 0 3.30 3.30 0 to 3.30 3.30 S/R 12.03.08 31.03.08 3.05 Fair Motarable 3.30
435 South Patna City
Total
225.42 69.16 68.48 86.28 1.50 93.82 95.25 36.35
436 South Central Patna West Bihta Bikram Pali Arwal
Road
SH-2 0 0.00 37.80 - 37.80 - 37.80 NH-30 at Bihta Chaurasta,
Mahabalipur
437 South Central Patna West Naubatpur Bihta Road SH-78 0 0.00 11.00 8.75 - 2.25 - - 11.00 Newly Classified
S.H. handed over
to E.E. S.H.
division,
Naubatpur, Sadisopur
438 South Central Patna West Naubabtpur to Rajgath SH-78 0 0.00 6.00 6.00 - - - - 6.00 Naubabtpur, Rajgath
439 South Central Patna West Dulhin Bazar Rani Talab
Pali Kinjer Road
SH-69 0 0.00 24.71 24.71 - - - - 24.71 Dulhin Bazar, Rani Talab
440 South Central Patna West Bailey Road
(Gate Road)
MDR 0 0.00 4.00 - - - 4.00 0.72 W/S 24.02.09 23.02.10 Good 31.03.13
c.h.-0 to
720 & 1720
to 4.00
4.00 Jagdeo Path More, Saguna
More, Roopas Pur Can. R.P.S.
More.
441 South Central Patna West Bankipur Danapur Road
(From Gandhi Maidan to
St Michael School)
MDR 0 0.00 5.20 5.20 5.20 W/S 24.02.09 23.06.09 Good 31.07.12 Good 5.20 Gandhi Maidan (Patna), St.
Michael School, Sadakat
Aashram, Golghar.
442 South Central Patna West Vijay Nagar Shivpuram
Road
MDR 0 0.00 1.54 1.54 0.994 W/S 31.08.09 30.01.10 Good 28.02.13 Good 1.54 Bailey Road (Vijay Nagar),
Shivpuram.
443 South Central Patna West Danapur Khagaul Road MDR 0 0.00 5.93 5.93 5.93 W/S 27.02.09 26.12.09 Good 25.01.13 Good 5.93 Cantt. Golamber, Danapur Rly.
Station, Khagaul, Saguna
More, St. Karen's School
Redient, DAV.
444 South Central Patna West Bankipur Danapur Road
(From St Michael's
School to Danapur
Canttonment end)
MDR 0 0.00 9.15 9.15 W/S 26.02.09 25.02.10 Good 24.03.13 9.15 St. Michael's School, End of
Cantonment, St. Michael's
Digha Hatt. Porsion Danapur
Block Cantonment.
445 South Central Patna West Anisabad Khagual MDR 0 0.000 1.40 1.40 1.395 W/S 12.12.06 11.06.08 Good 10.07.12 1.40 BMP-16, Rly. Station.
MDRPatna City Masaurhi-Naubatpur Via
Pitmas Road
Page 19 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
446 South Central Patna West Khagaul Jamaluddin Chak MDR 0 0.00 3.06 3.06 3.06 Work in progress Khagaul Block, Sarai Gumti.
447 South Central Patna West Khagaul Naubatpur MDR 0 0.00 15.80 - 11.80 4.00 11.80 4.00 Proposed under
NABARD
Danpur Rly. Station, Tengralla
Cannal, Shiwala More.
448 South Central Patna West Danapur Ushri - Shiwala MDR 0 0.00 6.36 - 6.36 - - 6.36 W/S 18.09.06 17.11.07 - 6.36 Proposed under
NABARD
Mubarakpur Danapur, Shiwala
More, Usri Baryar
Bhagwatipur.
449 South Central Patna West Shiwala Bihta MDR 0 0.00 13.86 13.86 1.00 W/S 29.03.07 31.03.09 30.04.12 13.86 Shiwala More, Bihta Chauraha,
Newraganj, Panali, Kanhauli.
450 South Central Patna West BMP - 16 to Khagaul Lock
(Link - road)
MDR 0 0.00 0.40 0.40 - - 0.40 W/S 22.10.08 21.04.09 Good 20.05.12 Good 0.40 B.M.P.-16, Main Gate, Khagaul
Lock, Maurya Colony.
451 South Central Patna West Gola Road
(From Baily Road to
Danapur Gola)
MDR 0 0.00 5.40 _ 3.40 2.00 _ 5.40 IRQP 10.12.10 09.12.11 _ 5.40 Work in progress 2nd Km Baily Road Gate Road,
Danapur Gola of BD Road,
Takiyapar of BD Road, ST.
