+ All Categories
Home > Documents > Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Date post: 02-Jan-2016
Category:
Upload: kylie-alvarado
View: 17 times
Download: 1 times
Share this document with a friend
Description:
Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC). “CLIC 6 th Stabilization Meeting’ on 9 June 2009”. Long (2-m) Main Beam Quadrupole prototype a remind…. Aim of this quadrupole prototype: - PowerPoint PPT Presentation
Popular Tags:
16
Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC) “CLIC 6 th Stabilization Meeting’ on 9 June 2009”
Transcript
Page 1: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Status on CLIC Long Quadrupole Prototype for Stabilization Studies

(M. Modena, CERN –TE/MSC)

“CLIC 6th Stabilization Meeting’ on 9 June 2009”

Page 2: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Long (2-m) Main Beam Quadrupole prototype

a remind….

Aim of this quadrupole prototype:

• Provide quickly a prototype for the stabilization studies

• Test different poles and coils assembly solutions (towards stabilization performances)

• Provide a magnet for developing and testing magnetic measurement system (very small and long magnet bore!)

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

2

Page 3: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

a remind…. 3 assembly options

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

3

Page 4: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Quadrupole Cross-Section: Final EM Optimization

(Courtesy of A.Vorozhtsov)

a remind…. NOTE: a gap of 3 mm between iron poles and coils is left to test different solutions for coils support/dumping system

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

4

Page 5: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Quadrupole Prototype procurement Status:

• Copper conductor : Ordered (with Luvata- Finland)• Iron: Ordered (AFNOR C10 R type)• Tender Drawings: Completed this week• Coils Call for Tender: Send out hopefully this week to 3 Companies• Iron machining: Selecting potential bidders

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

5

Page 6: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

6

Page 7: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

7

Page 8: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

8

Page 9: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

9

Page 10: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

10

Page 11: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

11

Page 12: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

12

Page 13: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Courtesy of R. Leuxe EN-MME

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

13

Page 14: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

14

Page 15: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

15

Page 16: Status on CLIC Long  Quadrupole  Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

“”CLIC

6th S

tabilization Meeting’ on 9 June 2009” M

. Modena – C

ER

N/T

E

16


Recommended