    Hatira Dincer

    Leyla Cabrera

    Maria Alejandra Ali

    PRODUCTION DEPARTMENT ANALYSIS

  • 8/2/2019 SteelWorks PP

    2/14

    Description

    SteelWorks is a rebar fabricating company

    managed by a team with more than 30years of experience in the steel industry.

    Their priority is to give a quick and reliableservice with cost-effective and precise

    products, using state of the art equipment.

  • 8/2/2019 SteelWorks PP

    3/14

    Our Mission

    To analyze the Production Departmentthrough a study of their complete processand be able to offer them

    recommendations that will ultimately makethe process more efficient and reduce

    their costs.

  • 8/2/2019 SteelWorks PP

    4/14

    Shearline

  • 8/2/2019 SteelWorks PP

    5/14

    Unequal workloads.

    When item tags are

    loaded into thestorage of themachine, the oldtasks done and thenew tasks get mixedup. Operator has tospend time measuringeach bar length andthen sorting out to

    see which barbelongs to which task.

  • 8/2/2019 SteelWorks PP

    6/14

    Alligator

  • 8/2/2019 SteelWorks PP

    7/14

    Operator has tocarry 70-80 lbsloads manually.

    Machine isoperated at fullcapacity only by

    one operator.

    The equipmentdesigned isunsuitable for the

    operator.

  • 8/2/2019 SteelWorks PP

    8/14

    Coil 16

  • 8/2/2019 SteelWorks PP

    9/14

    Storage process for thebended bars is timeconsuming becausethe operator has to

    organize them in apallet, which has to besurround wrapped inorder to maintain thebars standing.

    Operator has to stopthe machine constantlyto use the forklift

    himself to move thefinished pallets to theirstorage position.

  • 8/2/2019 SteelWorks PP

    10/14

    SteelWorks uses the aSaSoftware to assignfabrication dates, delivery

    dates, create fabricationand delivery schedulereports.

    Currently we are improvingthe communicationbetween the Sales andProduction Departmentsby assigning scheduling

    statuses for the placedorders.

  • 8/2/2019 SteelWorks PP

    11/14

    Ergonomics PLIBEL Method is a questionnaire developed

    by Kristina Kemmlert for identification of

    workplace injury hazards on workmen oroperators.

    Questionnaire has 17 items which examine

    issues related to the following body regions:- Neck, shoulders, upper back

    - Elbows, forearms, hands

    - Feet

    - Knees and hips

    - Lower back

  • 8/2/2019 SteelWorks PP

    12/14

  • 8/2/2019 SteelWorks PP

    13/14

    Safety: Overhead Traveling Cranes carrying chains should

    be prohibited. Floors should be hazard free and provide limitless

    movement space.

    Wear earplugs for high noise levels.

    Material Handling: Storage capacity should be increased. Implement the Master Bundling system.

    Standardization:

    Train workers to operate every machine forrotation.

  • 8/2/2019 SteelWorks PP

    14/14

    Thank you.

    Questions?