Karen's School452 South Central Patna West Ashiana Digha Road to
BD Road via Polsion Dairy
Road
MDR 0 0.00 1.85 _ _ 1.85 _ 1.85 Strengthening 10.12.10 09.09.11 _ 1.85 Work in progress 4th Km of Ashiyana Digha
Road, Near Poison Dairy,
Poision Diary
453 South Central Patna West Raghopur Patoot Road MDR 0 0.00 13.50 - - 13.50 13.30 W/S 12.12.06 28.02.09 Good 27.03.12 Good 13.50 Raghopur, Kanpa, Parari
Sikaria
454 South Central Patna West Masaurhi - Pitmas -
Naubatpur Jn 1050 to
2050
MDR 0 0.00 10.00 - 10.00 - - 10.00 W/S 21.09.06 20.03.08 Good Good 10.00 Pitmas Village, Naubatpur,
Pitmas Naubatpur Road
455 South Central Patna West Pali Ular Masaurhi Road MDR 0 0.00 11.50 - 11.50 - - 11.50 W/S 24.02.09 23.10.10 5.00 6.50 Work in progress Dharhara More, Near
Dewariya, Dharhara More,
Eachipur More, Eachipur,
Jamui, Dewariya456 South Central Patna West Chandoush Sigori Jamui
Road
MDR 0 0.00 9.20 9.20 - - - 2.20 Strengthening 08.12.08 07.12.09 Good Good 9.20 DLP Free-0 to 7
Km. 7.0 to 9.2 -
06.01.13
Chandoush More, Jamui,
Chandosh, Sigori, Sohra
457 South Central Patna West Missing Link in Pali Bazar
in 17th Km of DRPK Road
MDR 0 0.00 0.23 - 0.23 - - 0.23 IRQP 06.09.10 05.11.10 04.11.15 - 0.23 Pali Chaurasta, Durga Mandir
at Pali Bazar
458 South Central Patna West Bihta Lai Road MDR 0 0.00 8.10 8.10 - - 10.04.13 8.10 Bihta, Lai, Bihta Dariyapur
Nagar Bihta Lai
459 South Central Patna West Dulhin Bazar-Rani Talab-
Pali Kinjer Road
MDR 0 0.00 9.29 - 9.29 - - 9.14 W/S 15.11.06 28.02.09 Good 27.03.12 - 9.29 Dulhin Bazar, Saraiya Village,
Gulal Chak, Sadawah Kab
460 South Central Patna West Bihta Nawahi Road MDR 0 0.00 3.39 3.39 3.39 7th Km to BBPA Road Nawahi
Village
461 South Central Patna West DPS School to Bailey
Road
MDR 0 0.00 0.67 0.67 0.67 Work in progress Bailey Road to DPS (Junior
wing), DPS School
461 South Patna West
Total
219.33 57.72 60.68 61.76 39.18 0.00 0.00 156.14 63.19 0.00
462 South Magadh Aurangabad Shivganj Rafiganj Goh
Uphara Road
SH-68 0 0.00 53.50 53.50 53.50 53.50 Stenthing
463 South Magadh Aurangabad Gaya Panchanpur
Daudnagar Road
SH-7 0
(Goh)
35.30
(Daudnagar
3.05m
(70.50)
35.30 0.00 35.30 35.30 Goh, Daudnagar 3.05 mtr.
464 South Magadh Aurangabad Barun - Daudnagar Road MDR 0
(Barun)
30.50
(Daudnagar)
30.50 0.00 2.60 0.00 27.90 W&S being
done by LWE
18.00 9.50 3.00 Barun, Daudnagar Barun Rly.
Station
465 South Magadh Aurangabad Amba-Nabi Nagar Road MDR 0 24.00 24.00 4.00 20.00 W & I done 20.00 4.00 Amba, Nabi Nagar Rly. Station
466 South Magadh Aurangabad Pachrukhia Feshar
Aurangabad Road
MDR 0
(Pachrukhia)
35.00
(A.Bad)
35.00 4.60 30.40 W/S to be done
LWE
21.07 5.22 8.71 Pachrukhia Feshar Aurangabad
Feshar Rly. Station
467 South Magadh Aurangabad Deo More to Deo Road MDR 0
(Deo Mor)
6.40
(Deo Mandir)
6.40 0.00 6.40 W/S done 6.40 Deo More, Deo Mandir, Deo
Suraj mandir
468 South Magadh Aurangabad Old GT Road MDR 0
(Jasoiya)
5.3
(A.Bad
Farram)
5.30 0 to 5.3 5.30 W & S done 5.30 Jaswiya Aurangabad Farram,
Circuit House Aurangabad
Market
Page 20 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
469 South Magadh Aurangabad Aurangabad - Hariharganj
Road
MDR 0.00
(Ramesh
chowk)
1.3
(Bypass
A.Bad)
1.30 0 to 1.3 1.30 W & S done 1.30 A. bad Mkt. Ramesh Chowk, Bypass
Aurangabad, Animal Hospital.
470 South Magadh Aurangabad Barun - Nabinagar Road MDR 0.00
(Barun)
35.10
(Nabinagar
Rly. Station)
35.10 10.10 25.00 W & S
0 to 25, W & I
being done
under LWE
25.00 10.10 Nabinagar Rly.
Station
Barun, Nabinagar Rly. Station.
471 South Magadh Aurangabad Pachrukhia Haspura
Mehandiya Road
MDR 0
(Pachrukhia)
8.00
(Haspura)
8.00 0 8.00 IRQP work
done
8.00 Haspura Block Pacharekhia, Mahindiya,
Haspura Block.472 South Magadh Aurangabad Haspura Mehandia Road MDR 0
(Haspura)
6.40
(Mehandia)
6.40 0 6.40 W/S done 6.40 Haspura Mehandia.
473 South Magadh Aurangabad Barun - Nabinagar Link
Road
MDR 0
(Barun Block)
1.20
(Barun
Hospital)
1.20 0.00 1.20 W & I done 1.20 Barun Bazar Barun Block, Barun Hospital,
Barun Bazar.
474 South Magadh Aurangabad Sinha College More to
Rafiganj Road
MDR 0.00
(Sinha College
More)
28.20
(Rafigan)
28.20 0 to 28.2 28.20 IRQP
work done in 0
to 18.40)
0.00 18.40 9.80 Rafiganj Rly.
Station
Sinha College More, Rafiganj,
Rafiganj Rly. Station.
475 South Magadh Aurangabad Deo-Amba Road MDR 0
(Deo Mamdir)
16.10
(Amba)
16.10 0 16.10 16.10 Road selected in
LWE phase-II
Deo Mandir, Ambe, Deo Suraj
mandir.476 South Magadh Aurangabad Deo Hospital to Deo-
Amba Raod
MDR 0
(Deo
Hospital)
1.50
Deo-Amba
Raod
1.50 0 1.50 0.70 0.80 Deo Hospital, Deo Amba Road,
Deo Suraj mandir.
