The Installation Task
1
42
3567
89 10 11
12
The Barrel Muon system comprises 250 chambers in 7 flavors:
60 MB1 3SL 2 RPC ~2.0 x 2.54 m2 960kg60 MB2 3SL 2 RPC ~2.5 x 2.54 m2 1200kg60 MB3 3SL 1 RPC ~3.0 x 2.54 m2 1300kg40 MB4 2SL 1 RPC ~4.2 x 2.54 m2 1800kg10 MB1 2SL 1 RPC 10 MB2 2SL 1 RPC10 MB3 2SL 1 RPC
10 Sectors will be installed in SX5 => 210 Chambers(310 RPCs).Sectors 1 and 7 are used for the lowering fixture and will be installed in UX5 => 40 Chambers(60 RPCs).
Φ SL
Φ SL
ΘSLHoneycomb
3
MylarMylar
Electrode StripElectrode Strip
Cathode Al Strips
Wire
GASGAS: Ar/CO2 (85/15))
HV: HV: Wires 3600 VStrips 1800 VI-beams -1200 V
Tmax: Tmax: < 400 nsDrift Velocity :Drift Velocity : ~ 55µm/ns
Single Wire Single Wire 100µm ΦResolution : Resolution : < 300 µm 150µm θ
42mm
13 mm
4 Layers = 1 4 Layers = 1 SuperlayerSuperlayer (SL)(SL) Independent SubunitIndependent Subunit
(Gas tightness, HV, Front End)
Φ SL
Φ SL
Z SLHoneycomb
MB4 only Φ SLs250 Chambers172200 Anode Channels
6
Plates with strip electrodesCathode I beamsWires and wire fixation piecesCorner blocks and frames
Main components needed during mechanical assembly of a SL
13
Status of chamber assembly
Legnaro 8 ch + 15 Sl at 10/9 18 ch end 2002Aachen 8 ch + 9 Sl at 10/9 18 ch end 2002CIEMAT 12 ch at CERN +3 at Ciemat + 9 SL at 6/9 24 ch end 200
Aachen:40 days stop for climat.inst.//all 20 days stop for Aug. holidays
Hope to reach 60 chambers at end 2002 (70 were foreseen)
I-Beams Protvino/Bologna available for 97chambers ( at sept. 12)Plates Dubna/Torino cut in Torino for 165 chambers
assembled in Dubna (rate 8 surfaces/day) 76 chambers
Torino commissioning of first table Jan 2003 two tables march 2003first SL March 2003
Production of HVB and HVC in Beijing well advanced ,full lot sept 2003
14
1 2 3 4 1 2 3 4 1 22000 2001 2002
Nominal rate14.3 SL/4er/site
N.of SL/4er
CIEMAT
Padova
Aachen
1
5
10
15
LNL >1 month stopShort of plates
Aachen,new tools,Short of plates
Total CIEMAT 41 expect. by Apr. 2002 32 /siteTotal Padova 26 (Aa,CIEMAT,PD)Total Aachen 29Total 96 total expected 96
Total sept 10 126 expected 170 (-25%)
at June 20.1 SL did not passthe 100 mb test in MayProd.stop for tool impr.
Sept.10 >1 month stop in Aachen(Climat.inst.) plus 20 days holidaysevery where.
15
DT milestones 2003 INFN & CMS v33
9 camere MB3 giugno 200318 camere MB3 dicembre 2003Prima MB4 a Torino marzo 2003Inizio assemblaggio minicrates giugno 2003Installazione nella ruota centrale ottobre 2003
MB 076 10% of ch. DoneMB 1005 trial insertion doneMB 075 assembly line Torino Jan 03MB 079 35 % of ch. At CERN Jul 03MB 080 60% of ch.assembled march 04MB 1006 3rd wheel readiness March 04MB 083 End of inst. SX +2,+1,0 dec 04MB 1007 Readiness of 5th wheel apr 05MB 081 85% of Ch. At CERN apr 05MB 1008 End MB inst –2,-1 aug.05MB 005 end inst in UX may 06MB 1081 cabling feb 06MB 082 end of ch.assembly Nov 05MB 1084 cabling Jul 06
16
Status of MB4 Production PreparationSez. di Torino
2nd iron cast table will be delivered in Sette Comuni on 17th June.Delivered and alignedWork area enlargement approved by director, installation starts at the beginning of July. Time
estimated for completion of infrastructure work (crane extension, air conditioning system upgrade, final cleaning) 2 months.Begin work end July, expected to be finished by end SeptemberPlotters: driver cabinets cabled and ready. Only missing part are the beam supports. Mimmo,
back from China for MB4 support commissioning, will finish the drawings in July. Parts will be manufactured in September. BUTMimmo: designed details for MB4 supports insertion done in July but was not planned; presently working on gas system (first 2 weeks of Sept.) NOT working on MB4. Qutlook: will have start contract w/ integration on Nov. 1st and work on beam supports until end of Sept.Will start working on I-beams tool drawings in Oct.All other parts have been delivered. Plotter beams ready to be sent to CINEL for milling.
