LONDON BOROUGH OF CROYDON To: Croydon Council website Access Croydon & Town Hall Reception STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET MEMBER FOR TRANSPORT AND ENVIRONMENT ON 29 th July 2015 This statement is produced in accordance with Regulation 13 of the Local Authorities (Executive Arrangements) Meetings and Access to Information) (England) Regulations 2012. The following apply to the decisions listed below: Reasons for these decisions: are contained in the attached Part A report Other options considered and rejected: are contained in the attached Part A report Details of conflicts of Interest declared by the Cabinet Member: none Note of dispensation granted by the head of paid service in relation to a declared conflict of interest by that Member: none The Leader of the Council has delegated to the Cabinet Member the power to make the executive decisions set out below: CABINET MEMBER’S EXECUTIVE DECISION REFERENCE NO. 42/15/TE Decision title: Quietway Route 5 (Waterloo to Croydon) -Design Amendments Having carefully read and considered the report and the requirements of the Council’s public sector equality duty in relation to the issues detailed in the body of the report, the Cabinet Member for Transport and Environment, RESOLVED 1. To approve amendments to the original design interventions listed below, and as shown at Appendix 2, which were presented to Traffic Management Advisory Committee (TMAC) on 29 April 2015 as Cycle Quietways Route 77. Intervention 32: Brook Rd j/w Melfort Rd (Bensham Manor Ward) Intervention 33: Brigstock Rd (Bensham Manor Ward) Intervention 34: Pawsons Rd between Pitt Rd and Mayo Rd (Selhurst Ward) Intervention 36: Northcote Rd between its j/w The Crescent and Sydenham Rd (Selhurst Ward) 1
Transcript
Page 1: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

LONDON BOROUGH OF CROYDON

To: Croydon Council website Access Croydon & Town Hall Reception STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET MEMBER FOR TRANSPORT AND ENVIRONMENT ON 29th July 2015 This statement is produced in accordance with Regulation 13 of the Local Authorities (Executive Arrangements) Meetings and Access to Information) (England) Regulations 2012. The following apply to the decisions listed below: Reasons for these decisions: are contained in the attached Part A report Other options considered and rejected: are contained in the attached Part A report Details of conflicts of Interest declared by the Cabinet Member: none Note of dispensation granted by the head of paid service in relation to a declared conflict of interest by that Member: none The Leader of the Council has delegated to the Cabinet Member the power to make the executive decisions set out below: CABINET MEMBER’S EXECUTIVE DECISION REFERENCE NO. 42/15/TE Decision title: Quietway Route 5 (Waterloo to Croydon) -Design Amendments Having carefully read and considered the report and the requirements of the Council’s public sector equality duty in relation to the issues detailed in the body of the report, the Cabinet Member for Transport and Environment, RESOLVED

1. To approve amendments to the original design interventions listed below, and as shown at Appendix 2, which were presented to Traffic Management Advisory Committee (TMAC) on 29 April 2015 as Cycle Quietways Route 77. • Intervention 32: Brook Rd j/w Melfort Rd (Bensham Manor Ward) • Intervention 33: Brigstock Rd (Bensham Manor Ward) • Intervention 34: Pawsons Rd between Pitt Rd and Mayo Rd (Selhurst

Ward) • Intervention 36: Northcote Rd between its j/w The Crescent and

Sydenham Rd (Selhurst Ward)

1

Page 2: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

• Intervention 37: Sydenham Rd j/w St James’ Rd (Selhurst Ward and Fairfield Ward)

• Intervention 38: Sydenham Rd (Fairfield Ward) • Intervention 38: Sydenham Rd j/w Dingwall Rd (Fairfield Ward) Additional Intervention • Intervention 32: Brook Rd j/w Quadrant Road. Experimental Order: Trail Closure • Intervention 37: Sydenham Rd j/w Gladstone Rd (Selhurst Ward)

2. That the General Manager of Operations and Infrastructure (Highways and Parking) be delegated authority to carry out Statutory Consultation and make the necessary Traffic Management Orders under the Road Traffic Regulation Act 1984 (as amended) in order to implement the Recommendation above; and

3. Note that where material objections are received these will be reported back

to a future meeting of the Traffic Management Advisory Committee for determination by the Cabinet Member for Transport and Environment.

Date: 15 September 2015

2

Page 3: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

REPORT TO: Councillor Kathy Bee, Cabinet Member for Transport and Environment for

decision under delegated authority

SUBJECT: Quietway Route 5 (Waterloo to Croydon) Design Amendments

LEAD OFFICER: Jo Negrini, Executive Director Place

CABINET MEMBER: Councillor Kathy Bee, Cabinet Member for Transport and Environment

WARDS: NORBURY, UPPER NORWOOD, THORNTON HEATH, BENSHAM MANOR, SELHURST, FAIRFIELD

CORPORATE PRIORITY/POLICY CONTEXT: The proposal supports The Croydon Promise: Growth for All objectives including:

• Croydon will be a place that is easy to move around Genuine alternatives to the private car will be available, offering people the choice to travel by train, tram, bus, bicycle, or on foot

• Easier and safer to cycle in Croydon We will raise the status of cycling as a means to travel around the borough aiming eventually to put Croydon on a par with the most cycle-friendly cities in Europe

• Better pedestrian links Network of walkable routes will provide connections to key destinations including our interchange hubs where people will be able to easily change modes to cycle, bus, tram or rail.

AMBITIOUS FOR CROYDON & WHY ARE WE DOING THIS: The proposals support ambitions for Croydon including:

• ambitious for a Croydon where everyone is proud to live and work

• give disabled people, pedestrians and cyclists greater protection and make their journeys safer

• work with residents to establish ‘play streets’, where children are able to play safely in front of their homes with their friends and where communities can meet

• seek to significantly increase the number of journeys in Croydon by bicycle by undertaking a fundamental review of how the council supports cycling

FINANCIAL IMPACT There are no costs to be met by Croydon Council. All costs of delivering the Croydon leg of Quietways Route 5 will be fully met from the Transport for London’s (TfL)

1

Page 4: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

Quietways Budget.

KEY DECISION REFERENCE NO.: Not a key decision

1. RECOMMENDATIONS

That the Cabinet Member for Transport and Environment under delegated authority from the Leader of the Council dated 10 July 2015:

1.1. Consider and approve: 1.1.1 Amendments to the original design interventions listed below, and as shown at

Appendix 2, which were presented to Traffic Management Advisory Committee (TMAC) on 29 April 2015 as Cycle Quietways Route 5. • Intervention 32: Brook Rd j/w Melfort Rd (Bensham Manor Ward) • Intervention 33: Brigstock Rd (Bensham Manor Ward) • Intervention 34: Pawsons Rd between Pitt Rd and Mayo Rd

(Selhurst Ward) • Intervention 36: Northcote Rd between its j/w The Crescent and Sydenham

Rd (Selhurst Ward) • Intervention 37: Sydenham Rd j/w Gladstone Rd (Selhurst Ward) • Intervention 37: Sydenham Rd j/w St James’ Rd (Selhurst Ward and

Fairfield Ward) • Intervention 37: Sydenham Rd (Fairfield Ward) • Intervention 37: Sydenham Rd j/w Dingwall Rd (Fairfield Ward)

1.1.2 An additional Intervention 32 at Brook Rd j/w Quadrant Road. 1.2 Delegate to the General Manager of Operations and Infrastructure (Highways

and Parking) authority to carry out Statutory Consultation and make the necessary Traffic Management Orders under the Road Traffic Regulation Act 1984 (as amended) in order to implement Recommendation 1.1 above.

