N45 ARCHITECTURE INC. ST.MARY COPTIC ORTHODOX CHURCH EXPANSION Proposed Site 43 ECCLES STREET OTTAWA, ON. K1R 6S3 REPORT JULY 2016
Transcript
  • N45 ARCHITECTURE INC.

    ST.MARY COPTIC ORTHODOX CHURCH EXPANSION

    Proposed Site

    43 ECCLES STREETOTTAWA, ON.K1R 6S3REPORT JULY 2016

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    ST.MARY COPTIC ORTHODOX CHURCH EXPANSION

    REPORT

    EMA-GRAPHICTypewritten Text

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    TABLE OF CONTENTS Introduction / The Site / The Existing Church

    St.Mary Coptic Church Program

    Concepts

    General Zoning Information Specific to Option 7

    Ontario Building Code

    Options and New Options

    Existing Site Plan

    Option No.1

    Option No.2

    Option No.3

    Option No.4

    Option No.5

    Option No.6

    Option No.7

    Option No.8

    Room Data St.Mary Coptic Church Program

    Preferred Option No.7

    Cost Estimates & Schedule

    Moving Forward

    Stage One Pre-Design Fee Proposal Letter

    Appendix A: Municipal Comments

    Page 4

    Page 5

    Page 7

    Page 8

    Page 9

    Page 11

    Page 14

    Page 16

    Page 23

    Page 27

    Page 34

    Page 39

    Page 44

    Page 49

    Page 54

    Page 59

    Page 61

    Page 66

    Page 70

    Page 71

    Page 72

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    ______________________ INTRODUCTION N45 was commissioned through an invited Request for Proposals in December 2015 and was awarded the contract for Stage One, Pre-design Analysis in February 2016. Prior to analysis, we were provided the following data:

    - Construction Document Plans of Existing Church

    - Program of Spaces

    - Program of Space Comparison to St. Georges & St. Anthony Coptic Orthodox Church We also requested an up to date survey of the property and the Church requested that we conduct our study based on data from

    the City of Ottawa website as a survey wasn't available for this Stage. To this end, we used the following:

    - Site Specific Zoning

    - Mapping from "Geo Ottawa"

    THE SITE The site is located at the North West corner of Canfield and Greenbank Roads at 1 Canfield Rd. Currently it consists of the

    original church property and recent additions of three neighbouring residential properties. Three additional properties will be

    required to complete the land acquisition for the proposed development. Our study was to assume the acquisition of these

    properties.

    THE EXISTING CHURCH

    In the early stages of the concept design, reuse of the existing church was considered as an option. It was quickly ruled out for

    several reasons; firstly, the spaces (rooms) and structural grid system were not conducive to the requirements of the new program

    (too small) and secondly, under the current addition of the Ontario Building Code it would be too expensive to upgrade the

    structure of the church to meet current seismic requirements; finally, the location of the church on the site was not conducive to

    efficient use for design and planning purposes.

    4

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    ST. MARY COPTIC CHURCH PROGRAM

    CHURCH PROGRAM TABLE

    No. Name Requirement Area sf. General Notes

    CHURCH

    01 Nave 750-1000 seats 18-20,000

    - Men's Communion

    350

    - Women's Communion

    350

    - Main Alter

    640

    02 Crying Room 40 seats 400 Loose seats - rows

    03 Baptism Room 50 persons 550 standing

    04 Deacon's Area 75 persons 850 Seating

    05 Deacon's Room

    300 Sink only

    06 Control Room 150 Close to nave, Sound system, visual broad casting

    07 Coat Room 350 At Church Entrance

    08 Washrooms 1000 On Main Floor

    - Universal 100

    09 Dining Hall 400 persons 4000

    10 Elevator(s) - For Church & Service Building

    SUB TOTAL (NET) 29,390

    ----------------------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------

