Bridges Renewal Program Round Two
Projects as at 15 January 2018
State Project Name Project Description AG Funding Total Cost Project Status
Bridge Count
ACT Four Bridges on the Monaro Highway (3190, 3178, 3179, 3161) Strengthening
Strengthening of three box culvert bridges and one single span bridge to support Higher Productivity Vehicles as part of the ACT Freight Strategy network.
$1,000,660 $2,001,320 Completed 4
NSW Bathurst Regional Council - Rivulet Road Bridge Replacement
Replace a one-lane timber bridge with a two lane concrete bridge.
$390,000 $782,962 Completed 1
NSW Bega Valley Shire Council - Murrah River Bridge Upgrade
Upgrade substructure of iconic timber bridge.
$210,000 $420,000 Completed 1
NSW Bellingen Shire Council - Reids Bridge Replacement
Bellingen Shire Council - Reids Bridge replacement.
$192,000 $547,498 Completed 1
NSW Blacktown City Council - Rouse Road Bridge Replacement
Replace existing causeway with a bridge.
$3,500,000 $7,000,000 Underway 1
NSW Blayney Shire Council - Coombing Creek Bridge Replacement
Replace a one-lane timber bridge with a one lane concrete bridge.
$165,000 $384,270 Completed 1
NSW Boorowa Council - Bennett Springs Bridge Replacement
Replace a one-lane timber bridge with a two lane concrete bridge.
$478,000 $956,000 Underway 1
NSW Cessnock City Council - Fosters Bridge Replacement
Replace a one-lane timber bridge with a two-lane bridge to remove load limit.
$2,200,000 $4,400,000 Planned 1
NSW Cessnock City Council - Frame Drive Bridge Replacement
Replace a single lane closed timber bridge with a two lane concrete bridge and pathway.
$2,000,000 $4,000,000 Underway 1
NSW Clarence Valley Council - Jacks Bridge Replacement
Replace a two-lane timber bridge with a concrete pipe culvert.
$24,377 $48,755 Completed 1
NSW Clarence Valley Council - Kinghorn Bridge Replacement
Replace a two-lane timber bridge with a two lane concrete bridge.
$190,205 $380,411 Completed 1
Bridges Renewal Program Round Two
Projects as at 15 January 2018
NSW Clarence Valley Council - Romiaka Channel Bridge Replacement
Replace a two lane concrete bridge with two lane concrete bridge with footpath.
$1,731,000 $3,462,000 Underway 1
NSW Coffs Harbour City Council - Seccombes Bridge Replacement
Replace a two-lane timber bridge with a two lane concrete bridge.
$225,825 $451,650 Completed 1
NSW Coffs Harbour City Council - Taylors Bridge Replacement
Replace a one-lane temporary timber bridge with a two lane concrete bridge.
$176,898 $353,795 Completed 1
NSW Eurobodalla Shire Council - Tyrone Bridge Replacement
Replace a one-lane timber bridge with a one lane concrete bridge.
$1,250,000 $2,500,000 Underway 1
NSW Gilgandra Shire Council - Luckie’s Gully Bridge Replacement
Replace existing pipe culvert with two lane concrete bridge.
$434,500 $869,000 Completed 1
NSW Gilgandra Shire Council - Wallumburrawang Creek Bridge Replacement
Replace a timber bridge with a two lane concrete bridge.
$627,000 $1,254,000 Underway 1
NSW Gilgandra Shire Council - Webb’s Crossing Bridge Replacement
Replace a damaged culvert with two lane concrete bridge.
$401,500 $858,762 Completed 1
NSW Goulburn Mulwaree Council - Komungla Bridge Replacement
Replace a single lane concrete causeway with a two lane concrete bridge.
$1,526,000 $3,052,000 Completed 1
NSW Greater Taree City Council - Abdoos Bridge Replacement
Replace timber bridge with concrete culvert.
$200,000 $424,930 Completed 1
NSW Greater Taree City Council - Kellys Creek Bridge Replacement
Replace timber bridge with concrete culvert.
$600,000 $1,200,000 Underway 1
NSW Gunnedah Shire Council - Simpson Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge.
$800,000 $2,170,000 Underway 1
NSW Guyra Shire Council - Tenterden Road Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge.
$530,000 $1,060,000 Underway 1
Bridges Renewal Program Round Two
Projects as at 15 January 2018
NSW Hawkesbury City Council - West Portland Road Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge on an improved alignment.