1.3 Note that where material objections are received these will be reported back to

a future meeting of the Traffic Management Advisory Committee for determination by the Cabinet Member for Transport and Environment.

2. EXECUTIVE SUMMARY

2.1. This report provides details of amendments to the original key design

interventions as presented to TMAC on 29 April 2015 and one additional intervention. These design amendments have been developed by Sustrans.

2.2. The amendments arose as a result of concerns raised in the Road Safety Audit which was carried out on the original designs. London Borough of Croydon (LBC) Officers have reviewed the amended designs and are satisfied that these are deliverable and are suitable to Croydon’s Highway infrastructure. This has

2

Page 5: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

been an on-going process which has resulted in the refinement of the designs. The majority of the fundamental design issues have been resolved as detailed in this report.

2.3. They require urgent approval so as to meet TfL’s spring 2016 Quietways delivery deadline. Approval is required prior to undertaking the necessary public consultations. The results of which is to be presented to September 2015 TMAC.

2.4. Please note; the route number has been changed from Route 77 to Route 5 by TfL.

3. DETAIL

Quietways 3.1. Quietways are part of the Mayor of London’s Cycling Vision to provide a

network of routes on safer, lower-traffic back streets, aimed at new and less confident cyclists. They will be routes where people will want to cycle, by providing direct and comfortable journeys to key destinations across London, using parks and green spaces where suitable.

3.2. These routes will have easy to use signage and way finding to identify the routes and make it appeal to the less confident cyclists.

3.3. Quietways are a £120m programme to be delivered over 10 years. 3.4. The Quietways qualifying criteria defined by TfL and the Cycling Commissioner

include: • Directness and cohesion • Attractiveness to users • Traffic composition and impact to other users • Buildability • Political support • Network priority Quietway Route 5: Waterloo to Croydon

3.5. Much of the proposed 12 mile route already fulfills the Quietway criteria and the route utilises some good existing cycling infrastructure, notably parts of London Cycle Network routes 5 and 3.

3.6. The total cost of the entire Waterloo to Croydon Quietway Route 5 delivery

outside of the Central London Grid is estimated to be £2,962,596.

3.7. The total cost of the package of measures which would be delivered in LBC is estimated to be £890k which will be met from TfL Quietways Budget.

3.8. Signage would also be provided at key locations (such as intersections) and at

regular intervals along the route to ensure legibility for riders using both vertical signs and surface markings.

3

Page 6: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

3.9. The overview of the proposed route through the Borough of Croydon, shown in Appendix 1.

3.10. LBC requested Sustrans to undertake Road Safety Audit (RSA) of their concept

designs for the Croydon leg of Quietway Route 5 and they were received on 27 March 2015. The amendments described in this report are necessary so as to resolve the safety concerns identified in the RSA.

3.11. The amendments to the design of the interventions are listed below:

Intervention 32: Brook Road jw Melfort Road (Bensham Manor Ward) 3.12. The junction of Melfort Road and Brook Road forms a crossroad, with Melfort

Road having the priority. There is a Zebra crossing on the northern arm of Melfort Road. Brook Road slopes up eastbound across the junction. Currently cyclists using Brook Road face potentially long wait times to cross Melfort Road and the heavy traffic on Melfort Road can make it an intimidating junction for cyclists.

3.13. Originally it was proposed to: • Alter the junction priority from Melfort Road to give priority to the Quietway

alignment on Brook Road. This will also slow traffic on Melfort Road. • Proposed calming on Brook Road to consist of centre line removal and

introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated approximately 5m

further from its junction with Brook Road, to make space for give way and zig zag markings, improve inter-visibility, and allow a medium sized vehicle to clear the crossing and wait at the give-way line.

• Introduce ‘at any time’ parking restrictions on all approaches to the junction to improve sightlines.

3.14. Amendments to the original proposals:

• Remove the existing zebra crossing on Melfort Road. • Build out the kerbs at the junction Brook Road and Melfort Road tightening

the junction to shorten pedestrian crossing distances. The proposed kerb build outs also improve the alignment of the newly positioned uncontrolled crossing facilities onto the pedestrian desire line.

• In addition to the previously proposed double yellow line (DYL) on all approaches to the junction, it is also proposed to upgrade the existing single yellow line (SYL) on the south eastern side of Brook Road, from its junction with Melfort Road to Beulah Road, to DYL.

• Introduce red surfacing on both entries to Melfort Road raising awareness of the priority change.

• Maintain the extents of the existing raised table, but reduce the length of the ramps to make the table more effective in reducing vehicular speeds. Ramp gradient to be no more than 1:20.

• To realign the centre line markings along Brook Road to assist in introduce an advisory cycle lane.

3.15. For further details see drawing number HWY-CYC-1265-005-01 attached as

part of Appendix 2. 4

Page 7: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

Additional Intervention 32: Brook Road jw Quadrant Road (Bensham Manor Ward)

3.16. This existing layout of this junction has wide entries which encourages high

vehicular speeds. The junction has single yellow lines on all approaches.

3.17. Proposed to: • Buildout the kerblines tightening the junction radii to reduce the turning

speeds and decrease the crossing distance for pedestrians. • Upgrade the existing ‘SYL’ operational Mon-Sat from 8am to 5pm to ‘DYL’ at

any time restrictions on all approaches to the junction. • Upgrade the existing SYL to DYL on the south-eastern side of Brook Road

between Melfort Road and the north-south arm of Brook Road.

3.18. For further details see drawing number HWY-CYC-1265-005-01 attached as part of Appendix 2. Intervention 33: Brook Rd jw Brigstock Road (Bensham Manor Ward)

3.19. The junction of Brook Road and Brigstock Road forms a crossroad where Brigstock Road, a wide high street and bus route, has priority. There is a zebra crossing over Brigstock Road on the eastern junction arm. Potentially long wait times and intimidating for less confident cyclists crossing Brigstock Road. Sustrans originally offered two options for this junction, which was to introduce pedestrian refuge islands (Option 1) to create a central reservation pocket for cyclist or to signalise the junction (Option 2).

