+ All Categories
Home > Documents > Status report of ALADIN at CHMI

Status report of ALADIN at CHMI

Date post: 08-Feb-2016
Category:
Upload: vicki
View: 45 times
Download: 0 times
Share this document with a friend
Description:
Status report of ALADIN at CHMI. Martin Janoušek. Highlights. resolution upgrade of ALADIN/CE ALADIN/MFSTEP operational verification scores available from July 2002 products for RODOS SLHD / drag & lift / no envelope combination testing low-level cloudiness improvement - PowerPoint PPT Presentation
Popular Tags:
6
Status report of Status report of ALADIN at CHMI ALADIN at CHMI Martin Janoušek Martin Janoušek
Transcript
Page 1: Status report of ALADIN at CHMI

Status report of Status report of ALADIN at CHMIALADIN at CHMI

Martin JanoušekMartin Janoušek

Page 2: Status report of ALADIN at CHMI

HighlightsHighlights

resolution upgrade of ALADIN/CEresolution upgrade of ALADIN/CE ALADIN/MFSTEP operationalALADIN/MFSTEP operational verification scores available from July 2002verification scores available from July 2002 products for RODOSproducts for RODOS

SLHD / drag & lift / no envelope SLHD / drag & lift / no envelope combination testingcombination testing

low-level cloudiness improvementlow-level cloudiness improvement PBL height diagnosticsPBL height diagnostics

Page 3: Status report of ALADIN at CHMI

Computing Computing environmentenvironment

MSS

100 Mb Ethernet

archive serverSun E250Qualstar TLS 46120

HPCF NEC SX6/4B-32

1 Gb Ethernet

SAN

Linux cluster

data handling systemSun Fire 4810Sun StorEdge 9910

Internet 2 MbpsRMDCNWAN

Sun cluster

Page 4: Status report of ALADIN at CHMI

Operational suiteOperational suite ALADIN/LACE domainALADIN/LACE domain 309x277 grid points, 159x143 truncation 309x277 grid points, 159x143 truncation

(linear)(linear) 9 km resolution, 43 vertical levels9 km resolution, 43 vertical levels time step 360 stime step 360 s CY25T1_op4CY25T1_op4 COCONUT tuning + modified Xu-Randal COCONUT tuning + modified Xu-Randal

schemescheme DF blending cycleDF blending cycle DF blending + incremental DFI on short cut-offDF blending + incremental DFI on short cut-off

hourly DIAGPACKhourly DIAGPACK

Page 5: Status report of ALADIN at CHMI

MFSTEPMFSTEP Mediterranean Forecasting

System Toward Environmental Predictions• 589x309 grid points

• 299x159 truncation (linear)• 9.5 km resolution• 37 levels• coupled to ARPEGE, 3h coupling period

• continuous long cut-off blending cycle

• retuned on case studies over sea (Black Sea case)• modified thermal roughness length over sea• moist gustiness parameterization• cloud parameterization scheme tuning

• production forecast 1x week to +120h• OpenMP version in the preparation

Page 6: Status report of ALADIN at CHMI

Recommended