Done in July.Glueing machine under test to check functionality for 15mt long pipes and possibility of glue
dispenser splitting. One driver lost during set-up, replacement ordered.Tooling: I-beam tooling to be designed starting from September. See above
17
Status of MB4 Production PreparationSez. di Torino
MB4 HV and FE frame cabling: 2 electronicians will start to work with us after 8th july, they will go to Legnaro on 16 July to learn how to start SL frame cabling work. Frames already in Torinoready to be machined. DoneFrame cabling will start beginning of September.Preparing area, tools.Silvia collecting docs etc., waiting for material (3 profiles) from CINEL, Madrid (1, end of September);Electronicians will go to Padova, collect cables, connectors etc., more training. Start work in Torino.Schedule: within the present schedule we are expected to provide a first SL by the end of the year. Two months delay in production preparation due to integration work on HV cable length and MB4 support commissioning test in Bejing (Mimmo) -> no MB4 SL before the end of the year. CONFIRMED
18
Chamber Installation Scenario• in v33 42 ch/wheel in SX in v 32 38 ch./wheel in SX
•Installation crew of 4 technicians from home Institutions plus crane operators
• Installation rate of one chamber/day at start-up
• plateau at 8 chambers/week
• One wheel (10 Sectors) = 42 Chambers in 5 weeks
• YB 0 & YB-1,Sectors 8-9 September-December 2003 (42 + 8 ch.)
YB+2 January-February 2004 (42 ch.)
YB-2 Sectors 8-9 March 2004 ( 8 ch.)
YB+1 September 2004 YB-1 November 2004 (begin) (42 +?)
YB -1 YB -2 April-June 2005 (68 - ?)
• 10 Sectors (40 Chambers) are installed in UX5 starting September 2005 (~10 weeks to complete).
• for Alignment/Magnet Test
19
Installation Tools
Some tooling is still needed for full scale installation:• Transport frames for DT+RPC (CIEMAT). • Ancillary tools for cradle rotation (Padova).• Construction of a larger cradle for MB4.
In addition we will rely on existing SX5 equipment:• Cherry pickers, movable platforms …• Refurbished L3 scissor lift.
Tooling costs are within cost book estimates.
23
Last shipment of chambersfrom CIEMAT to CERN
April 2002
Currently 12 ch. From CIEMATstored at ISRLNL and Aachen will ship 8 ch.each in Oct./Nov. 2002. Delay due to the gluing of RPCPads at home.
24
Chamber Preparation• DT and RPC chambers are
sent to the ISR from the assembly centers fully tested
• Acceptance tests: HV, Leak-rate,noise, cosmics
• DT alignment calibration• DT cabling+services• DT assembly with RPCs• Storage in transport fixture
26
ISR:
Standard work: accept/store chambersgas tightness/HV/noise testrepair alignmentlong term HV test (1~3 months)insert/test minicratescooling testcouple to RPC(cooling test)
Non standard : glue RPC Pads to CIEMAT ch.(from now to July 03) insert and finish HV cables
(4 HV connectors/DT in ~ 80 ch at 4ch/weekthen done in the labs)complete gas and cooling piping(~ 60 ch. at 3 ch/day then done in the labs)
27
Presenze gruppi DT INFN ad ISR durante 2003
Bologna 2 persone X 6 mesi = 12 m/u Padova 2 persone X 6 mesi = 12 m/uTorino 2 persone X 2 mesi = 4 m/u
L’idea e’ di avere 4~ persone per I due mesi di installazioneE di due persone per 8 mesi per attivita’ di completamentoRicezione/stoccaggio e test . Altre 3 persone saranno inviateDa Aachen e CIEMAT.
Inoltre Pd e Bo chiedono di mantenere un fisico per 12 mesiComplessivamente e che questa persona sia conteggiata al di fuori dei 2.5 m/fte usuali.
