Outline
�M
otivation�
PR
ES
LHY O
verview�
WP
3 Release
�W
P4 Ignition
�W
P5 C
ombustion
�E
xploitation�
Closure
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
3H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
�S
cale-up of existing and new applications increase H
2 demand.
�Liquid hydrogen (LH
2) provides larger densities and gains in efficiencyand
potentially reduces risks compared to com
pressed gaseous transport and storage
�M
any knowledge gaps w
rt accidental behavior of LH2 and inconsistentand
potentially over-conservative RC
S (e.g. NFPA 2 and E
IGA
)
Motivation
!
?
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
4 H2 Liquefaction Symposium, 27 September 2019, Perth, Australia
PRESLHY Objectiveso Report initial state-of-the-art and knowledge gaps with priorities wrt intended use of LH2
o Execute adjusted experimental program addressing release, ignition and combustion phenomena with highest priorities
o Document and publish detailed, aggregated and interpreted data in a FAIR way
o Develop suitable models and engineering correlations and integrate them in a suitable open risk assessment toolkit
o Provide enhanced recommendations for safe design and operations of LH2 technologies
o Support international SDOs in• updating of existing standards or • developing of new international
performance based and risk informed standardso Document and disseminate the enhanced state-of-the-art
Motivation - PRESLHY Overview - WP3 Release - WP4 Ignition - WP5 Combustion – Exploitation - Closure
5H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
Partners & A
dvisorsAdvisor
Com
panyN
ation
Andrei TchouvelevAV
T, ISO
TC 197
Canada
Christoph H
aberstrohU
ni Dresden
Germ
any
Ethan Hecht
SN
LU
S
Derek M
illerA
ir Products
US
Etienne StuderC
EA
France
Franz Grafw
allnerE
T Energiesystem
eG
ermany
Herve B
arthelemy
CE
N/C
EN
ELE
CE
U
John Khalil
IEA H
ydrogen Task 37
US
Jens FranzenD
aimler
Germ
any
Julien SalvatToyota M
otor E
uropeB
elgium
Karl Verfondern
JülichG
ermany
Klaus Schäfer
DLR
Germ
any
Lee PhilipsS
hellU
K
Olav H
ansenLloyds
UK
Salvador AcevesLLN
LU
S
Shoji Kam
iyaK
HI
Japan
PartnerShortN
ame
Nation
Karlsruhe
Institute ofTechnology
KIT
Germ
any
Air LiquideA
LFrance
Health &
Safety Laboratory
HS
EU
nited Kingdom
International Association for H
ydrogen Safety
HYS
AFE
Belgium
INER
ISIN
ER
ISFrance
National
Center for
Scientific R
esearch "D
emokritos"
NC
SR
DG
reece
Pro-Science G
mbH
PS
Germ
any
University of
Ulster
UU
United K
ingdom
The U
niversity of W
arwick
UW
AR
United K
ingdom
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
6H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
External Netw
orking / Dissem
inationH
ySafe (+ Hydrogen Safety Panel)
RC
S SCGJR
C
(HIAD
)ISO TC
197
IEA H
ydrogen Task 37 US D
OE
WP1 –
Manage-m
ent(K
IT)
WP2
-Strategy
(AL)W
P5–
Com
bus-tion
(KIT)
WP3
–R
elease &
Mixing
(NC
SR
D)
WP6
–Im
plementation (U
U)
WP4
–Ignition(H
SL)
PRESLH
Y A
dvisory Board
Presentationon 19.10.2018
ISO/PW
I 24077: „Safe Use of LH
2 in N
on-Industrial Settings“ established on 6.12.2018
Presentationplanned
fornextm
eeting
GexC
on, IFE, E
quinor
SNL
KH
I, Toyota
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
7H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
General A
pproachM
otivation -PR
ESLH
Y Overview
-WP
3 Release -W
P4 Ignition -W
P5 C
ombustion –
Exploitation -C
losure
WP6
–Technical Im
plementation
WP1 –
Managem
entW
P2-Technical S
trategy&
Evaluation
WP5
–C
ombustion
WP3
–R
elease &
Mixing
Advisory B
oard
WP4
–Ignition
8H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
WP2 -R
efined Work Program
me
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
WP3 -R
ELEASE &
MIXIN
G�
Two-phase flow
anddispersion
�Im
pingingand/orw
all attachedjets
�LH
2 poolformation
andevolution
�W
ind effecton large-scaleLH
2 releases
�R
elease in congested/confined
spaces
WP4 -IG
NITIO
N�
Electrostatic
chargein
coldjet/plum
e�
LFL, UFL and
MIE
forcryogenic
H2
�H
2/condensedO
2 phase
mixtures
�LH
2 poolignition
WP5 -C
OM
BU
STION
�C
ryogenicand
LH2 jetfires
�LH
2 poolfires�
Flame acceleration FA and D
DT
�C
ombustion in congested or
confined areas�
BLEV
E
Envisaged revision of
ISO/TR
15916:2015“Basic considerations for the safety of hydrogen”via IS
O P
WI24077
9H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
WP6
–Technical Im
plementation
WP1 –
Managem
entW
P2-Technical S
trategy&
Evaluation
WP5
–C
ombustion
WP3
–R
elease &
Mixing
Advisory B