    SERVICE BUILDING

    11 10 Classrooms 20 Children 4000 Operable wall between two

    12 5 Classrooms 15 Children 1500 Operable wall between two

    13 Gym Single Gym size 4500 Suitable for Basketball, volleyball, soccer

    14 Stage

    1600

    15 Change Rooms

    - For Gym & Stage - 10- 15 people each

    16 Washrooms To Code 950 For Gym and stage

    5

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    17 Support Areas

    - See change rooms above

    18 Coat Room Sized for occupant load of theatre in gym

    350 Designed for Coat Check Service for some events

    19 Storage Rooms Size - various up to 200 sf - Number: a variety throughout

    20 Library

    250

    21 Study Room

    500 Seat 20 - adj. to library w/operable wall

    22 Chapel 100 seats 1500

    23 Bethlehem Room

    300 5-10 persons w/ bakery ovens

    24 Fitness Room

    300 Various equip.

    25 Multimedia Room

    150 Close to gym

    26 Commercial Kitchen 900 Depends on equipment/volunteers

    27 Book/Gift Store

    400

    28 Grocery Room

    300

    29 3 Priest Rooms

    450 150 ea. chair, desk , mtg table

    30 1 Visiting Priest Room

    000

    31 Guest Studio Apartment

    750 Separate kitchen, bedroom not in line of sight

    32 Board Room

    500

    33 Play Room

    800 U-12

    34 Large Meeting Hall

    0 Can be two class rooms

    35 Youth Room

    1000 Lounge seating

    36 Treasury Room

    150

    SUB TOTAL (NET) 25,775

    --------------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------

    TOTAL (NET) 55,165

    Gross -up 30% 16,550

    TOTAL (Gross) 71,715

    6

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    _______________ CONCEPTS

    Several concepts were explored. Initially, the Church Program was taken and areas assigned to each space based on the building code

    occupancy requirements. This generated actual square footage areas for each space. The outcome generated a program which needed

    to be adjusted in order to meet the space available on the site for both building and parking. It became obvious that part of the solution to

    meeting the needs of the growing congregation was to phase the construction. First phase would be the construction of the "Service

    Building" and followed by the second phase:- the demolition of the existing church and then the construction of the "New Church".

    A number of concepts were prepared, each with positive attributes and each with adjustments and refinements to the program of spaces.

    These are illustrated in this report.

    ZONING

    The Zoning on the site permits the continued "Institutional" use of the site. However, rezoning or variances of the residential properties

    will be required to meet the Program. The zoning permits a maximum lot coverage of 40% for the new building. The proposed designs

    fall within a range of 25 - 30% coverage; the remaining open space is utilized by landscaping in the set back requirements and surface

    parking. If all of the properties were not acquired, it is a possibility of achieving the building program through a redesign and with most if

    not all of the parking below grade. One can expect some resistance to more density, but this can only be tested through a meeting with

    the municipal planning department and a councilor and community association meeting.

    ONTARIO BUIDING CODE

    The edition of the Ontario Building Code in effect at the time of building permit application will be the governing code.

    There are no particular challenges foreseen at this stage.

    7

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    GENERAL ZONING INFORMATION SPECIFIC TO OPTION-7

    GENERAL ZONING FOR OPTION No.7 TABLE

    Zoning Mechanism Required Ottawa Zoning Provided

    Zoning Code 1b [ 428 ] Church

    Minimum Lot Area 1000 9325

    Minimum Lot Width 30 m -

    Minimum Front Yard Setback 6 m > 6 m

    Minimum Corner Yard 7.5 m 7.5 m

    Minimum Rear Yard 7.5 m > 7.5 m

    Minimum Interior Side yard 7.5 m > 7.5 m

    Maximum Lot Coverage 40 % 28.55 %

    Maximum Building Height 18 m < 18 m except for tower - a

    projection

    Gross Worship (assembly) Area Existing - 986 m

    Parking Space - 80

    Proposed Parking Space

    99 at a rate of

    10 parking / 100 m

    of assembly area*

    113

    Gross Building Area Option 7

    Phase 1 3043 m (32,750 s.f.)

    Phase 2 3152 m (33,930 s.f.)

    876 seats

    Phase 3 6195 m (66,680 s.f.)

    * assembly area excludes baptism room, chapel, dining hall, classrooms and activity rooms.

    8

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    ONTARIO BUILDING CODE SPECIFIC TO OPTION

    BUILDING CODE REVIEW (NEW BUILDING ) TABLE

    Required Provided

    1 Occupancy Church

    2 Building Classification

    Group A Div.2

    Code Ref. A-3.1.2.1.(1) -

    3 Sprinklered

    (Y/N) YES

    Code Ref. 3.2.2.56.