E’ chiaro che RPC devono essere coinvolti nell’operazioneE mantenere anch’essi qualcuno in permanenza,quando e in Quanti dipendera’ dagli sviluppi della loro costruzione
28
1 - Transport to CERN2 - Test at ISR3 - Alignment calibration 4 - Installation of RPC(s)5 - Transport to P56 - Test at P57 - Insertion in YB8 - Test in YB (gas,cooling,HV)
Several ancillary tools are neededthat are under design or construction
Extension railsfor DT+RPC DT+RPC
package
Insertion test : 1 MB2 ch in july-septemb 02Sector insertion : before the end of 2002
33
to the counting room
3) electronics:electronics is sitting on the chambers
4~6 ROB (Read Out Board) 128 wires 4~6TRB PHI(Trigger Board) 128 wires4 TDC (any of them can act as Master) 32 BTI,4 TRACO,1 TSServer
=> precise coordinates 2 TRB THETA housing BTIs only=>2 best MU in the Board (64 cm)
ONE TS Boardhouses the TSMaster
(two parts,any can act as master)=> 2 best MU in the chamber
Sector collector boardin the 4th station (now on the balcony)
in the Minicrates :
in each chamber of one CMS sector :
in the gas volume : F-End chips/boards & HV boards 32 F-End chips (2 Boards) feed:
RoB TB TSB DCSFront T B T T C T End D T R S o S SECTOR
C I A S n M Collector C.RoomC t O r
34
Phi Trigger Board 1
Theta Trigger Board 1
23
45
67
2
TRACO
TRACO
TRACO
TRACO
TSS9
5
previews 2
TST
sel
BTI
BTI
2
x 32
1
4
3
2
9
6
7
8
5
Ψ
hA
B
C
D
x
Out 0 Out 1 Out 2 Out 3 Out 4 Out 5 Out 6 Out 7 Out 8 Out 9 Out 10 Out 11
In 0 In 1 In 2 In3
OuterLayer
InnerLayer
X
K
D = 23.7 cm cor
cor
µ
µBTI
TRACO
Outer SL
Inner SL
µ
TRIGGER SERVER
Server Board
9+2
25
full tracks
To SectorCollector
TSMS
TSMD
TSMD
25
full tracks
16
previews20 bit θ
BTI
x 32
BTI sel30 bit φ
µ
DriftTubes Local-Trigger
35
TRB PHITRB THETACB/SBROB
MB1 (60)
MB2 (60)
MB3 (60)
MB4 (30)MB4 (10)
(10)
(5)
168 cm
205 cm
205
228
228
140
168
205
168
140
(5)
(5)
(5)
SCHEMATIC OF A MINICRATE
36
Further Installation Tests
•Sector Test: Install MB1, MB2, MB3 complete with cables and services.•Installation of a minicrate ( trigger,readout and control electronics) on a chamber already installed.
MB2 minicrate prototype with readout electronics under test in CIEMAT
38
• Madrid reports there are enough ROB-128 (with HPTDC v 1.1) to equip two full minicrates. • Final ROB-128 design will be verified in short time and 10 more boards will be available. Assembly of boards with final HPTDC will not start until late this year. • The company designing ROS-8 prototype PCB has reported routing problems and is delayed. The final board for MC operation is expected by September. Preliminary operation has been described.• Two MB1 minicrate mechanics are ready at the moment, two MB2 are in process.
HPTDC/Cern/Mic was resubmitted in September to include small correctionsmainly to the Voltage regulator .Using the HPTDC from the previous engineering run CIEMAT produced severalRout Boards
40
TRB1 TRB2 TRB3
25 lines to theControl Board11 lines to the Control Board
One BTIM nouses 4 BTIOne TRACO looks at 4 BTI inner and 12 BTI outerEach BTI outer is connected to 3 TRACO
41
C S BoardTRBTRB TRB
TRACO-TSS bus
TRACO TSM BTIM
Coonections from TRBs to CS Board
al Sector Collector
System test in June /July 02:Two TRBs and one CSB
42
BTI modules.(~14000 prod. 700 /month ?) contract signed in May ,first samples foreseen beg. Aug
delayed to end September (METALLUX)
TRB (~1600 prod. 200/month? ) tender closed 28 June,approved by INFN 19 Julyshould be signed in September (NOVATEL) new PCB design finished, 20 PCB 2nd half October5 TRBs end November for first MINICRATEtwo minicr. available for test beam of May 2003
Production plan for TRB:4 months for material procurement1 month 50 samples 1 month approvalPreserie 200 after 3 months
In June/July 2003200~250 TRB could be available to begin the “mass prod.” of Minicrates(200 TRB = ~ 40 Minicrates ,one wheel in SX ,but assembly rate of minicratesstill unknown and some delay in the production of TRB or BTI mod. is well possible) . The Minicrates need also Control&Server Board.
43
Control and server boards
They sit in the MINICRATES of which they control all the functionalities
These are two boards :the server is piggy backed on the Control.
