37
1 2 3 4 5 6 7 8 3rd Circle Solan 1 C/O Manjyat Patti- Deora road km. 0/0 to 7/145. Arki 205.38 184.84 FCA 3rd Circle Solan 2 C/o Ria- Kapoli Siyarli-Bakrori- Kiyardu- Charog- Talawti-Nerli road km. 0/0 to 10/580. Nalagarh 437.33 393.60 46.13 Total: 2 642.71 578.44 46.13 Joginder Nagar Circle 1 C/O Kuttkhetru Chandani road in Gram Panchayat main Bharola km. 0/0 to 4/300. Joginder Nagar 137.91 137.91 77.10 1st Circle Mandi 2 C/O Chandyal- Pipli Kuthari-Karshora kandhi- Tarapur -kharshi-Bangoan -Bari Jagar-Dola- Tikkar road km. 0/0 to 15/840. Mandi Divn. No.II 299.60 278.64 332.80 6th Circle Kullu 3 C/O 70.00 mtr steel truss bridge over river Chandra at yangley on link road to village Yangley . Udaipur 319.33 287.40 182.85 Total: 3 756.84 703.95 592.75 KANGRA 9th Circle Nurpur 1 C/O link road from Swan khad to Kashanpur via Ranoh km. 0/0 to 2/690. Dehra 107.93 98.04 99.54 Total: 1 107.93 98.04 99.54 RIDF-XV SHIMLA MANDI Exp. upto 31/03/2017 ZONE Name of Circle S. No. Name of scheme Name of Division Sanctioned Amount Nabard loan STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD RIDF-XV TO RIDF-XXII UPTO 31-03-2017 amount Rs. In lacs
Transcript
Page 1: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

1 2 3 4 5 6 7 8

3rd Circle Solan 1 C/O Manjyat Patti- Deora road km. 0/0 to 7/145.

Arki 205.38 184.84 FCA

3rd Circle Solan 2 C/o Ria- Kapoli Siyarli-Bakrori- Kiyardu-Charog- Talawti-Nerli road km. 0/0 to 10/580.

Nalagarh 437.33 393.60 46.13

Total: 2 642.71 578.44 46.13Joginder Nagar

Circle1 C/O Kuttkhetru Chandani road in Gram

Panchayat main Bharola km. 0/0 to 4/300.Joginder Nagar

137.91 137.91 77.10

1st Circle Mandi 2 C/O Chandyal- Pipli Kuthari-Karshora kandhi- Tarapur -kharshi-Bangoan -Bari Jagar-Dola-Tikkar road km. 0/0 to 15/840.

Mandi Divn. No.II

299.60 278.64 332.80

6th Circle Kullu 3 C/O 70.00 mtr steel truss bridge over river Chandra at yangley on link road to village Yangley .

Udaipur 319.33 287.40 182.85

Total: 3 756.84 703.95 592.75KANGRA 9th Circle Nurpur 1 C/O link road from Swan khad to Kashanpur

via Ranoh km. 0/0 to 2/690.Dehra 107.93 98.04 99.54

Total: 1 107.93 98.04 99.54

RIDF-XVSHIMLA

MANDI

Exp. upto 31/03/2017

ZONE Name of Circle S. No.

Name of scheme Name of Division

Sanctioned Amount

Nabard loan

STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD RIDF-XV TO RIDF-XXII UPTO 31-03-2017

amount Rs. In lacs

Page 2: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge at Bagchhal over Govind Sagar Reservoir on Panjpiri (Hiyarain) Kutehla Bagchhal road at Rd. 14/950 (Phase-II).

Bilaspur No.II 1603.00 1603.00 1735.97

10th Circle Bilaspur 2 C/O link road from Bard to Duhak via Morthal km. 0/0 to 6/270.

Ghumarwin 210.69 190.48 190.48

Total: 2 1813.69 1793.48 1926.45G.Total:- 8 3321.17 3173.91 2664.87

RIDF-XVISOUTH 4th Circle Shimla 1 Improvement/Up-gradation of Nanoo-Kuthar-

Basadhar road Km. 0/0 to 21/840.Theog 935.66 842.09 471.08

Total: 1 935.66 842.09 471.081st Circle Mandi 1 C/O Jablahi Nallah- Barnota-Karkoh road km.

0/0 to 5/50 i/c one bridge in Distt. Mandi.Mandi No.II 276.20 248.58 93.91

1st Circle Mandi 2 C/O 40.00 mtr span box girder bridge over Bakhli khad at Chari at Rd. 3/870 on Thunag Jainshal patakri road.

Gohar 139.51 125.56 105.43

1st Circle Mandi 3 C/O 50.00 mtr span PSC/RCC Box girder bridge over Jeuni khad on Khandal Nandi road at km. 1/215.

Gohar 150.19 135.17 206.43

1st Circle Mandi 4 C/O Nayapul Bhuwana to Gumohu road via village Bhangla in km. 0/0 to 4/825.

Sundernagar 115.35 103.82 162.46

Joginder Nagar Circle

5 C/O Balance work & M/T of Patti to Dwarado road km. 0/0 to 5/0 (Part-A of Bararta-Jajjar-Patti-Janjhel-Khataili-Reyur ).

Dharampur 177.77 162.01 187.84

HAMIRPUR

MANDI

Page 3: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

Joginder Nagar Circle

6 C/O road from Janjhel- Dharkhu-Khataili-Reyur road km. 6/510 to 12/255 (Part-B of Bararta-Jajjar-Patti-Janjhel-Khataili-Reyur ) i/c 75 mtr span bridge at Rd.7/525 over Sun khad (Phase-I).

Dharampur 449.27 404.34 212.42

Joginder Nagar Circle

7 C/O Khaddar Rahar Rangra Saroon Bhargawin Saroon Antola Traibmli road km. 0/0 to 6/0.

Joginder Nagar

191.84 172.66 0.05

Joginder Nagar Circle

8 C/O Kuni Katkal Bhalara Rains road i/c 3 Nos bridges over Katkal Nallah.

Joginder Nagar

321.98 289.78 291.76

Total: 8 1822.11 1641.92 1260.35th Circle Palampur

1 C/O 30.00 mtr span RCC Box girder bridge over Leod Nallah on Bhaled Kakra Dulli Chamiara road along with both sides approaches at km.0/285.

Kangra 93.67 84.30 83.26

5th Circle Palampur

2 C/O road from Tamloh to Bharanta from km. 0/0 to 1/300 i/c bridge at km. 0/626 over Neogal khad.

Palampur 253.92 228.53 248.17

5th Circle Palampur

3 C/O road from Balhara to Baradoon via Barballa, Tehri Jharundi km. 0/0 to 7/150.

Dehra 246.96 223.83 182.46

7th Circle Dalhousie

4 C/O Balance work of Rakh Dhanara road km. 0/0 to 2/880.

Bharmour 73.40 66.06 46.41

7th Circle Dalhousie

5 C/O 2 No. bridges on Chamba Sahu road at Sangera Nallah & Kahala Nallah (19.75 mtr span RCC T -Beam bridge over Sangera Nallah at Rd. 9/760 & 50 mtr span box girder bridge over Kehlala Nallah at Rd.8/280).

Chamba 246.59 221.93 235.60

9th Circle Nurpur 6 C/O balance work of Baglamukhi temple to Naushera road.

Dehra 155.79 140.21 122.11

KANGRA

Page 4: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

9th Circle Nurpur 7 C/O Balance work of road from Dehrain to paisa rd.0/0 to 5/960 via Salehar i/c 40 mtr span bridge at rd. 2/300.

Dehra 320.19 288.17 185.82

Total: 7 1390.52 1253.03 1103.838th Circle Hamirpur 1 C/O link road Ukhli to Samtana via

Dharamshala Tudan Durban road km. 0/0 to 6/0.

Barsar 182.90 164.61 68.34

8th Circle Hamirpur 2 C/O Charian-Di-Dhar to Baura via Lambran- Di-Dhar km. 0/0 to 5/130 i/c 1 No. bridge at Rd.1/290.

Tauni Devi 303.89 273.50 185.03

10th Circle Bilaspur 3 C/O Jarora ket Naswal Matoli Kassaru road km. 3/420 to 7/150 (Phase-I) i/c 32 mtr span Box Girder bridge.

Ghumarwin 203.30 182.97 151.84

15th Circle Una 4 C/O road from Bohru to Olinda via Chowkhat Sanahal Salangri road km. 0/0 to 11/090 (Phase-I).

Bangana 483.71 435.34 0.01

Total: 4 1173.80 1056.42 405.22G.Total:- 20 5322.09 4793.46 3240.43

RIDF-XVII3rd Circle Solan 1 C/O Swarghat Fakred Kohla Dungi Plate

Luttani Jhimgi road km. 0/0 to 11/640.Nalagarh 596.83 537.15 0.15

4th Circle Shimla 2 Up-gradation of Matiana Mohari Guthan road km. 0/0 to 24/0.

Theog 906.45 815.81 662.85

12th Circle Nahan 3 C/O Balance work of Dalyanoo Pulliani road Nenidhar road km. 0/0 to 30/0 (Portion km. 0/0 to 13/0).

Sangrah 453.88 408.49 322.23

Total: 3 1957.16 1761.45 985.236th Circle Kullu 1 C/O 68.00 mtr span motorable bridge across

river Bhaga near vilage Gawazang .Udaipur 341.20 307.08 0.00

Joginder Nagar Circle

2 C/O Balance work of Ahju Khajoor Traimbali Basahi road i/c Metalling and tarring in km. 12/0 to 33/0.

Joginder Nagar

736.82 663.14 529.18

HAMIRPUR

SHIMLA

MANDI

Page 5: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

Joginder Nagar Circle

3 C/O Draman Naroli Gangoti Nimelary road km. 0/0 to 6/375 (Phase-I).

Joginder Nagar

185.85 167.27 30.55

Total: 3 1263.87 1137.49 559.735th Circle Palampur

1 C/O Balance work of link road from Rajhoon Gadiara to Khatin via Makrehar km. 0/0 to 3/210.

Palampur 99.25 95.95 106.48

5th Circle Palampur

2 C/O road from Dhatehar- Mahrana- Duhak road km. 0/0 to 6/495.

Palampur 389.43 350.49 175.73

5th Circle Palampur

3 C/O road from Indrunag to Bhangrothu Triunnd road (Portion Indrunag to Tilla Mata Mandir km. 0/0 to 6/345).

Dharamshala 229.20 214.40 38.67

5th Circle Palampur

4 C/O link road to village Khirku km. 0/0 to 2/810.

Dharamshala 108.04 97.24 0.00

5th Circle Palampur

5 C/O link road from Jandnah Aerta Dola Kardand road km. 8/0 to 13/765 to 16/295 i/c bridge over Nakkar khad at Rd. 16/295.