    4 Gross Building Area (m2) 6195

    5 Combustible Construction

    NO

    Code Ref. 3.2.2.24.

    6 Exits

    Exits 4 4

    Code Ref. 3.4.2.1. (5) -

    7 Occupant Load

    Persons 2286

    Code Ref. 3.1.17.1.

    8

    Water Closet (req.)

    Occupant Load for W/C 2216

    Males 17

    Females 21

    Code Ref. 3.7.4.3. (1)

    9

    Travel Distance Travel Distance (m) 45 m < 45 m

    Code Ref. 3.4.2.5. (1) (c) -

    10

    Stair (Exits) mini. width (mm) 1100 mm/each 1100 mm/each

    Code Ref. 3.4.3.2. -

    Corridor (doorway) width (mm) 1100 > 1100

    9

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    WATER CLOSET TABLE

    Levels Occupant Load Required Provided

    Male Female O.B.C. Male Female Uni.

    Level 1

    608 seats 4 4 3.7.4.3. (16)

    6 10 1 480 gym 5 10

    3.7.4.3. (1) 1/150 person 185 stage

    Level 2 200 students 2 4 3.7.4.3. (1)

    5 4 1 268 seats 1 1

    3.7.4.3. (1) 1/150 person

    Basement 75 students 1 2 3.7.4.3. (1)

    7 7 1 400 dining hall 7 7 3.7.4.3. (4)

    11 Code Ref. 3.4.3.2.(1)

    12

    Fire-Resistance Rating

    mezzanine (h) 1h

    floor (h) 1h

    Code Ref. 3.2.2.24. (2)

    13 Mezzanine

    Area (m2) 272

    exits 2 2

    Travel Distance (m) 45 m 40 m

    10

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    OPTIONS AND NEW OPTIONS

    A number of options were prepared. As the actual number of options were unknown as we proceeded, they were not identified in

    a logical order. Option 8, highlighted in Green is the preferred Option. Below are the Options titled and dated in the order that they

    were produced:

    Option no.

    Title Date Comments

    Existing Site Plan March 2016

    The area of the existing Church site is approximately 1.2 acres which excludes the three residential properties that the church currently owns. With those properties and the remaining three houses under consideration for purchase, the total site area for development would be approximately 2.3 acres.

    1

    Proposed Site Plan Option A Phases 1, 2, 3, Ground Floor, Second Floor, Basement Plan

    March 2016

    This was the first scheme and illustrated the program fulfilled in three phases. Phase One kept the existing church in place for worshipping and constructing the "Service" portion. This structure housed a new entrance and core program of: priest rooms, future ancillary spaces for the gymnasium(phase three), classrooms, and a 100 seat chapel on the second floor, and support spaces such as the washrooms and storage. Phase Two replaced the existing church. It accommodated seating for 860, baptism room, crying room, communion rooms, a study/library room, dining hall, kitchen, youth room, additional classrooms, storage rooms and classrooms. Phase Three added the single gymnasium and stage.

    2

    Existing Site Plan, Proposed Site Plans Phases 1, 2 , 3, Ground Floor, Second Floor, Basement Plan

    March

    Essentially updates to Option No. 1 above. Ground Floor changes see Guest Studio located to the Ground Floor of Phase One, Baptism and Crying Rooms changing locations. Chapel relocated to the Basement Floor of Phase 2 (Main Church), Study Room/Library relocated to Basement, Dining Hall and Kitchen relocated, as well as the Youth Room and Play Room.

    3

    Proposed Site Plan Option B Phase 1, Proposed Site Plan Option B Phase 2, Ground Floor, Second Floor, Basement, and Different Phasing Plan Options Study

    23 March

    New Two Phase Option - Keeping Existing Church in place temporarily. Phase 1 builds the "Service" portion first. This accommodates the entire program with the exception of the Main Church component. It houses, some classrooms, guest studio, fitness room, gift/book store, offices, gymnasium, stage, washrooms, chapel, playroom and priests rooms. The Main Church houses the 860 seat nave, Baptism and Crying Rooms, Communion Rooms, Study Room/Library, Board Rooms and washrooms. In this Study, there was also a short study to explore two other options for the development of the site.

