STATE OF THE REGION PORTFOLIO COMMITTEE 2 SEPTEMBER 2009 GAUTENG REGION. An Age of hope: a National Effort for Corrections, Rehabilitation and Social Re-integration of Offenders. Regional Commissioner: DDG Advocate Tozama Mqobi. Area Commissioners : Baviaanspoort, Mr Malinga - PowerPoint PPT Presentation
27
STATE OF THE REGION STATE OF THE REGION PORTFOLIO COMMITTEE PORTFOLIO COMMITTEE 2 SEPTEMBER 2009 2 SEPTEMBER 2009 GAUTENG REGION GAUTENG REGION An Age of hope: a National Effort for Corrections, Rehabilitation and Social Re- integration of Offenders
Transcript
Page 1: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

STATE OF THE REGIONSTATE OF THE REGION

PORTFOLIO COMMITTEE PORTFOLIO COMMITTEE

2 SEPTEMBER 20092 SEPTEMBER 2009

GAUTENG REGIONGAUTENG REGION

An Age of hope: a National Effort for Corrections,

Rehabilitation and Social Re-integration of Offenders

Page 2: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

Regional Commissioner: DDGAdvocate Tozama Mqobi

Deputy Regional CommissionerMr Freddie Engelbrecht

Area Commissioners:Baviaanspoort, Mr Malinga

Boksburg, Mr LudadaJohannesburg, Mr BouwerKrugersdorp, Ms MbebeLeeuwkop, Mr MashiyaModderbee, Mr BaloyiPretoria, Ms Molatedi Zonderwater, Mr Tana

Regional Head: CorrectionsMs ME Madisa

Regional Head: Corporate ServicesMr E Khoza

Regional Head: Financeand Supply Chain Management

Mr MM Molefe

Acting Regional Head: Development and Care

Mr MM Molefe

Page 3: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

Composition of Region

• Gauteng consists of eight (8)Management Areas: Baviaanspoort; Boksburg; Krugersdorp; Modderbee; Leeuwkop; Johannesburg; Pretoria and Zonderwater with 26 Correctional Centres, including:• Two Female Correctional Centres - Pretoria and

Johannesburg• One High Detention facility at Pretoria• Six classified maximum facilities: Baviaanspoort,

Boksburg (Juveniles), Johannesburg (2x), Leeuwkop and Zonderwater

• ATD Centres Jhb, Pta, Boksburg. Modderbee and Krugersdorp

• Youth Facilities at Baviaanspoort, Leeuwkop, Boksburg• Centres of Excellence at Baviaanspoort Emthonjeni,

Johannesburg Female and Medium C, Leeuwkop Medium B and Pretoria Central

Page 4: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

Composition of Region

• Community Corrections Offices at each Management Area

• Agriculture at Leeuwkop, Baviaanspoort, Zonderwater, Modderbee (Nigel and Devon), Pretoria (Odi and Atteridgeville)

• Workshops at Boksburg, Leeuwkop, Pretoria, Zonderwater, Johannesburg

ESTABLISHMENT• Approved, financed establishment: 9788• Positions filled: 8586• Vacancies: 1202• Vacancy rate: 12.28%

Page 5: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

• Approved accommodation: 25 347 (at 100%)• Unlock total: 44 392 @ 175%

– ATDs: 15 768– Sentenced: 28 624

• Juveniles: – ATD’s: 57 females, 2 069 males– Sentenced: 47 females, 1 794 males

• Adults:– ATD’s: 422 females, 13 219 males– Sentenced: 836 females, 25 947 males

• Security Classification:– Maximum: 74 females, 9 195 males– Medium: 885 females: 18 547 males

Offender population of Region:

Page 6: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

Parolees, probationers population of Region:

26032959

82588865

27422927

85119071

27853011

85659193

28572445

85429286

1098711342

33876

36415

0

5000

10000

15000

20000

25000

30000

35000

40000

April May June July Total

Population of parolees and probationers

Probationers(2008)

Probationers(2009)

Parolees(2008)

Parolees(2009)

Page 7: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

Unnatural deaths– Offender Dlalda: Leeuwkop Medium A – 5 May 2009 – not gang related,

