STHE Overpressure Protection
• Changes in guidance & practice since 2000
• Response times of relief devices
• Dynamic analysis of STHE overpressure and relief
• Defining the problem with implementation
• Incident examples
• Design & operational issues
• JIP Proposal
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Changes in Guidance – API521/BS EN ISO 23251
• Two-thirds rule replaced with:
− “Loss of containment of the low-pressure side to atmosphere is unlikely to result from a tube rupture where the pressure in the low-pressure side (including upstream and downstream systems) during the tube rupture does not exceed the corrected hydrotest pressure”
− “Pressure relief for tube rupture is not required where the low-pressure exchanger side (including upstream and downstream systems) does not exceed the criteria noted above.”
• Dynamic analysis:
− “This type of analysis is recommended, in addition to the steady-state approach, where there is a wide difference in design pressure between the two exchanger sides [e.g. 7 000 kPa (approx. 1 000 psi) or more], especially where the low-pressure side is liquid-full and the high-pressure side contains a gas or a fluid that flashes across the rupture. Modelling has shown that, under these circumstances, transient conditions can produce overpressure above the test pressure, even when protected by a pressure-relief device [64], [65], [66]. In these cases, additional protection measures should be considered.”
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Changes in Guidance – API521/BS EN ISO 23251
• Tube rupture design basis:
− “The user may perform a detailed analysis and/or appropriately design the heat exchanger to determine the design basis other than a full-bore tube rupture. However, each exchanger type should be evaluated for a small tube leak.
The detailed analysis should consider
a) tube vibration,
b) tube material,
c) tube wall thickness,
d) tube erosion,
e) brittle fracture potential,
f) fatigue or creep,
g) corrosion or degradation of tubes and tubesheets,
h) tube inspection programme,
i) tube to baffle chafing.”
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Current Practice
• API521/BS EN ISO 23251 allows use of relief valves or bursting disks but states:
− “The opening time for the device used…..should also be compatible with the requirements of the system.”
• Opening times of relief valves considered to be too slow, hence bursting disks commonly used.
• Advances in heat exchanger design practice e.g. vibration analysis, materials etc. have decreased likelihood of tube rupture
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Response Times of Relief Devices
• Bruce Ewan, University of Sheffield
Relief device
Relief diameter
(in)4mm orifice 8mm orifice 15mm orifice
Relief pressure (bar)
Open tube 39 38 37 0
Graphite disc 4 51 50 49 10
6 55 54 53 10
Stainless steel disc 4 41 42 40 15
(reversed dome) 8 48 47 46 15
2” Spring loaded pop action RV
- 59 58 57 15
2” Bellows RV - 62 61 60 15
2” Pilot operated RV - 66 65 64 15
Summary of test conditions and test numbers – phase 1
05
1015
2025
3035
4045
0 0.002 0.004 0.006 0.008 0.01 0.012
Test 49p 1.9ms Rupture
K4 Pressure Time (seconds)
Pressure (bar)
1. 10
Sheffield Model - Re-Calibrated after Test 39p
Max = 40.87
Min = 0
4” graphite disc. Rupture time = 1.9 msHigh pressure test
2” spring loaded RV. 110% open capacity in 6 ms
Low pressure test
-10
0
10
20
30
40
50
0 0.002 0.004 0.006 0.008 0.01 0.012
Test 59p 10% Capacity in 6ms
K4 Pressure Time (seconds)
Pressure (bar)
6. 8
Sheffield Model - Taken from Test 51p
Max = 27.38
Min = 0
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012
Test 57p 10% Capacity in 4ms
K4 Pressure Time (seconds)
Pressure (bar)
5. 8
Sheffield Model - Taken from Test 51p
Max = 100.75
Min = 0
2” spring loaded RV. 110% open capacity in 4 ms