    11

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    4

    Site Plan Option 1, Ground Floor Plan, Second Floor Plan, Basement Plan

    14 April

    A new more interesting 2 phase option which provides a courtyard space between the phases. Phase 1 provides a welcoming entrance/vestibule, a play room, youth room, gift/book store, offices, chapel and miscellaneous support spaces on the ground level. The second level accommodates the gymnasium, stage, change rooms, fitness room, and washrooms; the basement level houses the classrooms, washrooms, miscellaneous support spaces and daylight from the courtyard. Phase 2 is the construction of the Church. It's main level accommodates the main entrance, nave (876 seats- total both levels), Baptism and Crying Rooms, Communion Rooms. The Second Floor accommodates the mezzanine, guest studio, board room and a meeting room; The basement houses the dining hall, kitchen, study room/library, Bethlehem room, grocery room, additional classrooms and miscellaneous support rooms.

    5

    Site Plan Option 2, Ground Floor Plan, Second Floor Plan, Basement Plan

    14 April

    Second option - building upon the courtyard feature. Phase 1 is the "Service" wing. In this scheme the ground floor accommodates a feature entrance, the gift/book store, gymnasium, stage, change rooms, washrooms, youth room, and hall/crush space. The second floor accommodates the classrooms, and washrooms. The basement level houses the Chapel, study/library, fitness room, washrooms and miscellaneous storage rooms. Phase 2 is the construction of the Church. It's main level accommodates the main lobby, the nave (876 seats - total both levels), Baptism and Crying Rooms, Communion Rooms and misc. Space. The Second Floor accommodates the mezzanine, guest studio, board room and a meeting room; The basement houses the dining hall, kitchen, Bethlehem room, grocery room, several classrooms, playroom, offices and miscellaneous space.

    6

    Site Plan Option 1, Ground Floor Plan, Second Floor Plan, Basement Plan

    9 May

    Revision to Option 4 above. The main differences are: Ground Floor:- addition of tower/stair on the SE corner to complete the "+" configuration, relocation of control room to allow larger Deacon's Room, Second Floor:- relocation of Fitness Room to basement level. Basement:- Dining Hall increases in size with the elimination of an exit corridor; kitchen, Bethlehem room, and Grocery increase in size.

    7

    Site Plan Option 2, Ground Floor Plan, Second Floor Plan, Basement Plan

    9 May

    Revision to Option 5 above The main differences are: Ground Floor:- addition of tower/stair on the SE corner to complete the "+" configuration, relocation of control room to allow larger Deacon's Room, reconfiguration of washrooms, stage and gymnasium to eliminate the hall, thus decreasing the size of the foot print; Second Floor:- addition of an office and adjustment in location of elevator. Basement:- Dining Hall increases in size, kitchen, Bethlehem room, and Grocery relocated; classrooms added. Courtyard does not go to basement freeing up significant space for hall. Space has skylights from courtyard above.

    12

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    8

    Site Plan Option 3, Ground Floor Plan, Second Floor Plan, Basement Plan

    9 May

    New Scheme; - shown as two phase, but has the option of being three phases ( Gymnasium and stage could be the 3rd phase). As shown, Phase 1 Ground Floor:- Lobby, Gift/book store, gymnasium, stage, fitness room, offices and washrooms. Second Floor:- Classrooms and washrooms Basement:- Chapel, Youth Room, Study room/library, washrooms, hall Phase 2:- Ground Floor:-Main Church, Baptism and Crying rooms, Lobby Second Floor:-Mezzanine, Guest Studio, Board Room and Meeting room, reception area Basement:-Dining Hall, Kitchen, grocery room, Bethlehem room, class rooms, play room, miscellaneous space.