Criminal Investigation pending– Offender Sevhaba: Jhb Med A – 5 May 2009 - not gang related, Criminal

Investigation pending– Offender Strydom: Leeuwkop Max – 29 May 2009 - not gang related,

Criminal Investigation pending

Escapes– Pretoria Central: 27 May 2009: Escaped from Workshops via roof of

Workshops– Jhb Med B: 21 July 2009: Escaped from Chris Hani Bara Hospital while

official went to bathroom – half of the cuff was found to the hospital bed, other part gone with offender

Deaths and Escapes:

Page 8: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMBUDGET

ALLOCATION EXPENDITURE

TO DATE

PERCENTAGE

SPENT

ADMINISTRATION 219,992,200 139,871,900 63.58

SECURITY 772,218,600 393,592,131 50.97

CORRECTIONS 253,454,900 105,155,859 41.49

CARE 408,564,750 131,038,166 32.07

DEVELOPMENT 87,115,800 36,761,452 42.20

SOCIAL RE-INTERGARTION

69,157,400 31,084,347 44.95

FACILITIES 29,491,750 10,053,279 34.09

TOTAL 1,839,995,400 847,557,134 46.06

2009/10 Budget Programmes: Allocation, Expenditure until 20 August 2009

Page 9: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

2009/10 Budget Item Classification: Allocation, Expenditure until 20 August 2009

ITEM CLASSIFICATIONBUDGET

ALLOCATION EXPENDITURE

TO DATE

PERCENTAGE

SPENT

COMPEN OF EMPLOYEES 1,462,078,000 683,045,687 46.72

GOODS & SERVICES EXT. 369,031,700 159,655,239 43.26

TRANSFERS & SUBSIDIES 4,578,600 2,685,986 58.66

PAY ON CAP ASSETS EXT.

4,307,100 2,170,222 50.39

TOTAL 1,839,995,400 847,557,134 46.06

Page 10: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

Suppliers

1. Sun Cleaning Services

2. Bosasa (Nutritional Services)

3. Dept. of Health (Doctors rendering services in Centres)

Amounts1. R 53 816.91 (June 2009 to August 2009: R 17 938.97 per month)

2. R 59 851 163.60 (Payments from March 2009 to July 2009)

3. R 944 071.66 (Payments for March, April and July 2009)

Duration of Contracts

1. 13 Months from 1 June 2009 to 30 June 2010

2. 36 Months from 1 February 2009 to 31 January 2012

3. Currently no contract in place but just a service agreement continuation.

Expenditure on outsourced work:

Page 11: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

Transfers and Subsidy:

Available expenditure to 20 August 2009: R 2 690 483

Capital Asset Expenditure

Available expenditure to 20 August 2009: R 3 574 624

Capital Assets & Transfers and Subsidies: Expenditures to Date

Page 12: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME ADMINISTRATION (Fin and SCM)

ACHIEVEMENTS• Compliance to balancing of final budget for

2008/2009• Payments, asset and debt management• Improvement in AG report

CHALLENGES• Computer Systems• Budgetary constraints

Page 13: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME ADMINISTRATION (Corporate Services)

ACHIEVEMENTS• Regional Health and Wellness structures• OHS training• HIV and AIDS support group for staff• Employee Youth Prayer Day• Training in service terminations – reduction on

incomplete service terminations• Control Room Operators (90) and -Supervisors

(16) appointed• Persal users (14) trained• Organisational Culture Survey conducted• Participation in Public Service Week (exhibition)

Page 14: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME ADMINISTRATION (Corporate Services)

CONSTRAINTS• Officials utilised in Special Programmes

Components (Health and Wellness, Occupational Health & Safety) – adhoc basis

• No meetings between Unions and Management – OSD and OSD related industrial action