3.20. Following safety concerns raised by the Road Safety Audit and LBC officers regarding the proposed refuge islands and central reservation pocket for cyclists, the preferred option for this junction is to have it signalised for cyclists crossing Brigstock Road. Signalisation

3.21. Originally proposed to: • Signalise the junction, with pedestrian crossings and advance stop lines for

cyclists on all arms. • The signals will have a pedestrian phase on request. • Remove the existing zebra crossing. • Buildout the kerbs to improve the alignment of the junction and to shorten the

crossing distance

3.22. Additionally it is proposed to: • Introduce yellow box to keep the junction clear at all time.

5

Page 8: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

• Upgrade the single yellow lines on approach to the junction to double yellow lines.

• Reduction of 1 pay and display shared use parking bay on Brook Road. • Relocate the existing bus top on Brigstock Road further away from the

junction with Boswell Road.

3.23. For further details see drawing number HWY-CYC-1265-005-02 attached as part of Appendix 2. Intervention 34: Pitt Rd jw Pawsons Rd and Pawsons Rd jw Mayo Rd (Selhurst Ward)

3.24. Pawsons Road has two mini-roundabouts at its junctions with Pitt Road and Mayo Road respectively. Pawsons Road is fairly wide with central hatchings and formalised footway parking on either side. It also has 2 speed cushions and a central pedestrian refuge island. Mini-roundabouts can be intimidating to cyclists. Speed cushions, traffic islands and parking encourage erratic swerving behaviour from motorists.

3.25. Originally proposed to: • Remove the two existing mini-roundabouts at the junctions of Pitt Road and

Mayo Road with Pawsons Road and replace with a give way priority to favour the Quietway Route, to maintain the traffic calming effect.

• Remove the existing informal refuge island and replace it with a raised zebra crossing. This improves the level of service to pedestrians and serves as traffic calming.

• The proposed zebra crossing with its associated zig-zag markings will result in the loss of approximately 7 footway parking spaces. All other formalised footway parking to remain.

• Remove existing speed cushions, centre line and central hatch markings. • Install 3 new sinusoidal humps on Pawsons Road. One before either

approach to the proposed give ways at the junctions with Pitt Road and Mayo Road respectively and another between these two junctions.

3.26. Additionally it is proposed to:

• Introduce kerb buildouts providing a deflection to slow vehicles entering this section of the quietway and prevent illegal parking on the junction. The junction treatment will also serve to enhance the priority change.

• Apply red surfacing to emphasis the priority change. • Introduce some additional double yellow lines.

3.27. For further details see drawing number HWY-CYC-1265-005-03 attached as part of Appendix 2. Intervention 36: Northcote Rd/Selhurst Rd and its jw The Crescent and Sydenham Rd (Selhurst Ward)

6

Page 9: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

3.28. Northcote Road is a busy bus route. The Crescent joins it at a T-junction with tight corner radii. Sydenham Road joins it at a wide T-junction with a speed hump and informal pedestrian crossing with a pedestrian refuge island near the junction mouth. A zebra crossing sits on Northcote Road between the The Crescent and Sydenham Road.

3.29. Currently there is informal/illegal footway parking taking place on both side of Northcote Road west of its junction with The Crescent. Due to the restrained dimensions of the carriageway and footways in this location it would not be possible to formally allow parking to take place on both the northern and southern footways.

3.30. Northcote Road is a busy and intimidating road for less confident cyclists, especially when turning right into Sydenham Road.

3.31. The original proposal is being discarded as the highway lacked the physical space to accommodate the design.

3.32. The new proposal include: • Removing the existing Zebra Crossing on Northcote Road, between the The

Crescent and Sydenham Road. • Introducing two new raised Zebra Crossings, one on Selhurst Road

immediately east of its junction with Sydenham Road and the other on Northcote Road immediately west of its junction with The Crescent. These will provide pedestrian crossing facilities; introduce breaks in traffic flows and slow traffic on approach to this section of the Quietway.

• Introducing a Sinusoidal Speed hump on Northcote Road, between The Crescent and Sydenham Road to maintain low vehicular speeds between the raised tables.

• Building out the footways on the northern side of Northcote Road/Selhurst Road from its junctions with The Crescent and Sydenham Road to reduce the vehicular running lanes to two 3 metres lanes promoting cyclists into the primary position.

• Introduce a 1.5m wide pedestrian refuge island on Northcote Road just west of its junction with The Crescent. The island allows for a protected right turn pocket for cyclists on Northcote Road across the junction of The Crescent.

• Introducing a kerb buildout on the entry into Sydenham Road to tighten the junction and decrease turning speeds. The existing refuge islands to be relocated to accommodate the proposed buildout and improve pedestrian crossing facilities.

• Upgrade the existing single yellow line waiting to restrictions to double yellow lines for this section of Quietway to keep the carriageway clear to traffic at all times.

• Upgrade the existing single yellow line waiting to restrictions to double yellow lines on the southern side of Northcote Road from the junction of The Crescent to its junction with Beaconsfield Road to remove the illegal/unsafe parking on the footway.

3.33. The introduction of the raised zebra crossing with the 1.5 metre refuge island

will reduce the parking capacity on the footway west of the junction with The Crescent. Under this proposal there is a loss of two footway parking spaces on the northern side Northcote Road if the parking is formalised. This does not

7

Page 10: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

account for the loss of spaces on the southern side of Northcote Road as the carriageway dimensions does not allow for them in a formal arrangement. Please see Appendix 4 showing the constrained carriageway layout unable to formally accommodate the current parking practice of parking on both footways on Northcote Road.

3.34. For further details see drawing number HWY-CYC-1265-005-05 attached as part of Appendix 2. Intervention 37: Sydenham Rd jw Gladstone Rd (Selhurst Ward)

3.35. Sydenham Road is a long, straight residential road with parking on both sides in places and speed cushions in places. There is a narrow rail bridge midway with mini-roundabout at its junction with Gladstone Road. Gladstone Road is currently used as a rat-run from Gloucester Road to Sydenham Road by motorists avoiding the junction of Whitehorse Road and St James’s Road. The motorists also avoid the heavily calmed and heavily parked Gloucester Road. Long, straight road encourages rat-running and speeding vehicles resulting in an intimidating environment to cycle in.

3.36. Originally proposed to;

• Replace the two existing speed humps on the Sydenham Road Bridge with sinusoidal humps.

• Remove the existing mini-roundabout at the junction of Sydenham Road and Gladstone Road. This gives priority to the Quietway on Sydenham Road.

• Introduce a point closure at the entry of Gladstone Road to Sydenham Road, allowing access to cyclists only. This will reduce the rat-run traffic northbound on Sydenham Road.

• Create a turning facility at the point closure on Gladstone to assist small vehicles.

3.37. The closure will serve to reduce the number of vehicles using Sydenham Road.

3.38. Additionally it is proposed:

• Upgrade the existing single yellow lines (SYL) to double yellow to prevent park cars impeding visibility. The existing SYL are operational Mon to Sat from 7am to 7pm.

Experimental Closure

3.39. Officers recommend implementing the partial road closure on Gladstone Road under an experimental order to allow the consultation (trial) to run for 6 months to gather data on the effects of the closure. After the 6 month period the closure can be removed or made permanent pending the results of the trial.