Tanda 418.71 376.84 298.68

5th Circle Palampur

6 C/O link road from Baroi Mohalkar Nihunda linking Kawari i/c bridge over Baner khad km. 0/0 to 4/0.

Dharamshala 386.95 348.26 274.46

5th Circle Palampur

7 C/O link road from Lilly Amtrar Mundla road km. 0/0 to 3/0 i/c 2 No. bridges .

Tanda 383.36 345.02 222.74

7th Circle Dalhousie

8 C/O 68.00 mtr span steel truss bridge over Pallani Nallah on Bharmour Badgram road at Rd. 19/624 i/c approaches.

Bharmour 213.49 192.14 20.00

7th Circle Dalhousie

9 C/O link road to village Sirna in G.P. Janghi km. 0/0 to 5/250.

Chamba 328.90 296.01 94.68

9th Circle Nurpur 10 C/O Balance work of Kaloha to Shantla via Saleti road km. 0/0 to 16/720 i/c 4 No. bridges.

Dehra 786.06 775.85 484.79

9th Circle Nurpur 11 C/O link road from Lumb Chatra to Masroor Kaphari km. 0/0 to 4/0.

Dehra 158.00 142.20 82.76

KANGRA

Page 6: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

9th Circle Nurpur 12 C/O link road from Dhatehar to Duhak via Kuri Balrere i/c link to village Dib in km. 0/0 to 9/270.

Dehra 544.76 490.28 225.80

9th Circle Nurpur 13 C/O Theda to Dhanot via Jurahi road i/c bridge.

Dehra 83.03 74.73 7.67

Total: 13 4129.18 3799.41 2032.468th Circle Hamirpur 1 C/O link road khiah to Bhatera via Bharnot,

Thalakana i/c bridge over Pung khad km. 0/0 to 4/855.

Hamirpur 277.89 250.10 232.75

8th Circle Hamirpur 2 C/O Mair to Tikker via markanda Khugan Fahal Lahara Phahal road km. 0/0 to 19/120.

Barsar 566.17 509.55 330.11

10th Circle Bilaspur 3 C/O Balance work of Namhol Ashamajhan road km. 0/0 to 10/555.

Bilaspur No.II 234.46 211.01 221.89

10th Circle Bilaspur 4 Up-gradation of Samoh Geherwin Thuran road km. 0/0 to 13/0.

Ghumarwin 241.57 217.41 182.58

10th Circle Bilaspur 5 C/O Link road from Slashi to Hairapur km. 0/0 to 2/735 i/c 35 mtr single span bridge.

Ghumarwin 217.00 195.30 0.00

10th Circle Bilaspur 6 C/O Sannour to patta via karyalag Nagroan & harizan Basti Churan Gugga Temple road km. 0/0 to 6/095.

Ghumarwin 367.79 331.01 358.21

Total: 6 1904.88 1714.38 1325.54G.Total:- 25 9255.09 8412.73 4902.96

RIDF-XVIII3rd Circle Solan 1 C/O Balance work of Mamligh- Kuftu road km.

0/0 to 13/400.Arki 633.42 570.08 400.25

3rd Circle Solan 2 C/O Balance work of Galog Kunihar in km. 8/630 to 15/330.

Arki 346.09 311.48 219.90

3rd Circle Solan 3 C/O Balance work of Kimughat Chakki-Ka-More road km. 0/0 to 15/180.

Kasauli 396.22 356.60 234.84

3rd Circle Solan 4 M/T on Lohanji Mari Ka Ghat via Behli road km. 0/0 to 13/200.

Kasauli 590.45 531.39 378.02

SHIMLA

HAMIRPUR

Page 7: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

4th Circle Shimla 5 Up-gradation /Improvement of Bhakhalty-Sarog-Barog-Kiartoo road km. 0/0 to 13/060.

Theog 442.78 398.50 326.42

4th Circle Shimla 6 Improvement of Gadhana to Banari road km. 7/0 to 20/615.

Theog 543.40 489.06 450.11

11th Circle Rampur 7 M/T on Behna-Dalash-Kotadhar road upto Kandagai km. 0/0 to 17/345.

Nirmand 639.91 575.92 352.14

12th Circle Nahan 8 C/O Balance work of Magwa Siun road upto village Lagnoo km. 0/0 to 16/015.

Sangrah 732.57 659.31 337.91

12th Circle Nahan 9 M/T, CD work and C/O Balance work on Jabal Kanoti upper Surla Kathana road km. 0/0 to 5/225.

Nahan 319.13 287.22 266.40

12th Circle Nahan 10 C/O Bridge across river Bata on Kishanpura Santoshgarh road at Rd. 1/180.

Paonta Sahib 1872.02 1684.82 646.00

12th Circle Nahan 11 C/O Bridge over Giri River Bata on Rampurghat manpur Deora road at Rd. 3/290.

Paonta Sahib 1907.15 1716.44 454.26

14th Circle Rohru 12 C/O Balance work of Chamain Chouri Baghal road km. 0/0 to 10/780.

Jubbal 159.60 143.64 154.10

14th Circle Rohru 13 C/O Balance work on Dochi- Mehana sarhana Sarot Raika road km. 0/0 to 6/225.

Jubbal 269.03 242.13 164.94

14th Circle Rohru 14 C/O Link road from Sawra- Kathasu road km. 8/0 to 13/250.

Jubbal 235.73 212.15 247.15

14th Circle Rohru 15 C/O link road from Chamaru Jachi km. 0/0 to 4/0.

Jubbal 178.96 161.06 200.41

Total: 15 9266.46 8339.80 4832.851st Circle Mandi 1 C/O Kahnoo to Pargan road via Durkano km.

0/0 to 5/585.Karsog 331.65 298.49 106.64

1st Circle Mandi 2 C/O link road Segali Radu Dadoh Bhiyarta via Dinak road km. 0/0 to 3/225.

Sundernagar 367.80 331.02 180.99

1st Circle Mandi 3 C/O M/T on katyandi Tandi Thunag road km. 0/0 to 6/525.

Gohar 251.87 226.68 127.74

MANDI

Page 8: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

1st Circle Mandi 4 C/O M/T and balance work on Neri Shiva Bihandhar Gharan road km. 0/0 to 17/810.

Padhar 446.00 401.40 372.74

1st Circle Mandi 5 M/T & CD work to Majhwar- Movi Seri via Rakhoon road km. 0/0 to 10/600.

Mandi No.II 360.83 324.75 339.37

1st Circle Mandi 6 C/O Nagla-Redu-Kaner-Lower Barot road km. 0/0 to 3/945.

Sarkaghat 153.87 138.48 143.32

1st Circle Mandi 7 C/O balance work of Rissa Surangri Bhaderwas via Garoru road km. 0/0 to 8/250 i/c 30 mtr span bridge at km. 0/165.

Sarkaghat 369.39 332.45 221.56

6th Circle Kullu 8 C/O Spangni to Kanda road km. 4/640 to 12/0.

Kullu No.I 320.06 288.05 234.24

6th Circle Kullu 9 C/O 85.00 mtr span steel trussover river Chenab at Lobber i/c approaches on Hinsa Shakoli Bardang Lobber road at km. 7/400.

Udaipur 524.68 472.21 356.69

6th Circle Kullu 10 C/O 75.00 mtr span bridge over River Chenab at Thanwani.

Udaipur 327.07 294.36 0.00

Joginder Nagar Circle

11 C/O Bridge over Beas River at Sanda . Joginder Nagar

2285.62 2057.06 540.15

Joginder Nagar Circle

12 C/O Balance work i/c MT of Darkoti Nichala Bharyara upto village Gharlon.

Joginder Nagar

419.46 377.51 332.64

Total: 12 6158.30 5542.46 2956.085th Circle Palampur

1 C/O link road from Darang Block to Madhya Marg Gadiara Jamwal Awadi & Harizan Basti via Forest hut to link NH-20 km. 0/0 to 3/780.

Palampur 312.21 280.99 191.01

5th Circle Palampur

2 C/O link road to village Chori-Da-Lahar Nagni Pump House km. 0/0 to 2/255.

Palampur 88.54 79.69 38.94

5th Circle Palampur

3 Improvement & Strengthening of jalag dali Nalhana Dhupkiara road km. 0/0 to 8/906.

Baijnath 352.89 317.60 191.32

KANGRA

Page 9: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

5th Circle Palampur

4 Improvement & M/T on Charri to Ghera road (Purana Gaj Project road ) km. 0/0 to 8/555.

Kangra 414.74 373.27 347.84

5th Circle Palampur

5 C/O Bhaled Dulli Kakra Chamiara road km. 0/0 to 9/200.

Kangra 269.09 242.18 120.29

5th Circle Palampur

6 C/O 110.00 mtr span stiffened suspension bridge over Gaj khad between villages Spail & Kalru .

Kangra 420.24 378.22 303.52

5th Circle Palampur

7 C/O Morchh Gharghuni road km. 0/0 to 3/240 i/c 2 No. Bridges 60 mtr span PSC BoxGirder bridge at Rd. 1/726 & 25.00 mtr span RCC Box Girder Bridge at Rd.2/625 i/c approache.

Kangra 374.12 336.71 45.56

5th Circle Palampur

8 C/O 2 No. Bridges (RCC T-Beam bridge over bandla Nallah at km. 0/300 & RCC T Beam Bridge over Jhullar Nallah at km. 1/123 on Shahpur Kiari-Shahpur Dohab chowk road.

Kangra 74.51 67.06 62.62

5th Circle Palampur

9 C/O link road Tarkhankar to Chatreta km. 0/0 to 1/600.

Kangra 62.09 55.88 59.90

5th Circle Palampur

10 Removal of formation deficiency and M/T to Katharu to Bhatti Dehru sandh Rajal road km. 0/0 to 3/810.

Kangra 254.29 228.86 215.92

5th Circle Palampur

11 C/O Bridge over Awa khad at km. 11/300 on link road from kulani to Speedu i/c approaches.

Palampur 220.13 198.12 78.26

5th Circle Palampur

12 C/O link road to village Jamula km. 0/0 to 1/330.

Dharamshala 56.82 51.14 48.92

5th Circle Palampur

13 C/O link road from Ankhan Khola Sudhed road km. 0/0 to 2/540.

Dharamshala 158.97 143.07 154.10

Page 10: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

5th Circle Palampur

14 C/O link road Brana Mariyari Chowki Nihar Palahchaklu road km. 0/0 to 8/300 i/c bridge over Hounsty khad at Rd. 8/300.