    Preferred option

    Option 7 9 May

    13

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    EXISTING SITE PLAN

    14

  • 15

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    OPTION No.1

    March 2016

    Proposed Site Plan Phase 1

    Proposed Site Plan Phase 3

    Ground Floor Plan

    2nd Floor Plan

    Basement Plan

    Drawing No.2

    Drawing No.3

    Drawing No.4

    Drawing No.5

    Drawing No.6

    Drawing No.7

    16

    EMA-GRAPHICTypewritten Text

    EMA-GRAPHICTypewritten Text

    EMA-GRAPHICTypewritten Text

  • 17

  • 18

  • 19

  • 20

  • 21

  • 22

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    OPTION No.2

    21 March 2016

    Ground Floor Plan

    2nd Floor Plan

    Basement Plan

    Drawing No.1

    Drawing No.2

    Drawing No.3

    23

  • 24

  • 25

  • 26

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    OPTION No.3

    23 March 2016

    Proposed Site Plan Phase 1

    Proposed Site Plan Phase 2

    Ground Floor Plan Option

    2nd Floor Plan Option

    Basement Plan Option

    Phasing Plan Option

    Drawing No.1

    Drawing No.2

    Drawing No.3

    Drawing No.4

    Drawing No.5

    Drawing No.6

    27

  • N

    28

  • 4

    5

    .

    7

    8

    m

    94.07m

    68.54m

    36.40m

    30.18m

    1

    9

    .

    7

    7

    m

    8

    7

    .

    0

    5

    m

    N

    29

  • N

    30

  • N

    31

  • N

    32

  • 33

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    OPTION No.4

    14 April 2016

    Site Plan Option 1

    Ground Floor Plan Option 1

    2nd Floor Plan Option 1

    Basement Plan Option 1

    Drawing No.1

    Drawing No.2

    Drawing No.3

    Drawing No.4

    34

  • 35

  • 36

  • 37

  • 38

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    OPTION No.5

    14 April 2016

    Site Plan Option 2

    Ground Floor Plan Option 2

    2nd Floor Plan Option 2

    Basement Plan Option 2

    Drawing No.5

    Drawing No.6

    Drawing No.7

    Drawing No.8

    39

  • 40

  • 41

  • 42

  • 43

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    OPTION No.6

    9 May 2016

    Site Plan Option 1

    Ground Floor Plan Option 1

    2nd Floor Plan Option 1

    Basement Plan Option 1

    Drawing No.1

    Drawing No.2

    Drawing No.3

    Drawing No.4

    44

  • 45

  • 46

  • 47

  • 48

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    OPTION No.7

    9 May 2016

    Site Plan Option 2

    Ground Floor Plan Option 2

    2nd Floor Plan Option 2

    Basement Plan Option 2

    Drawing No.5

    Drawing No.6

    Drawing No.7

    Drawing No.8

    49

  • 50

  • 51

  • 52

  • 53

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    OPTION No.8

    9 May 2016

    Site Plan Option 3

    Ground Floor Plan Option 3

    2nd Floor Plan Option 3

    Basement Plan Option 3

    Drawing No.9

    Drawing No.10

    Drawing No.11

    Drawing No.12

    54

  • 55

  • 56

  • 57

  • 58

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    ROOM DATA TABLE

    No.

    Name

    Provided

    Area (s.f.) (March 2016 Options)

    Area (s.f.) (May 2016 Options)

    General Notes

    Option 1 Option 3 Option 4 Option 7 Option 8 Option 7 is the preferred option

    CHURCH

    1 Nave 876 seats 9200 9200 9440 9440 9440

    2 Men's Communion 350 350 380 380 380

    3 Women's Communion 350 350 380 380 380

    4 Main Alter 650 650 700 700 700

    5 Crying Room 400 seats 400 400 395 395 395 Loose seats - rows

    6 Baptism Room 50 persons 560 560 550 550 550 standing

    7 Deacons Area 70 persons 1000 1000 1010 1010 1010 Seating

    8 Deacon's Room 320 320 350 350 350 Sink only

    9 Control Room 140 140 155 155 155 Close to nave, Sound system, visual broad casting

    10 Coat Room 320 320 350 350 350 At Church Entrance

    11 Elevator(s) - - - - - For Church & Service Building

    SERVICE - - - - -

    12 Dining Hall 400 persons 4100 4100 5060 5700 5700

    13 10 Classrooms 20 children 5150 4700 4150 4000 4130 Operable wall between two

    14 5 Classrooms 15 children 2690 2690 1560 1740 1510 Operable wall between two

    15 Gym Single Gym size 6730 4870 4870 4870 4870 Suitable for Basketball, volleyball

    16 Stage 1500 1100 1010 1150 1000

    17 Gym Lobby - 540 - 1440 550

    18 Change Rooms 900 380 170 170 170 For Gym & Stage - 2 Change rooms

    19 Multimedia Room 210 185 100 100 100 Close to gym

    20

    Coat Room Sized for occupant load of theater in gym

    530 580 770 400 350 Designed for Coat Check Service

    ROOM DATA ST.MARY COPTIC ORTHODOX CHURCH PROGRAM

    59

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    No.