477 South Magadh Aurangabad Dadareje - Anti - Rafiganj
Road
MDR 0
(Maruka)
3.25
(Makdum
Pur)
3.25 0.00 3.25 IRQP work
done
3.25 Maruka, Makdum Pur.
478 South Magadh Aurangabad Kutumba Urban Link
Road
MDR 0
(Kutumba
Bazar Mor.)
2.25
(Kutumba)
2.25 0.00 2.25 W&S done 2.25 Kutumba
479 South Magadh Aurangabad Piroo Bantara Road MDR 0
(Piroo)
15.00
(Bantara)
13.60 0.00 13.60 W&I done 13.60 Deo Kund Piroo, Bantara, Deo Kund.
479 South Aurangabad
Total
306.90 123.15 82.05 95.10 6.60 177.52 91.47 37.91
480 South Magadh Gaya-1 Gaya - Khijarsarai -
Islampur Road
SH-1 0 0.00 35.50 2.95 32.55 0.00 to 35.00 W/S 30.04.10 7.00n.
31.50km.
3.65m.
2.85km
7.00m.
0.65km,
Good 4th
to 27th 31
to 35
good 28th
to 30th
30.04.11 Good 35.50
481 South Magadh Gaya-1 Gaya Fatehpur-Rajauli-SH
70
SH-70 0 0.00 38.00 38.00 Good 38.00 Work through
BSRDC
482 South Magadh Gaya-1 Gaya - Panchanpur SH-07 0 0.00 35.20 35.20 30.04.11 Good 35.20 Work completed
through CPWD
483 South Magadh Gaya-1 Link to Tekari Road MDR 0 0.00 1.25 0 to 1.25 1.25 0 to 1.25 IRQP 28.02.09 June.-09 3.65 Good June.-12 Good 1.25
484 South Magadh Gaya-1 Sherghati - Imamganj-SH
69
SH-69 0 0.00 28.00 28.00 Good 28.00 Work through
BSRDC
485 South Magadh Gaya-1 Karmine Mathurapur -SH
69
SH-69 0 0.00 18.00 18.00 work going
on
18.00 Work through
BSRDC
486 South Magadh Gaya-1 Mathurapur Guraru-SH69 SH-69 0 10.40 10.40 10.40 work going
on
10.40 Work through
BSRDC
487 South Magadh Gaya-1 Gurau Ahiapur-SH69 SH-69 0 12.80 12.80 12.80 work going
on
12.80 Work through
BSRDC
488 South Magadh Gaya-1 Dumaria Imamganj-SH69 SH-69 0 24.50 24.50 24.50 work going
on
24.50 Work through
BSRDC
489 South Magadh Gaya-1 Tekari - Mau Kurtha-SH69 SH-69 0 16.20 16.20 16.20 work going
on
16.20 Work through
BSRDC
490 South Magadh Gaya-1 Tekari - Khaira - Konch
Road
MDR 0 0.00 8.20 0 to
8.20
8.20 0 TO 8.20 W/S 09.03.07 30.03.10 5.50 Good Mar.-13 Good 8.20 Widening into
7.00m under LWE
Tekari, Konch
491 South Magadh Gaya-1 Sherghati - Imamganj MDR 0.00 1.70 0 to
1.70
1.70 1.10 1.70 W/S work taken in
LWE
Imamganj
Page 21 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
492 South Magadh Gaya-1 Gaya - Bodh Gaya Road MDR 0 0.00 11.20 0 to
11.20
11.20 3,4p, 5p, 11,
12p
IRQP 20.02.08 23.06.11 5.50 Good Sept. 08 Good 11.20 Km. 0.0 to 2.30
W/S under plan &
rest under LWE in
progress
Gaya, Bodh Gaya
493 South Magadh Gaya-1 Kalchakra Maidan Road MDR 0 0.00 1.06 0 to
1.06
1.06 1.00 W/S 24.07.10 23.08.10 7.0/5.50 Good 22.08.13 Good 1.06 Work completed
under plan.
494 South Magadh 0 0.00 32.20 25.20 7.00 0.0 to 3.0 W/S Feb.09 31.03.10 1 to 3 km.
7.0m 4th
to 29.7 km.
4.88
Good Good 32.20 3rd to 29.70 W/S
under LWE rest
W/S under plan
head completed
Gaya,Sherghati, Cherki,
Sherghati
494 South 4.0 to 15.0 Strength. Feb.09 31.03.10
494 South 16.00 to
29.70
IRQP Feb.09 31.03.10
494 South 29.90 to
32.20
W/S 16.08.11 15.08.14 Warsaliganj
495 South Magadh Gaya-1 Daderji - Rafiganj Road MDR 0 0.00 17.20 0 to
17.20
17.20 12.0 to 17.20 IRQP 20.02.08 31.03.10 3.65 Fair Mar.-13 Fair 17.20 Widening 7.0m.
Under LWE
Daderji Morka
496 South Magadh Gaya-1 Chichora more to Usas
Deora Road
MDR 0 0.00 12.00 0 to
12.00
12.20 0 to 12.0 IRQP 27.02.09 31.03.10 3.65 Good Oct.-12 Good 12.00 Widening 7.0m.
Under LWE
Chichora more, Usas Deora,
Tuturkhi, Usasdeora
497 South Magadh Gaya-1 Mau Kurkut Bigha
Kaiyatanr Road
MDR 0 0.00 8.20 0 to 8.20 8.20 0 to 4.0 IRQP 02.03.09 31.12.09 3.05 Fair Dec.12 Fair 8.20 Widening into 7.00
under LWE in
progress
Mau, Usasdeora, Kurkut,
Bigha,
498 South Magadh Gaya-1 Gewal Bigha Road under
Gaya town
MDR 0 0.00 1.28 0 to
1.275
1.28 1.10 IRQP 13.09.08 5.50 Fair Sep.-11 Fair 1.28 Widening work
completed under
plan.