Dharamshala 384.97 346.47 64.81

5th Circle Palampur

15 C/O link road from Thana Bargran to Bushal km. 0/0 to 4/300 i/c 65 mtr span PSC Box Girder bridge over Bathu Khad at Balah at km. 1/890. Thana Bargran to Bushal via Thana Lahal road.

Dharamshala 422.35 380.12 200.30

5th Circle Palampur

16 C/O 45.00 mtr span of Steel truss foot bridge over Daroon khad joining chhanwar Serathan road at Rd. 0/160.

Dharamshala 53.38 48.04 75.33

7th Circle Dalhousie

17 C/O link road from Patka to Hathidhar portion kathed (Patka) to Druma km. 0/0 to 10/400.

Dalhousie 516.11 464.50 154.87

7th Circle Dalhousie

18 C/O Ghoom to Janjla road km. 0/0 to 4/800. Chamba 207.64 186.88 155.25

7th Circle Dalhousie

19 C/O Tikru Machyari Panjla road km. 0/0 to 1/200.

Chamba 73.61 66.25 35.71

7th Circle Dalhousie

20 C/O 40.00 mtr span steel truss bridge over Suil River on Bhandal Panoga road at km. 0/550.

Salooni 146.54 131.89 0.10

9th Circle Nurpur 21 C/O Nana Banderu Gheli Dhewa road km. 0/0 to 6/435.

Jawali 330.92 297.83 247.33

9th Circle Nurpur 22 C/O 5/7 mtr wide motorable road from Houri Devi, Banaharr (Harizan /Brahaman) latwal, km. 0/0 to 4/300.

Jawali 234.77 211.29 118.54

9th Circle Nurpur 23 C/O link road from Jounta High School Tattal via Math Meaner km. 0/0 to 2/195.

Nurpur 189.88 170.89 156.69

9th Circle Nurpur 24 C/O Balance work of Guler Nandpur road in km. 0/0 to 5/135.

Dehra 135.98 122.38 52.73

9th Circle Nurpur 25 C/O link road from Guler to Dhangar khas in km. 0/0 to 5/360.

Dehra 152.57 137.31 91.01

Page 11: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

9th Circle Nurpur 26 C/O Balance work of Har Pukhar to Bill-Ka-Bharoo road km. 0/0 to 3/255.

Dehra 66.68 60.01 36.00

9th Circle Nurpur 27 C/O Balance work of Chintpurni to Baldwara road km. 5/0 to 10/0.

Dehra 137.55 123.80 105.52

9th Circle Nurpur 28 C/O balance work of Lag Balina to Amb Tilla with link road chanauta via lag Thakran i/c causeway Rd. 0/0 to 3/125.

Dehra 180.91 162.82 123.15

Total: 28 6292.50 5663.27 3475.548th Circle Hamirpur 1 C/O Bragram to kalwal road via than, chaleli ,

Manjru km. 0/0 to 5/840 i/c 2 No. bridges.Barsar 599.04 539.14 349.28

8th Circle Hamirpur 2 C/O 69.00 mtr span PSC Box girder bridge over Garli/Jhanjiani khad at Rd. 0/585 on Darkoti to Shah Talai road i/c approaches.

Barsar 216.56 194.90 216.56

8th Circle Hamirpur 3 M/T Dasmal lagmanwain road via Tooh Tihra maira jar Bhounkhar Gadru road km. 2/825 to 6/500.

Barsar 89.71 80.74 89.71

8th Circle Hamirpur 4 C/O Tarkwari to Jalahu via Bhater Kosed Takotta km. 0/0 to 2/825.

Barsar 184.33 165.90 133.87

8th Circle Hamirpur 5 C/O link road from Utpur to Bakker khad via Tap km. 0/0 to 4/260.

Touni Devi 228.26 205.43 147.80

8th Circle Hamirpur 6 C/O link road from NH-70 Kaloor to Kohla Nadaun Amtar Bilvkaleshwar road km. 0/0 to 10/360.

Hamirpur 556.68 501.01 457.79

10th Circle Bilaspur 7 Up-gradation of Panol Nihan Ser via Kajal road km. 0/0 to 10/390.

Ghumarwin 172.36 155.12 208.81

10th Circle Bilaspur 8 Up-gradation of link road from Gangloh to Malroun km. 0/0 to 22/0.

Ghumarwin 477.07 429.36 418.23

10th Circle Bilaspur 9 C/O link road from NH-21 to village Mehrog km. 0/0 to 1/180.

Bilaspur No.II 42.61 38.35 0.00

10th Circle Bilaspur 10 C/O Kothi Bhareri Gallyana via Balh Bural road km. 0/0 to 3/390.

Bilaspur No.I 171.62 154.46 150.64

HAMIRPUR

Page 12: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

15th Circle Una 11 C/O link road to Mohalla Gujjran km. 0/0 to 3/0 in Gram Panchayat Saghnai .

Bharwain 179.91 161.92 128.04

15th Circle Una 12 C/O link road from Gondpur Banehra to nangal Jariyalan km. 0/0 to 2/885.

Bharwain 295.79 266.21 225.19

15th Circle Una 13 C/O link road from Police station Gagret to Industrial Area Shiv Bari km. 0/0 to 2/685.

Bharwain 195.19 175.67 168.60

15th Circle Una 14 C/O link road from Jawar to Lahar km. 0/0 to 3/180.

Bharwain 283.36 255.02 162.91

15th Circle Una 15 C/O link road from Thana upper to kut, Chhatrer to Alsan Harizan Basti Bhiambi and Jhigla Thana km. 0/0 to 6/115.

Bangana 190.54 171.49 130.18

Total: 15 3883.03 3494.72 2987.61G.Total:- 70 25600.29 23040.25 14252.08

RIDF-XIX3rd Circle Solan 1 C/O Bridge over Sirsa Nadi on Baddi Sitalpur

road at Rd. 1/338.Nalagarh 630.52 567.47 531.18

3rd Circle Solan 2 C/O Bridge over Sirsa Nadi on Khera Nanowal road at Rd. 2/700.

Nalagarh 648.58 583.72 533.99

3rd Circle Solan 3 C/O road to village Ali Bhurjani km. 0/0 to 6/135.

Arki 204.42 183.98 137.27

3rd Circle Solan 4 CD &MT on Baddi Sai Ramshehar road km. 22/0 to 30/0.

Nalagarh 535.92 482.33 360.74

3rd Circle Solan 5 C/O road from Danoghat to Sahjada Neri Plata km. 0/0 to 5/360.

Arki 253.23 227.91 0.00

3rd Circle Solan 6 Improvement, CD and MT on Bhud Gullarwala Ghare Patta km. 0/0 to 13/130.

Nalagarh 221.12 199.00 153.82

3rd Circle Solan 7 C/O Tarashari to Perri road km. 0/0 to 300. Kasauli 165.84 149.26 54.39

3rd Circle Solan 8 C/O Shalaghat to Galot Soriya road km. 0/0 to 9/0.

Arki 421.71 379.54 268.51

SHIMLA

Page 13: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

4th Circle Shimla 9 Improvement of Shakildar-Aloti-Drawal-Devban road km. 0/0 to 18/390.

Theog 727.08 654.37 545.88

4th Circle Shimla 10 M/T of Hari Devi Seri road km. 0/0 to 3/700. Rural Dhammi.

179.95 161.96 132.30

4th Circle Shimla 11 Bridge over Giri at Belewog G.P.Balag. Theog 158.47 142.62 195.53

4th Circle Shimla 12 Widening / Metalling & Tarring from Shari-Garkhan-Khatnol road G.P. Deola Khatnol , Majhewar(Pargna Chaultha) km. 5/500 to 10/0.

Shimla Rural (Dhami)

709.51 638.56 331.31

4th Circle Shimla 13 MT Jabli Bathmana road and Dhalaya Kangti road km. 0/0 to 8/060.

Shimla Rural (Dhami)

210.14 189.13 203.63

11th Circle Rampur 14 M/T of Khalwan to Bankoti via Saroga road km. 0/0 to 3/910 .

Kumarsain 144.47 130.02 69.99

11th Circle Rampur 15 C/O link road from Hurling to Gue km. 0/0 to 9/730.

Kaza 275.65 248.09 0.00

11th Circle Rampur 16 C/O link road from Shalabag Kuhl Daranghatti road km. 0/0 to 3/645.

Rampur 244.40 219.96 167.92

11th Circle Rampur 17 C/O Bhutti Karahan Dealth road (Portion Lahru to Kharela) in km. 5/840 to 10/360.

Rampur 419.36 377.42 278.47

11th Circle Rampur 18 C/O Kholvi Kenchi to Bhadevag road km. 0/0 to 2/990.

Kumarsain 148.84 133.96 128.64

11th Circle Rampur 19 C/O link road from Chaklot to Chunagai (Nirmand Block).

Nirmand 356.44 320.80 271.98

12th Circle Nahan 20 M/T of Nohradhar-Bogdhar-Methli road km. 0/0 to 34/0.

Shillai 1684.14 1515.73 1254.88

14th Circle Rohru 21 Up-gradation/Metalling & Tarring of Gumma Tapri-Pahal-Pohal-Bakhol road Km.0/0 to 6/0.

Jubbal 276.67 249.00 230.99

14th Circle Rohru 22 Up-gradation of Metalling/ Tarring on Kupvi Sail Pav road.

Chopal 929.26 836.33 317.36

14th Circle Rohru 23 Widening & MT on Kuddu Naliya-Chhajpur -Attu (Trailer) via Sansog road.

Jubbal 522.86 470.57 179.97

Page 14: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

14th Circle Rohru 24 Widening / MT on Ramnagar to Thana-Adayog Fanail -Mihani road.

Jubbal 439.40 395.96 225.00

14th Circle Rohru 25 M/T of Chopal Jhikanipul via Chikiya road km. 0/0 to 16/135.

Chopal 748.97 674.07 86.50

14th Circle Rohru 26 Improvement and MT of Ganasidhar Kadiwan Ghasni road km. 0/0 to 10/655.

Rohru 560.63 504.57 286.05

14th Circle Rohru 27 Improvement and MT of Tutu Pani Kuthari Khaigar Deoli road km. 0/0 to 3/0 and 9/300 to 19/680.