• Shortage of officials to implement 7 Day establishment

• Unavailability of approved HR policies and procedures

Page 15: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME SECURITY

ACHIEVEMENTS• One escape for quarter (against target of 4.75)• Incidents of attempted escapes foiled• Three unnatural deaths (against target of 3.75)• Security Audit on CoE – performance of 80.7%• EST training on new fire arm (9mm glock)• Security analysis report – for planning and

identification of risks

Page 16: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME SECURITY

CONSTRAINTS• High number of assaults – overcrowding, shortage

of personnel• Smuggling of unauthorized articles• Insufficient/unavailability of security equipment• Non-compliance to internal security measures• Condition of perimeter fence• Non-operating (training, maintenance) of control

rooms• Lack of National Training Curriculum for security

personnel• Shortage of staff

Page 17: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME FACILITIES

ACHIEVEMENTS• CSPB building projects• Completion of Krugersdorp ARV site• Completion of 9 new dog kennels at Krugersdorp• Staff Support Offices, Call Centre, Cost Centre

clerk and Communication Office (Krugersdorp) – 98% towards completion

• Building of JHB CSPB offices

Page 18: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME FACILITIES

CONSTRAINTS• Finalization of lease agreements, acquisition of

new office space• Slow progress on RAMP• Budget constraints• Shortage of artisans• Building project specifications from PWD vs needs

of Management Areas

Page 19: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME CARE

ACHIEVEMENTS• Accreditation of Krugersdorp ARV• 100% access to primary health care• All Pharmacies licensed with Pharmacy Council• SLA with Gauteng Dept of Health• Monitoring and evaluation in all Management

Areas indicates improvement in compliance to national norms and standards

• Delegated National Monitoring and Evaluation task team regarded the Gauteng M&E System and the implementation there of as best practise for possible National implementation

Page 20: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME CARE

CONSTRAINTS• Limited resources and HIV Area Coordinators who

are working on an adhoc basis. • Private pharmacies are utilized by Baviaanspoort

and Zonderwater Management Areas• Shortage of specialized occupational classes• Lack of office equipment

Page 21: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME DEVELOPMENT

ACHIEVEMENTS• Implementation of formal educational programmes• Implementation of skills development programmes• Outcome of National Offender Choir and Regional

Arts Work competitions• Implementation of all programmes for sports, arts,

culture, library, The Presidential Awards – Art Exhibition and Confederation Cup

• Improved compliance levels in Production Workshops

Page 22: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME DEVELOPMENT

CONSTRAINTS

• Limited resources. classrooms, suitably qualified officials and resignations by the educationists.

• Lack of human and financial resources in Workshops and Agriculture negatively impacted on the set production targets.

Page 23: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME CORRECTIONS

ACHIEVEMENTS

• The number of ATD children - from 99 to 74. • 507 officials trained on Unit Management and

compilation of sentenced plans. • Correctional Sentence Plans developed for

offenders serving 24 months and more• Monitoring Tool to monitor the implementation of

unit management. Current population level at 212%, which exceeds the set (175%) Regional target by 37%.

Page 24: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME CORRECTIONS

CONSTRAINTS• Management of overcrowding, especially ATDs.• The current ratio on official to offender is 1-80 and

is a concern as it impacts negatively on unit management.

• Provision of three meals system to offenders in single cells is not yet in accordance with the stipulated intervals due to the shortage of staff and current shift system.

• The non-existence of a post establishment for correctional programmes facilitators.

Page 25: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME SOCIAL REINTEGRATION

ACHIEVEMENTS

• SLA with SAPS - results in the tracing of absconders - increased from 79 to 103.

• Task team to design a manual for house visitation to be used by Reintegration Case Officers during house monitoring.

• Management Areas partnered with communities (projects) in an effort to alleviate poverty.

Page 26: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

PROGRAMME SOCIAL REINTEGRATION

CONSTRAINTS

• Reluctance of magistrates to place people directly under correctional supervision.

• Shortage of personnel retards positive progress on effective service delivery.

• Policies and procedures that are not congruent with operations.

• Lack of support for offenders eligible for parole to be placed out in the community.

Page 27: STATE OF THE REGION  PORTFOLIO COMMITTEE  2 SEPTEMBER 2009 GAUTENG REGION

THANK YOU

An Age of Hope: A National Effort for Corrections, Rehabilitation and

Social Re-integration of Offenders

THANK YOU

The End Let’s make a difference.

Renewing our pledge – a National partnership to correct, rehabilitate

and re-integrate offenders for a safer and secure South Africa.