Gaya Town
499 South Magadh Gaya-1 Godawari Road MDR 0 0.67 0.67 0 to
0.67
0.67 0.67 IRQP 19.01.09 5.50 Fair 18.01.12 Fair 0.67 Widening work
completed under
plan.
Gaya Town
500 South Magadh Gaya-1 Amas - Naudiha - Kasma
Road (with Bazar Portion)
MDR 0 0.00 19.60 0 to
19.60
19.60 0 to 18.0 plan W/S 28.02.09 5.00 Good Good 19.60 Completed Amas - Naudiha - Kasma
501 South Magadh Gaya-1 Sheghati - Imamganj
(Bazar Portion) Road
MDR 0 0.00 0.60 0.60 Fair Fair 0.60
502 South Magadh Gaya-1 Bodh Gaya - Approch
Road
MDR 0 0.00 3.20 0 to
3.20
3.20 0.0 to 3.10 Strength. 24.07.10 23.12.10 7.00 Good 20.11.13 Good 3.20 Work done under
LWE
Dumuhan Bodh Gaya
503 South Magadh Gaya-1 West Church (Kasinath
more to Gewal Bigha
more)
MDR 0 0.00 1.22 0 to
1.215
1.22 1.215 W/S 02.03.09 31.03.10 11.80 Good Mar.-13 Good 1.22 Widening work
completed under
plan.
Gaya Town
504 South Magadh Gaya-1 Station Road MDR 0 0.000 0.30 0 to
0.30
0.30 0.300 W/S 18.08.09 17.05.10 7.00 Good 16.05.13 Good 0.30 Widening work
completed under
plan.
Gaya Town
505 South Magadh Gaya-1 Kazmi More to RLY
Hospital Road
MDR 0 0.00 0.34 0.34 W/S 16.02.10 15.08.10 Good 14.08.13 Good 0.34 Widening work
Completed.
Gaya Town
506 South Magadh Gaya-1 Koiribari Dighi More Road MDR 0 0.00 0.078 0 to
0.078
0.078 0.078 W/S 11.11.10 5.50 Good 10.11.13 Good 0.078 W/S completed
under plan
Gaya Town
507 South Magadh Gaya-1 Ram Sagar Road MDR 0 0.00 0.93 0 to
0.93
0.93 0.930 W/S 11.11.10 7.00 Good 10.11.13 Good 0.93 W/S completed
under plan
Gaya Town
508 South Magadh Gaya-1 RLY Hospital to Station
Road
MDR 0 0.000 0.54 0 to
0.543
0.54 0.400 W/S 16.02.10 15.08.10 7.00 Good 14.08.13 Good 0.54 Widening work
completed under
plan.
Gaya Town
509 South Magadh Gaya-1 Railway Hospital to Kazmi
more Road
MDR 0 0.000 0.34 0.34 0.339 W/S 16.02.10 15.08.10 7.00 Good 14.08.13 Good 0.34 Widening work
completed under
plan.
510 South Magadh Gaya-1 Swarajpuri Road MDR 0 0.00 0.79 0 to
0.79
0.79 0.790 W/S 18.08.09 17.05.10 11.80/7.0 Good 16.05.13 Good 0.79 Widening work
completed under
plan.
Gaya Town
511 South Magadh Gaya-1 Bata More Road MDR 0 0.085 0.085 0 to
0..085
0.085 0.085 W/S 18.08.09 17.05.10 7.00 Good 16.05.13 Good 0.085 Widening work
completed under
plan.
Gaya Town
MDRGaya-1 Gaya - Sherghati Road
Page 22 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
512 South Magadh Gaya-1 Bata More to Karimganj
Road to Mirja Galib Road
MDR 0 0.117 0.117 0 to
0.117
0.117 0.117 W/S 16.02.10 15.08.10 7.00 Good 14.08.13 Good 0.117 Widening work
completed under
plan.
Gaya Town
513 South Magadh Gaya-1 Karimganj to Mirja Galib
College Road
MDR 0 0.581 0.581 0 to
0.581
0.581 0.344 W/S 16.02.10 15.08.10 11.00 Good 14.08.13 Good 0.581 Widening work
completed under
plan.