Rohru 620.69 558.62 217.51

14th Circle Rohru 28 Up-gradation of Metalling & Tarring ofKathrot Kanchi to Himri & Jangroli road Km.0/0 to 8/705.

Jubbal 440.43 396.39 299.50

Total: 28 12878.70 11591.34 7463.311st Circle Mandi 1 C/O Pungh Kapahi via Patsal road km. 0/0 to

9/300 i/c 45 mtr bridge over Suketi khad at Rd. 6/565.

Sundernagar 483.30 434.97 308.78

1st Circle Mandi 2 C/O Slapper-Tattapani road km. 0/0 to 30/690.

Sundernagar 506.08 455.47 149.98

1st Circle Mandi 3 C/O Roda Nallah to Dhandhal road km. 0/0 to 2/900.

Mandi No.II 193.04 173.74 156.79

Total: 3 1182.42 1064.18 615.555th Circle Palampur

1 C/O Balance work of link road Ballah to lower Khation Trutti Bat km. 0/0 to 3/230.

Palampur 126.38 113.74 107.63

5th Circle Palampur

2 C/O link road from Village Galu to kheel Jhanijharda Bhol & Soham km. 0/0 to 4/525.

Palampur 281.19 253.07 260.89

5th Circle Palampur

3 C/O link road from Dramanpul to Subedar Patial House km. 0/0 to 1/045 i/c bridge over Rangru Nallah on Balh Gujreda road at km. 0/120.

Baijnath 255.05 229.54 9.87

5th Circle Palampur

4 C/O link road from Daka to Bandla and Harizan basti (kholi) km. 0/0 to 3/100.

Kangra 146.55 131.90 59.57

5th Circle Palampur

5 C/O Kedara Chandar Datti Samba Kona road km. 2/400 to 8/400.

Palampur 165.34 148.81 134.79

MANDI

KANGRA

Page 15: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

5th Circle Palampur

6 C/O road from Kasba Narwana to Bagaira km. 0/0 to 3/510 i/c bridge over Ikku khad at km. 1/060.

Dharamshala 418.42 376.58 310.82

5th Circle Palampur

7 C/O 34.107 mtr span RCC T-Beam bridge over Salangi Nallah on link road from upper Chetru to lower Chetru at Rd. 2/170.

Dharamshala 127.49 114.74 93.87

7th Circle Dalhousie

8 C/O Dhanju Nallah bridge on Tissa Satyas road at km. 4/090.

Chamba 49.56 44.60 42.24

7th Circle Dalhousie

9 C/O Sukrali Nallah bridge on Tissa Satyas road at km. 7/540.

Chamba 249.47 224.52 246.72

9th Circle Nurpur 10 C/O bridge over Surdwam khad on Indora Rey road at km. 30/105.

Fatehpur 289.58 260.62 220.30

9th Circle Nurpur 11 C/O Balance work of Dhounta to Samnoli road km. 0/0 to 3/120.

Dehra 147.35 132.62 111.12

9th Circle Nurpur 12 C/O link road from Gurer Tory Adhwani i/c bridge over Toru khad and link road Mangtayal to Seri km. 3/750 to 7/880.

Dehra 297.18 267.46 86.41

9th Circle Nurpur 13 C/O link road from Bag to Ambi via Bagedhar Pant km. 0/0 to 2/600.

Dehra 123.88 111.49 42.00

9th Circle Nurpur 14 C/O Pucca Tiala Mehla road to village Paplother via Rajput Basti km. 0/0 to 2/600.

Dehra 162.98 146.68 62.36

9th Circle Nurpur 15 C/O Balance work of link road from Masroor to Gharia km. 0/0 to 2/780.

Dehra 123.56 111.20 42.00

9th Circle Nurpur 16 C/O road from Baduhi Jatoli to Jabbar khad bridge via Thora School i/c C/O 2 No. bridges km. 0/0 to 5/680.

Nurpur 284.42 255.98 156.63

9th Circle Nurpur 17 C/O 10.37 mtr span RCC Slab bridge over Lohla Nallah at Rd. 4/638.

Nurpur 74.07 66.66 18.35

9th Circle Nurpur 18 C/O Baleer to Dakwan via Sammon Randoh road km. 0/0 to 6/0.

Fatehpur 287.02 258.32 58.63

Page 16: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

9th Circle Nurpur 19 C/O Bassin to Khalag road km. 0/0 to 1/260. Dehra 91.21 82.09 35.62

9th Circle Nurpur 20 C/O RCC Box Cell Bridge over Sanjwan khad on Khatiar Damtal Indora road at Rd. 25/150.

Jawali 259.83 233.85 166.36

9th Circle Nurpur 21 C/O Pucca Bharo to lower Chalali road km. 0/0 to 2/655.

Dehra 156.78 141.10 50.36

Total: 21 4117.31 3705.57 2316.548th Circle Hamirpur 1 C/O link road from Banal to Chamiana via

manglair Daddar km. 0/0 to 7/185.Hamirpur 179.78 161.80 88.01

8th Circle Hamirpur 2 C/O Jeoli Devi to kanoh via Saheli, Baditar, Karsai road km. 0/0 to 8/0 i/c 2 No. bridges.

Barsar 600.24 540.22 402.21

8th Circle Hamirpur 3 C/O Farsi to Upper Hareta, Patnehri ,Kotlu , Makrana, Ropru, Satpura, Bushiar, Galhian, Lower hareta road and bridge over Kotlu Nallah.

Barsar 391.86 352.67 240.33

8th Circle Hamirpur 4 C/O road from Chakmoh to Sathavi via Samaila Dhariyani Maharal Jaglu i/c 2 No. bridges.

Barsar 524.05 471.65 145.10

8th Circle Hamirpur 5 C/O link road from Dhirar to Bhaleri via Dadu mandir Manjho Saplahu Kot km. 0/0 to 3/165.

Barsar 185.46 166.91 164.90

8th Circle Hamirpur 6 C/O Dhanpur Pathariya Karlooi Dhamander road km. 0/0 to 3/0.

Hamirpur 140.95 126.86 77.98

8th Circle Hamirpur 7 C/O Balance work of link road from Nara Galot via Balh Doda road km. 0/0 to 3/795.

Hamirpur 104.96 94.46 54.39

8th Circle Hamirpur 8 C/O 153.348 mtr span RCC Box Girder Bridge over Sukhar khad on Bhota Bijhari road.

Barsar 373.94 336.55 201.92

HAMIRPUR

Page 17: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

10th Circle Bilaspur 9 C/O 101.50 mtr span Pre-stressed concrete box girder bridge over Seer khad on Bhollu Ballori road at Rd. 4/450.

Ghumarwin 220.78 220.78 193.39

10th Circle Bilaspur 10 C/O Chhatyal Balh to Dabbar road km. 0/0 to 2/650.

Ghumarwin 56.92 51.23 51.23

15th Circle Una 11 C/O road from Krishan Nagar to Checksarai via Barrian.

Bangana 530.90 477.81 344.54

15th Circle Una 12 C/O link road from Dangoh Bijli ghar via Dauran- da- Tubewell up Satsang Ghar Chalet road km. 0/0 to 2/430.

Bharwain 143.64 129.28 115.86

15th Circle Una 13 C/O Bridges on Dhussara to upper Dhussara via Satother road km. 0/0 to 1/150 i/c MT.

Bharwain 140.26 126.23 130.93

15th Circle Una 14 C/O road from Sayali to Handola via Kamoon Pattian km. 0/0 to 11/120 i/c 2 no. bridges at Rd. 2/225 & 8/170.

Bangana 524.77 472.29 422.39

Total: 14 4118.51 3728.74 2633.18G.Total:- 66 22296.94 20089.83 13028.58

RIDF-XX3rd Circle Solan 1 M/T of Guggahat-Dangri Jayola road Km.0/0

to 2/00.Solan 67.11 60.40 9.75

3rd Circle Solan 2 M/T and balance work of Kaithlighat Basha Kehlog road (Portion Kehlog to Basha Km.0/0 to 12/0).

Solan 694.00 624.60 155.98

3rd Circle Solan 3 C/O road from Khadyana to Ranopul via kothi G.P.Deothi road Km.0/0 to 2/460.

Kasauli 121.13 109.02 42.10

3rd Circle Solan 4 CD & MT of Gambhar Pul to Marheta via Malera Anji road Km.0/0 to 5/330 i/c bridge over Gambhar Khad at RD.0/400.

Kasauli 606.06 545.45 0.00

SHIMLA

Page 18: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

3rd Circle Solan 5 CD & MT of Bhat-Ki-Hatti Bughar Bania Devi Km.4/630 to 8/735 i/c bridge over Gamber Khad.

Kasauli 516.21 464.59 0.00

3rd Circle Solan 6 CD & MT of Sai Bawasni road Km.16/0 to 20/240.

Nalagarh 246.25 221.63 88.91

4th Circle Shimla 7 M/T & Balance work Dhami Bainsh road Km.0/0 to 6/150.

Shimla Rural (Dhami)

180.48 162.43 200.02

4th Circle Shimla 8 C/O Kot to Sadhupul G.P.Kot Geha Km.0/0 to 5/600.

Shimla Rural (Dhami)

442.45 398.21 0.00

4th Circle Shimla 9 C/O Dhapan, Sandoa, Galleah, Sarech road at Km.0/0 to 9/195.

Shimla Rural (Dhami)

645.18 580.66 0.92

4th Circle Shimla 10 ROFD & M/T of road from Sr.Secondary School Baychari to village Jawag Km.0/0 to 2/130.

Shimla Rural (Dhami)

168.27 151.44 6.82

4th Circle Shimla 11 M/T of Ghanatti Bhajol Bhaghar Km.4/700 to 15/300.

Shimla Rural (Dhami)

511.65 460.49 125.94

4th Circle Shimla 12 C/O 32.00mtr. Span Arch Bridge over Giri Khad at Kavanti Km.15/020.

Theog 272.59 245.33 298.96

4th Circle Shimla 13 Improvement & Up-gradation of Basadhar Gian Kot via Tikker road Km.0/0 to 14/00.

Theog 692.35 623.12 65.62

4th Circle Shimla 14 Improvement/Up-gradation of Kargoli Nallah to Deha road Km.0/0 to 8/00.

Theog 434.21 390.79 339.25

11th Circle Rampur 15 C/O road from Ahar to Bartanighatti Kangal in Km.0/0 to 3/555.

Kumarsain 218.84 196.96 83.45

11th Circle Rampur 16 C/O Loga Badubagain Changadhar Dadesh Banot Nallah road Km.0/0 to 6/970.