    Name

    Provided

    Area (s.f.) (March 2016 Options)

    Area (s.f.) (May 2016 Options) General Notes

    Option 1 Option 3 Option 4 Option 7 Option 8

    21 Storage Rooms Size - various 780 780 2050 1300 330 Number: a variety throughout

    22 Library 250 250 250 250 250

    23 Study Room 500 500 500 500 500 Seat 20 - adj. to library w/operable wall

    24 Chapel 100 seats 4100 4100 1600 1500 1550

    25 Bethlehem Room 250 250 540 300 300 5-10 persons w/ bakery ovens

    26 Fitness Room 350 330 540 600 470 Various equip.

    27 Washrooms To Code 2900 2300 2100 2000 1750 All Washrooms

    28 Commercial Kitchen 650 650 1030 1050 1070 Depends on equipment/volunteers

    29 Book/Gift Store 340 400 400 410 400

    30 Grocery Room 250 250 540 320 370

    31 3 Priest Rooms 550 480 520 450 460 chair, desk, table

    32 Meeting Room - - 360 360 360

    33 Guest Studio apart. 670 700 850 850 850 Separate kitchen, bedroom not in line of sight

    34 Board Room 600 430 430 430 430

    35 Play Room 680 550 840 800 800 U-12

    36 Large Meeting Hall - - - - - Can be two class rooms

    37 Youth Room 1500 1500 1000 1060 680 Lounge seating

    38 Treasury Room 180 180 155 150 180

    39 Mec/Elec/Wat Room 510 510 850 800 460

    40 Common Area (Circ.) 11060 11800 14300 17800 14810

    SUB TOTAL (NET) 58,620 55,795 60,255 62,320 59,110

    TOTAL (Gross) 65,400 61,000 64,600 68,670 63,100

    60

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    PREFERRED OPTION No.7

    May 2016

    Site Option 7

    Ground Floor Plan Option 7

    2nd Floor Plan Option 7

    Basement Plan Option 7

    Drawing No.5

    Drawing No.6

    Drawing No.7

    Drawing No.8

    61

  • 62

  • 63

  • 64

  • 65

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    COST ESTIMATE & SCHEDULING

    COST ESTIMATE

    It was requested of N45 Architecture to provide a class D Order of Magnitude Construction Cost for the various options. The

    estimates are an opinion of probable cost only and reflects the current market conditions and normal competitive conditions in

    Ottawa as of the date of this report.

    We do not guarantee that tenders or actual construction costs will not vary from this estimate. Adverse market conditions,

    proprietary and/or sole source specifications, single sourcing of materials and equipment or reduced competition among

    contractors may cause the bids to vary from reasonable estimates on normal competitive conditions.

    The purpose of this is to provide St. Mary Coptic Orthodox Church with a budget framework within which the project can be

    developed and cost managed from Feasibility to Tender award stage.

    The estimate is based on the preliminary drawings as well as the functional program provided. Some of the major assumptions

    we have made with respect to this cost analysis:

    Project to be procured via Stipulated Lump Sum Tender

    No major site grading allowed for; relatively flat site assumed

    Excluding demolition

    Excluding Interior Fit-Up

    Excluding all development charges and permits

    The estimate excludes costs associated with site preparation, site servicing, and off site costs mandated by the city.

    No "accelerated" schedule premiums allows

    No LEED premiums assumed

    Costs do not include municipal fees, building permit fees or other development charges.