$920,000 $2,184,229 Completed 1
NSW Kyogle Council - Barretts Bridge Replacement
Replace a single lane timber bridge with a single lane concrete and steel bridge.
$228,600 $641,031 Completed 1
NSW Kyogle Council - Renewal of Six Bridges on Gradys Creek
Replacement of six timber bridges on Gradys Creek and Lions Roads
$1,973,400 $3,946,800 Underway 6
NSW Narrabri Shire Council - Eulah Creek Road Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge.
$378,000 $756,000 Planned 1
NSW Orange City Council - Forest Road Bridge Replacement
Duplicate a narrow lane bridge to increase the capacity for Higher Productivity Vehicles.
$1,250,000 $2,500,000 Not Currently Proceeding
1
NSW Palerang Council - Back Creek Bridge Replacement
Replace a one-lane timber bridge with a two lane concrete bridge.
$875,000 $1,750,000 Planned 1
NSW Parkes Shire Council - Kadina Bridge Replacement
Replace a two-lane culvert with a two lane concrete bridge.
$297,000 $595,000 Planned 1
NSW Port Macquarie - Hastings Council - Bulli Creek Bridge Replacement
Replace a single lane timber bridge with two lane concrete bridge.
$800,000 $1,600,000 Planned 1
NSW Port Macquarie-Hastings Council - Albert Street Bridge Replacement
Replace a one-lane timber bridge with two-lane concrete box culvert.
$200,000 $400,000 Planned 1
NSW Port Macquarie-Hastings Council - O’Neill’s Bridge Replacement
Replace a two-lane timber bridge with two lane reinforced concrete culverts.
$240,000 $480,000 Planned 1
NSW Shoalhaven City Council - Moona Moona Creek Bridge Replacement
Replace a two-lane timber bridge with a two lane concrete bridge.
$750,000 $1,600,000 Planned 1
NSW Singleton Council - Brookers Bridge Replacement
Replace a one-lane timber bridge with a two lane concrete bridge.
$1,100,000 $2,200,000 Planned 1
Bridges Renewal Program Round Two
Projects as at 15 January 2018
NSW Tamworth Regional Council - Rimbanda Bridge Replacement
Replace a one-lane timber bridge with a one lane concrete causeway.
$82,500 $156,405 Completed 1
NSW Tamworth Regional Council - Swamp Creek Bridge Replacement
Replace a one-lane timber bridge with a one lane concrete bridge.
$190,850 $381,700 Planned 1
NSW Tumut Shire Council - Replacement of Three Bridges on Wee Jasper Road
Replace three single lane timber bridges, with three single lane concrete bridges.
$392,000 $785,000 Completed 3
NSW Upper Hunter Shire Council - Middlebrook Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge.
$1,164,000 $2,328,000 Underway 1
NSW Wagga Wagga City Council - Eunony Bridge Replacement
Replace the existing Eunony Bridge with a Higher Mass Limit capacity bridge.
$4,906,000 $9,812,000 Planned 1
NSW Walcha Council - Aberbaldie Road Bridge Replacement
Replace a two-lane timber bridge with a wider two-lane bridge.
$248,500 $497,000 Completed 1
NSW Walcha Council - Flags Niangala Bridge Replacement
Replace a one-lane timber bridge with a wider, higher load limit one-lane bridge.
$152,500 $305,000 Completed 1
NSW Walcha Council - Kangaroo Flat Road (5218) Bridge Replacement
Replace a single lane timber bridge with a single lane concrete bridge.
$238,500 $477,000 Completed 1
NSW Walgett Shire Council - Blacks Timber Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge.
$445,500 $891,000 Underway 1
NSW Walgett Shire Council - Harris Timber Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge.
$445,500 $891,000 Planned 1
NSW Walgett Shire Council - Wanourie Timber Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge.
$668,250 $1,336,500 Underway 1
NSW Warrumbungle Shire Council - Allison Bridge Replacement
Replace a two-lane bridge increasing the capacity.
$965,000 $2,010,000 Completed 1
Bridges Renewal Program Round Two
Projects as at 15 January 2018
NSW Warrumbungle Shire Council - Ross Crossing Bridge Replacement
Replace a one-lane timber bridge with a concrete bridge.
$350,000 $700,000 Completed 1
NSW Weddin Shire Council - Blacks Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge.