Kumarsain 382.14 343.93 172.54

Page 19: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

11th Circle Rampur 17 Balance work for C/O 97.60mtr. Span Bailey suspension type motorable bridge at Tangti Yogma Gogma to village Khar at RD.0/379.

Kaza 577.28 519.55 83.33

12th Circle Nahan 18 C/O culvetrts/drain and M/T on Dinger Sikkon Kinner Bhagyan Ghat road Km.0/0 to 9/330.

Rajgarh 481.24 433.12 90.95

14th Circle Rohru 19 C/O Bakholi Magwani Nandla road Km.0/0 to 3/200.

Rohru 149.10 134.19 0.57

14th Circle Rohru 20 Up-gradation of Rohru Barara Sharog road Km.0/0 to 8/0.

Rohru 375.19 337.67 52.07

14th Circle Rohru 21 Up-gradation of road Madarli to Karchhari via Shallan Kupri Melthi Sheelghat (Kharapather) road Km.0/0 to 12/200.

Jubbal 554.53 499.08 73.82

14th Circle Rohru 22 C/O Link road Kawalta to G.P.Giltari Km.0/0 to 2/870.

Jubbal 161.75 145.58 10.25

14th Circle Rohru 23 M/T & Up-gradation of Mural Kelvi Dadot Dhapli road Km.0/0 to 8/600.

Jubbal 422.20 379.98 1.15

14th Circle Rohru 24 M/T of Gazta Joney Garag road Km.0/0 to 5/00.

Jubbal 219.28 197.35 58.00

14th Circle Rohru 25 M/T of link road to village Saskir Km.0/0 to 4/450.

Jubbal 239.47 215.52 56.38

14th Circle Rohru 26 M/T and Up-gradation of Deorighat Jashla road Km.0/0 to 7/225.

Jubbal 361.19 325.07 89.57

14th Circle Rohru 27 C/O Balance work and Metalling Tarring of Kaina Kot Jubbal road Km.0/0 to 5/615.

Jubbal 298.48 268.63 56.28

14th Circle Rohru 28 M/T of Bhollar Nallah to village Poakta Bhollar and Chopari road Km.0/0 to 10/890.

Jubbal 671.87 604.68 340.20

14th Circle Rohru 29 Improvement & MT Deoli, Khalai Dharikuper, Khera road Km.0/0 to 8/765.

Jubbal 401.85 361.67 0.00

Page 20: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

14th Circle Rohru 30 M/T & Up-gradation of road from Tikkari, Gurti Sagroti via Janog and Shamtah road Km.0/0 to 17/135.

Chopal 617.10 555.39 140.28

Total: 30 11729.45 10556.53 2643.115th Circle Palampur

1 C/O link road from Saroot to Chapreher road Km.0/0 to 2/0 i/c Bridge over Saroot Khad at RD.0/360.

Dharamshala 212.14 190.93 2.68

5th Circle Palampur

2 C/O link road from Lower Jadrangal to Shiund linking Baldhar Jassour roa Km.0/0 to 6/690 i/c Bridge over Ikku Khad at RD.2/008.

Dharamshala 451.53 406.38 16.02

5th Circle Palampur

3 C/O Balance work/Improvement of road from Nagrota to Pathiar in Km.0/0 to 4/900 i/c bridge over Chor Nallah at RD.4/377.

Dharamshala 336.17 302.55 69.39

5th Circle Palampur

4 C/O road from Thural to Challah Dhagera road and C/O Bridge over Neogal Khad Km.0/0 to 4/960.

Balakrupi 944.73 850.26 107.68

5th Circle Palampur

5 C/O road from Bhadal Devi Mandir to Salloh Km.0/0 to 1/150.

Palampur 185.39 166.85 157.93

5th Circle Palampur

6 C/O road from Bandhua to Bairghatta Km.0/0 to 4/885 i/c 2No.Bridges over Kotlu Nallah and Moul Khad.

Balakrupi 847.48 762.73 3.69

5th Circle Palampur

7 C/O of balance work of M/T of Gahlian Bari Behi Chhoti Behi road Km.0/0 to 4/150.

Kangra 112.53 101.28 29.22

5th Circle Palampur

8 C/O of link road from Kulthi to Balol Km.0/0 to 1/625 i/c Bridge over Naheli Khad at RD.0/785.

Kangra 211.10 189.99 59.32

5th Circle Palampur

9 C/O Balance work of link road from Rajal to Balehar Km.0/0 to 1/690.

Kangra 68.42 61.58 43.87

5th Circle Palampur

10 C/O Balance work/Improvement of Sidhbari Tapovan, Kaned Mashrehar Jheol Yol road Km.0/0 to15/0.

Dharamshala 630.63 567.57 660.18

KANGRA

Page 21: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

7th Circle Dalhousie

11 M/T & Balance work on Kheri to Bhunad roa Km.0/0 to 9/450.

Salooni 422.19 379.97 281.87

7th Circle Dalhousie

12 C/O Balance work i/c M/T of Chhudra to Thuin road Km.0/0 to 2/225.

Salooni 208.73 187.86 52.18

9th Circle Nurpur 13 M/T on Raja-Ka-Talab Batrahan Golwan Chatter Lohali to connect Rehan Samlet road Km.0/0 to 16/525.

Fatehpur 741.82 667.64 241.70

9th Circle Nurpur 14 C/O link road from Darkat Tripal road to Sandlor via Billpar Km.0/0 to 1/660.

Dehra 123.95 111.56 0.00

9th Circle Nurpur 15 C/O Link road frommangarh to Bankhandi viaGher road Km.0/0 to 4/830.

Dehra 285.57 257.01 0.00

9th Circle Nurpur 16 C/O road from Govt. High School Lag to Didiyan Km.0/00 to 1/630.

Dehra 104.31 93.88 36.84

9th Circle Nurpur 17 C/O link road from Kahru to Panchyat Ghar lower Tippri via Kothi in Km.0/00 to 3/045.

Dehra 211.88 190.69 59.08

9th Circle Nurpur 18 C/O link road from Dhatti Parmala to Kural via Gal road in Km.0/0 to 4/100.

Dehra 329.07 296.16 0.00

9th Circle Nurpur 19 C/O link road from Silh to Gagruhi via Dhareen Jangal in Km.0/0 to 5/00.

Dehra 324.09 291.68 0.00

9th Circle Nurpur 20 C/O 55.00mtr. Span Suspension Type foot Bridge over Brahal Khad from PCM road at 33mile near village Seouni Bhalli to connect village Kalri with Bhalli.

Jawali 79.59 71.63 75.40

9th Circle Nurpur 21 C/O Bridge over Sarola Khad at Km.0/492 on Sarola Ludhiar road.

Jawali 49.69 44.72 32.50

Page 22: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

9th Circle Nurpur 22 C/O Nana Banderu Gheli Dhewa Durana padar Bassa Jol Ghatnalu road Km.0/0 to 27/115 (Portion Padar to Jol Km.15/0 to 23/015).

Jawali 432.11 388.90 82.47

Total: 22 7313.12 6581.82 2012.02Joginder Nagar

Circle1 M/T Reyur Baral Chah Kaloga, Chhatter

Bhadyar road Km.0/0 to 5/420.Dharampur 656.51 590.86 32.71

1st Circle Mandi 2 C/O, MT & CD on Bag-Saroli road Km.0/0 to 4/750.

Sarkaghat 357.18 321.46 107.93

1st Circle Mandi 3 C/O Chahari School to Trambi Dehri Galu Shil Kunt Bhyii Gadvahan Doh Rewalshan Naina Devi road Km.0/0 to 2/150.

Mandi No.II 209.39 188.45 25.29

1st Circle Mandi 4 M/T work on Kasan Rachhora Scheduled Casste Basti road Km.0/0 to 4/700.

Mandi No.II 166.17 149.55 10.00

6th Circle Kullu 5 C/O 120.00mtr. Span Bridge over Solang Nallah at RD.0/170.

Kullu No.II 371.68 334.51 60.31

Total: 5 1760.93 1584.83 236.248th Circle Hamirpur 1 C/O link road from Pung Khad in Village

Chamyola Km.0/0 to 1/610 i/c 1No.Bridge at RD.0/165.

Hamirpur 144.75 130.28 46.51

8th Circle Hamirpur 2 C/O 30.00mtr. Span RCC Box Girder Bridge over Ghori Nallah on link road to village Bahal at Km.0/525.

Hamirpur 55.30 49.77 10.87

8th Circle Hamirpur 3 Widening & M/T of link road to village Marhana Km.0/0 to 1/345.

Hamirpur 68.87 61.98

8th Circle Hamirpur 4 C/O link road from Kotlu to Naungin Km.0/0 to 2/405.

Touni Devi 189.97 170.97 27.10

8th Circle Hamirpur 5 C/O main road Jalari Parmaran to Jalari Bhadiaran Km.0/0 to 1/885.

Hamirpur 58.77 52.89 39.89

8th Circle Hamirpur 6 C/O link road from Kangoo to Malag-Khatrod via Charada Km.0/0 to 2/360 i/c C/O 40.00mtr. Span Bridge over Charada Nallah at Km.2/310.

Hamirpur 281.16 253.05 1.47

MANDI

HAMIRPUR

Page 23: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

8th Circle Hamirpur 7 C/O link road from Vety.Hospital to Amroh via Fakruhi hanoh Garli Bunga road Km.0/00 to 2/420.

Barsar 301.56 271.40 72.48

8th Circle Hamirpur 8 C/O Bijhari to Chaisai, Chakrala Ambota Ghangot road Km.0/0 to 7/900.

Barsar 407.00 366.30 130.66

10th Circle Bilaspur 9 C/O Balance work of link road from Chandpur to Dali road via Miyan Bandla Km.0/0 to 5/240.

Bilaspur No.I 104.95 94.46 3.56

10th Circle Bilaspur 10 C/O 144.00mtr. Span PSC Box Girder Bridge over Seer Khad at Matyal RD.3/405 on Lethwin Lanjta Dharwara road.

Bilaspur No.I 426.32 383.69 40.06

10th Circle Bilaspur 11 C/O link road Beri Jamla to Salnoo Km.0/0 to 3/285.

Bilaspur No.I 150.32 135.29 88.93

10th Circle Bilaspur 12 M/T of link road Cheli Tank to Dhinwan Kaghdhani Simolol road Km.0/0 to 4/120.

Ghumarwin 124.12 111.71 20.08

15th Circle Una 13 Link road from NMT road Touriwala Mohalla Bhangal Km.0/0 to 2/005.

