Power Generation and Plant Operation
•
General layoutthermal power plant
Coal Handling Plant (CHP)
• Unloading:
• Conveying :
• Crushing:
Transportation of Coal
5 ways of Transportation.
• 1. Railways.
• 2. Ropeways.
• 3. Roadways.
• 4. waterways.
• 5. Airway.
7/2
4/2
01
6
5
Coal Handling Plant (CHP)
• Unloading Plant:(Wagon Tipper)
• Conveying Plant:(It is used for conveying coal from unloading to the coal yard or directly to the bunker)
• Crushing Plant:
General Layout Of CHP
7/24/2016 7
Wagon Tippler(W/T) Crusher House
Bunkers
Tripper Trolley
Conv. Belts Vibrating
Screens
Crushers
Feeder Surge
Hopper
Hopper
CHP Auxiliaries7
/24
/20
16
8
Operational Cycle
Bunkering Cycle
Stacking Cycle
Reclaiming Cycle
7/2
4/2
01
6
9
Bunkering Cycle
7/24/2016 10
Bunkers
From W/T
Bunkering
Belts
Surge Hopper
Vibrating Feeder
Crusher House
Crusher
Stacking Cycle
7/24/2016 11
Bunkers
Stacking Belts
Crushed
Yard
From W/T
Crusher House
Bunkering
Belts
By-Passed Coal
Coal Is not required if bunker is full or Due any
maintenance
Reclaiming Cycle
7/24/2016 12
Bunkers
Reclaiming Belts
Crushed
Yard
Non-
Crushed
Yard
From W/T
Crusher House
Bunkering
Belts
If Outer Supply of coal Is Not Present
Stocked Coal
Wagon Tippler
• These are used to unload the coal wagons into coal hoppers in very less time (e.g. 20 wagons/hr. or more).
• Weighing of coal is carried out at wagon tippler.
• Normally 55-60 metric ton of coal come in each wagon.
7/2
4/2
01
6
13
Conveyor Belt System
• Construction of Conveyor Belt
• Conveyor Belt Drive System
• Protection System
– Interlocking
– Magnetic Separator
7/2
4/2
01
6
14
Conveyor Belt Drive System7
/24
/20
16
15
Motor G / B
Fluid Coupling
Filled with 3/4th oil
Fusible plug Head End Pulley
Tail End Pulley
oSpeed before crusher 2.4 m/secoSpeed After Crusher 2.7 m/sec
Belt Speed
Protection System
• Interlocking is used for safety purpose.
• If any belt fails all other belts stop working which are interconnected.
• Magnetic Separator is used to remove metal particle from coal conveyed through conveyor belt for improving boiler efficiency.
7/2
4/2
01
6
16
Crushing Mechanism In CHP
• Three Stage Crushing System is used in Plant.
– 1.Double Roll Crusher
– 2.Rotary Breaker Crusher
– 3.Impact Crusher
7/2
4/2
01
6
17
W / T No.4
DRCR RBCR Impact
250 mm
80 mm
600 mm
20-25 mmStage 1 Stage 2
Stage 3
•