High pressure test
-5
0
5
10
15
20
25
30
0 0.002 0.004 0.006 0.008 0.01 0.012
Test 66p 10% Capacity in 4ms
K4 Pressure Time (seconds)
Pressure (bar)
8. 8
Sheffield Model - Taken from Test 51p
Max = 22.11
Min = 0
2” pilot operated RV. 110% open capacity in 4 ms
Low pressure test
-20
0
20
40
60
80
100
0 0.002 0.004 0.006 0.008 0.01 0.012
Standard
Test 64p 10% Capacity in 2.5ms
K4 Pressure Time (seconds)
Pressure (bar)
7. 8
Sheffield Model - Taken from Test 51p
Max = 84.07
Min = 0
2” pilot operated RV. 110% open capacity in 2.5 ms
High pressure test
Summary of test conditions – phase 2
Relief Device Size
Driver
Pressure
(barg)
4mm
Orifice
8mm
Orifice
15mm
Orifice
Safety Valve (SRV)
2 H 3 100 Test no. 2 Test no. 1 Test no. 3
4 L 6 100 Test no. 23 Test no. 24 Test no. 25
Relief Valve 4 in 100 Test no. 21 Test no. 20 Test no. 19
Stainless Steel Disc 3 in 100 Test no. 6 Test no. 5 Test no. 4
4 in 100 Test no. 7 Test no. 8 Test no. 9
Graphite Disc3 in 20 Test no. 18 Test no. 16 Test no. 15
4 in 20 Test no. 13 Test no. 12 Test no. 11
4” relief valve4L6 safety relief valve
0
5
10
15
20
25
30
35
0 0.002 0.004 0.006 0.008 0.01 0.012
Standard Test
Test Vent 23
K4 to Device Pressure Time (seconds)
Pressure (barg)
3. 15
Sheffield Shock Tube
Max = 27.34
Min = .45
4L6 safety. 110% open capacity in 10 ms
Low pressure test
0
20
40
60
80
100
0 0.002 0.004 0.006 0.008 0.01 0.012
Standard Test
Test Vent 25
K4 to Device Pressure Time (seconds)
Pressure (barg)
1. 15
Sheffield Shock Tube
Max = 91.39
Min = .18
4L6 safety. 110% open capacity in 4 ms
High pressure test
SRV, RV and Graphite Disc at High Pressure
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Dynamic Analysis of Tube Rupture
• Ian Wyatt, Atkins
Dynamic Modelling of Tube RuptureIan Wyatt - Atkins
JIP on Bursting Disks for Shell & Tube Exchangers – 1st Stakeholders Meeting
API-521/BS EN ISO 23251 – 5.19
API-521.BS EN ISO 23251 does not dictate what has to be done:
• If a steady-state method is used, the relief-device size should be based on the gas and/or liquid flow passing through the rupture.
• A one-dimensional dynamic model can be used …
• This type of analysis is recommended, in addition to the steady-state approach,
• where there is a wide difference in design pressure [e.g. 7 000 kPa …
There is a warning at the bottom:
• Modelling has shown that, under these circumstances, transient conditions can produce overpressure above the test pressure, even when protected by a pressure-relief device ...
Different Exchanger Configurations
Similar Tube Rupture consequences apply to all of these configurations:
• Single pass gas, single pass liquid• Multiple pass gas and/or multiple pass
liquid• HP Gas on tube side or shell side• Cooling Duty or Heating Duty• Horizontal or Vertical or Angled
Liquid
LiquidGas
Gas
Liquid
LiquidGas
Gas
Gas
GasLiquid
Liquid
Stages to Tube Rupture
For all configurations there are four phases to the consequences of a Tube Rupture – identified in the tube rupture tests performed as part of the previous JIP:
Phase I – Percussive Shock
Phase II – Fast Transient
Phase III – Liquid Discharge
Phase IV – Gas Discharge
Phase I – Percussive Shock
• Rapid rupture creates percussive shock wave
• Extremely short lived <0.1ms
• Shell does not ‘feel’ the pressure spikes
• Not Model
Liquid
LiquidGas
Gas
Flare Header
Phase II – Fast Transient
• Gas entering shell is faster than time to overcome liquid momentum• Fast transient pressure wave results travelling at sonic velocity• Pressure wave usually breaks bursting disc• Shell and pipework overpressures possible• Simulated using software with necessary fast transient capability• Shell baffle path ‘straightened’ – 1D Model
Liquid
LiquidGas
Gas
Flare Header
Phase II – Fast Transient