3.40. For further details see drawing number HWY-CYC-1265-005-06 attached as part of Appendix 2.

8

Page 11: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

Intervention 37: Sydenham Rd jw James’s Rd (Selhurst Ward and Fairfield Ward)

3.41. This junction is signalised with narrow approach lanes into the junction.

3.42. Originally proposed to; • Introduce Advance Stop Lines (ASL’s) on all arms of the junction to assist

cyclists making turning movements and get ahead of motor vehicles.

3.43. Additionally it is proposed to: • Introduce a sinusoidal speed hump on Sydenham Road on the approach to

its junction with St James’ Road. • Introduce lead in lanes to gain easy access to the proposed ASL’s where

carriageway width allows.

3.44. For further details see drawing number HWY-CYC-1265-005-07 attached as part of Appendix 2. Intervention 37: Sydenham Rd (Fairfield Ward)

3.45. There is currently no pedestrian crossing provision for St Mary’s RC Junior School.

3.46. Originally proposed to; • Introduce a Zebra Crossing outside St Mary’s RC Junior School. The zebra

crossing and its associated zig zag markings are proposed to replace the existing school keep clear markings.

3.47. Amendments:

• Minor relocation of the proposed Zebra Crossing as not to impede existing vehicular crossovers.

• Introduce two sinusoidal speed humps, one either approaches to the crossing.

• The new location of Zebra Crossing removes one parking space, however to negate this, a new bay will be added at the other end of the row of bays.

3.48. For further details see drawing number HWY-CYC-1265-005-08 attached as

part of Appendix 2. Intervention 37: Sydenham Rd jw Dingwall Rd (Fairfield Ward)

3.49. This junction is signalised.

3.50. Originally proposed to; • Introduce ASL on all 3 approaches to the junction to assist cyclists making

turning movements and get ahead of motor vehicles.

3.51. Additionally it is proposed: • Reduce the width of the existing parking bays on Sydenham Road and

Dingwall Road from 2.5 metre to 2 metre. This free up space to accommodate lead in cycle lanes.

9

Page 12: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

• Introduce lead in lanes on all approaches to gain easy access to the proposed Advanced Stop Lines.

3.52. For further details see drawing number HWY-CYC-1265-005-09 attached as

part of Appendix 2.

4. CONSULTATION

Statutory Consultation

4.1. The legal process requires that the formal consultation takes place in the form of Public Notices published in the London Gazette and a local paper (Croydon Guardian) together with relevant documents being made available for inspection at the council’s principal offices. Although not a legal requirement, the Council also affixes street notices to lamp columns in order to ensure that as many people as possible are aware of the proposal.

4.2. Official bodies such as the Fire Brigade, Ambulance Service, Police, Freight

and Road Haulage Associations will be consulted separately at the same time as the public notice. Other organisations are also consulted, depending on the relevance of the proposal.

5 FINANCIAL AND RISK ASSESSMENT CONSIDERATIONS

The effect of the decision

5.1. The decision has no direct financial consequences for the council. Risks

5.2. There is a risk that if the schemes cannot be implemented, for example, by negative outcome of feasibility studies or consultation, TfL would then have to reallocate the funding either within Croydon or another London Borough.

Options

5.3. Should the schemes not be agreed then the do nothing option remains.

Savings/ Future efficiencies 5.4. The proposals are not expected to bring direct and short-term savings /

efficiencies to the Council. However in the longer term, the implementation of Quietways and other such proposals to encourage cycling are intended to bring health benefits, thus reducing the health and care costs that might otherwise fall on the council.

5.5. Approved by: Dianne Ellender , Head of Finance and Deputy S151 officer 6. COMMENTS OF THE COUNCIL SOLICITOR AND MONITORING OFFICER

10

Page 13: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

6.1. The Solicitor to the Council comments that Section 6, 124 and Part IV of Schedule 9 to the Road Traffic Regulation Act 1984 (as amended) provides powers to introduce, vary and implement Traffic Management Orders. In exercising this power, section 122 of the Act Imposes a duty on the Council to have regard (so far as practicable) to secure the expeditious, convenient and safe movement of vehicular and other traffic (including pedestrians) and the provision of suitable and adequate parking facilities on and off the highway. The Council must also have regard to such matters as the effect on the amenities of any locality affected.

6.2. The Council needs to comply with the necessary requirements of the Local

Authorities Traffic Order Procedure (England and Wales) Regulations 1996 by giving the appropriate notices and receiving representations. Such representations must be considered before a final decision is made.

6.3. Approved by: Gabriel MacGregor Head of Corporate Law on behalf of the

Council Solicitor and Monitoring Officer 7. HUMAN RESOURCES IMPACT 7.1 There are no human resources implications arising from this report. 7.2 Approved by Adrian Prescod, HR Business Partner, for and on behalf of

Director of Human Resources. 8. EQUALITIES IMPACT 8.1. People without access to cars will benefit if cycling in the borough is made

easier. 9. ENVIRONMENTAL IMPACT 9.1. The introduction of Quietway Route 5 through Croydon will help to make to

borough more accessible to all levels of cyclist and to reduce traffic congestion by making cycling more viable as an option. A modal shift to sustainable travel will help to improve air quality.

10. CRIME AND DISORDER REDUCTION IMPACT 10.1. There are no crime and disorder reduction impacts in this report.

11. REASONS FOR RECOMMENDATIONS/PROPOSED DECISION 11.1 The proposed scheme should assist the Council in encouraging more

sustainable transport use such as walking and cycling by reducing vehicle speeds and improving safety and the perception that the streets are safer and more user friendly. Any modal shift to more sustainable transport achieved will

11

Page 14: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

also assist in improving air quality and reducing carbon emissions contributing to the Council’s objectives

12. OPTIONS CONSIDERED AND REJECTED

12.1 None

CONTACT OFFICER: Sue Ritchie, Senior Engineer, Network Improvement Team 0208 726 6000 ext 63823 Report Author Leonardo Morris, Engineer, Network Improvements Team 0208 726 6000 x63159

BACKGROUND PAPERS -TMAC 290415 Cycle Quietways Route 77

12

Page 15: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated
Page 16: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated
093087
Text Box
Revised Drawing HWY-CYC-1265-005-01 Brook Road APPENDIX 2
Page 17: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated
093087
Text Box
Revised Drawing HWY-CYC-1265-005-02 Brigstock Road APPENDIX 2
Page 18: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated
093087
Text Box
Revised Drawing HWY-CYC-1265-005-03 Pawsons Road APPENDIX 2
Page 19: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated
093087
Text Box
Revised Drawing HWY-CYC-1265-005-04 Whitehorse Road APPENDIX 2
Page 20: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated
093087
Text Box
Revised Drawing HWY-CYC-1265-005-05 Northcote Road APPENDIX 2
Page 21: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated
093087
Text Box
Revised Drawing HWY-CYC-1265-005-06 Gladstone Rd APPENDIX 2
Page 22: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated
093087
Text Box
Revised Drawing HWY-CYC-1265-005-07 Sydenham Road j/w St James APPENDIX 2
Page 23: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated
093087
Text Box
Revised Drawing HWY-CYC-1265-005-08 Sydenham Rd Zebra Crossing APPENDIX 2
Page 24: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated
093087
Text Box
Revised Drawing HWY-CYC-1265-005-09 Sydenham Road j/w Bedford Park APPENDIX 2
Page 25: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

