Floating bridges in fjord crossings Stian Moe Johannesen Norwegian Public Roads Administration 26.10.2017
Transcript

Floating bridges in fjord crossings

Stian Moe Johannesen

Norwegian Public Roads Administration

26.10.2017

Short historic overview

● 1939 – Lacey V.Murrow Memorial Bridge – 2020m - US

● 1961 - William A. Bugge Bridge - Hood Canal Bridge - 2400 - US

● 1963 - Governor Albert D. Rosellini Bridge “Evergreen point” - 2350m - US

● 1989 – Homer M, Hadley Meomorial bridge – 1771 - US

● 1992 - Bergsøysundet Bridge - 931m -NOR

● 1994 – Nordhordland Bridge - 1614m - NOR

● 2008 - William R. Bennett Bridge (Okanagan) – 1060m – CAN

● 2017 – New «Evergreen point» replacement bridge - 2350m - US

Floating bridges in fjord crossings

26.10.2017

Values given in total bridge length [m]

Why evaluate floating bridges as concept

Floating bridges in fjord crossings

26.10.2017

H, Svensson, Cable-Stayed Bridges – 40 Years of Experience Worldwide,2012Logarithmic scale on horizontal axis

Side anchored floating bridges

Floating bridges in fjord crossings

26.10.2017

End anchored floating bridges

Floating bridges in fjord crossings

26.10.2017

Bjørnafjorden basin

Floating bridges in fjord crossings

26.10.2017

Situation overview

K8 – side anchored floating bridge

26.10.2017

High bridge; Tower and navigation channel

K8 – side anchored floating bridge

26.10.2017

Bridge girder

K8 – side anchored floating bridge

26.10.2017

Bridge girder

K8 – side anchored floating bridge

26.10.2017

Pontoons

K8 – side anchored floating bridge

26.10.2017

North abutment

K8 – side anchored floating bridge

26.10.2017

Mooring plan – anchor locations

K8 – side anchored floating bridge

26.10.2017

Robustness in loss of mooring cluster

K8 – side anchored floating bridge

26.10.2017

Ship impact

K8 – side anchored floating bridge

26.10.2017

Maximum stress plot in bridge girder from centric and eccentric impacts on all pontoons (axis 3–35)

Deckhouse collision with bridge girder, ongoing project with NTNU

Pontoon verification test at SINTEF Ocean AS

Objective: Verification of numerical simulation tools (low period range)

Scope: Single pontoon test

● Estimate added mass and radiation damping (apply forced motion)

● Estimate excitation forces by measuring forces in 6 DOF for a fixed model in regular waves

K8 – side anchored floating bridge

26.10.2017

Animation

K8 – side anchored floating bridge

26.10.2017

Situation overview

K7 – end anchored floating bridge

26.10.2017

High bridge, tower and navigational channel

K7 – end anchored floating bridge

26.10.2017

Bridge girder

K7 – end anchored floating bridge

26.10.2017

Pontoons «low part of floating bridge»

K7 – end anchored floating bridge

26.10.2017

Pontoons – «high part of floating bridge»

K7 – end anchored floating bridge

26.10.2017

North abutment

K7 – end anchored floating bridge

26.10.2017

Building methods

K7 – end anchored floating bridge

26.10.2017

Building methods

K7 – end anchored floating bridge

26.10.2017

Marine operations

K7 – end anchored loating bridge

26.10.2017


Recommended