Gaya Town
514 South Magadh Gaya-1 Wazirganj - Fatehpur
Road
MDR 0 19.67 19.67 0 to
19.67
19.67 0.0 to 19.67 P/R 15.01.09 4.88 Good Dec.-11 Good 19.67 W/S in progress
under LWE
Wazirganj, Fatehpur Road
515 South Magadh Gaya-1 Wazirganj - Fatehpur
Road (Bazar portion)
MDR 0 0.60 0.60 0.60 0.60 P/R 20.03.09 5.00 Good March.-10 Good 0.60
516 South Magadh Gaya-1 Tapowan - Banganga MDR 5.50 15.40 9.90 5.50 to
15.40
9.90 30.10.11 7.00 Oct.-14 8.50 9.90 Tapowan, Sautar-Jamuwan
517 South Magadh Gaya-1 Khijarsarai - Bypass Road MDR 0 2.063 2.063 2.063 1st to 2.063 W/S 31.01.11 7.00 Good Jan.-14 Good 2.063 W/S completed
under LWE
Khijarsarai
518 South Magadh Gaya-1 Bhindus - Chamandih
Road
MDR 0 21.35 21.35 0 to
21.35
21.35 1st to 21.35 Improv. 02.03.07 31.03.10 5.50 Good 04.08.13 Good 21.35 W/S is progress
under LWE
Bhindus, Chamandih,
Ghahlaut, Siwardanga,
Nawada Road
519 South Magadh Gaya-1 Manpur - Bypass MDR 0 3.60 3.60 3.60 Good 3.60 Work done by
CPWD ROB
Manpur
520 South Magadh Gaya-1 Moulanagar - Bathani
Road
MDR 0 12.50 12.50 12.50 Fair Fair 12.50 W/S is progress
under LWE
Moulanagar, Bathani, Atri,
Jagjiwanpur
521 South Magadh Gaya-1 Manpur - Sarbahda Road MDR 0 28.90 28.90 28.90 0.0 to 16.30 0.00 to
16.300,
7.00 16.30
to 28.90
3.65m
Good Fair 28.90 0 to 16.30 in
progress under
LWE rest
completed under
PMGSY
Manpur, Sarbahda, Teulsa,
522 South Magadh Gaya-1 Khijarsarai - Atri Road MDR 0 12.00 12.00 0 to
12.00
12.00 3rd to 10th IRQP 02.03.08 12.06.10 5.00 Good 11.06.13 Good 12.00 W/S is progress
under LWE
Khijarsarai, Atri, Teulsa
523 South Magadh
0 to
18.20
18.20 1st to 9th
17th to 18.20
IRQP work 12.03.08 31.03.10 5.50 Good 31.03.13 Good Atari, Jethian, Mohanpur,
Chamandih
523 South 10th, 13th to
16th
IRQP work 02.03.09 31.03.10 5.50 Good March, 13 Good Begusarai, Matihani, Samho
524 South Magadh Gaya-1 Fatehpur Bazar MDR 0.64 0.64 0 to
0.64
0.64 P/R 2.03.09 5.00 0.64 40978.00 Good 0.64 Fatehpur
525 South Magadh Gaya-1 Gaya - Nawada MDR 1.40 1.40 0 to
1.40
1.40 1.40 1.40 Gaya, Manpur
526 South Magadh Gaya-1 Banganga tapowan Road MDR 5.50 15.40 9.90 9.90 6th (500m)
&
15.40th
W/S 30.10.11 7.00 Good 10./14 Good 9.90 W/S completed
under LWE
527 South Magadh Gaya-1 Rameshwer Sinha Road MDR 0 0.000 0.53 0 to
0.525
0.53 0 to 525m. W/S 03.09.10 28.01.11 7.00 Good 0.71 Good 0.53
528 South Magadh Gaya-1 Nai Sadak Road MDR 0 0.23 0.23 0 to
0.23
0.23 0 to 230m. W/S 03.01.11 02.05.11 7.00 Good 5./14 Good 0.23
529 South Magadh Gaya-1 Chandchaura to narayan
chua
MDR 0.00 0.68 0.68 0.68 0.68
530 South Magadh Gaya-1 Maranpur to N.H Bypass
Via akshaywat
MDR 0 0.00 1.15 0 to
1.15
1.15 0 to 1.15km. W/S 10.12.10 09.03.11 7.00 Good 3./14 Good 1.15
531 South Magadh Gaya-1 A P colony near late MP
singh building to
Chandauti police station
Via matan Bigha
MDR 0 0.00 1.10 0 to
1.10
1.10 0 to 1.10km. W/S 03.09.10 02.06.11 7.00 Good 6./14 Good 1.10
532 South Magadh Gaya-1 Mirzagalib collage to NH
83 via D M Residence ,
Circuit House
MDR 0 0.00 1.15 0 to
1.15
1.15 0 to 1.15km. W/S 20.08.10 19.05.11 7.00 Good 5./14 Good 1.15
18.20MDR 0 18.20 18.20Atari - Jethian RoadGaya-1 W/S is progress
under LWE
Page 23 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
533 South Magadh Gaya-1 Block Office to Jail supt
resident Via Asha singh
more
MDR 0 0.00 1.85 0 to
1.85
1.85 0 to 1.85 W/S 03.09.10 02.06.11 7.00 Good 6./14 Good 1.85
534 South Magadh Gaya-1 Falgu Bridge Approach
Road (Gaya - Nawada
Road)
MDR 0 0.00 1.40 1.40 Good Good 1.40
535 South Magadh Gaya-1 Gaya Town Road from
NH-83 (Near Gaya
College to katari Hill via
Asha Singh More)
MDR 0 1.75 1.75 1.75 1.75 W/S 01.09.10 Good Good 1.75
536 South Magadh Gaya-1 Kirani ghat to koiri Bari
more via Ramana Road &
Piramsur chowk) Gaya
main Town Road
MDR 0 1.63 1.63 0.85 0 to
0.775
0.78 1.625 W/S 01.07.10 0.775km.-
7.0,
0.850km.
5.50
Good Good 1.63
537 South Magadh Gaya-1 Gaya District court to
Rang (via Registry office,
Durgawari, Godown &
Panchmukhi Mahadeo)
MDR 0 1.40 1.40 0 to
1.40
1.40 0.525 Widening 26.05.10 25.02.11 5.50 Good Good 1.40 W/S completed
under plan
538 South Magadh Gaya-1 Bhusundi More to
Kalisthan Telbigha Via
Bairagi More (Town
Road)
MDR 0 1.50 1.50 1.50 Good 1.50
539 South Magadh Gaya-1 Bangia Asthan Rd to
Fathehpur Bahadur Sivala
Road via khairat Ahamed
& Azad park)
MDR 0 1.30 1.30 1.30 Good 1.30
540 South Magadh Gaya-1 J.P. Jhama - Katari Hill -
Chandaui more Road
MDR 0 0.00 5.10 0 to
5.10
5.10 0 to 5.10 W/S 06.09.10 08.06.11 7.00 Good 07.06.14 Good 5.10 W/S work
completed under
plan head
541 South Magadh Gaya-1 Ramshila (N.H-83) -
Chhootki Nawada
Bageshwari Gumti - Gaya
Station Road
MDR 0 0.00 3.00 3.00 3.00 W/S 06.09.10 1.37km.
7.0
1.386km.