• Gas entering shell is faster than time to overcome liquid momentum• Fast transient pressure wave results travelling at sonic velocity• Pressure wave usually breaks bursting disc• Shell and pipework overpressures possible• Simulated using software with necessary fast transient capability• Shell baffle path ‘straightened’ – 1D Model
Liquid
Flare Header
Liquid
Pressure
Liquid
LiquidGas
Gas
Flare Header
Liquid
LiquidGas
Gas
Flare Header
Liquid
LiquidGas
Gas
Flare Header
Liquid
LiquidGas
Gas
Flare Header
Phase III – Liquid Discharge
• Gas bubble grows towards exits• Liquid displaced through available exits• Volume flow balance between bubble and
displaced liquid• Possible to over pressurise Shell and
connected pipework• Gas-Liquid interfaces affect pipe supports • Shell baffle path ‘straightened’ – 1D Model
Liquid
LiquidGas
Gas
Flare Header
Phase IV – Gas Discharge
• Gas from rupture passes out of system
• Pseudo steady state depending on gas supply
• Usually not modelled
Liquid
LiquidGas
Gas
Flare Header
Results
• Relief device does not always protect against over pressure
• Even some below 2/3rds rule exceed limits – two of them lower pipework design pressures
0%
100%
200%
300%
400%
500%
600%
700%
800%
0% 100% 200% 300% 400% 500% 600% 700% 800% 900% 1000%
%HP/LP Design Pressure
%P
eak/
LP
Des
ign
Pre
ssu
re
Results LP Short Term Design Limit "2/3rds Rule" Max HP
EPT
STH
E O
verp
ressu
re P
rote
cti
on
STHE Overpressure Protection – the “problem”
• Increased use of bursting disks to protect STHEs over past 10 to 15 years
• Estimated frequency of guillotine tube rupture − 0.0009 per unit per year (~1 per 1,100 years)[1]
• Frequency of bursting disk failures protecting STHEs − 7 incidents in 13 years (~50 exchangers)− 0.011 per unit per year (~1 per 90 years)[2]
• Future growth in numbers of high pressure STHEs requiring overpressure protection
• Has the balance of risk shifted?1. IP Guidelines for the Design and Sae Operation of Shell & Tube Heat Exchangers to Withstand the Impact of Tube Failure, Aug 20002. Estimate based on incidents known to BP
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Two major hazards associated with bursting disk failures:
• Impairment of relief system – liquid inflow & overfill
• Incident escalation - reverse rupture leads to uncontrolled hydrocarbon release from relief system
STHE Overpressure Protection – the “problem”
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Incident #1 – liquid overfill
Relief Header
Flare Knockout Drum
Flare
• Bursting disk rupture in forward direction• PSHH in void space of bursting disk assembly fails to isolate exchanger• Sustained cooling medium flow into relief system• Liquid overfill & potential overpressure of knockout drum
PSHH
EPT
STH
E O
verp
ressu
re P
rote
cti
on
225 psig
50 psig
100 psig
225 psig
Note: The top disc impacted bottom disc causing it to also rupture
80 psig Burst
80 p
sig
Bur
st
Incident #2 – excessive backpressure
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Incident #2 ctd.
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Any other incidents……?
???
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Design & Operational Issues
• HSE Safety alert 01/2008 Steve Murray, HSE
Health and Safety Executive
Bursting disc failure: flare
system impairment
Stephen Murray
HSE Inspector, Offshore Division
HSE Safety Alert 01/2008
http://www.hse.gov.uk/offshore/alerts/sa_01_08.htm
Alerts:
• to advise industry of incidents
• enable lessons to be learned
• industry takes appropriate action to avoid similar incidents
HSE Safety Alert 01/2008
gas SWS
SWR
HP Flare Drum
Heat Exch.
HSE Safety Alert 01/2008
PAH
gas
SWS
SWR
Heat Exch.LAH ESD
ESDV
Closed drain
HP Flare Drum
LP flare drum
Over-board
ESDV
HSE Safety Alert 01/2008
PAH
gas
SWS
SWR
Heat Exch.LAH ESD
ESDV
Closed drain
HP Flare Drum
LP flare drum
Over-board
ESDV
disc failure
no alarmtell-tail blocked?
