STEEL CULVERTS AND STRUCTURAL PLATES 08012 CONTRACTOR INFORMATION LEGAL BUSINESS NAME Contech Engineered Solutions Company Internet URL Address www.conteches.com Company Ordering/Mai ling Address: Contech Engineered Solutions 11835 NE Glenn Widing Dr. Portland, OR 97220 Payment to be sent to: Contech Engineered Solutions LLC 16445 Collections Center Dr. Chicago, IL 60693 Authorized Sales Representati ve and Usage Reports Name: Ken Wake Phone: 360-609-1634 Fax: 866-508-9920 Email: [email protected] Additional Sales Representati ve Name: Trevis Jordan Phone: 972 590-2025 Fax: 972 590-2039 Email: [email protected] MAP BELOW IS FOR DNR REGIONAL USE ONLY
Transcript
Page 1: STATE OF WASHINGTON  · Web viewCulvert Supplier will give 48 hours advance notice of delivery to Purchaser. FOB Plant – Structural Plate. Shipping. Prepaid and add per structural

STEEL CULVERTS AND STRUCTURAL PLATES 08012

CONTRACTOR INFORMATIONLEGAL BUSINESS NAME Contech Engineered Solutions

Company Internet URL Address www.conteches.com

Company Ordering/Mailing Address:

Contech Engineered Solutions

11835 NE Glenn Widing Dr.

Portland, OR 97220

Payment to be sent to:

Contech Engineered Solutions LLC

16445 Collections Center Dr.

Chicago, IL 60693

Authorized Sales Representative and Usage Reports

Name: Ken Wake

Phone: 360-609-1634

Fax: 866-508-9920

Email: [email protected]

Additional Sales Representative

Name: Trevis Jordan

Phone: 972 590-2025

Fax: 972 590-2039

Email: [email protected]

MAP BELOW IS FOR DNR REGIONAL USE ONLY

Page 2: STATE OF WASHINGTON  · Web viewCulvert Supplier will give 48 hours advance notice of delivery to Purchaser. FOB Plant – Structural Plate. Shipping. Prepaid and add per structural

Current Contract InformationContract No. 08012 Steel CulvertsPage 2

REGIONS

Below is a list of DNR regions and the counties included in the DNR regions for non-DNR Purchasers. Oregon is included as a seventh “region” in the Price Sheet.

DNR Regions Counties Assigned to DNR Regions for non-DNR PurchasersOlympic Clallam, Jefferson, Mason, Kitsap, Grays Harbor

Pacific Cascade Pacific, Lewis, Skamania, Clark, Cowlitz, Wahkiakum

Page 3: STATE OF WASHINGTON  · Web viewCulvert Supplier will give 48 hours advance notice of delivery to Purchaser. FOB Plant – Structural Plate. Shipping. Prepaid and add per structural

Current Contract InformationContract No. 08012 Steel CulvertsPage 3

Northwest Whatcom, Skagit, Snohomish,South Puget Sound King, Pierce

Northeast Okanogan, Ferry, Stevens, Pend Oreille,Southeast Chelan, Douglass, Grant, Lincoln, Spokane, Kittitas, Adams, Whitman,

Yakima, Benton, Franklin, Walla Walla, Columbia, Garfield, Asotin, Klickitat

Not Serviced San Juan – Not currently part of this contract as Bid.

Oregon is included as a seventh “region” in the Price Sheet (See attachment in Contract Pricing Section below).

Purchase Cards: YES: Visa, MasterCard Minimum Orders: None (Special)- See Freight terms belowDeposits: None- This contract is not subject to a deposit rule. Payment Terms: No Prompt Payment Discount.

Shipping Terms:

FOB Destination - CMPShipping

Culverts are not to be nested for shipping.

Offloading of delivered culverts will be provided by Purchaser.

Culvert Supplier will give 48 hours advance notice of delivery to Purchaser.

FOB Plant – Structural PlateShipping

Prepaid and add per structural plate freight sheet.

Freight

CMP

There will be no minimum order requirements. However, for total orders under $5,000.00, freight may be prepaid and added to the invoice.

Structural Plate – Prepaid and add per order

Contract Pricing:

Pricing Per region (See Attachment Below)

A Vendor Management fee of 1.5 Percent will be added on to the cost as a separate line item.

Page 4: STATE OF WASHINGTON  · Web viewCulvert Supplier will give 48 hours advance notice of delivery to Purchaser. FOB Plant – Structural Plate. Shipping. Prepaid and add per structural

Current Contract InformationContract No. 08012 Steel CulvertsPage 4

Technical Specs

Corrugated Metal Pipe (CMP) will meet the requirements of AASHTO M 36-03 Corrugated Steel Pipe, Metallic-Coated, for Sewers and Drains except as modified by the embedded specifications below. The term “corrugated metal pipe” as used in this contract includes both Type I and Type II pipe.

Because of idiosyncrasies of MS Word, it is necessary to click the embedment below and any pop ups several times to open it.

CCI HISTORY:RevisionDate:

EffectiveDate: CCI # & DESCRIPTION

11/7/14 11/7/14 Administrative Update

N/A 12/17/2012CCI 01: Contract Award: Agreement signed by the State on 12/7/12 with Contech Engineered Solutions. Contract awarded, the effective date is 12/17/12 and runs for 12 months.

12/9/2013 1/25/2014

CCI 02: Contract extended, Effective dates 1/25/2014 to 1/24/2016. Extension amendment attached.

3/27/2013 7/1/2013

Amendment 1 (2)- Management Fee:

3/28/2014 5/1/2014 Amendment 3- Items Addition for Steel Structural Plates:

Page 5: STATE OF WASHINGTON  · Web viewCulvert Supplier will give 48 hours advance notice of delivery to Purchaser. FOB Plant – Structural Plate. Shipping. Prepaid and add per structural

Current Contract InformationContract No. 08012 Steel CulvertsPage 5

3/30/2015 3/30/2015

Amendment 4-Update section 1.2 Purchasers:

7/01/2017

Amendment 5- Vendor Management Fee and Extension

:


Recommended