$425,000 $850,000 Completed 1
NSW Wellington Council - Gundy Creek Bridge Replacement
Replace a two-lane timber bridge with a two lane concrete bridge for Higher Mass Limit vehicles.
$620,041 $1,240,082 Planned 1
NSW Wingecarribee Shire Council - Belanglo Rd Culvert Replacement
Replace a one-lane culvert with a two-lane culvert and improve the road approaches.
$197,844 $395,688 Completed 1
NSW Wyong Shire Council - Sohier Park Bridge Replacement
Replace a two-lane timber bridge with a two lane concrete bridge.
$680,000 $1,360,000 Planned 1
NSW Yass Valley Council - Dicks Creek Road Bridge Replacement
Replace a one-lane timber bridge with a two lane concrete bridge.
$723,000 $1,447,652 Completed 1
NSW Young Shire Council - McHenrys Creek Bridge Widening
Widen the bridge and increase the load capacity.
$419,000 $838,000 Planned 1
NT Katherine Town Council - Leight Creek Bridge Replacement
Replace low-level bridge with a raised bridge to increase flood immunity and year round access.
$1,500,000 $3,865,000 Planned 1
QLD Banana Shire Council - Callide Creek Bridge Replacement
Replace a low-level floodway and culvert with a two-lane bridge including sealed approach works.
$2,365,000 $4,730,000 Planned 1
QLD Boulia Shire Council - Georgina River Bridge Upgrade
Upgrade a one lane concrete bridge and approaches to current standards.
$41,000 $82,000 Underway 1
QLD Boulia Shire Council - Wills River Bridge and Double Creek Bridge Upgrades
Upgrade a concrete bridge on Wills River Crossing and a concrete bridge and a culvert on Double Creek.
$118,051 $236,103 Completed 1
QLD Bundaberg Regional Council - Monduran Road Bridge Replacement
Replace existing one lane timber bridge with a two lane concrete bridge.
$1,590,000 $3,180,000 Completed 1
Bridges Renewal Program Round Two
Projects as at 15 January 2018
QLD Cairns Regional Council - Deep Creek Bridge Replacement
Replace a one lane steel girder bridge with a two lane concrete bridge.
$1,200,000 $2,400,000 Completed 1
QLD Cairns Regional Council - Rudge Bridge Replacement
Replace a one lane steel girder bridge with a two lane concrete bridge.
$1,900,000 $3,800,000 Underway 1
QLD Cassowary Coast Regional Council - Victory Creek Bridge Replacement
Replace a one-lane bridge with a two-lane bridge with realigned approaches.
$1,518,000 $3,036,000 Planned 1
QLD Charters Towers Regional Council - Eight Mile Creek Bridge Replacement
Replace a one-lane grid bridge with a strengthened one lane concrete bridge.
$200,000 $400,000 Completed 1
QLD Charters Towers Regional Council - Reedybrook Creek Bridge Replacement
Replace a one-lane grid bridge with a strengthened one lane concrete bridge.
$95,500 $191,000 Completed 1
QLD Somerset Regional Council - Gallanani Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge.
$490,139 $980,278 Completed 1
QLD Somerset Regional Council - Larkhill Boundary Road Bridge Replacement
Replace a single lane timber bridge with a double lane concrete bridge.
$430,206 $860,413 Completed 1
QLD South Burnett Regional Council - Marshlands Bridge Replacement
Replace a timber bridge reduced to single lane with a two lane concrete bridge.
$601,509 $1,203,018 Completed 1
QLD Southern Downs Regional Council - Boxs Bridge Replacement
Replace a single lane timber bridge with a concrete bridge.
$474,041 $948,082 Completed 1
QLD Southern Downs Regional Council - Connells Bridge Replacement
Replace a single lane timber bridge with a concrete bridge.
$407,832 $815,664 Completed 1
QLD Whitsunday Regional Council - Gregory River Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge.
$1,250,000 $2,500,000 Completed 1
Bridges Renewal Program Round Two
Projects as at 15 January 2018
QLD Toowoomba Regional Council - Lemontree-Bostock Road Bridge Replacement
Lemontree-Bostock Road Bridge Replacement.
$1,390,250 $2,780,500 Planned 1
QLD Toowoomba Regional Council - Scrubby Road Culvert Replacement
Scrubby Road Culvert Replacement.