The Control board was slightly modified after the system test tohouse some buffers and to accept new connectors. The designof the new PCB is going on and will be finished by end september.
The Server part is complete and ready to be produced.The funding for both is allocated in the 2002 /2003 And first orders will be placed soon. However the Control mustWait for the final TTC/RX . We hope to have by october the Pin out in order to complete the PCB.A proto with the old scheme is in any case needed for the MINIC. Testat the end of 2002
44
DT Power & Grounding Layout for One Sector
AnalogP.S.
DigitalP.S.
LVDS
LVDS
LVDS
SLcover
SLcover
SLcover
20m
LV
cab
les
Splitboard
AnalogP.S.
DigitalP.S.
LVDS
LVDS
SLcover
MINICRATE
15m
LV
cab
les
Splitboard
SLcover
AnalogP.S.
DigitalP.S.
AnalogP.S.
DigitalP.S.
MB1 MB4
SECTORcollector
AC
cou
pled
LVD
S lin
ks
HC
& A
l fra
me
HC
& A
l fra
me
BALCONY GND
Floating Power Supply and AC coupled LVDS links allow common mode freedom
MINICRATE
45
SL ΦRB3/4
SL ΦSL Θ (MB3 only)
RB3/4
MB3/4
SL Φ
RB1/2_OUTSL ΦSL Θ
RB1/2_IN
IRO
N
MB1/2
Grounding DT & RPC
IRO
N
IRON Connection
Cu
brai
d to
link
box
46
01 01 01 01 02 02 02 02 03 03 03 03
TDC * * *Readout B. * * * * *
BTI * * *TRACO * * *BTIM * * * * * * * *TSS * * * *Trigger B. * * * * * * *
TSM * * *Contr/Serv. B. * * * * *MINICRATE * * * * * * * ** Order * samples available * samples * production
*
*
47
DT milestones 2003 (INFN)
9 ch a LNL giugno 200318 ch. a LNL dicembre 2003Primo SL MB4 a Torino marzo 2003Inizio assemblaggio minicrates giugno 2003Installazione nella ruota centrale ottobre 2003
DT milestones 2002 (INFN)8 MB3 a Padova per Maggio 5 in Giu. ma SL per 10altre 8 per Ottobre si’ (* )Linea a Torino in Settembre: GennaioAssemblaggio primo Minicrate in Ott. Dicembre
(*)Conflitto su tavolo inc. tra camere e Pad Rpc
48
4000 ~ 4500 KCHF sono:
200 Per parti delle camere (I-beams and plates and…) (I,G,S 2/1/1)1830 Per HV supplies + cavi (costo tot.stimato 2830) (I,G)400 per HV chiesti nel 2003 (I)630 per LV supplies + cavi (costo tot. stimato 900) (G)100 Rout boards (S)100 Trigger (I)660 Sector collector board (I,G,S 2/1/1)60 ch. Control (I,G,S)
3980+ altro (gara TRB non conclusa, cavi e assemblaggio minicrates…incertezze su cablaggio ruote etc)
Richiesti alle F.A. nel rapporto del funding tra I/G/S = 11.1 / 4.44 / 3.05
49
Richieste CORE 2003
Totale circa 1500 KCHF 1816Costruzione camere 47 (small parts,patch panels)Produzione parti 121(Dubna,Protvino)Trigger 473(TRB 205Contrl/Sboard/Master 117 >>> 360BTIM 160)HV supplies,connettori 624Strutture per installaz. 36Manpower per sopra 45Gas piping on chambers 110Assemblaggio minicrates ?
Tot 1790
1820
50
Possibili ritardi su:
BTIM coperti da impegno gara contratto in ritardoTRB idem gara in ritardoFEB to ROB 204 ass. 2002 dettagli finali in corsoContr/Serv/etc 325 ass. 2002 sj (sblocco settembre)
C’e’ un bisogno disperato di moduli HV nuovi (2002?)soprattutto per test agli ISR (test accettazione e lunga durata)
Assegnazioni INFN tabella Campana
98 99 00 01 02 03 tot686 1714 2432 2471 1820 1790 10 913
(IVA incl) (IVA incl)
Total funding 11 100 + 2.200 disp. 2 390
5198 99 00 01 02 03 04 05
Committed 15000 60% (71%)
To be committed 6000 24% (29%)
Missing 4000 16 % (19%)
(missing funding 8%)(Extra cost 11%)
98 99 00 01 02 03 04 05
1000
2000
3000
4000
KChF
MoUReal
Payments and commitments updated to April 02
INFN ( profile of MoU ‘98)