oard
WP4
–Ignition
WP3
–R
elease &
Mixing
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
10 H2 Liquefaction Symposium, 27 September 2019, Perth, Australia
Modelling HEM / HNEM Two-Phase Choked Flowe.g. NASA test 1197 (P0=12.9 bar, T0=30.7 K)
Motivation - PRESLHY Overview - WP3 Release - WP4 Ignition - WP5 Combustion – Exploitation - Closure
11 H2 Liquefaction Symposium, 27 September 2019, Perth, Australia
Benchmarking� KIT / PS
� Design and set-up of tests E3.1, E3.4� HSL
� Design of tests E3.5 � INERIS
� Sharing of existing LHe experiments data� Excluded tests
� test 0 for no humidity info� tests 1,2 for too large wind variation� tests 7-9 for no H1, H2, L info
� Tests 3 and 6 selected for validation
L the length of the cloud on the groundH1 the height of the base of the cloudH2 the height at the top of the cloud.
Motivation - PRESLHY Overview - WP3 Release - WP4 Ignition - WP5 Combustion – Exploitation - Closure
12 H2 Liquefaction Symposium, 27 September 2019, Perth, Australia
• > 200 tests performed at DISCHA facility at HYKA / KIT• Warm tests (ambient temp) and cold tests (77 K Tsat,LN2)
where 2.81 L stainless steel vessel and release line cooled by bath of LN2
• 4 nozzle diameters (0.5, 1, 2, 4 mm) • 7 initial vessel pressures (5, 10, 20, 50, 100, 150, 200 bar)• Every experiment was repeated at least 2 times (> 100
warm and | 100 cold tests in total)• Only single (gaseous) phase conditions at nozzle were
achieved• D3.4 delivered M18 and data for selected tests published
in website
Experimental series E3.1a Small Scale Multiphase Release experiments (PS/KIT)
Motivation - PRESLHY Overview - WP3 Release - WP4 Ignition - WP5 Combustion – Exploitation - Closure
13H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
Experimental series E3.1a
Small scale, high p 80K
+300 K release experim
ents
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
see https://doi.org/10.5445/IR
/1000096833.
14H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
Next R
elease & M
ixing Experiments
�E
3.1b CR
YO
STAT 2-P
hase release (KIT/P
S)
�E
3.4 Pool release (K
IT/PS
)�
E3.5 R
ain-out tests (HS
E)
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
LH2
Flow-
MeterValve
Nozzle
PT
T
PosI
PosII
Line as shortas possible
15H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
WP6
–Technical Im
plementation
WP1 –
Managem
entW
P2-Technical S
trategy&
Evaluation
WP5
–C
ombustion
WP3
–R
elease &
Mixing
Advisory B
oard
WP4
–Ignition
WP4
–Ignition
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
16H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
E4.1 MIE D
evice(IN
ERIS)
�Triggered
spark�
Currentand voltage m
easuredin the spark
gap�
Inductance = 1 mH
or zero�
Capacitance : variable
�From
a few m
icrojoules to 1 joule�
Am
bient reference tests successful
�80K
tests under preparation
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
17H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
E4.1 Ignition by hot surfaces/power
(INER
IS)
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
-
100,00
200,00
300,00
400,00
500,00
600,00
700,00
-140-120
-100-80
-60-40
-200
20
T ignition (°C)
Temperature of the atm
osphereFirst results:�
Ignition on hot surface independent on T of surface�
Stoichiom
etry and flow velocity m
arginal influence
18H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
�The electrostatic ignition experim
ents in cold jets are completed
�E
lectrostatic field measurem
ents with 2 field m
ills were perform
ed in more
than 100 DisC
ha-experiments (Î
E3.1a)
�N
o spontaneous ignition was observed in the com
plete DisC
ha-campaign (> 200 experim
ents)
Field M
ill 2(FM
2)
Field M
ill 1(FM
1)
E4.2 ElectrostaticIgnition in cold jet (K
IT)M
otivation -PR
ESLH
Y Overview
-WP
3 Release -W
P4 Ignition -W
P5 C
ombustion –
Exploitation -C
losure
19H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
Preliminary results
�S
trong electrostatic fields (~6000 V/m
)observed for 80 K
releases (~ factor 100 larger than at ambient T)
�P
ositive as well as negative values
�Larger electrostatic fields close to nozzle (field m
ill FM1)
than at farther position (FM2)
�Larger electrostatic fields for cold than for w
arm releases
�Increasing electrostatic field values w
ith increasing pressure
E4.2 ElectrostaticIgnition in cold jet (K
IT)M
otivation -PR
ESLH
Y Overview
-WP
3 Release -W
P4 Ignition -W
P5 C
ombustion –
Exploitation -C
losure
see https://doi.org/10.5445/IR/1000096833.
