+ All Categories
Home > Technology > STEP 2: SELECT (Map Critical Security Controls v4.1 to NIST SP 800-53 Revision 4)

STEP 2: SELECT (Map Critical Security Controls v4.1 to NIST SP 800-53 Revision 4)

Date post: 25-May-2015
Category:
Upload: james-w-de-rienzo
View: 983 times
Download: 2 times
Share this document with a friend
Description:
A mapping of the Critical Security Controls Version 4.1 to NIST SP 800-53 Revision 4. Note: The Critical Security Controls Version 4.1 were previously known as the SANS Top 20 or the Consensus Audit Guidelines (CAG) 3.0.
7
Transcript
Page 1: STEP 2: SELECT (Map Critical Security Controls v4.1 to NIST SP 800-53 Revision 4)
Page 2: STEP 2: SELECT (Map Critical Security Controls v4.1 to NIST SP 800-53 Revision 4)
Page 3: STEP 2: SELECT (Map Critical Security Controls v4.1 to NIST SP 800-53 Revision 4)
Page 4: STEP 2: SELECT (Map Critical Security Controls v4.1 to NIST SP 800-53 Revision 4)
Page 5: STEP 2: SELECT (Map Critical Security Controls v4.1 to NIST SP 800-53 Revision 4)
Page 6: STEP 2: SELECT (Map Critical Security Controls v4.1 to NIST SP 800-53 Revision 4)
Page 7: STEP 2: SELECT (Map Critical Security Controls v4.1 to NIST SP 800-53 Revision 4)

Recommended