Statewide ITS Strategic Plan
and Architecture
Statewide ITS Strategic Plan
and Architecture
Illinois Public Transportation AssociationBoard Meeting
01-11-2005Scott Lee
IDOT ITS Technical Coordinator
What is ITS?• Transportation Projects where
Technology is being implemented and Integrated.– The National Architecture has a great
listing of ITS functions and services http://itsarch.iteris.com/
– A lot of projects already become part of a traditional construction job. Those projects where electronic data and data integration are a focus are ITS.
– Security is the latest area. GIS, Maintenance DB’s, Traveler Information and Traffic Management
Project Overview• Statewide and Regional Workshops
– Data Collection – Survey and Scenarios
• Overview of the Architecture Process
• Turbo Architecture 3.0 Training• Making ITS Part of Regional
Transportation Planning
• Statewide Strategic Plan
Consultant Roles and Responsibilities
• Facilitate the Process• Provide the Starter File and Technical
Support as needed.• Build the Statewide Architecture and
Strategic Plan based on ‘our’ needs and goals.
• The team should be able to answer most questions at most levels.
• The team and the ITS Office will focus support to the Champions
Consultant Roles and Responsibilities
• Regions are defined.• Regions can choose to break out an
Architecture as needed.• We expect Rural Area needs to be
encompassed in the Statewide Architecture.
Keys to the Regional Architectures…
• Identify key stakeholders and interrelationships
• Describe required activities or functions
• Define interconnections and interdependencies between functions
• Develop a blueprint for integration of systems – Define Projects
Architecture Development Process
How does this apply to Projects?
• Projects are typically defined by need.• FHWA via its programs has committed
to the Systems Engineering Process.– Allows for methodical process to define an
implementation project.
• Identification of addition integration options
• Consideration of options and standards
Systems Engineering Process
Project Outputs• Regional Architectures
– Metro East Collinsville/East St. Louis– Champaign-Urbana– Peoria– Quad Cities– Rockford– Springfield
• Statewide Architecture and Strategic Plan
• www.ilits.org
Transit Focus w/in the Architecture
• Service Area’s– Archived Data Management– Public Transportation– Traveler Information– Traffic Management– Vehicle Safety– Commercial Vehicles– Emergency Management– Maintenance and Construction
Management
Public Transportation Market Packages
• APTS1 – Transit Vehicle Tracking• APTS2 – Transit Fixed-Route Operations• APTS3 – Demand Response Transit
Operations• APTS4 – Transit Passenger and Fare
Management• APTS5 – Transit Security• APTS6 – Transit Maintenance• APTS7 – Multi-modal Coordination• APTS8 – Transit Traveler Information
Integration Opportunities• AD1 – ITS Data Warehouse or AD2 – ITS
Virtual Data Warehouse• ATIS1 – Broadcast Traveler Information• ATIS2 – Interactive Traveler Information• ATMS6 – Traffic Information Dissemination• ATMS9 – Traffic Forecast and Demand
Management• EM2 – Emergency Routing• EM8 – Disaster Response and Recovery• EM10 – Disaster Traveler Information• MC10 - Maintenance and Construction
Activity Coordination
The Real Stuff• Vehicle Location Systems for Transit
Management• Arrival Information Systems• Asset Management Systems• Transit Security – cameras,
emergency call boxes• Traveler Information• Trip Planning –Multi-Modal
Concept of Operations• Identify current and planned ITS services
and functions
• What is the Statewide Transit Vision?• Signal Priority Barriers• Staffing to Support ITS• AVL Meeting Traveler Information
Requirements• Standards proving• How do I use the data?• Integration of electronic payment systems
Focus• Regions have been ‘turned loose’
– MPO, IDOT ITS Coordinators and ITS Program Office are Championing the efforts.
• Project Team and ITS Office Review• Technical Committee Meeting was
held on January 5th in Springfield.
• Next Technical Committee – March 3rd
• Next Steering Committee – March 10th