Bharwain 124.85 112.37 96.98

15th Circle Una 14 C/O link road to Abadi Khatrian Village Saloh Km.0/0 to 1/150.

Una 112.65 101.39 59.56

15th Circle Una 15 C/O link road from G.P.S. Baliwal to Dalit Basti Mohalla Jhorian Km.0/0 to 1/575.

Una 177.21 159.49 143.10

15th Circle Una 16 C/O link road from Panjuwana to Baliwal via Bhanewal Km.0/0 to 1/0.

Una 75.88 68.29 71.68

15th Circle Una 17 C/O & MT of link road from Takarala to Basuni Ambotu Awadi Km.0/0 to 7/915.

Bharwain 438.39 394.55 329.46

15th Circle Una 18 C/O & MT of link road to Harijan Basti Rumbal Nali Jawal Km.0/0 to 1/00.

Bharwain 80.70 72.63 29.97

15th Circle Una 19 C/O 165.725mtr. Span RCC Box Cell Bridge over Garni Khad on Baruhi Takrala road at Km.0/140.

Bharwain 638.12 574.31 435.40

Page 24: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

Total: 19 3960.89 3564.82 1647.76G.Total:- 76 24764.39 22288 6539.13

RIDF-XXI3rd Circle 1 Improvement ,CD & Metalling Tarring on Seri,

Jhandian, Plasra, Jamala, Kalyanpur road km. 0/0 to 9/180.

Nalagarh 271.72 244.55

3rd Circle 2 C/o 41.50 mtr span box girder bridge over Palli khad on Ambwala Gurdaspur Chanobri Vaid- Ka-Johar road km.0/645 including both side approaches.

Nalagarh 171.98 154.78

3rd Circle 3 C/o Balance work of cross drainage & MT on Kohu- Sour to Bain-Da-Ghat road km. 3/0 to 11/800.

Arki 544.05 489.65

3rd Circle Solan 4 C/O balance work of Kiari Banglow Malga via Majhol road km. 0/0 to 11/760.

Solan 348.49 313.64

3rd Circle Solan 5 C/O balance work of Kandaghat Chausha via Kawarg road km. 0/0 to 6/480.

Solan 621.17 559.05

4th Circle Shimla 6 Metalling Tarring & Up-gradation of Shananghatti Dargi Katal via Shoal road km. 0/0 to 12/450.

Shimla Rural Dhami

340.71 306.64 77.71

4th Circle Shimla 7 Construction & Improvement of link road Goro Kanowan to Kanechi, Ohri, Geha km. 0/0 to 7/520.

Shimla Rural Dhami

219.12 197.21

4th Circle Shimla 8 Construction & MT on link road from Chailly Beont to Bhung Batol School km. 0/0 to 2/150.

Shimla Rural Dhami

84.50 76.50

4th Circle Shimla 9 M/T link road Shakoli Koti Hanuman Mandir via Masn Jadari km. 0/0 to 1/450.

Shimla Rural Dhami

132.63 119.37

4th Circle Shimla 10 C/O link road from Karachi to Tabog km. 0/0 to 3/300 (G.P. Dummi & Pahal).

Shimla Rural Dhami

220.90 198.81

SHIMLA

Page 25: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

11th Circle Rampur 11 M/T of Matiana Thathal Kotighat Kangal Chamola road km. 0/0 to 42/635 (Portion Thathal to Chamola km. 26/0 to 42/635).

Kumarsain 637.24 573.52 43.55

11th Circle Rampur 12 M/T Kepu -Kirti road in km. 0/0 to 7/0. Kumarsain 278.62 250.76 100.66

11th Circle Rampur 13 Up-gradation of Barach to Bevat road km. 0/0 to 9/700.

Rampur 630.82 567.74 124.37

11th Circle Rampur 14 C/O link road to Spiti Valley via Leo km. 0/0 to 11/500 i/c 75.00 mtr steel truss bridge over Spiti khad at Rd. 11/500.

Kaza 1043.04 938.74

12th Circle Nahan 15 C/O Link raod Mimyad (Shivpur) to Choriyan (Sainj) km. 0/0 to 5/500.

Sangrah 376.80 339.12

12th Circle Nahan 16 C/O road from Bandol to Chunoti via Shilahan Kuna km. 0/0 to 5/255 i/c 2 No. Bridges.

Sangrah 533.06 479.75

12th Circle Nahan 17 C/O link road from Tirmalti to Devana in G.P. Khud Drabil km. 0/0 to 8/0.

Sangrah 581.04 522.94

12th Circle Nahan 18 C/O link road to village Talangna km. 0/0 to 8/0.

Sangrah 483.70 435.33

12th Circle Nahan 19 M/T on Chourighat Sarsoo road km. 0/0 to 5/800.

Rajgarh 387.95 349.16

12th Circle Nahan 20 C/O RCC Box cell type bridge over Sunkar khad on Dhaulkuan to Giri Nagal road at Rd. 0/345 & C/O 6.00 mtr span RCC Slab culvert at Rd. 0/518.

Paonta 245.58 221.03

12th Circle Nahan 21 C/O & Imp. Of Shyampur Bhood, manpur Deora Guruwala Bhagani road km. 0/0 to 6/810.

Paonta 399.41 359.47

12th Circle Nahan 22 C/O link road from Kothewala bridge to Ghuttanpur , Patlion, Surajpur i/c 1 No. solid cuaseway bridge.

Paonta 249.13 224.22

Page 26: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

12th Circle Nahan 23 Balance work of Nadheta, Taru, danda, Kalatha, Badhana Killor road km. 0/0 to 16/670.

Paonta 323.77 291.39

12th Circle Nahan 24 C/O 48.00 mtrs span PSC Box Cell Girder lane bridge over Mandi Khala on Dhaulakuan Giri Nagar road at Rd. 3/402.

Paonta 314.75 283.28

12th Circle Nahan 25 C/O 52.00 mtr span RCC bridge over Bata Khalla (Konthri Khalla) on Dhaulakuan Giri Nagar road at Rd. 1/948 to 2/0.

Paonta 358.43 322.59

12th Circle Nahan 26 C/O Bridge over Markanda river on Shambhuwala to Bankala road at Rd. 0/180.

Nahan 582.11 523.90 84.36

12th Circle Nahan 27 MT & CD on Nalka Shamalka Vikram Bag Transformer to Kairwala & link road to village Chassi km. 0/0 to 4/200.

Nahan 231.65 208.49

12th Circle Nahan 28 C/O 52.00 mtr span double lane bridge at Andheri over Roon Nadi on Palion Andheri road at Rd. 4/200.

Nahan 383.08 344.77

12th Circle Nahan 29 C/O 180.00 mtr span bridge over Markanda river on Salani Devni Pipalwala road at Rd. 1/240.

Nahan 925.60 833.04

12th Circle Nahan 30 Improvement/ MT on Shilla Gundha road km. 0/0 to 33/0 (Portion 17/0 to 23/0).

Shillai 327.66 294.89

14th Circle Rohru 31 M/T & Up-gradation of Saraidhar-Tilludhar -Koti road via Jagterli in km.5/300 to 16/0.

Jubbal 572.66 515.39

14th Circle Rohru 32 C/O Barvi Garaog road km. 0/0 to 7/0. Jubbal 313.74 282.37

14th Circle Rohru 33 M/T & Up-gradation of Chandigarh, Sayri link road in G.P. Pujarli-3 km.0/0 to 6/300.

Jubbal 360.68 324.61 30.41

Page 27: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

14th Circle Rohru 34 Widening& Up-gradation of Jubbal link road upto Santoshi Nagar.

Jubbal 329.89 296.90

14th Circle Rohru 35 MT & Up-gradation of Chebri link road km. 0/0 to 8/570.

Jubbal 513.61 462.25 5.12

14th Circle Rohru 36 Up-gradation of Parsa Dhara Shekhal road km. 0/0 to 12/645.

Rohru 758.18 682.36

14th Circle Rohru 37 M/T & Up-gradation of Kansakoti Kanerwa Bham Nallah Jakher to Khashkandi road km. 0/0 to 6/800.

Rohru 405.33 364.80

14th Circle Rohru 38 C/O Link road Bhaloon Kainchi to village Bhaloon via Marthi & Kupper in G.P. Bhaloon road km. 0/0 to 3/460.

Rohru 264.91 238.42

14th Circle Rohru 39 Up-gradation of Badiyara Tikkar Diswani road km. 0/0 to 7/500.

Rohru 484.36 435.93

14th Circle Rohru 40 C/O road from Andhra Jhanjwani & Giyari road km. 0/0 to 8/500.

Rohru 418.71 376.84

14th Circle Rohru 41 Balance work of Machoti Sarasa road i/c M/T. Rohru 101.86 91.67

14th Circle Rohru 42 C/O Gunsari-Ruasi via Gokswari road G.P. Gonsari.

Rohru 276.46 248.81

14th Circle Rohru 43 C/O Bye Pass road Rohru i/c Bridge km. 0/0 to 6/025.

Rohru 318.08 286.27

14th Circle Rohru 44 C/O Bakhirna to Kotsari via Mandli km. 0/0 to 5/075.

Rohru 269.00 242.10

Total: 44 17636.181st Circle Mandi 1 C/O Kateru Slapper via Paura Kothi road km.

0/0 to 16/0.Sunder Nagar 725.12 652.61

1st Circle Mandi 2 C/O 58.00 mtr Span PSC Box Girder Bridge over Suketi khad on Sunder Nagar Meramasit via Dharnda road at Chandpur Rd 2/240.

Sunder Nagar 200.83 180.75

1st Circle Mandi 3 C/O Proun, Ranger, Kharoon Saklana Khanour road km. 0/0 to 10/585.

Dharampur 540.70 486.63

MANDI

Page 28: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

1st Circle Mandi 4 MT on Trohla Richhi Dhar (Manudhar) road km. 0/0 to 4/900.

Dharampur 276.65 248.99

6th Circle Kullu 5 C/O 84.00 mtr span stiffened suspension bridge over river Chinab at Nalda.

Udaipur 432.74 389.47 47.23

6th Circle Kullu 6 Improvement & Widening of Shilla Hallan road km. 6/0 to 9/555.

Kullu No.II 221.65 199.49 32.68

6th Circle Kullu 7 C/O 85.00 mtr span bridge over river Beas at 17 Miles i/c approaches.