120

Ro

ute

De

live

ry P

lan

| W

ater

loo

- C

royd

on

Uni

que

Ref

eren

ceQ

W77

-32-

C-0

1-01

Loca

tio

nB

rook

Rd

/ M

elfo

rt R

oad

junc

tion

Hig

hway

Aut

hori

tyC

royd

on

Exi

stin

g C

hara

cter

isti

csC

ross

road

s w

here

Mel

fort

Roa

d h

as p

riorit

y. Z

ebra

is o

n no

rthe

rn ju

nctio

n ar

m o

f M

elfo

rt R

oad

. Bro

ok R

oad

slo

pes

up

eas

tbou

nd.

Map

32:

Bro

ok R

d /

Mel

fort

Roa

d ju

nctio

nP

hoto

gra

ph

32: M

elfo

rt R

oad

junc

tion,

vie

w n

orth

-ea

st, t

aken

from

Bro

ok R

oad

.

Bar

rier

s fo

r cy

clis

tsP

oten

tially

long

wai

t tim

es t

o cr

oss

Mel

fort

Roa

d a

nd h

eavy

tra

ffic

can

mak

e it

intim

idat

ing

for

cycl

ists

.In

terv

enti

on

Ass

essm

ent

Op

tio

nO

pti

on

Des

crip

tio

nC

ost

)

1A

lter

prio

ritie

s so

tha

t d

river

s on

Bro

ok R

oad

and

cyc

lists

on

the

Qui

etw

ay h

ave

prio

rity.

Cre

ate

an a

dvi

sory

cyc

le la

ne fo

r cy

clis

ts t

rave

lling

up

hill

(eas

tbou

nd).

Rel

ocat

e ze

bra

furt

her

wes

t up

Mel

fort

Roa

d.

18,6

15

Pre

ferr

ed

op

tio

n &

ra

tio

nal

e

Alte

red

prio

rity

will

gre

atly

imp

rove

wai

t tim

es a

nd e

xper

ienc

e fo

r cy

clis

ts u

sing

the

Qui

etw

ay.

Vehi

cles

on

Mel

fort

Roa

d w

ill b

e fo

rced

to

stop

.

Key

ch

arac

teri

stic

s

TL

RN

NS

RN

NS

ign

als

N

TM

OY

Lo

ss o

f p

arki

ng

YB

us

rou

teY

Key

ris

ks t

o d

eliv

ery

�Tf

L B

uses

ob

ject

to

pro

pos

als

to a

lter

the

prio

rity

due

to

pot

entia

l inc

reas

e in

jo

urne

y tim

es.

�Lo

cal r

esid

ents

and

bus

ines

ses

obje

ct t

o p

rop

osal

s to

alte

r th

e p

riorit

ies

and

re

mov

e p

arki

ng.

Tim

esca

les

Aut

umn

2015

Del

iver

abili

tyM

oder

ate

Cu

rren

t st

atu

s �C

once

pt

des

ign

app

rove

d b

y Tf

L. �C

once

pt

des

ign

app

rove

d b

y LB

C.

Nex

t st

eps

�C

onsu

lt Tf

L B

uses

. �C

onsu

lt lo

cal r

esid

ents

and

Cou

ncill

ors.

�U

nder

take

det

aile

d d

esig

n.

Inte

rven

tio

n 32

: Bro

ok

Rd

/ M

elfo

rt R

oad

junc

tio

n

093087
Text Box
Sustrans original drawing QW77-32-C-01-01 Rev A - Melfort Rd APPENDIX 3
093087
Snapshot
Page 26: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

122

Ro

ute

De

live

ry P

lan

| W

ater

loo

- C

royd

on

Uni

que

Ref

eren

ceQ

W77

-33-

C-0

1-01

Loca

tio

nB

rook

Rd

/ B

rigst

ock

Rd

/ B

osw

ell r

d

Hig

hway

Aut

hori

tyC

royd

on

Exi

stin

g C

hara

cter

isti

cs

Cro

ssro

ads

whe

re B

rigst

ock

Roa

d, a

wid

e hi

gh s

tree

t an

d b

us r

oute

, has

prio

rity.

Th

ere

is a

zeb

ra c

ross

ing

over

Brig

stoc

k R

oad

on

the

east

ern

junc

tion

arm

. One

co

llisi

on in

volv

ing

a cy

clis

t ha

s oc

curr

ed h

ere

in t

he la

st t

hree

yea

rs (s

ee A

pp

end

ix F

fo

r d

etai

ls).

Map

33:

Bro

ok R

d /

Brig

stoc

k R

d /

Bos

wel

l rd

Pho

tog

rap

h 33

: Jun

ctio

n of

Bro

ok R

oad

and

Brig

stoc

k R

oad

, vie

w n

orth

Bar

rier

s fo

r cy

clis

tsP

oten

tially

long

wai

t tim

es a

nd in

timid

atin

g fo

r le

ss c

onfid

ent

cycl

ists

.In

terv

enti

on

Ass

essm

ent

Op

tio

nO

pti

on

Des

crip

tio

nC

ost

)

1In

stal

l tra

ffic

isla

nds

eith

er s

ide

of t

he z

ebra

and

on

the

far

sid

e of

the

junc

tion

to

crea

te a

sp

ace

whe

re c

yclis

ts c

an w

ait

in b

etw

een

a tw

o st

age

cros

sing

mov

emen

t.54

,026

2S

igna

lise

the

junc

tion,

with

ped

estr

ian

cros

sing

s an

d a

dva

nce

stop

line

s fo

r cy

clis

ts

on a

ll ar

ms.

£109

,515

Pre

ferr

ed

op

tio

n &

ra

tio

nal

e

Sig

nals

(op

tion

1) w

ill a

llow

cyc

lists

to

safe

ly c

ross

Brig

stoc

k R

oad

and

will

imp

rove

cro

ssin

g fa

cilit

ies

for

ped

estr

ians

.

Key

ch

arac

teri

stic

s

TL

RN

NS

RN

NS

ign

als

Y

TM

OY

Lo

ss o

f p

arki

ng

YB

us

rou

teY

Key

ris

ks t

o d

eliv

ery

�Tf

L B

uses

ob

ject

to

pro

pos

als

to s

igna

lise

the

junc

tion

due

to

pot

entia

l inc

reas

e in

jo

urne

y tim

es.

