+ All Categories
Home > Documents > Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012

Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012

Date post: 22-Feb-2016
Category:
Upload: arlo
View: 15 times
Download: 0 times
Share this document with a friend
Description:
Hands-Free Toilet Flush Adapter. Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012. A IR toilet adapter that allows the toilet to flush only when bathroom latch is moved from the locked to unlocked position. Need For Design. - PowerPoint PPT Presentation
Popular Tags:
8
Status Report #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012 A IR toilet adapter that allows the toilet to flush only when bathroom latch is moved from the locked to unlocked position Hands-Free Toilet Flush Adapter
Transcript
Page 1: Status Report  #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012

Status Report #7Zachary LunaPhillip Cox

Dasola AlatiseApril 11, 2012

A IR toilet adapter that allows the toilet to flush only when bathroom latch is moved from the

locked to unlocked position

Hands-Free Toilet Flush Adapter

Page 2: Status Report  #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012

Need For Design

• This adapter will provide a hands-free flush, maximize sanitation, and minimize water used per use

Page 3: Status Report  #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012

Flusher and Latch Code Written

Circuit is fully connected and programmed

Getting the HTFA ready for demo day

Design Milestones

Page 4: Status Report  #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012

Circuit is fully connected and programmed

Completed a Design for the Device’s casing

Demo Day Poster Complete

Recently Completed Tasks

Page 5: Status Report  #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012

Ongoing Tasks

Receive Casing from machine shop

Testing

Page 6: Status Report  #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012

Upcoming Tasks

Writing the final draft of the final report

Demo Day

Page 7: Status Report  #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012

100%

100%

100%

100%

Block Diagram

100%

100%100%

100%

Page 8: Status Report  #7 Zachary Luna Phillip Cox Dasola Alatise April 11, 2012

Schedule

100%

100%

100%

100%

100%

100%100%100%

100%100%

100%

100%

100%

100%


Recommended