Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland
Transcript
Page 1: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.

Status of GSN-GUAN Improvement Activities

Richard K. Thigpen

Implementation Project Manager

GCOS Secretariat

Geneva, Switzerland

Page 2: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.
Page 3: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.

GSN Stations in Archive

Page 4: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.
Page 5: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.
Page 6: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.
Page 7: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.

Revitalization Activities

Equipment Replacement

Hydrogen Generators and Upper Air Systems

Gan, Maldives Dar es Salaam, Tanzania

Windhoek, Namibia Harare, Zimbabwe

Yerevan, Armenia Penrhyn, Cook Islands

Douala, Cameroon Antananarivo, Madagascar

Dakar, Senegal Addis Ababa, Ethiopia

Nairobi, Kenya Bauerfield, Vanuatu

Honiara, Solomon Islands Laoag, Philippines

Galapagos, Ecuador

Radiosondes and Balloons To Many

Page 8: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.

Number of Silent Guan

0

5

10

15

20

25

2001Dec

2002Apr

2002Jun

2002Jul

2002Sep

2002Dec

2003Sep

2003Nov

2004Feb

2004Dec

Number

Page 9: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.

CBS Lead Centers for GCOS

Have Authority to Contact Country Directly

WMO Very Formal About Contact with Members

Japanese Met Service First for GSN

Then NCDC for GSN and GUAN

Recently IRAN for GSN and GUAN

Now Australia and Morocco for GSN and GUAN

Page 10: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.

Lead Center Representatives

Hiroshi Nakamigawa JMA

Matt Menne US

Mina Jabbari Iran

Phil Alford Australia

Rachid Sebbari Morocco

Jonathan Shanklin BAS

Jorge Carrasco Chile

Page 11: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.

CBS Lead Centers

Training Session Last month

Good Progress Already

Iran has contacted >12 Countries

Retrieved Historic Data

See Results Already

Language, Cultural, & Regional Differences

Page 12: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.

CBS Lead Centers

Initial Recommendations

Additional Centers Needed

Africa (IGAD and SADC)

Europe

Yearly Coordination Meetings

All Centers Equal, GCOS be “LEAD” Lead Center

Page 13: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.
Page 14: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.

GCOS Technical Support Projects

Three One Year Projects Established

Pacific Islands (New Zealand Met Service)

Caribbean (Private Company)

SADC Africa (Botswana Met Service)

Visit Each GUAN Station 2 Times per Year

Visit as Many GSN as Possible

Monitor reports from all Stations

Page 15: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.

Technical Support Projects

Site Visits:

Better Meta Data

Including Photos Around Sensor Suite

Actual Location of Many are Wrong

Many are no Longer Good Sites

Calibration and Training

Page 16: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.

GCOS

Technical Support Projects

Terms of Reference

Visit each GUAN 2 times per Year

Visit as many GSN as Possible

Actively Monitor all GUAN/GSN

Up to 3 Unscheduled Repair Missions/Year

Training and Calibration

Limited Common Spare Parts

Quarterly Reports

Page 17: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.

GCOS

Technical Support Projects

Finding Lots of Station Problems

Encroachment of Airports, Errors, etc

Begun Station Position Verification and Photos

Made Part of Each Site Visit

GPS Receiver used to verify Position

Working With NCDC on Meta Data Format and Content

Page 18: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.
Page 19: Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.

Photos Around Station

Example


Recommended