�Tf

L S

igna

ls a

nd N

etw

ork

Pla

nnin

g ob

ject

to

pro

pos

als

to s

igna

lise

the

junc

tion

due

to

the

pot

entia

l im

pac

t on

veh

icle

flow

s. �Lo

cal r

esid

ents

and

bus

ines

ses

obje

ct t

o p

rop

osal

s to

sig

nalis

e th

e ju

nctio

n an

d

alte

r p

arki

ng.

Tim

esca

les

Win

ter

2015

Del

iver

abili

tyC

omp

lex

Cu

rren

t st

atu

s �Tf

L B

uses

, Sig

nals

and

Net

wor

k P

lann

ing

team

s ha

ve b

een

show

n in

itial

des

igns

. �LB

C h

ave

conc

erns

reg

ard

ing

HG

Vs

not

bei

ng a

ble

to

turn

ont

o/of

f Brig

stoc

k R

oad

due

to

traf

fic is

land

s. C

onse

que

ntly

LB

C s

upp

ort

optio

n 2.

Nex

t st

eps

�C

ontin

ue d

iscu

ssio

ns w

ith T

fL B

uses

, Sig

nals

and

Net

wor

k P

lann

ing

team

s.

Und

erta

ke T

fL m

odel

ling.

�C

onsu

lt w

ith lo

cal b

usin

esse

s, r

esid

ents

and

Cou

ncill

ors.

�U

nder

take

det

aile

d d

esig

n

Inte

rven

tio

n 33

: Bro

ok

Rd

/ B

rig

sto

ck R

d /

Bo

swel

l rd

093087
Text Box
Sustrans original drawing QW77-33-C-01-01 Rev B - Brigstock Rd APPENDIX 3
093087
Snapshot
Page 27: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

124

Ro

ute

De

live

ry P

lan

| W

ater

loo

- C

royd

on

Uni

que

Ref

eren

ceQ

W77

-34-

C-0

1-01

Loca

tio

nP

awso

ns R

oad

Hig

hway

Aut

hori

tyC

royd

on

Exi

stin

g C

hara

cter

isti

cs

Pitt

Roa

d h

as m

ini-

roun

dab

out

at ju

nctio

n w

ith P

awso

ns R

oad

. Paw

sons

Roa

d is

fa

irly

wid

e w

ith c

entr

al h

atch

ings

and

tw

o w

heel

on

kerb

car

par

king

on

eith

er s

ide.

It

also

has

sp

eed

cus

hion

s an

d c

entr

al is

land

s. M

ayo

Roa

d a

lso

join

s P

awso

ns

Roa

d o

n a

min

i-ro

und

abou

t.

Map

34:

Paw

sons

Roa

dP

hoto

gra

ph

34: J

unct

ion

of P

itt R

oad

with

Paw

sons

R

oad

, vie

w e

ast

Bar

rier

s fo

r cy

clis

tsM

ini-

roun

dab

out

can

be

intim

idat

ing

to c

ycle

on.

Sp

eed

cus

hion

s, t

raffi

c is

land

s an

d

par

king

enc

oura

ge e

rrat

ic, s

wer

ving

beh

avio

ur fr

om m

otor

ists

.In

terv

enti

on

Ass

essm

ent

Op

tio

nO

pti

on

Des

crip

tio

nC

ost

)

1

Rem

ove

the

two

min

i-ro

und

abou

ts a

nd r

epla

ce w

ith p

riorit

y ju

nctio

ns w

ith t

he

Qui

etw

ay r

oute

hav

ing

prio

rity.

Rep

lace

the

sp

eed

cus

hion

s an

d t

raffi

c is

land

with

a

zeb

ra c

ross

ing

on a

rai

sed

tab

le. R

epla

ce s

pee

d c

ushi

ons

with

sin

usoi

dal

roa

d

hum

p a

nd in

stal

l sin

usoi

dal

s on

Paw

sons

Roa

d.

33,6

00

Pre

ferr

ed

op

tio

n &

ra

tio

nal

e

Prio

rity

junc

tion

is e

asie

r fo

r cy

clis

ts t

o ne

gotia

te a

nd s

igni

fican

tly r

educ

es c

yclis

t w

ait

times

. R

educ

ing

the

prio

rity

alon

g P

awso

ns R

oad

sho

uld

slo

w v

ehic

les

and

red

uce

rat-

runn

ing

beh

avio

ur.

New

sin

udoi

dal

s w

ill s

low

tra

ffic.

Key

ch

arac

teri

stic

s

TL

RN

NS

RN

NS

ign

als

N

TM

OY

Lo

ss o

f p

arki

ng

YB

us

rou

teN

Key

ris

ks t

o d

eliv

ery

�Lo

cal r

esid

ents

ob

ject

to

pro

pos

als

to a

lter

the

prio

ritie

s an

d p

arki

ng p

rovi

sion

.

Tim

esca

les

Aut

umn

2015

Del

iver

abili

tyM

oder

ate

Cu

rren

t st

atu

s �C

once

pt

des

ign

app

rove

d b

y Tf

L. �LB

C h

ave

rece

ntly

res

urfa

ced

thi

s ro

ad a

nd a

re r

eluc

tant

to

rem

ove

the

min

i ro

und

abou

ts.

Nex

t st

eps

�C

onsu

lt lo

cal r

esid

ents

and

Cou

ncill

ors.

�A

gree

ap

pro

ach

for

det

aile

d d

esig

n w

ith L

BC

and

und

erta

ke d

etai

led

des

ign.

Inte

rven

tio

n 34

: Paw

sons

Ro

ad

093087
Text Box
Sustrans original drawing QW77-34-C-01-01 Rev A - Pawsons Rd APPENDIX 3
093087
Snapshot
Page 28: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

126

Ro

ute

De

live

ry P

lan

| W

ater

loo

- C

royd

on

Uni

que

Ref

eren

ceQ

W77

-35-

C-0

1-01

Loca

tio

nW

hite

hors

e R

oad

/ T

he C

resc

ent

junc

tion

Hig

hway

Aut

hori

tyC

royd

on

Exi

stin

g C

hara

cter

isti

cs

Whi

teho

rse

Roa

d is

a s

trat

egic

res

iden

tial r

oad

and

par

t of

the

SR

N. P

rince

ss

Roa

d a

nd T

he C

resc

ent

have

rai

sed

sid

e ro

ad e

ntry

tre

atm

ents

with

info

rmal

p

edes

tria

n cr

ossi

ngs.

The

re is

a p

elic

an c

ross

ing

on t

he n

orth

sid

e of

the

junc

tion

on

Whi

teho

rse

Roa

d.

Map

35:

Whi

teho

rse

Roa

d /

The

Cre

scen

t ju

nctio

nP

hoto

gra

ph

35: W

hite

hors

e R

oad

junc

tion,

vie

w w

est,

ta

ken

from

The

Cre

scen

t w

ith P

rince

ss R

oad

on

the

right

.B

arri

ers

for

cycl

ists

Pot

entia

lly lo

ng w

ait

times

and

intim

idat

ing

for

less

con

fiden

t cy

clis

ts.