    The estimate excludes HST

    66

  • 43 ECCLES STREET

    OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    COST ESTIMATE TABLE

    Option Floor Phase 1 Phase 2

    Total Area (s.f) $/s.f Cost ($) Area (s.f) $/s.f Cost ($)

    1

    Ground 7880 $175 $1,379,000 21376 $260 $5,557,760

    Second 7880 $175 $1,379,000 6620 $175 $1,158,500

    Basement 7880 $175 $1,379,000 12776 $175 $2,235,800

    Subtotal 23640

    $4,137,000 40772

    $8,952,060 $13,089,060

    2

    Ground 7880 $175 $1,379,000 12776 $260 $3,321,760

    Second 7880 $175 $1,379,000 6620 $175 $1,158,500

    Basement 7880 $175 $1,379,000 12776 $175 $2,235,800

    Subtotal 23640

    $4,137,000 32172

    $6,716,060 $10,853,060

    3

    Ground 9472 $175 $1,657,600 12776 $260 $3,321,760

    Second 9472 $175 $1,657,600 6620 $175 $1,158,500

    Basement 9472 $175 $1,657,600 12776 $175 $2,235,800

    Subtotal 28416

    $4,972,800 32172

    $6,716,060 $11,688,860

    4

    Ground 10040 $175 $1,757,000 13907 $260 $260

    Second 10040 $175 $1,757,000 6975 $175 $1,220,625

    Basement 10040 $175 $1,757,000 13907 $175 $2,433,725

    Subtotal 30120

    $5,271,000 34789

    $7,270,170 $12,541,170

    5

    Ground 15145 $175 $2,650,375 13907 $260 $3,615,820

    Second 8180 $175 $1,431,500 6975 $175 $1,220,625

    Basement 11464 $175 $2,006,200 13907 $175 $2,433,725

    Subtotal 34789

    $6,088,075 34789

    $7,270,170 $13,358,245

    67

  • 43 ECCLES STREET

    OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    SCHEDULE

    The estimates are based on the construction industry in 2016. Scheduling will be a function of a few factors. The first being

    when the Church can both approve construction and put the funding in place. The second will be the actual program scope

    and phasing of the project. Once the project has been approved to proceed, the following are general time lines for project

    activities:

    6

    Ground 10040 $175 $1,757,000 13907 $260 $3,615,820

    Second 10040 $175 $1,757,000 6975 $175 $1,220,625

    Basement 10040 $175 $1,757,000 13907 $175 $2,433,725

    Subtotal 30120

    $5,271,000 34789

    $7,270,170 $12,541,170

    7

    Ground 13476 $175 $2,358,300 13907 $260 $3,615,820

    Second 8396 $175 $1,469,300 6975 $175 $1,220,625

    Basement 11410 $175 $1,996,750 13907 $175 $2,433,725

    Subtotal 33282

    $5,824,350 34789

    $7,270,170 $13,094,520

    8

    Ground 13756 $175 $2,407,300 13907 $260 $3,615,820

    Second 7007 $175 $1,226,225 6975 $175 $1,220,625

    Basement 8578 $175 $1,501,150 13907 $175 $2,433,725

    Subtotal 29341

    $5,134,675 34789

    $7,270,170 $12,404,845

    Preferred Option

    Ground 13476 $175 $2,358,300 13907 $260 $3,615,820

    Second 8396 $175 $1,469,300 6975 $175 $1,220,625

    Basement 11410 $175 $1,996,750 13907 $175 $2,433,725

    Subtotal 33282

    $5,824,350 34789

    $7,270,170 $13,094,520

    68

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    69

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    MOVING FORWARD

    A Pre Application meeting was held on 17 June at Ottawa City Hall with Ann O'Connor, Planner who was assigned to the project. The preferred Option 7 was presented and it was explained that the Church hopes to acquire the remaining residential properties

    and be in a position to make a formal application for Site Plan Approval and Variances in the near future. From the meeting it was

    understood that the City had a number of concerns, as follows:

    1. Current zoning on the Church site is Minor Institutional Zone, Subzone B, Exception 428. The abutting residential lots are

    currently R1FF - Residential First Density, Subzone FF. The residential lots will require a Major Zoning Amendment to

    allow for the expansion into the new combined Church site.

    2. The rezoning will require a Major By-law amendment and Site Plan Control with Manager Approval and consultation with

    the Councilor and Community Association.

    3. From a planning perspective, the design will need to address the residential context. By the removal of the houses, the

    design will need to address the context and scale and address this by providing a street edge that will be sensitive to the

    remainder of the residential neighbourhood.

    4. Transportation considerations are important. A Traffic Impact Assessment will be required and the number, location and

    design of site accesses will need to be to the satisfaction of the Engineering Department.

    5. Site services:- sanitary and storm water management, water capacity and pressure are to be evaluated as well.

    6. The Design of the new building(s) is important. The project needs to address the neighbourhood context, employ

    complimentary materials and be well landscaped.