Kullu No.II 908.64 817.77 323.81

6th Circle Kullu 8 C/O Babeli Jindodur road km. 0/0 to 9/840. Kullu No.II 550.27 495.24

6th Circle Kullu 9 Improvement & Metalling & Tarring on Karal Himari road km. 0/0 to 7/960.

Kullu No.II 311.78 280.60

Total: 9 4168.385th Circle Palampur

1 C/O link road to village Chaluhi km. 0/0 to 1/600 i/c 40.00 mtr span bridge over Awa Khad at Rd.1/245.

Baijnath 199.63 179.67 76.50

5th Circle Palampur

2 C/O link road from NH to Kukaaina Nouri Trehal Labol Behru km. 0/0 to 5/345.

Baijnath 318.08 286.77

5th Circle Palampur

3 M/T on main road Ropri to Nalhana via Masand Basti (Stage-II) km. 0/0 to 3/105.

Baijnath 94.11 84.70

5th Circle Palampur

4 Balance work on Bahroo Nadli Gharchindi Malli road.

Baijnath 254.64 229.18

5th Circle Palampur

5 Balance work of Subhash Nagar, Sapehar, Nakki, Chath, Amotu Lad-Galu road km. 0/0 to 6/475.

Baijnath 374.98 337.48

5th Circle Palampur

6 C/O road from Kuddan to Dehl km. 0/0 to 2/105.

Palampur 152.16 136.94

5th Circle Palampur

7 C/O link road from Chandpur to Kandwari via Speru km. 0/0 to 1/150 i/c 40.00 mtr span PSC Box Girder Bridge over Awa khad.

Palampur 297.33 267.60

KANGRA

Page 29: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

5th Circle Palampur

8 Up-gradation of road from SSB Chowk to connect Lohna via Goswami Awadi i/c 10.00 mtr span culvert over Moul khad km. 0/0 to 6/020.

Palampur 255.41 229.87

5th Circle Palampur

9 Improvement & Up-gradtion of rathan to Maniara via Ropa Ghar Kapoor Basti Maniara road km. 0/0 to 6/120.

Palampur 182.58 164.32

5th Circle Palampur

10 M/T link road from Harnera to Chellian (Chellian) km. 0/0 to 3/0.

Kangra 96.68 87.01 53.4

5th Circle Palampur

11 Balance work & Improvement of Yol Rajiana 53 miles road km. 0/0 to 10/555.

Dharamshala 811.15 730.04 0.03

5th Circle Palampur

12 Improvement & Metalling /Tarring on Bushal Naryalkar Sippanpatt Broh road km. 0/0 to 4/425.

Kangra 267.3 240.57

5th Circle Palampur

13 C/O Bandi Maitiari, Gallu Kasrehra, Mumta road km. 0/0 to 3/560 i/c bridge over Chor Nallah at Rd. 2/165 & Joggal at Rd. 2/255.

Dharamshala 648.15 583.34 0.67

5th Circle Palampur

14 C/O 60.837 mtr Span centre to centre bearing (2 span of 30.00 mtr each) RCC Box Girder Bridge over baner Khad on Dadh to Subidha Complex Baroi Chowk at Rd. 0/486.

Dharamshala 293.34 264.01

5th Circle Palampur

15 C/O road from Majheen Chowki Dhorian Jaman Mehera Harwah via Jandar Chirr km. 0/0 to 5/270.

Jaisingpur 212.36 191.12 24.79

5th Circle Palampur

16 C/O Link road from Khanyara to rakkar via Tillu Naddi road km. 0/0 to 2/390 i/c bridge over Manooni khad at Rd. 0/900.

Dharamshala 279.74 251.77 1.43

Page 30: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

5th Circle Palampur

17 C/O link road from Sambhar lahar to village Thathri km. 0/0 to 3/570.

Dharamshala 328.54 295.69 1.43

5th Circle Palampur

18 Improvement & strengthening of Marhoon Kural, Akshina Mandir road from km. 0/0 to 6/890.

Palampur 244.08 219.67

5th Circle Palampur

19 C/O link road from Mundi lahroo via Sippanpatt.

Palampur 97.25 87.53 0.5

7th Circle Dalhousie

20 C/O Balance work i/c Metalling Tarring of Gunnu Nallaha Kainthly Ladhan road km. 0/0 to 4/220.

Chamba 311.97 280.77

7th Circle Dalhousie

21 Improvement/ MT of khud Patruma road km. 5/030 to 7/030.

Salooni 173.72 156.35 10.28

7th Circle Dalhousie

22 C/O 75.00 mtr span suspension jeepable bridge over river Ravi at Ghera on link road to village Lech at Rd. 0/390 i/c C/O approaches.

Bharmour 271.62 244.46

7th Circle Dalhousie

23 C/O 68.00 mtr span steel Truss bridge over River Ravi at luna on Luna Ohra road in Tehsil Bharmour Distt. Chamba.

Bharmour 429.92 386.93

9th Circle Nurpur 24 C/O Samoon road km. 0/0 to 1/700 i/c bridge one Chhounch khad.

Fatehpur 356.52 320.87

9th Circle Nurpur 25 C/O Haler khad Bridge to Indpur via Changrara road km. 0/0 to 3/24.

Fatehpur 217.83 196.05

9th Circle Nurpur 26 C/O Link road from Ade-Di- Hatti to Gagruhi via Masrehar Rehar road km. 0/0 to 5/630.

Dehra 435.81 392.23

9th Circle Nurpur 27 C/O link road from Jeen to Banaha via Kumbhker Kaseti in km. 0/0 to 1/840.

Dehra 231.92 208.73

9th Circle Nurpur 28 C/O Bridge over Pole Nallah on Jakhbar Dhanuna road alongwith approaches at Rd. 14/170.

Fatehpur 94.28 84.86 30.95

9th Circle Nurpur 29 Up-gradation of road from Charuri to Gheta via Mehta Ghura road km. 0/0 to 6/360.

Nurpur 329.4 296.46 2.98

Page 31: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

9th Circle Nurpur 30 C/O Bhaglahar Chowk to Chabwan Papahan Dungi Ambe- Di-Kawali road km. 0/0 to 2/465.

Jawali 185.01 166.51

Total: 30 8445.51 7601.5 202.968th Circle Hamirpur 1 C/O road from Chouri Ranger to Village Sanu

km. 0/0 to 2/520.Hamirpur 134.62 121.16

8th Circle Hamirpur 2 Widening & M/T of link road from Jandral to Lambri km 0/0 to 2/810.

Hamirpur 197.33 177.6

8th Circle Hamirpur 3 Widening & MT of link road to village Jiar km. 0/0 to 1/405.

Hamirpur 108.37 97.53

8th Circle Hamirpur 4 C/O link road from Pounch village to Andral road km. 0/0 to 3/695 i/c 1 No. bridge at km. 1/485.

Touni Devi 384.62 346.16

8th Circle Hamirpur 5 C/O Jhiralari to Aghar raod via Chhek Loader Meena- Ka- Dehra Mansuhi Sour, Chakroha Chowkar km. 0/0 to 7/342.

Barsar 546.56 491.90

8th Circle Hamirpur 6 C/O link road from Beri to Harijan Basti Village Khatwin in km. 0/0 to 1/700.

Hamirpur 119.96 107.96

8th Circle Hamirpur 7 C/O link road NH-88/70-Kallar-Darol-Chunan Kotla road km. 0/0 to 4/300.

Hamirpur 182.63 164.37 10.46

8th Circle Hamirpur 8 C/O 40.15 mtr span (2 span 19.75 mtr each c/c) RCC T-Beam bridge over Sunehal khad on Dasmal lagmanwin road via Tohu, Tihra, Maira, Bhounkhar Gadru at Rd. 6/390.

Barsar 128.87 115.98

10th Circle Bilaspur 9 C/O link raod Kothi Bhulsai to Barri road km. 0/0 to 3/105 i/c 19.75 mtr span RCC-T-Beam bridge over Doderi khad at Rd. 1/735.

Bilaspur No.I 240.72 216.65 21.61

10th Circle Bilaspur 10 M/T on Kothi Bhareri Ghalyana via Balh Bural road km. 0/0 to 3/390.

Bilaspur No.I 127.22 114.50

10th Circle Bilaspur 11 C/O Village Bachrin Bhatoli Matyal Dehlwin road km. 4/0 to 6/360 (Phase-II).

Ghumarwin 136.27 122.64

HAMIRPUR

Page 32: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

15th Circle Una 12 Widening, Strengthening & Improvement of Bangana to Shanthla road km. 0/0 to 10/750.

Bangana 856.59 770.93 43.84

15th Circle Una 13 C/O Bangana Hathoon Talmet road from km. 1/150 to 2/975 including 2 No. bridges over Lunkhari khad at km. 1/240 to 2/00.

Bangana 375.61 338.05 0.75

15th Circle Una 14 C/O road from Mansoh to Kudu via Charola Nangal Salangri road km. 0/0 to 9/0.

Bangana 564.12 507.71

15th Circle Una 15 C/O M/T link road Bhatehar to Baret road km. 0/0 to 2/600.

Bharwain 192.92 173.63 8.10

15th Circle Una 16 Widening Strengthening & Improvement of Baruhi to Khurwain road km. 0/0 to 17/730 ( 8.70/10.20 mtr wide road).

Bharwain 1009.69 908.72 0.87

15th Circle Una 17 C/O & MT Kuthera Kherla to Katauhar khurd Katauhar Kalan to Una main road km. 0/0 to 4/900.

Bharwain 444.17 399.75 0.07

15th Circle Una 18 C/O road from Ispur Gagret road to Lower Panjawar via patwar Khana Bhaira, Border road km. 0/0 to 7/040.

Una 506.65 455.99 293.94

15th Circle Una 19 C/O & M/T link road from Gagret Oel Ispur road to Mohalla Tiperian (Tippra) upto Swan river in km. 0/0 to 6/650.

Una 404.32 363.89 203.73

15th Circle Una 20 Imp. & balance work of Daulatpur to Behra road km. 0/0 to 5/075.

Bharwain 330.19 297.17 154.43

15th Circle Una 21 C/O link road Kuha Devi to Satsang Ghar Babehar via Babehar up to Co-operative Society km. 0/0 to 2/015.

Bharwain 153.88 138.49 44.71

Page 33: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

15th Circle Una 22 C/O & MT of link road from Daulatpur Dholbeh road km. 0/585 to Harijan Basti Behal km. 0/0 to 1/450 i/c solid causeway.