20H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
Next Ignition Experim
ents
�E
4.1b Cold M
IE (IN
ER
IS)
�E
4.3 Electrostatic Ignition in plum
e (HS
L)�
E4.4 Ignition above pool (K
IT)�
E4.5 C
ondensed phase ignition (HS
L)
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
21H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
WP6
–Technical Im
plementation
WP1 –
Managem
entW
P2-Technical S
trategy&
Evaluation
WP5
–C
ombustion
WP3
–R
elease &
Mixing
Advisory B
oard
WP4
–Ignition
WP5
–C
ombustion
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
22H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
E5.2: Com
bustion-Tube-FacilityTube experim
ents for FA and D
DT criteria for T dow
n to 80K
•E
nd-Flange with ports for:
�Therm
ocouple�
Pressure-S
ensor�
Gas-O
utlet
•Front-Flange w
ith ports for: �
Gas-Inlet
�G
low-P
lug�
Thermocouple
•A
long the tube 52 ports for:�
Pressure S
ensors (2 different types),�
Phototransistors
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
23H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
E5.2: Com
bustion-Tube-Facility
•2 different obstacles (B
R 30%
and BR
60%),
•obstacles w
ill be positioned evenly along the complete tube length
(spacing: 1 inner diameter of tube) via three thin threaded rods,
•obstacles w
ere manufactured externally (already delivered).
BR
30%B
R 60%
•O
bstacles
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
24H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
E5.5: Integral test in congested space
Pool in congestion rig
Jet release into congestion rig
Higher flow
rate release into rig, larger orifice
Jet opening angle? (24 deg)B
lockage ratio?
Variables:•
LH2 pool or jet
•C
ongestion level•
Confinem
ent level•
LH2 jet flow
rateIgnition source located just dow
nstream
of rig to limit inventory of unburnt gas
prior to entry into the congestion rig, this is to lim
it noise
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation -Closure
25H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
FAIR
Data M
anagement
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation-C
losure
�D
evelopment of the
Data M
anagement P
lan�
Com
parison and final selection of K
ITopenfor the project O
pen S
cientific Data
Repository
�First prototypical data published
for WP3
experimental series E
3.1 https://doi.org/10.5445/IR
/1000096833.
26H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
PRESLH
YExploitation
&
Dissem
inationA
ctivities
Managem
ent(W
P1)Im
plementation
(WP6)
Task 1.3 W
ebsite
Data
Managem
entEngineering
toolsH
andbookG
uidelines RC
S Recom
-m
endationsW
hite Paper
Task 6.6 D
issemina-
tionC
onference
Outreach
ww
w.preslhy.eu
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation-C
losure
27H
2 LiquefactionS
ymposium
, 27 Septem
ber 2019, Perth, A
ustralia
Acknow
ledgement
The PR
ESLH
Y project has received funding from the Fuel C
ells and Hydrogen 2 Joint
Undertaking under the European U
nion’s Horizon 2020 research and innovation program
under the grant agreem
ent No 779613.
Motivation -P
RE
SLHY O
verview -W
P3 R
elease -WP
4 Ignition -WP
5 Com
bustion –E
xploitation-C
losure
… and m
any thanks to all contributors(e.g. Equinor, SH
ELL, …)