Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Executive Committee session of IEA-IAs on Pol. Div Tokamaks and Large Tokamaks, Naka, Japan, May 21, • Status of flywheel generator(s) • Midterm hardware extensions • planning for 2007/2008 campaign(s) • Status of ITPA joint experiments
Transcript
Page 1: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

Status of the ASDEX UpgradeTokamak Programme

Hartmut ZohmMPI für Plasmaphysik, EURATOM Association

Joint Executive Committee session of IEA-IAs on Pol. Div Tokamaks and Large Tokamaks, Naka, Japan, May 21, 2007

• Status of flywheel generator(s)

• Midterm hardware extensions

• planning for 2007/2008 campaign(s)

• Status of ITPA joint experiments

Page 2: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

Status of Generator EZ4

ASDEX Upgrade powered by 3 flywheel generators:

• EZ2 (1450 MJ / 167 MVA) for toroidal field coils

• EZ3 ( 500 MJ / 144 MVA) + EZ4 (650 MJ / 220 MVA) for poloidal

field coils and auxiliary heating Accident in April 2006 led to severe damage on EZ4

• failure of control system – generator continued to run until out of oil

• rotor touched stator – damage to stator windings, rotor shaft

rotor - can be repaired stator - must be rebuilt

Repair is possible at Siemens Dynamowerk Berlin

• expensive and time consuming, projected delivery ~mid 2008

Page 3: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

Midterm Hardware Extensions

Page 4: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

Midterm Hardware Extensions

Will open unique possibilities for the EU Accompanying Programme

Page 5: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

Status of Tungsten Wall Project

April 2007

Page 6: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

W-coated divertor tile with solid W Langmuir heads

Status of Tungsten Wall Project

Full W-coverage in 2007:

• all PFCs now W-coated

Future AUG wall could be W or C:

• depends on possible performance limitations

• need qualified answer for ITER first

• JET ‘ITER-like wall project’ may need direct experimental support)

Page 7: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

Extension of ASDEX Upgrade ECRH system

2-frequency gyrotron (GYCOM, Russia) 105/140 GHz, 1 MW, 10 s(first of its kind – next will be 4-frequency)

2-frequency gyrotron (GYCOM, Russia) 105/140 GHz, 1 MW, 10 s(first of its kind – next will be 4-frequency)

Fast (50 ms)steerable launcher forreal-time deposition control

Fast (50 ms)steerable launcher forreal-time deposition control

Page 8: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

Internal Coils and Conducting Shell

Proposal is staged to allow several physics applications

• 24 coils to generate up to n=4 error fields with different poloidal strucuture

• with 1 power supply, n=1,2 and 4 is possible (fast track to ELM suppression)

• with 12 power supplies, n=3 and rotating helical field studies can be done

• together with conducting shell, n=1 RWM stabilisation experiments possible

• further upgrade to 24 power supplies would enable multi-mode control

3 poloidal sets (midplane outside)4 toroidal sets

Page 9: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

Planning for 2007/2008 campaigns

Page 10: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

Programme Planning for 2007

Operation of ASDEX Upgrade without EZ4 possible at reduced parameters

• limit to current/shaping capability, pulse length and heating power

The tungsten wall programme in 2007 can be conducted

• will require careful approach (power, pulse length) anyway

ITER relevant plasma physics experiments will need EZ4 back in 2008

• need to go to small * at low collisionality

• demonstration of sophisticated feedback control needs longs pulses

Page 11: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

Programme Planning for 2007

A stepwise approach for the tungsten programme was agreed:

1.) study of compatibility of W-wall with ITER scenarii

2.) extension of parameter space to higher power/lower density

3.) ITER physics studies where emphasis is not on W (e.g. Improved H-mode)

significant limitation to general ITER physics studies in 2007 (also impacting possibilities for ITPA joint experiments)

Page 12: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

• Operation/investigation of W machine without (any) intrinsic low-Z

radiator• Comparison of boronised / un-boronised machine:

maybe able to proof of hypothesis on B influence• D retention ‚without‘ low-Z (C,B) contamination• Comparison of D pumping W wall / boronised W wall

and H-D transition

However, at the cost of higher (initial) O-concentration

Together with reduced generator power, restart was somewhat slower

Startup without boronisation…

Page 13: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

…successfully accomplished this month!

Page 14: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

…successfully accomplished this month!

Page 15: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

…successfully accomplished this month!

Low loop voltage startupSaves generator power

Low loop voltage startupSaves generator power

Page 16: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

…successfully accomplished this month!

Radiated power is low(Prad/Ptot = 1/3) and stable

Radiated power is low(Prad/Ptot = 1/3) and stable

Page 17: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

…successfully accomplished this month!

Managed to inject 3 MW(2.5 absorbed) of ECRHfrom 5 gyrotrons!

Managed to inject 3 MW(2.5 absorbed) of ECRHfrom 5 gyrotrons!

Page 18: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

Status of ITPA joint experiments

Page 19: Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.

Status of ITPA joint experiments

No experiments since April 2006, but AUG staff participating in otherjoint experiments:

• role of pedestal in improved H-mode (C. Maggi at DIII-D)

• investigation of b-scaling of transport (L. Vermare at DIII-D)

• size scaling of NTM stabilisation by ECCD (L. Urso at JT-60U)

Highest priority in 2007 is on tungsten wall programme

• ITPA experiments only within present boundary conditions

In mid 2008, full performance experiments should be possible again

• damaged generator should be back in operation

• full W-wall is still a boundary condition that has to be observed