$157,281 $314,563 Completed 1
QLD Western Downs Regional Council - Charleys Creek Bridge Two Replacement
Replace a single lane timber bridge with a new two lane concrete bridge.
$885,586 $1,771,172 Completed 1
QLD Townsville City Council - Rollingstone Bridge Upgrade
Upgrade closed bridge with new superstructure.
$382,045 $764,090 Completed 1
QLD Rockhampton Regional Council - Sandy Creek Bridge Replacement
Replace existing timber bridge with five cell concrete box culverts.
$338,000 $676,000 Planned 1
QLD Scenic Rim Regional Council - Adams Bridge Replacement
Replace single lane bridge with a dual lane concrete bridge.
$1,666,000 $3,332,000 Completed 1
QLD Scenic Rim Regional Council - Tramway Bridge Replacement
Replace a single-lane timber bridge with a concrete bridge.
$694,372 $1,388,745 Completed 1
QLD Somerset Regional Council - Crossdale Bridges 1 and 2 Replacements
Replace two single lane timber bridges with two single lane concrete crossings.
$618,051 $1,236,103 Completed 2
QLD Somerset Regional Council - Duffys Bridge Replacement
Replace a two-lane timber bridge with a two lane concrete bridge.
$408,569 $817,138 Completed 1
QLD City of Gold Coast Council - Chardon Road Bridge Replacement
Replace a one-lane timber bridge with a two lane concrete bridge.
$1,610,000 $3,220,000 Planned 1
QLD Fraser Coast Regional Council - Gutchy Creek Bridge Replacement
Replace a timber bridge with a two lane concrete bridge.
$1,109,479 $2,218,959 Completed 1
Bridges Renewal Program Round Two
Projects as at 15 January 2018
QLD Gladstone Regional Council - NRG Balloon Loop Railway Crossing Upgrade
Increase the structural capacity of the bridge to maintain load limit requirements for a Higher Mass Limit route.
$250,000 $500,000 Underway 1
QLD Gympie Regional Council - Goomong Road Bridge Replacement
Replace a single lane timber bridge with a concrete bridge.
$955,500 $1,911,000 Completed 1
QLD Gympie Regional Council - Kandanga Creek Road Bridge Replacement
Replace timber bridge with a two lane concrete bridge.
$758,328 $1,516,656 Completed 1
QLD Isaac Regional Council - Cherwell Creek Bridge Replacement
Replace existing narrow low-level bridge.
$2,750,000 $5,500,000 Completed 1
QLD Mareeba Shire Council - Oakey Creek Bridge Replacement
Replace a one-lane timber bridge with a one lane concrete bridge.
$170,000 $350,561 Completed 1
QLD McKinlay Shire Council - Punchbowl Rd Bridge Replacement
Replace a one-lane culvert with a one lane, concrete bridge and realign the road.
$1,314,538 $2,629,077 Completed 1
QLD Moreton Bay Regional Council - Drapers Crossing Bridge Replacement
Replace a low-level single lane timber bridge and causeway with a high level two lane concrete bridge.
$3,430,000 $6,860,000 Underway 1
QLD North Burnett Regional Council - Deep Creek Bridge Replacement
Replace the existing timber bridge with a concrete bridge.
$2,200,000 $4,400,000 Planned 1
QLD Palm Island Aboriginal Council - Sandy Boyd Creek Bridge Upgrade
Upgrade width, strength and safety of existing bridge.
$216,000 $432,000 Completed 1
QLD Rockhampton Regional Council - Louisa Creek Bridge Replacement
Replace existing timber bridge with three cell concrete box culverts.
$180,000 $360,000 Planned 1
QLD Scenic Rim Regional Council - Churchbank Bridge Replacement
Replace a one-lane timber bridge with a two lane concrete bridge.
$1,360,000 $2,720,000 Underway 1
QLD Somerset Regional Council - Dunlops Bridge Replacement
Replace a single lane timber bridge with a single lane concrete crossing.
$100,152 $200,304 Completed 1
Bridges Renewal Program Round Two
Projects as at 15 January 2018
SA Clare and Gilbert Valley Councils - Simmo's Bridge Replacement
Replace a one-lane bridge with a two-lane bridge.
$165,000 $377,639 Completed 1
SA Kangaroo Island Council - Bark Hut Road Bridges (10 & 11) Upgrades
Strengthening and widening of two bridges to support heavy vehicles.