Inte

rven

tio

n A

sses

smen

tO

pti

on

Op

tio

n D

escr

ipti

on

Co

st (

£)

1R

aise

the

ent

ire ju

nctio

n an

d t

ight

en t

he ju

nctio

n co

rner

rad

ii.28

,310

Pre

ferr

ed

op

tio

n &

ra

tio

nal

e

Rai

sing

the

junc

tion

will

slo

w t

raffi

c sp

eed

s th

roug

h th

e ju

nctio

n, m

akin

g th

e cr

ossi

ng le

ss

intim

idat

ing

to c

yclis

ts.

Key

ch

arac

teri

stic

s

TL

RN

NS

RN

YS

ign

als

N

TM

ON

Lo

ss o

f p

arki

ng

NB

us

rou

teY

Key

ris

ks t

o d

eliv

ery

�Tf

L B

uses

ob

ject

to

vert

ical

defl

ectio

n p

rop

osal

s d

ue t

o p

oten

tial i

mp

act

on

jour

ney

times

. �Lo

cal r

esid

ents

ob

ject

to

the

pro

pos

ed c

hang

es.

Tim

esca

les

Win

ter

2015

Del

iver

abili

tyM

oder

ate

Cu

rren

t st

atu

s �C

once

pt

des

ign

app

rove

d b

y Tf

L. �C

once

pt

des

ign

app

rove

d b

y LB

C.

Nex

t st

eps

�C

onsu

lt w

ith T

fL B

uses

. �C

onsu

lt lo

cal r

esid

ents

and

Cou

ncill

ors.

�U

nder

take

det

aile

d d

esig

n

Inte

rven

tio

n 35

: Whi

teho

rse

Ro

ad /

The

Cre

scen

t ju

ncti

on

093087
Text Box
Sustrans original drawing QW77-35-C-01-01 Rev A - Whitehorse Rd APPENDIX 3
093087
Snapshot
Page 29: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

128

Ro

ute

De

live

ry P

lan

| W

ater

loo

- C

royd

on

PRINCE

Uni

que

Ref

eren

ceQ

W77

-36-

C-0

1-01

Loca

tio

nN

orth

cote

Roa

d /

The

Cre

scen

t ju

nctio

n

Hig

hway

Aut

hori

tyC

royd

on

Exi

stin

g C

hara

cter

isti

cs

Nor

thco

te R

oad

is a

bus

y b

us r

oute

. The

Cre

scen

t jo

ins

it at

a T

-jun

ctio

n w

ith t

ight

co

rner

rad

ii. S

yden

ham

Roa

d jo

ins

it at

a w

ide

t-ju

nctio

n w

ith a

sp

eed

hum

p a

nd

info

rmal

ped

estr

ian

cros

sing

with

isla

nd n

ear

the

junc

tion

mou

th. A

zeb

ra c

ross

ing

sits

bet

wee

n th

e tw

o ju

nctio

ns.

Map

36:

Nor

thco

te R

oad

/ T

he C

resc

ent

junc

tion

Pho

tog

rap

h 36

: Nor

tcot

e R

oad

, vie

w w

est

Bar

rier

s fo

r cy

clis

tsN

orth

cote

Roa

d is

a b

usy

and

intim

idat

ing

road

for

less

con

fiden

t cy

clis

ts, e

spec

ially

w

hen

turn

ing

right

.In

terv

enti

on

Ass

essm

ent

Op

tio

nO

pti

on

Des

crip

tio

nC

ost

)

1

Tigh

ten

the

corn

er r

adii

on S

ynd

enha

m R

oad

. Ins

tall

a ce

ntra

l med

ian

strip

alo

ng

Nor

thco

te R

oad

and

pai

nt c

ycle

mar

king

s in

the

cen

tre

of t

he la

ne. I

nsta

ll a

traf

fic

isla

nds

on t

he fa

r si

de

of e

ach

junc

tion

to c

reat

e p

rote

cted

rig

ht t

urn

poc

kets

for

cycl

ists

. Pla

ce t

he e

xist

ing

zeb

ra c

ross

ing

on a

rai

sed

tab

le.

33,0

08

Pre

ferr

ed

op

tio

n &

ra

tio

nal

e

Tigh

ter

corn

er r

adii

will

red

uce

vehi

cle

spee

ds

into

and

out

of S

yden

ham

Roa

d. A

cen

tral

med

ian

strip

will

red

uce

carr

iage

way

lane

s to

3m

mea

ning

veh

icle

s w

on’t

be

able

to

over

take

cyc

lists

. P

rote

cted

rig

ht t

urn

poc

kets

allo

w c

yclis

ts t

o w

ait

safe

ly fo

r a

gap

in t

raffi

c.

Key

ch

arac

teri

stic

s

TL

RN

NS

RN

NS

ign

als

N

TM

OY

Lo

ss o

f p

arki

ng

NB

us

rou

teY

Key

ris

ks t

o d

eliv

ery

�Tf

L B

uses

ob

ject

to

vert

ical

defl

ectio

n p

rop

osal

s d

ue t

o p

oten

tial i

mp

act

on

jour

ney

times

. �Lo

cal r

esid

ents

ob

ject

to

the

pro

pos

ed c

hang

es.

Tim

esca

les

Win

ter

2015

Del

iver

abili

tyM

oder

ate

Cu

rren

t st

atu

s

�C

once

pt

des

ign

app

rove

d b

y Tf

L. �LB

C s

upp

ortiv

e of

con

cep

t d

esig

n b

ut h

ave

conc

erns

reg

ard

ing

traf

fic is

land

s im

ped

ing

turn

ing

into

Syd

enha

m R

oad

by

HG

Vs

as t

his

is a

loca

l dis

trib

utor

roa

d.

LBC

hav

e p

lans

to

have

a p

lug

no e

ntry

at

the

nort

hern

end

of T

he C

resc

ent,

with

a

pro

pos

ed s

ectio

n of

one

way

.

Nex

t st

eps

�C

onsu

lt w

ith T

fL B

uses

. �C

onsu

lt lo

cal r

esid

ents

and

Cou

ncill

ors.

�U

nder

take

det

aile

d d

esig

n

Inte

rven

tio

n 36

: No

rthc

ote

Ro

ad /

The

Cre

scen

t ju

ncti

on

093087
Text Box
Sustrans original drawing QW77-36-C-01-01 Rev B - Northcote Rd APPENDIX 3
093087
Snapshot
Page 30: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

130

Ro

ute

De

live

ry P

lan

| W

ater

loo

- C

royd

on

Uni

que

Ref

eren

ceQ

W77

-37-

C-0

1-01

Loca

tio

nS

yden

ham

Roa

d

Hig

hway

Aut

hori

tyC

royd

on

Exi

stin

g C

hara

cter

isti

cs

Long

, str

aigh

t re

sid

entia

l roa

d w

ith p

arki

ng o

n b

oth

sid

es in

pla

ces

and

sp

eed

cu

shio

ns in

pla

ces.