    The Church Committee will take the following action to resolve the issues and be in a position to resubmit in the future.

    To fulfill this action the following must happen:

    1. Ensure that the required design professionals are used to provide the design, reports and data necessary for approval

    2. Take the design to a sufficient level to allow the professions to provide the material to the City for review and ultimately for

    approval (both internally and with the community).

    3. The Schematic Design will have to address both phases to ensure the Planners are satisfied.

    70

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    STAGE ONE PRE-DESIGN FEE PROPOSAL LETTER

    71

  • 43 ECCLES STREET OTTAWA ON,

    K1R 6S3

    REPORT

    July 2016

    APPENDIX A : MUNICIPAL COMMENTS

    72

  • 43 ECCLES STREET OTTAWA ON, K1R 6S3

    REPORT July 2016

    73

  • 43 ECCLES STREET OTTAWA ON, K1R 6S3

    REPORT July 2016

    74

  • 43 ECCLES STREET OTTAWA ON, K1R 6S3

    REPORT July 2016

    75

  • 43 ECCLES STREET OTTAWA ON, K1R 6S3

    REPORT July 2016

    76

  • 43 ECCLES STREET OTTAWA ON, K1R 6S3

    REPORT July 2016

    77

  • 43 ECCLES STREET OTTAWA ON, K1R 6S3

    REPORT July 2016

    78

  • 43 ECCLES STREET OTTAWA ON, K1R 6S3

    REPORT July 2016

    79

  • 43 ECCLES STREET OTTAWA ON, K1R 6S3

    REPORT July 2016

    80

  • 43 ECCLES STREET OTTAWA ON, K1R 6S3

    REPORT July 2016

    81

  • 43 ECCLES STREET OTTAWA ON, K1R 6S3

    REPORT July 2016

    82

  • 43 ECCLES STREET OTTAWA ON, K1R 6S3

    REPORT July 2016

    83

    TITLE-PAGE11 - Existing Site Plan (a4)world pdf report 15-13401 PLANNERS COMMENTS - TITLE BLOCK1101123456789

    option 1.1 - Binder (a4).pdf2 - Site Plan - Phase 13 - Site Plan - Phase 24 - Site Plan - Phase 35 - Ground Floor Plan6 - 2nd Floor Plan7 - Basement Plan

    option2 Binder (A4).pdf1 - Ground Floor Plan2 - 2nd Floor Plan3 - Basement Plan

    option3 Binder (a4).pdfPlan 1Plan 2Plan 3Site Phase 1Site Phase 2

    option 4 - Binder1 (a4).pdf1 - Site Plan - Option 12 - Ground Floor Plan - Option 13 - 2nd Floor Plan - Option 14 - Basement Plan - Option 1

    Binder-OPTION5 (A4).pdf5 - Site Plan - Option 26 - Ground Floor Plan - Option 27 - 2nd Floor Plan - Option 28 - Basement Plan - Option 2

    Binder-OPTION6(A4).pdf1 - Site Plan - Option 12 - Ground Floor Plan - Option 13 - 2nd Floor Plan - Option 14 - Basement Plan - Option 1

    option7 - Binder (a4).pdf5 - Site Plan - Option 26 - Ground Floor Plan - Option 27 - 2nd Floor Plan - Option 28 - Basement Plan - Option 2

    option 8 - Binder (A4).pdf10 - Ground Floor Plan - Option 311 - 2nd Floor Plan - Option 312 - Basement Plan - Option 39 - Site Plan - Option 3

    option7 - Binder (a4).pdf5 - Site Plan - Option 26 - Ground Floor Plan - Option 27 - 2nd Floor Plan - Option 28 - Basement Plan - Option 2

    option 1.1 - Binder (a4).pdf2 - Site Plan - Phase 13 - Site Plan - Phase 24 - Site Plan - Phase 35 - Ground Floor Plan6 - 2nd Floor Plan7 - Basement Plan

    option2 Binder (A4).pdf1 - Ground Floor Plan2 - 2nd Floor Plan3 - Basement Plan

    option3 Binder (a4).pdfPlan 1Plan 2Plan 3Site OptionsSite Phase 1Site Phase 2


Recommended