11.00
Fair Fair 3.00 W/S work progress
under plan head
542 South Magadh Gaya-1 Gewal Bigha-Durga
Asthan-Police Line N.H-
83 Road
MDR 0 0.00 2.75 2.75 Fair 2.75
543 South Magadh Gaya-1 Chand Chaura-Vishnu Pad
Mandir-Smashanghat-
Bangali Ashram-Baitami
Talab N.H-82
MDR 0 1.70 1.70 0 to
1.70
1.70 0 to 0.675 IRQP 03.12.10 02.04.11 7.00 Good 01.04.14 Good 1.70 Chand Caura to
Shamshan
completed under
IRQP
544 South Magadh Gaya-1 Rly. Malgodown-
Rangbahadur-N.H-83
MDR 0 0.00 1.40 1.40 Good 1.40
545 South Magadh Gaya-1 Rly. Station-Gurudwara-
G.B.road
MDR 0 0.00 1.00 1.00 W/S PQC Good 1.00 W/S work
completed under
plan CMUIDP
546 South Magadh Gaya-1 Hospital more-Nai Godam
more-Jhilganj-Balti
Karkhana-N.H-83
(Jhilganj Pahshi Road)
MDR 0 0.00 1.40 1.40 Good 1.40
547 South Magadh Gaya-1 Tekari Road Delha Bus
Stand-Kharkhura Main
Road - Shanichar Bhagat
more Kharkhura-Bairaghi-
Cotton Mill Road
MDR 0 0.00 3.15 0 to
3.15
3.15 0.00 to 3.15 W/S 03.01.11 02.01.12 5.50 Fair Fair 3.15 W/S work in
progress under
plan head
548 South Magadh Gaya-1 Katari Hill-Rly. Over
Bridge-N.H-7 (G.P.O)
Road
MDR 0 0.00 1.87 1.87 W/S Good Good 1.87 W/S work in
progress under
plan head
549 South Magadh Gaya-1 Dandi Bag Road MDR 0 0.00 1.25 1.25 Fair 1.25
Page 24 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
550 South Magadh Gaya-1 Panchanpur Tekari to
Sub. Div. Tekari road
MDR 0 1.50 1.50 1.50 —do— Fair Fair 1.50 Work in progress
under non-plan
550 South Gaya-1
Total
522.79 42.48 169.85 308.87 1.80 2.04 429.51 93.28 0.00
551 South Magadh Jehanabad Kinjer - Kurtha Road SH 69 SH 69
(Kinjer)
12.80
(Kurtha)
12.80 0.0 to
12.80
12.80 11.00 1.80
552 South Magadh Jehanabad Deokund Baidarabad
Road
SH-68 0
(Deokund)
6.00
(Baidarabad)
6.00 0.0 to
6.00
6.00 6.00
553 South Magadh Jehanabad Baidrabad-Belkhara Road SH 68 0
(Baidrabad)
4.00
(Belkhara)
4.00 0.0 to
4.00
4.00 4.00
554 South Magadh Jehanabad Jehanabad Ghoshi Road SH-71 0
(Jehanabad)
13.60
(Ghoshi)
13.60 0.0 to
13.60
13.60 0.00 13.60
555 South Magadh Jehanabad Ghoshi Islampur Road SH-71 0(Ghoshi)
10.00(Islampur)
10.00 0 to
10.00
10.00 0.00 10.00
556 South Magadh Jehanabad Deokund Baidrabad Road SH SH 68 10.00 10.00 10.00 10.00 10.00
557 South Magadh Jehanabad Imamganj-Karpi-
Mahendia
MDR 0
(Imamganj)
28.80
(Mahendia)
28.80 0 to
28.80
28.80 - - W/S under LWE 27.80 1.00 Imamganj, Mahendia, Karpi,
Shahar Telpa, Usari, Jaipur
558 South Magadh Jehanabad Manikpur-Bithra-Senari MDR 0
(Manikpur)
12.00
(Senari)
12.00 0 to
12.00
12.00 - - W/S C.R.F. 0 to
12- 6.60 5.20 0.20 Manikpur,Senari, Bithra,
Majhiayama, Orbigha
559 South Magadh Jehanabad Babhna-Shakurabad MDR 0
(Babhna)
8.80
(Shakurabed)
8.80 0 to
8.8
8.80 - - W/S under LWE 0.00 8.80 Babhna, Shakurabad, Amain,
Shahpur, Chainpura
560 South Magadh Jehanabad Wazitpur-Terra-Karpi MDR 0
(Wajitpur)
10.00
(Karpi)
10.00 0 to 10 10.00 - - 0.00 10.00 Wazitpur, Karpi, Terra, Karwa
561 South Magadh Jehanabad Makhdumpur-Sonma-
Hulasganj Road
MDR 0
(Makhdumpur
)
20.00
(Hulasganj)
20.00 0 to
20.0
20.00 13.60 5.50 0.90 Makhdumpur,Hulasganj,Sonma
, Nababganj
562 South Magadh Jehanabad Makhdumpur-Barabar
Road
MDR 0
(Makhdumpur
)
9.00
(Barabar
Pahar)
9.00 0 to
9.0
9.00 0.00 9.00 Makhdumpur,Barabar Pahar
563 South Magadh Jehanabad Serthua-Mandil-
Shakurabad Road
MDR 0
(Serthua)
8.18
(Karota)
8.18 0 to
8.175
8.18 IRQP 0.00 8.18 Serthua, Karota, Mandil
564 South Magadh Jehanabad Narru Mai Halt MDR 0
(Narru)
1.64
(Mai Halt)
1.64 0-1.64 1.64 1.64 Narru, Mai Halt
565 South Magadh Jehanabad Ghoshi-Sukiyama-
Hulasganj-Khudaganj
Road
MDR 0
(Ghoshi )
16.60
(Khudaganj)
17.50 0.00
to
14.20
14.20 14.20
to
17.50
3.30 W/S under LWE 14.50 3.00 900 mtr. Under SH-
4 from CH 11.2 to
12.1 Actual length
under RCD, Road
Div. No.-1,
Ghoshi, Khudaganj, Sukiyama,
Hulasgnj, Khudaganj, Surajpur
566 South Magadh Jehanabad Bandhuganj-Bharthu-
Sukiyama Road
MDR 0
(Bandhuganj)
12.50
(Sukiyama)
12.50 0 to
12.50
12.50 12.50 0.5 Km. was
further added for
construction under
Plan Head, Now
Road length has
become 12.50 Km.