Nar

row

rai

l brid

ge in

cen

tre

with

min

i-ro

und

abou

t on

junc

tion

with

Gla

dst

one

Roa

d. C

ross

es o

ver

two

sign

alis

ed ju

nctio

ns. T

wo

colli

sion

s in

volv

ing

cycl

ists

hav

e oc

curr

ed a

t th

e S

t Ja

mes

’ Roa

d ju

nctio

n in

the

last

thr

ee

year

s, o

ne o

f whi

ch w

as s

erio

us (s

ee A

pp

end

ix F

for

det

ails

).

Map

37:

Syd

enha

m R

oad

Pho

tog

rap

h 37

: Syd

enha

m R

oad

, vie

w s

outh

.

Bar

rier

s fo

r cy

clis

tsLo

ng, s

trai

ght

road

enc

oura

ges

rat-

runn

ing

and

sp

eed

ing

vehi

cles

res

ultin

g in

an

intim

idat

ing

envi

ronm

ent

to c

ycle

in.

Inte

rven

tio

n A

sses

smen

tO

pti

on

Op

tio

n D

escr

ipti

on

Co

st (

£)

1C

lose

Gla

dst

one

Roa

d o

ff to

mot

or v

ehic

les

from

Syd

enha

m R

oad

. Pro

vid

e ze

bra

cr

ossi

ng o

utsi

de

scho

ol a

nd a

dva

nced

sto

p li

nes

at s

igna

ls.

27,3

82

Pre

ferr

ed

op

tio

n &

ra

tio

nal

e

Clo

sing

Gla

dst

one

Roa

d s

houl

d d

ecre

ase

thro

ugh

traf

fic. N

ew z

ebra

cro

ssin

g w

ill b

enefi

t p

edes

tria

ns a

nd s

choo

ls. A

dva

nced

sto

p li

nes

will

hel

p c

yclis

ts t

o m

ake

turn

ing

mov

emen

ts a

nd

get

ahea

d o

f mot

or v

ehic

les.

Key

ch

arac

teri

stic

s

TL

RN

NS

RN

NS

ign

als

N

TM

OY

Lo

ss o

f p

arki

ng

NB

us

rou

teN

Key

ris

ks t

o d

eliv

ery

�Lo

cal r

esid

ents

ob

ject

to

the

pro

pos

ed c

hang

es t

o G

lad

ston

e R

oad

clo

sure

.

Tim

esca

les

Win

ter

2015

Del

iver

abili

tyM

oder

ate

Cu

rren

t st

atu

s �C

once

pt

des

ign

app

rove

d b

y Tf

L an

d L

BC

.

Nex

t st

eps

�U

nder

take

com

mun

ity e

ngag

emen

t, in

clud

ing

with

loca

l res

iden

ts a

nd s

choo

ls

(see

Sec

tion

6).

�U

nder

take

det

aile

d d

esig

n

Inte

rven

tio

n 37

: Syd

enha

m R

oad

093087
Text Box
Sustrans original drawing QW77-37-C-01-01 Rev A - Sydenham Rd APPENDIX 3
093087
Snapshot
Page 31: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

132

Ro

ute

De

live

ry P

lan

| W

ater

loo

- C

royd

on

This

pag

e is

inte

ntio

nally

bla

nk

093087
Text Box
Sustrans original drawing QW77-37-C-01-02 - Sydenham Rd APPENDIX 3
093087
Snapshot
Page 32: STATEMENT OF EXECUTIVE DECISIONS MADE BY THE CABINET … · 2020. 6. 5. · introducing 1.5m wide advisory cycle lanes. • Existing zebra crossing on Melfort Road to be relocated

136

Ro

ute

De

live

ry P

lan

| W

ater

loo

- C

royd

on

Uni

que

Ref

eren

ceQ

W77

-38-

C-0

1-01

Loca

tio

nD

ingw

all R

oad

rou

ndab

out

Hig

hway

Aut

hori

tyC

royd

on

Exi

stin

g C

hara

cter

isti

csR

ecen

tly u

pgr

aded

rou

ndab

out

with

tre

e p

lant

ing

and

flus

h fo

otw

ays.

No

form

al

cros

sing

poi

nt fo

r p

edes

tria

ns h

ead

ing

to/f

rom

Eas

t C

royd

on s

tatio

n.

Map

38:

Din

gwal

l Roa

d r

ound

abou

tP

hoto

gra

ph

38: D

ingw

all R

oad

, vie

w n

orth

Bar

rier

s fo

r cy

clis

tsTh

e ro

und

abou

t ha

s re

cent

ly b

een

muc

h im

pro

ved

, but

the

str

aigh

t as

pec

t of

D

ingw

all R

oad

can

mea

n m

otor

tra

ffic

trav

el a

t hi

gher

sp

eed

s.In

terv

enti

on

Ass

essm

ent

Op

tio

nO

pti

on

Des

crip

tio

nC

ost

)

1P

rovi

de

new

zeb

ra c

ross

ing

on t

he e

xist

ing

ped

estr

ian

des

ire li

ne s

outh

of t

he

roun

dab

out.

.18

,000

Pre

ferr

ed

op

tio

n &

ra

tio

nal

e

Zeb

ra c

ross

ing

will

ben

efit

ped

estr

ians

by

pro

vid

ing

a fo

rmal

cro

ssin

g to

the

sta

tion.

It w

ill a

lso

slow

tra

ffic

in b

oth

dire

ctio

ns, m

akin

g it

safe

r fo

r cy

clis

ts.

Key

ch

arac

teri

stic

s

TL

RN

NS

RN

NS

ign

als

N

TM

OY

Lo

ss o

f p

arki

ng

NB

us

rou

teY

Key

ris

ks t

o d

eliv

ery

�Tf

L Tr

amlin

k’s

pla

ns fo

r a

new

tra

m li

ne a

long

Din

gwal

l Roa

d m

ay c

onfli

ct w

ith

thes

e d

esig

ns.

�Tf

L B

uses

ob

ject

to

the

pro

pos

ed n

ew z

ebra

.T

imes

cale

sA

utum

n 20

15D

eliv

erab

ility

Sim

ple

Cu

rren

t st

atu

s �C

once

pt

des

ign

app

rove

d b

y LB

C, a

lthou

gh a

rea

is li

kely

to

chan

ge d

ue t

o ne

w

tram

line

.

Nex

t st

eps

�O

bta

in la

test

pla

ns fo

r Tf

L fo

r ne

w T

ram

link

trac

k on

Din

gwal

l Roa

d a

nd in

volv

e Tr

amlin

k in

des

ign

pro

cess

. �C

onsu

lt lo

cal r

esid

ents

and

Cou

ncill

ors.

�U

nder

take

det

aile

d d

esig

n

Inte

rven

tio

n 38

: Din

gw

all R

oad

ro

und

abo

ut

093087
Text Box
Sustrans original drawing QW77-38-C-01-01 - Dingwall Rd jw Lansdowne Rd APPENDIX 3