$53,500 $107,000 Completed 2
SA Light Regional Council - Orchard Bridge Replacement
Replace a load-limited concrete and stone masonry bridge with a reinforced concrete arch bridge.
$300,000 $812,988 Completed 1
SA Naracoorte Lucindale Council - Sandstone Ave/Cadgee Road Bridge Replacement
Replace existing culvert with a wider culvert and increase load limit.
$73,000 $146,000 Completed 1
SA City of Port Lincoln - London Street Bridge Replacement
Replacement of the London Street bridge with a bridge suitable for Greater Mass Limit vehicles.
$2,242,500 $4,521,231 Completed 1
SA The District Council of Mount Remarkable - Spear Creek Rd Bridges (1077, 9024, 9025,9030) Upgrades
Strengthen one culvert and three masonry arches to enable heavy vehicle access.
$192,500 $385,000 Completed 4
SA Town of Gawler Council - Gawler Bridge Upgrade
Structural renewal and remediation of the historic Gawler Bridge.
$660,000 $1,320,000 Planned 1
TAS Dorset Council - Dead Horse Hill Road Bridge (1614) Replacement
Replace a single lane timber and concrete bridge with a single lane concrete bridge.
$192,405 $384,810 Completed 1
TAS Meander Valley Council - Union Bridge Replacement
Replace a single lane timber bridge with a dual lane concrete bridge.
$1,360,000 $2,720,000 Completed 1
TAS Break O’Day Council - Cornwall Road Bridge Replacement
Replace a one-lane timber bridge with a two-lane concrete bridge.
$110,000 $253,054 Completed 1
TAS Northern Midlands Council - Lake River Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge.
$719,500 $1,463,953 Completed 1
Bridges Renewal Program Round Two
Projects as at 15 January 2018
TAS Derwent Valley Council - Tyenna and Newbury Road Bridges Replacement
Replace two single lane timber bridges with single lane concrete bridges.
$270,000 $570,000 Completed 2
TAS Break O’Day Council - Golden Fleece Rivulet Bridge Replacement
Replace a single lane timber bridge with a two-lane concrete bridge.
$665,525 $1,331,051 Completed 1
TAS Burnie City Council - Tittie Gee Creek Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge.
$121,500 $269,114 Completed 1
VIC Alpine Shire Council - Morses Creek Bridge Upgrade
Strengthen load-limited bridge to provide access for heavy vehicles and emergency services.
$131,831 $263,662 Completed 5
VIC Alpine Shire Council - Smarts Creek Bridge Upgrade
Strengthen a load-limited bridge to provide access for heavy vehicles and emergency services.
$23,169 $46,338 Completed 1
VIC Ararat Rural City Council - Ritchies Bridge Replacement
Replace a single lane, load limited timber bridge with a two lane concrete bridge.
$229,718 $459,437 Completed 1
VIC Baw Baw Shire Council - Daveys Road Bridge Replacement
Replace a 15 tonne limit bridge with a 70 tonne limit concrete bridge.
$332,624 $665,249 Completed 1
VIC Benalla Rural City - Williams Road Bridge Strengthening
Strengthen the existing bridge to maintain load limits.
$190,042 $380,084 Completed 1
VIC Cardinia Shire Council - Bunyip-Modella Road Bridge Replacement
Replace a 10 tonne load limited bridge to provide access for heavy vehicles and emergency services.
$694,000 $1,388,000 Completed 1
VIC Central Goldfields Shire Council - Parker’s Bridge Replacement
Replace a one lane timber and steel bridge with a two lane concrete bridge.
$250,000 $500,000 Completed 1
VIC City of Ballarat - Kennedys Road Culvert Renewal
Strengthen the existing bridge to maintain load limits.
$95,000 $190,000 Completed 1
VIC City of Ballarat - Miners Rest Road Bridge Replacement
Replace a load-limited bridge with a concrete bridge.
$265,621 $531,242 Completed 1
Bridges Renewal Program Round Two
Projects as at 15 January 2018
VIC Strathbogie Shire Council - Curries Road Bridge Upgrade
Re-deck timber bridge to increase load limit and provide access to heavy vehicles and emergency services.
$30,000 $105,333 Completed 1
VIC Strathbogie Shire Council - Nelsons Road Bridge Upgrade
Replace one abutment to increase load limit.
$25,000 $53,380 Completed 1
VIC Warrnambool City Council - Ziegler Parade Bridge Upgrade
Upgrade bridge to increase load limit.