Bandhuganj, Sukiyama,
Bharthu, Kinzi
567 South Magadh Jehanabad Bandhuganj-Okri-
Masaurhi Raod
MDR 0
(Bandhuganj)
15.50
(Barari)
15.50 6.0 to 7.0 2.00 0.0 to
5.0 &
8.0 to
15.5
13.50 W/S under Plan
0.00-5.00 &
8.00-14.00
15.30 0.20 Bandhuganj, Barari,
Modanganj
568 South Magadh Jehanabad Kazisarai-Imalia Road MDR 0 (Kazisarai) 14.63
(Imalia)
14.63 0.0 to
14.63
14.63 W/S LWE 0.00-
14.53
9.00 5.63 Kazisarai, Imalia, Golakpur
Road has been
transferred to
state highway
division, Gaya &
being
constructed by
BSRDC, PIU,
Gaya
Road has been
transferred to state
highway division,
Nawada & being
constructed by
BSRDC, PIU, Gaya
Page 25 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
569 South Magadh Jehanabad Hati More-Korra-
Mosimasarai Road
MDR 0
(Mosimasarai)
18.00
(Hati More)
18.00 0.0 to
18.00
18.00 W/S under LWE
0.00-18.00
10.00 8.00 Mosimasarai, Hati More, Korra,
Tejbigha,
570 South Magadh Jehanabad Bibipur-Barawan-
Mogalbigha Road
MDR 0 (Bibipur) 7.00
(Mogalbigha)
7.00 0 to 7 7.00 0.00 7.00 Bibipur, Mogalbigha, Barawan
571 South Magadh Jehanabad Ghoshi Bazar Missing Link MDR 0
(Ghoshi More)
0.90
(Ghoshi
Bazar)
0.90 0 to
0.90
0.90 0.00 0.90 Ghoshi More, Town Bazar
More, Jafarganj
572 South Magadh Jehanabad Durga Mandir More to
Court Station Gumti
missing link (Patna-Gaya)
MDR 0
(Durga
Mandir)
0.60
(Court
Gumti)
0.60 0 to 0.60 0.60 IRQP 0.00 0.60 Durga Mandir, Court Gumti,
Jahanabad Court
573 South Magadh Jehanabad Jehanabad-Ghoshi
Missing Link
MDR 0
(Ghoshi More)
1.00
(Town Bazar
More)
1.00 0-1.0 1.00 IRQP 0.00 1.00 Ghoshi More, Town Bazar
More, Jafarganj
574 South Magadh Jehanabad Baidarabad NH-98
Missing Link
MDR 0
(Baidarabad)
0.562
(NH-98)
0.56 0 to
0.562
0.56 IRQP 0.00 0.56 Baidarabad Village, NH-98
575 South Magadh Jehanabad Jehanabad-Ghoshi
Missing Link
MDR 0
(Ghoshi More)
1.00
(Town Bazar
More)
1.00 0-1.0 1.00 IRQP 0.00 1.00 3.20 km road
transferred to S.H.
In km 1st Rly. Level
crossing required
575 South Jehanabad
Total
244.01 52.84 141.47 49.70 190.02 32.89 21.10
576 South Magadh Nawada Gaya Nawada SH SH 08 14.65 14.65 14.65 14.65
577 South Magadh Nawada Nawada Pakaribarawan
Road
SH SH 08 30.80 30.80 30.80 30.80
578 South Magadh Nawada Hisua-Nawada-
Pakribarawan-Sikandra
SH 8 0.00 45.45 45.45 45.45 W/S work
completed in
2009-10
45.45 Work Executed by
CPWD, Div., Gaya
(under) RSVY)
579 South Magadh Nawada Gaya Fatehpur Sirdalla
Rajauli
SH 70 38.00 58.00 21.00 21.00 W/S work
completed in
2011-12
21.00 Work Executed by
BSRDC, Rajgir
(under ADB fund)
580 South Magadh Nawada Jahanabad-Ghosi-
Islampur-Giriak-
Parbatipur
SH-71 81.80 85.00 3.20 3.20 W/S work
completed in
2011-12
3.20 Work Executed by
BSRDC, Rajgir
(under ADB fund)
581 South Magadh Nawada Warsaliganj-Barbigha
Road
SH 83 0 24.18 24.18 24.18 - - W/S work of Km.
1,2,3,9,10
completed in
2007-08 and W/S
of Km. 4 to 8
and W/S of Km.
4 to 8 and 11 to
24.18 completed
in 2010-11
10.00 14.18 Work Executed by
Road Div., Nawada
(under Plan haed)
Barbigha more, Warsaliganj
582 South Magadh Nawada Kawakol - Jamui Road MDR 0 16.00 16.00 0.00 16.00 IRQP work of
Km. 1(p), 2(p),
3,6,7,8 and 12 to
16 completed in
2009-10 and P/R
work of km.
4,5,9,10,11
completed in
2009-10
11.00 5.00 Work Executed by
Road Div., Nawada
(under Non Plan
head)
Kawakol Rani Bazar
583 South Magadh Nawada Quadirganj-Roh-Kawakol
Road
SH 82 0 31.045 31.045 0.00 31.045 IRQP work of
Km. 0 to 16
completed in
2008-09 and
W/S work of
Km. 17 to
31.045
completed in
2009-10
19.00 12.045 Work Executed by
Road Div., Nawada
(under Plan head
15.00 Km. & Non
Plan Head 16.00
Km.)