water enters drum
does not trip
seawater pumps
not tight shut-off
fills fills
overfills
no level >LAH
press = 4 barg
(no alarm)
closed
What happened?liquid @+40m
HSE Safety Alert 01/2008
Summary
• uncontrolled flow of seawater into flare system
• several hours to identify source
• flaring event may have lead to serious gas release
HSE Safety Alert 01/2008
Lessons
• Be aware of potential for impairment of flare/relief system from uncontrolled cooling medium flow from ruptured bursting disc
• Ensure disc rupture will initiate measures to ensure isolation of cooling medium so that flare/relief system is not compromised
HSE Safety Alert 01/2008
Legal requirements
• Provision and use of Work Equipment Regs 1998
• Management of Health & Safety at Work Regs 1999
• Offshore Installations (Prevention of Fire & Explosion and ER) Regs 1995
Health and Safety Executive
Bursting disc failure: flare
system impairment
Stephen Murray
HSE Inspector, OSD
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Design & Operational Issues
• Bursting disks utilised for overpressure protection of STHEs
− Once opened, they maintain an open flow path from the process/utility system to the relief system.
− A sufficient margin (~30%) must be maintained between operating and set pressure to avoid rupture. In STHE applications, they are often located on cooling medium systems which can be susceptible to pressure surges.
− Failure in the reverse direction due to superimposed backpressures from the relief system.
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Design & Operational Issues
• Bursting disks utilised for overpressure protection of STHEs
− Once opened, they maintain an open flow path from the process/utility system to the relief system.
− A sufficient margin (~30%) must be maintained between operating and set pressure to avoid rupture. In STHE applications, they are often located on cooling medium systems which can be susceptible to pressure surges.
− Failure in the reverse direction due to superimposed backpressures from the relief system.
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Design & Operational Issues
• Selection of relief route
− Multiphase – high velocity liquid slugs
− HP or LP flare system (high pressure gas under relief conditions but large liquid volumes under a failure case)
− Should relief from STHEs be segregated from other relief routes?
• Is HAZOP effective at identifying potential failure modes and consequences?
• Additional protective measures required for failure cases.
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Gaps in current guidance
• Broader design requirements associated with bursting disks and interface with relief systems not addressed
• At what pressure ratio are relief valves acceptable?
− Large differential pressure may actually favour relief valve – extent of overpressure may yield sufficiently rapid response
− Lower differential pressures – shell & nozzles may survive overpressure.
• What extent and duration of overpressure is acceptable?
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Aims of JIP
• Eliminate or mitigate hazards associated with overpressure protection of STHEs
• Develop revised set of design guidelines for overpressure protection of STHEs principally to address:
− Heat exchanger design.
− Relief device selection.
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Heat Exchanger Design (1)
• Determine criteria to assess if guillotine fracture is possible based on the mechanical properties of the materials of construction used in heat exchanger tubes.
• Determine any minimum tube thickness specification required to prevent guillotine fracture.
• Define the vibration analysis requirements that need to be applied to ensure that the likelihood of guillotine fracture is minimised.
• Define any sensitivity analysis of process variations which should be carried out to ensure that the design is robust.
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Heat Exchanger Design (2)
• Determine if differential pressure limits can be established below which transient effects can be ignored.
• Determine the maximum allowable transient overpressures in the shell under tube rupture conditions to cater for peak pressures. This will require experimental and analytical work.
• Determine the impact of transient loads on the piping systems if bursting disks are not applied for overpressure and develop appropriate design guidelines to ensure that the piping design is robust but not overly conservative.
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Relief Device Selection
• Develop a rule-set for relief device selection to accommodate the tube rupture case
− Scale-up to typical relief device sizes encountered in real applications.
− Testing of response times of a variety of relief valves to a range of overpressures .
− Establish mechanical integrity criteria for relief valves for use in tube rupture service.
− Establish the range of process conditions for which conventional relief valves could be utilised to protect against tube rupture and those for which bursting disks are required. This needs to consider aspects such as differential design pressure between low and high pressure side of exchanger etc.
EPT
STH
E O
verp
ressu
re P
rote
cti
on
Shopping list – issues captured in Stakeholders’ meeting
• Deliverable – software
• Criteria for selecting RDs
• Set points – selection criteria
• Overpressure/overpressure times
• Testing and inspection
• Type/size/etc of RD and response capability, affecting selection
• Design issues including
− Instrumentation
− Seawater system
• Learning from experience – what went wrong: capture findings/lessons learned
• Construction/operation/maintenance etc of whole system
• HAZOP – pertinent guide words (like RABS guidelines)
• HE stress distribution – revisit/extend Sheff Uni work