$600,000 $1,200,000 Planned 1
VIC Yarriambiack Shire Council - Dunmunkle Creek Culverts Upgrade
Renew and upgrade major culverts over the Dunmunkle Creek, on the Banyena Pimpinio Road.
$44,000 $110,000 Completed 1
VIC Horsham Rural City Council - Polkemmet Road Culvert Replacement
Replacement of a major box culvert.
$50,000 $100,101 Completed 1
VIC Horsham Rural City Council - Three Bridges Road Bridge Replacement
Replace the bridge on Three Bridges Road over Mackenzie River.
$538,500 $1,077,000 Completed 1
VIC Mansfield Shire Council - Mansfield Heavy Vehicles Bypass Bridge Replacement
Replace one lane, low level crossings with two lane concrete bridges.
$450,000 $950,000 Completed 2
VIC Macedon Ranges Shire Council - Romsey Road Culvert Replacement
Replace two culverts on an existing two-lane road.
$62,500 $176,334 Completed 2
VIC Rural City of Wangaratta Council - Morton’s Bridge Replacement
Replace a single lane timber bridge with two lane concrete bridge.
$174,300 $348,600 Completed 1
VIC Strathbogie Shire Council - Cullens Road Bridge Replacement
Replace a load-limited bridge with a bridge providing access to heavy vehicles and emergency services.
$161,789 $323,578 Completed 1
VIC Moyne Shire Council - Scotts North Road Bridge Strengthening and Realignment
Strengthening and realignment of the bridge suitable for B-Double and Higher Mass Limit vehicles.
$110,000 $220,000 Completed 1
Bridges Renewal Program Round Two
Projects as at 15 January 2018
VIC Moyne Shire Council - Tarrone Lane Bridge Upgrade
Widening, strengthening and realignment of a single lane bridge suitable for B-Doubles and Higher Mass Limit vehicles.
$309,215 $618,431 Completed 1
VIC Mitchell Shire Council - Highlands Rd (1405 & 1411) Bridge Replacements
Replace two bridges (1405 and 1411) to a 160 tonne load limit.
$292,034 $584,068 Completed 2
VIC Mitchell Shire Council - Dropmore Road (1394) Bridge Replacement
Replace a one-lane 20 tonne limit concrete bridge with a two-lane 160 tonne limit concrete bridge.
$184,000 $398,843 Completed 1
VIC City of Wodonga Council- Conisbee Lane Bridge Replacement
Replace a load limited timber bridge with six cell concrete box culverts.
$35,000 $154,900 Completed 1
VIC Corangamite Shire Council - Castle Carey Road Bridge Replacement
Replace and realign a one-lane timber bridge with a two lane concrete bridge.
$2,600,000 $5,200,000 Underway 1
VIC East Gippsland Shire Council - Lindenow Glenaladale Road Bridge Replacement
Replace a one lane steel and timber 44 tonne limit bridge with a one-lane 70 tonne limit concrete bridge.
$1,202,500 $2,405,000 Underway 1
VIC Gannawarra Shire Council - Wells Bridge Replacement
Replace a one lane timber and steel bridge with a two-lane concrete bridge.
$838,000 $1,707,323 Completed 1
VIC Golden Plains Shire Council - Pitfield-Cressy Rd Bridge Replacement
Replace a 15 tonne limit two-lane bridge with a 68 tonne limit two lane concrete bridge.
$300,000 $602,665 Completed 1
VIC City of Greater Bendigo Council - Sheepwash Creek Bridge Replacement
Replace a one lane timber and steel bridge with a two lane concrete bridge.
$741,545 $1,483,090 Completed 1
WA Shire of Boyup Brook - Bridge 270, Cranbook Road Bridge Replacement
Replace a single lane timber bridge with a two lane concrete bridge.
$2,450,000 $4,900,000 Underway 1
WA Shire of Pingelly - Bullaring Road Bridge (1191) Replacement
Replace a two lane timber bridge with a two lane strengthened box culvert.
$81,000 $163,000 Completed 1
Bridges Renewal Program Round Two
Projects as at 15 January 2018
WA Shire of Donnybrook - Balingup, Bridge 3643A, Trevena Road Bridge Replacement
Replace a one-lane timber bridge with a two lane concrete bridge.
$750,000 $1,500,000 Planned 1