Bharwain 126.81 114.13 53.70

Total: 22 7272.12 6544.91 836.21G.Total:- 105 37522.19 14146.41 1039.17

RIDF-XXIISHIMLA 3rd Circle Solan 1 C/O Solan Rajgarh Bye Pass road Km.0/0 to

5/410.Solan 2598.30 2338.47

3rd Circle Solan 2 M/T on Baddi Lakkarpul Jhadmajari Haripur via Kotla Kalan road Km.0/0 to 4/120.

Nalagarh 215.35 193.82

4th Circle Shimla 3 ROFD & MT of Pakki Bawri (Ghanahatti) to Sakrah Sedan road Km.0/0 to 5/700.

Shimla Rural Dhami

282.60 254.34

4th Circle Shimla 4 Widening/Up-gradation of link road from Dak Bangla Gharech to Kanwarpur Km.0/0 to 9/600.

Theog 838.50 754.65

4th Circle Shimla 5 C/O 35.50mtr.Span Steel Truss Bridge over nauti Khad on Gumma jabal road Km.0/0 to 2/240.

Shimla No.I 438.04 394.24

11th Circle Rampur 6 C/O balance work on Bhadrash Brandli road Km.0/0 to 34/090 (Portion Km.20/0 to 34/090).

Rampur 944.29 849.86

11th Circle Rampur 7 Up-gradation of Rattanpur Uchi Dofda Mashnoo Daranghatti Deothi road Km.9/0 to 41/350.

Rampur 944.29 849.86

11th Circle Rampur 8 C/O road from Peo-Khawangi to NH-22 Km.0/00 to 3/600.

Kalpa 255.54 229.99

12th Circle Nahan 9 Improvement & MT of link road from Mashi toKando Km.0/0 to 3/600.

Shillai 241.12 217.01

12th Circle Nahan 10 C/O Jandrauan Manal Dochi Kelwa Sanag Bhutmarhi road Km.0/0 to 1/645.

Sangrah 328.85 295.97

12th Circle Nahan 11 Metalling Tarring & Cross drainage on Jamta mahipur Becher-Ka-Bag road Km.0/00 to 27/585.

Paonta 1411.69 1270.52

Page 34: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

12th Circle Nahan 12 C/o 144.00mtr.Span bridge over Majhara Khad on Banog Kheri road at RD.29/750.

Nahan 762.32 686.09

14th Circle Rohru 13 C/O Bagi Khabal road Km.0/0 to 10/00. Rohru 460.75 414.68

14th Circle Rohru 14 M/T of Bag to Kiarnoo Koti Dhanag Sarain Dhuwandli-Renvi road Km.0/0 to 7/300.

Chopal 311.90 280.71

14th Circle Rohru 15 Improvement & MT on Alawang Naksetali Reoghati via Kangi Nallah Km.0/0 to 4/800.

Jubbal & Kotkhai

291.48 262.33

14th Circle Rohru 16 MT & Up-gradation of link road to Village Thana via Turan Km.0/0 to 5/060 in GP Rawin, Tehsil Jubbal.

Jubbal & Kotkhai

299.72 269.75

14th Circle Rohru 17 MT & Up-gradation of Chole Badrooni Gahrog Bari link road (Kotkhai) Km.0/0 to 3/375.

Jubbal & Kotkhai

251.19 226.07

14th Circle Rohru 18 C/O 35.00mtr.Span Bridge (double land)Pre-stressed concrete bridge alongwith footpath both side over Sundli Nallah on link road to Jubbal Bazar upto Santoshinagar at RD.1/390.

Jubbal & Kotkhai

223.40 201.06

Total:- 18 11099.33MANDI 1st Circle Mandi 1 C/O Uhl valley road (Portion Riyagri to Tikkar)

Km.31/0 to 43/705.Mandi No.I 1097.20 987.48

6th Circle Kullu 2 Improvement &MT of Spangani to Kanda road Km.0/0 to 4/640.

Kullu No.I 344.80 310.32

6th Circle Kullu 3 M/T on Garsa to Diyar via Thawari Hungri road Km.0/0 to 4/640.

Kullu No.I 330.15 297.14

6th Circle Kullu 4 Improvement & M/T on Kolibehar to Kaisdhar (Barahar) road Km.0/0 to 6/0.

Kullu No.I 324.56 292.10

6th Circle Kullu 5 Improvement & M/T on Ruar Gharot Narol Khorage Pagli road Km.0/0 to 7/860.

Kullu No.I 372.37 335.13

Joginder Nagar Circle

6 Balance work of Majharnoo Kundunu Kufuru road Km.0/0 to 6/0.

Joginder Nagar

551.16 496.04

Page 35: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

Total:- 6 3020.24KANGRA 5th Circle

Palampur1 C/O road from Chowki Patwarkhana to Rajpur

Chowk (Kalu-Di-Hatti), Kesar Bag Colony and Govt.College Palampur Km.0/0 to 2/930 with bridge over Bhairal Khad and Mohal Khad.

Palampur 258.28 232.45

5th Circle Palampur

2 Improvement.& Up-gradation of Rakh to Bandla via Gamrota Jayun Sukeri road Km.17/400 to 31/400.

Palampur 472.48 425.23

5th Circle Palampur

3 C/O link road from Massal Tikka Bagian Rana Basti Hatwas to link Chahri to Saheed Braham Dass Marg to Kala Basti Ambari i/c bridge over Joggal khad at Km.0/0 to 2/990.

Dharamshala 351.47 316.32

5th Circle Palampur

4 C/O link road from Kaned to Thamba Km.0/0 to 1/045 i/c bridge over Ghiari Khad at RD.1/045.

Dharamshala 177.75 159.98

5th Circle Palampur

5 C/O link road from Katialu Shivji Temple to Dhardi Rajol via Bhatti Barot in Km.0/0 to 2/645.

Jaisinghpur 189.73 170.76

5th Circle Palampur

6 C/O link road from Mallahoo to Nag Baba Mandir Km.0/0 to 1/315 (Phase-II).

Palampur 59.26 53.33

5th Circle Palampur

7 C/O link road from Langhu to jamerla Km.0/0 to 4/500.

Baijnath 205.71 185.14

5th Circle Palampur

8 Balance work of Mouli Ther Sokni-Da-Kot to Panchyat Ghar Patola road Km.0/0 to 3/250.

Dharamshala 222.95 200.66

5th Circle Palampur

9 C/O balance work of Daulatpur Har Jalari Kharet road Km.4/00 to 7/00.

Kangra 164.67 148.20

5th Circle Palampur

10 C/O 104.00mtr.Span bridge over Baner Khad on Daulatpur Jalari-har-Khart road at RD.5/740.

Kangra 343.26 308.93

7th Circle Dalhousie

11 Balance work including MT on link road to village Rulyani Km.0/0 to 3/020.

Dalhousie 240.02 216.02

Page 36: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

7th Circle Dalhousie

12 Improvement/Widening crash barrier & MT on Chamba Sahoo road Km.0/0 to 16/0.

Chamba 738.82 664.94

7th Circle Dalhousie

13 C/O link road from Karian to Bailly Km.0/0 to 4/0.

Chamba 327.07 294.36

7th Circle Dalhousie

14 C/O Nera Mainkda Thalli road (Portion Sikari Mod to Village Nera) Km.0/0 to 5/500 i/c bridge.

Chamba 467.70 420.93

7th Circle Dalhousie

15 C/O 2No.bridges over Trella nallah and Bhangi Nallah Bridge on Trella Bhunderi mangli road in Tehsil Churah.

Chamba 523.93 471.54

9th Circle Nurpur 16 Improvement of Hatli Khadoun Kuthar road, alongwith bridge over Khadoun khad and Improvement of Kuthar Mohar.

Fatehpur 831.27 748.14

9th Circle Nurpur 17 C/O Kudal-Jagnoli-Ghait-Janjal-Nagal road Km.0/0 to 9/665 i/c 2No.Bridges over Chalal Khad & Jagnoli Khad.

Fatehpur 1166.91 1050.22

Total: 17 6741.28HAMIRPUR 8th Circle Hamirpur 1 C/O link road from Chhamb to Kujabalh via

Ropari Km.0/0 to 2/360 i/c bridge over Bakkar Khad.

Touni Devi 310.30 279.27

8th Circle Hamirpur 2 Up-gradation of Rural road Infrastructure in Barsar, Bhutlar, Harsour, Chakmoh, Kalwal, Bijhari, Chowki, Balh Bihal, Samtana, Ropari, Dandroo etc.

Barsar 985.05 886.55

8th Circle Hamirpur 3 C/O link road Chamiana to Bhadheen via Triyambi Km.0/0 to 2/980 (Stage-II).

Hamirpur 105.61 95.05

8th Circle Hamirpur 4 M&T Jol to Upper Hareta road via Sangaharal Biar Tangol Raien, Roproo Km.0/0 to 3/745.

Barsar 127.74 114.97

Page 37: STATUS OF ONGOING PROJECTS SANCTIONED UNDER NABARD …hppwd.gov.in/Download/nabard ongoing 2017.pdf · 10th Circle Bilaspur 1 C/O Balance work of 317.50 mtr span RCC cantilever bridge

10th Circle Bilaspur 5 C/O Padyalag Dohru Maryani Chhandoh School Dadhol Kallan Patta Dakhuit road Km.0/0 to 6/450.

Ghumarwin 418.72 376.85

15th Circle Una 6 C/O, Improvement/Widening & Strengthening of Jhalera bridge to Una via Lower Lal Singh road Km.0/0 to 4/340.

Una 355.83 320.25

15th Circle Una 7 C/O Old Saloh Bhadouri road to Dolan Mohalla Pandoga Panjawar to Jol Mohalla.

Una 169.88 152.89

15th Circle Una 8 Widening & Improvement of Laluwal Gondpur road upto Punjab Border Km.0/0 to 6/360.

Una 572.09 514.88

15th Circle Una 9 C/O Old Haroli road Gugga Mandir upa to Paijal Yojna Haroli Km.0/0 to 2/240.

Una 190.20 171.18

15th Circle Una 10 C/O link road from Guglehar road to Badehra Rajputan Kutlehria Mahalla Km.0/0 to 1/105.

Bharwain 78.69 70.82

15th Circle Una 11 C/O balance work of Mawa Kohllan Nangal Jariyalan road i/c 3Nos.Solid causeway to connect Mohalla Jharera & Dhabban with Nangal Jariyalan Km.0/0 to 2/100.

Bharwain 135.11 121.6

15th Circle Una 12 Improvement & Widening of Una Basoli Chattara Pir Nigah RD.Km.0/0 to 8/00.

Una 732.84 659.56

Total: 12 4182.06G.Total:- 53 25042.91