Roh, Rupoh, Bhalauahi,
Kawakol
Page 26 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
584 South Magadh Nawada Warsaliganj - Kharat MDR 0 11.10 11.10 0 to
11.10
11.10 W/S work
completed in
2010-11
0.00 11.10 Work Executed by
Road Div., Nawada
(under Plan haed)
Kharat more at NH-31,
Dariyapur Warsaliganj
585 South Magadh Nawada Warsaliganj - Katarpur MDR 0 8.40 8.40 0.00 8.40 W/S completed
in 2009-10
0.00 5.00 0.00 3.40 Work Executed by
Road Div., Nawada
(under Plan haed)
586 South Magadh Nawada Simri Byepass MDR 0 2.80 2.80 0 to 2.8 2.80 Width 3.65km.
Strengthening
work completed
in 2006-07
0.00 2.80 Warsaliganj
587 South Magadh Nawada Sarkati more Subhanpur
via Kasichak Rly. Station
MDR 0 10.00 10.00 0 to 10 10.00 Width 3.05m.,
Strengthening
work completed
of Km. 1,2(p),
3,4(p), 10(p) in
2007-08 and
IRQP work Km.
2(p), 4(p),
5,6,7,8,9 and
10(p) completed
in 2009-10
0.00 5.00 0.00 1.00 0.00 4.00 Kasichak, Bhatta, Subhanpur
588 South Magadh Nawada Pakribarawan -
Warsaliganj
MDR 0 12.50 12.50 0 to
12.5
12.50 W/S work
completed in
2010-11
0.00 8.00 0.00 4.50 Work Executed by
Road Div., Nawada
(under Plan haed)
Pakribarawan, Dhebdha,
Warsaliganj
589 South Magadh Nawada Pakribarawan - Kawakol MDR 0 18.80 18.80 0.00 18.80 W/S work of
Km.
1,2,3,7,8,9,10
completed in
2008-09 and
W/S of Km. 4
to 6 and 11 to
18.80
completed in
2010-11
0.00 8.80 0.00 10.00 Work Executed by
Road Div., Nawada
(under Plan haed)
Kachanamore, Gulni, Pali,
Barraj
590 South Magadh Nawada Kawakol-Shekhodeura MDR 0 2.80 2.80 0 to
2.8
2.80 W/S completed
in 2010-11
0.00 2.80 Work Executed by
Road Div., Nawada
(under Plan head)
Kawakol, Shekhodeura
591 South Magadh Nawada Hisua-Khanwan MDR 0 11.20 11.20 0.00 11.20 W/S work of Km.
0 to 3 completed
in 2010-11 and
W/S of Km. 4 to
11.20 completed
in 2009-10
6.00 3.20 2.00 Work Executed by
Road Div., Nawada
(under Plan head)
Repairing work is in
tender process as
cntractor is not
maintaining DLP
after several
reminders.
Hisua, Narhat, Khanwan
592 South Magadh Nawada Antri-Jethian-Tapowan-
Banganga
MDR 27.70 33.30 5.60 0.00 5.60 W/S work
completed in
2011-12
5.60 Work Executed by
Road Div., Nawada
(under Plan head)
Banganga more
593 South Magadh Nawada NH-31 Nawada Bazar MDR 0 6.20 6.20 0.00 6.20 Strengthening
work completed
in 2011-12
0.00 6.20 Work Executed by
Road Div., Nawada
(under Non Plan
head)
Nawada Town
594 South Magadh Nawada NH-31 Rajauli Bazar MDR 0 4.20 4.20 0.00 4.20 Strengthening
work completed
in 2011-12
0.00 4.20 Work Executed by
Road Div., Nawada
(under Non Plan
head)
Rajauli
595 South Magadh Nawada Nepura-Noama MDR 0 6.40 6.40 0.00 6.40 Width 3.05m,
Strengthening
work completed
in 2009-10
2.00 4.40 Work Executed by
Road Div., Nawada
(under 12th FC)
Repairing work is in
tender process as
contractor is not
maintaining DLP
after several
reminders.
Nepura more, Bajitpur, Noama
Page 27 of 28
Road Statistics
Ch. Length Ch. Length Ch. Length Ch. Length From To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 18
Road Condition
Good Fair BADRemarks
Lane Width (M)
Overall
status of
the road
From Km.
Expirty
date of
defect
liability
period
Sl.
No.Wing Circle Division Name of Road
Category NH
/ SH/ MDR
Total
Length
(Km.)
Intermediate
Lane - 5.50m.
Width
Two Lane - 7.0m.
Width
More than 7.0m
widthDate of
Start
Date of
Completio
n (Actual)
Status of
the
stretch
Single Lane-3.75m.
WidthLane
Width (M)
Chainage
(from.to)
Length
(Km.)To Km.
Nature of
work [W/S,
Strength,
IRQP, PR,OR
& FDR]
Important Place in
the road.
Chainage Work done in previous years (up to ……………………………)
596 South Magadh Nawada Warsaliganj-Kochgoan MDR 0 2.40 2.40 0.00 2.40 Width 3.05m,
Strengthening
work in Km. 1st,
Completed in
2008-09 and P/R
work of Km.
2,3(p 2008-09
0.00 2.40 Work Executed by
Road Div., Nawada
(under Non Plan
head)
Kochgoan
597 South Magadh MDR 0.00 15.00 17-31 15.00 15.00 15.00
597 MDR 0.00 16.00 0-16 16.00 16.00 16.00 0 to 16=16.00 Km
Work in progressHasanpur Sakhuwaghat
597 Nawada Total 319.73 68.40 169.88 81.45 0.00 0.00 217.80 91.53 10.40
Nawada Kadirganj-Roh-Kawakol
Road
Page 28 of 28